Background technology
Box beam is one kind of science of bridge building central sill, and internal is hollow shape, and there is the edge of a wing top both sides, is similar to chest, thus obtains
Name.Box beam is divided into prefabricated case beam and cast-in-situ box girder, and wherein prefabricated case beam, can be with reference to Bridge Erector after the completion of independent place is prefabricated
Set up after the completion of the engineering of bottom, project progress can be accelerated, the duration is saved, be bridge formation means conventional at present.It is real in production
In trampling, it is often necessary to set up precast box beam hydraulic internal model in box beam before pouring, to guarantee that what is poured is smoothed out.
Wherein, precast box beam hydraulic internal model of the prior art mainly includes multiple bases, the setting along suitable bridge to arrangement
Multiple jacking cylinders, the piston being connected with multiple jacking cylinders respectively and the gang form being connected with piston on base,
Field Force is by base along along bridge, to fixing, be fixedly connected sequentially on each base jacking cylinder, and jacking cylinder is along suitable
Bridge is risen or is fallen by jacking cylinder band piston in the vertical direction, so that gang form is reached in single-row arrangement
Specified location, to guarantee that what is poured is smoothed out.
However, present inventor has found, precast box beam hydraulic internal model of the prior art, as jacking cylinder is single
Arrange, stability in the large is bad, along bridge to intensity it is not enough, lead to not integral hoisting and transport;And due to jacking cylinder
For single setting, therefore in order to ensure jacking cylinder does not shift in motor process, need to arrange in jacking cylinder and live
Plug, thus it is higher to the quality of fit requirement of jacking cylinder and piston, if piston is not high with the quality of fit of jacking cylinder, repeatedly
After use, piston can occur abrasion deformation, so as to cause precast box beam hydraulic internal model integrally to deform upon, and then cause overall mistake
Surely, therefore using the precast box beam hydraulic internal model of prior art, stability is not high, it is impossible to life-time service.
Utility model content
The purpose of this utility model is to provide a kind of precast box beam hydraulic internal model, to alleviate existing precast box beam hydraulic
Internal model stability is not high, it is impossible to the technical problem of life-time service.
A kind of precast box beam hydraulic internal model, including:To the multiple bases for arranging, match with multiple bases and set along along bridge
The deck type longeron put, is arranged on the deck type longeron bottom and along suitable bridge to two row jacking cylinders being distributed, on described
Hold the gang form of formula longeron top connection.
When actually used, the gang form includes:First for being horizontally disposed with and being connected with the deck type longeron top
Template, the second template being flexibly connected with the first template left and right sides, with second template away from first template
Side be flexibly connected the 3rd template.
Wherein, the precast box beam hydraulic internal model that this utility model is provided also includes:First hydraulic cylinder and second hydraulic cylinder;Institute
The one end and first template for stating first hydraulic cylinder is hinged, and the other end is hinged with second template;The second hydraulic cylinder
One end be hinged with second template, the other end is hinged with the 3rd template.
Wherein, first template is attached by way of welding with the deck type longeron.
During practical application, the supporting parts for deck type longeron described in support, the deck type on the base, are provided with
The bottom of longeron is provided with the projection matched with the supporting parts.
During practical application, the deck type longeron includes:Along along bridge is to the framework that the cross section for arranging is rectangle and sets
Put in the framework both sides, correspond to the support member that each base is arranged respectively, the bottom of the jacking cylinder and the support member
Connection.
Wherein, the fixing end of the jacking cylinder is provided with ring flange, and the bottom of the support member is provided with and the method
The screwed hole of blue disk matching.
During practical application, on the deck type longeron, suspension ring are provided with.
Wherein, the precast box beam hydraulic internal model that this utility model is provided includes:Along suitable bridge to the end segment section, change for setting gradually
Section and standard sections, the deck type longeron are arranged at the end segment section, the variable cross-section section and the standard knot
Duan Zhong, the base are uniformly arranged in the standard sections, and are provided with link between each described base.
Specifically, described in the end segment section, the bottom of deck type longeron is provided with temporary support.
Relative to prior art, precast box beam hydraulic internal model described in the utility model has the advantage that:
In the precast box beam hydraulic internal model that this utility model is provided, including:Along along bridge to the multiple bases for arranging, it is and multiple
The deck type longeron that base matching is arranged, is arranged on two row jacking cylinders of the suitable bridge in deck type longeron bottom and edge to distribution, with
The gang form of deck type longeron top connection.Thus analysis understands, using in the precast box beam hydraulic that this utility model is provided
Mould, is provided with deck type longeron, and deck type longeron as edge is along the bridge provided with matching on multiple bases, and multiple bases
Bottom, therefore deck type longeron and gang form are driven perpendicular in jacking cylinder along along bridge to being provided with two row jacking cylinders
During Nogata is moved upwards, deck type longeron uniform force, stability are high, and deck type longeron respect thereto is less likely to occur
Skew, therefore frictional force is little between jacking cylinder and piston, so as to ensureing that piston will not occur serious after long-term use
Abrasion deformation, and then ensure that precast box beam hydraulic internal model will not integrally be deformed upon, therefore using the pre- of this utility model offer
It is not high that box beam hydraulic internal model processed can alleviate existing precast box beam hydraulic internal model stability, it is impossible to which the technology of life-time service is asked
Topic.
Description of the drawings
In order to be illustrated more clearly that this utility model specific embodiment or technical scheme of the prior art, below will be right
Needed for specific embodiment or description of the prior art, accompanying drawing to be used is briefly described, it should be apparent that, describe below
In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness
On the premise of work, can be with according to these other accompanying drawings of accompanying drawings acquisition.
The formwork view of the precast box beam hydraulic internal model that Fig. 1 is provided for this utility model embodiment;
The receipts mould view of the precast box beam hydraulic internal model that Fig. 2 is provided for this utility model embodiment;
Fig. 3 is part A partial enlarged drawing in Fig. 1;
Fig. 4 is part B partial enlarged drawing in Fig. 2;
The formwork state of the precast box beam hydraulic internal model that Fig. 5 is provided for this utility model embodiment is illustrated to section along bridge
Figure.
Reference:
1- concrete components, 10- bases, 11- supporting parts, 12- links;
20- deck type longerons, 21- jacking cylinders, 22- are raised, 23- frameworks, 24- support members, 25- ring flanges;
The first templates of 31-;The second templates of 32-;The 3rd templates of 33-;
41- first hydraulic cylinders;42- second hydraulic cylinders;
50- end segment sections, 51- variable cross-section sections, 52- standard sections;
60- temporary supports.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described
Embodiment is a part of embodiment of this utility model, rather than the embodiment of whole.Based on the embodiment in this utility model, this
The every other embodiment obtained under the premise of creative work is not made by field those of ordinary skill, belongs to practical
Novel protected scope.
In description of the present utility model, it should be noted that term " " center ", " on ", D score, "left", "right", " perpendicular
Directly ", the orientation or position relationship of the instruction such as " level ", " interior ", " outward " is, based on orientation shown in the drawings or position relationship, to be only
For the ease of describe this utility model and simplify description, rather than indicate or imply indication device or element must have it is specific
Orientation, with specific azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.Additionally, term " the
One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relative importance.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited, term " peace
Dress ", " being connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or integratedly
Connection;Can be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary,
It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
Concrete meaning of the language in this utility model.
The formwork view of the precast box beam hydraulic internal model that Fig. 1 is provided for this utility model embodiment;Fig. 2 is this reality
The receipts mould view of the precast box beam hydraulic internal model provided with new embodiment;Fig. 3 is part A partial enlarged drawing in Fig. 1;
Fig. 4 is part B partial enlarged drawing in Fig. 2;The formwork shape of the precast box beam hydraulic internal model that Fig. 5 is provided for this utility model embodiment
State is along bridge to schematic cross-section.
As Figure 1-Figure 2, a kind of precast box beam hydraulic internal model that this utility model embodiment is provided, including:Along along bridge
To arrange multiple bases 10, match with multiple bases 10 setting deck type longeron 20, be arranged on 20 bottom of deck type longeron,
And along suitable bridge to two row jacking cylinders 21 being distributed, the gang form being connected with 20 top of deck type longeron.
Relative to prior art, the precast box beam hydraulic internal model described in this utility model embodiment has the advantage that:
This utility model embodiment provide precast box beam hydraulic internal model in, as Figure 1-Figure 2, including:Along along bridge to
Arrange multiple bases 10, match with multiple bases 10 setting deck type longeron 20, be arranged on 20 bottom of deck type longeron and
Along suitable bridge to two row jacking cylinders 21 being distributed, the gang form being connected with 20 top of deck type longeron.Thus analysis understands, makes
The precast box beam hydraulic internal model provided with this utility model embodiment is as edge is along the bridge provided with multiple bases 10 and many
Matching on individual base 10 is provided with deck type longeron 20, and 20 bottom of deck type longeron, along along bridge to being provided with two row jackings oil
Cylinder 21, therefore during jacking cylinder 21 drives deck type longeron 20 and gang form in the vertical direction is moved, on
20 uniform force of formula longeron is held, stability is high, skew, therefore jacking cylinder are less likely to occur 20 respect thereto 10 of deck type longeron
Between 21 and piston, frictional force is little, so as to ensureing that piston will not occur serious abrasion deformation, Jin Erbao after long-term use
The precast box beam hydraulic internal model that card this utility model embodiment is provided will not integrally be deformed upon, therefore use this utility model reality
Applying the precast box beam hydraulic internal model of example offer, can to alleviate existing precast box beam hydraulic internal model stability not high, it is impossible to makes for a long time
Technical problem.
When actually used, in order that gang form is brought into close contact with 1 inner surface of concrete component of prefabricated case beam, such as scheme
Shown in 1- Fig. 2, gang form includes:The first template 31 that is horizontally disposed and being connected with 20 top of deck type longeron, with the first mould
The second template 32 that 31 left and right sides of plate is flexibly connected, with the second template 32 away from the first template 31 side be flexibly connected the
Three templates 33, using this kind of setting, the relative position between the shape and polylith template of polylith template freely can be adjusted, so as to
Ensure that gang form can be brought into close contact with 1 inner surface of concrete component of prefabricated case beam.
Wherein, in order that gang form successfully launches and shrinks, as Figure 1-Figure 4, this utility model embodiment is carried
For precast box beam hydraulic internal model also include:First hydraulic cylinder 41 and second hydraulic cylinder 42;One end of first hydraulic cylinder 41 and the
One template 31 is hinged, and the other end is hinged with the second template 32;One end of second hydraulic cylinder 42 is hinged with the second template 32, the other end
It is hinged with the 3rd template 33, first hydraulic cylinder 41 and second hydraulic cylinder 42 are respectively provided with two groups, and respectively along direction across bridge section
Line is symmetrical arranged, and as first hydraulic cylinder 41 is hinged with the first template 31 and the second template 32, therefore first hydraulic cylinder 41 can
The second template 32 is driven to rotate relative to the first template 31, in the same manner, second hydraulic cylinder 42 can drive the second template 32 the relative 3rd
Template 33 is rotated, therefore under the collective effect of first hydraulic cylinder 41 and second hydraulic cylinder 42, can make gang form successfully
Launch or shrink.
Herein it should be added that, gang form is launched into as shown in Figure 1 from as shown in Figure 2 mould state of receiving
During mould state, jacking cylinder 21 should be first driven, gang form is integrally risen, be made the first template 31 prop up concrete component 1 and push up
The inner surface at end, then drive first hydraulic cylinder 41 to extend, the second template 32 is outwards launched and is propped up the interior table of concrete component 1
Face, finally drives second hydraulic cylinder 42 to extend, the 3rd template 33 is outwards launched and is propped up the inner surface of concrete component 1.Group
Shuttering is shrunk to receipts mould state as shown in Figure 2 from formwork state as shown in Figure 1, contrary with the process of expansion.
Wherein, in order that deck type longeron 20 is connected with the first template more firmly, the first template 31 and deck type longeron 20
It is attached by way of welding, is welded to connect relative to other connected modes, more firmly, it is not easy to, so as to ensure combination
Template is during rising or falling with deck type longeron 20, and during launching or shrinking, indulges with deck type all the time
Beam 20 closely connects, and is not susceptible to rock, so as to ensure that deck type longeron 20 does not shift during rising or falling, from
And extend the service life of the precast box beam hydraulic internal model that this utility model embodiment is provided.
During practical application, in order that base 10 is more easily coordinated with deck type longeron 20, as Figure 3-Figure 4, base
It is provided with the supporting parts 11 for support deck type longeron 20 on 10, the bottom of deck type longeron 20 is provided with and supporting parts 11
The projection 22 matched somebody with somebody, using this kind of setting, when jacking cylinder 21 is packed up completely, raised 22 are coordinated with supporting parts 11, so as to ensure
Deck type longeron 20 is interfixed with the position of base 10.
During practical application, in order that deck type longeron 20 is not susceptible to offset during rising or falling, such as Fig. 1-
Shown in Fig. 2, deck type longeron 20 includes:Along along bridge is to the framework 23 that the cross section for arranging is rectangle and is arranged on 23 liang of framework
Side, the support member 24 for corresponding to each setting of base 10 respectively, jacking cylinder 21 are connected with the bottom of support member 24, are set using this kind of
Put, the spacing of two row jacking cylinders 21 can be made bigger, so that the support force suffered by deck type longeron 20 is more dispersed, it is to avoid by
Excessively concentrate in 20 stress of deck type longeron, so as to cause deck type longeron 20 to shift during rising or falling.
Wherein, for the ease of dismantling jacking cylinder 21, as Figure 3-Figure 4, the fixing end of jacking cylinder 21 is provided with method
Blue disk 25, the bottom of support member 24 are provided with the screwed hole matched with ring flange 25, are arranged on using energy after finishing using this kind of
It is enough that jacking cylinder 21 is separated with the dismounting of deck type longeron 20, be readily transported, if while jacking cylinder 21 damage also can be independent
Jacking cylinder 21 is changed, so as to extend the service life of the precast box beam hydraulic internal model of this utility model embodiment offer.
During practical application, for the ease of lifting, on deck type longeron 20, suspension ring are provided with.
Wherein, as shown in figure 5, the precast box beam hydraulic internal model that this utility model embodiment is provided includes:Along along bridge to according to
The end segment section 50 of secondary setting, variable cross-section section 51 and standard sections 52, deck type longeron 20 are arranged at end segment section 50, variable cross-section section
51 and standard sections 52 in, so as to ensure it is overall to concrete component 1 play a supporting role, base 10 is uniformly arranged on standard
In sections 52, and link 12 is provided between each base 10, using this kind of setting, ensure that phase between each base 10
To fixation, so as to improve the stability of base 10, meanwhile, base 10 is arranged in standard sections 52, each base 10
Structure is identical, while the shape of link 12 is also identical, can reduce difficulty of construction.
Specifically, for the deck type longeron 20 of support end sections 50, as shown in figure 5, deck type longeron in end segment section 50
20 bottom is provided with temporary support 60, and temporary support 60 typically selects jack, so as to opposite end sections 50 on hold
Formula longeron 20 plays temporary support effect, cost-effective, while can also reduce difficulty of construction.
Finally it should be noted that:Various embodiments above is only illustrating the technical solution of the utility model, rather than which is limited
System;Although being described in detail to this utility model with reference to foregoing embodiments, one of ordinary skill in the art should
Understand:Which still can be modified to the technical scheme described in foregoing embodiments, or to which part or whole
Technical characteristic carries out equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from this practicality new
The scope of each embodiment technical scheme of type.