CN206058757U - A kind of power circuit model based on geographic information data - Google Patents

A kind of power circuit model based on geographic information data Download PDF

Info

Publication number
CN206058757U
CN206058757U CN201620540443.4U CN201620540443U CN206058757U CN 206058757 U CN206058757 U CN 206058757U CN 201620540443 U CN201620540443 U CN 201620540443U CN 206058757 U CN206058757 U CN 206058757U
Authority
CN
China
Prior art keywords
model
region
contact surface
power circuit
high tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620540443.4U
Other languages
Chinese (zh)
Inventor
胡世昊
冯瑞芬
吴伟
陈丽敏
何伟
陈少文
史明涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiujiang Power Supply Branch Of Guo Wang Jiangxi Electric Power Corp
State Grid Corp of China SGCC
Original Assignee
Jiujiang Power Supply Branch Of Guo Wang Jiangxi Electric Power Corp
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiujiang Power Supply Branch Of Guo Wang Jiangxi Electric Power Corp, State Grid Corp of China SGCC filed Critical Jiujiang Power Supply Branch Of Guo Wang Jiangxi Electric Power Corp
Priority to CN201620540443.4U priority Critical patent/CN206058757U/en
Application granted granted Critical
Publication of CN206058757U publication Critical patent/CN206058757U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This utility model is related to a kind of power circuit model based on geographic information data, by the agricultural criteria range in soil, economic condition region, planning condition region, soil potential criteria range, control area constitutes, each region exterior is made up of stone or wooden unit and each intra-zone carries rugged contact surface, each contact surface both sides is respectively provided with high tower model, corner rod model, on the outside of high tower model therein, alarm unit is set, corner rod model external connection concatenation module therein, line bar model is set between the high tower model and corner rod model of same contact surface;The terrain model for meeting corresponding region condition is set above each contact surface, so as to form the model group of four sets of different topographical features.This utility model, is conducive to completing the economic coefficient mesh modeling to planning region according to this model that can flexibly assess arrangement by classifying according to land seizure, economic characteristics, soil potential compensation and four regions of planning construction respectively.

Description

A kind of power circuit model based on geographic information data
Technical field
This utility model is related to power circuit plan optimization modeling technique, more particularly to a kind of based on geographic information data Power circuit model.
Background technology
Power circuit plan optimization mainly solves economy and scientific problem of the power circuit in process of construction.Rule The multiformity of line road optimization aim causes layout of roads not require nothing more than reduced investment, also requires that reliability is high, floor space is little, ring Border pollutes little etc., so there is a problem for how realizing multiple objective optimizations.
In traditional planning process, need artificial exploration obtain topography and geomorphology, cities and towns village, power circuit intersection across More etc., consider various factors, integrated economics technical specification carries out planning, path is chosen.Now, the development of 3 " S " technology makes Manually explore and replaced by convenient and science geographical information technology (GIS), information system management to power system and The construction of digital power grid serves impetus;The planning of power circuit, road are carried out by setting up power circuit information platform Footpath is chosen, the pre- tier pole of shaft tower position, is designed optimization to power circuit path, shaft tower position, can shorten the survey and design of engineering Duration, reduce construction investment.But, the development of 3 " S " technology is not but obtained to the economy problems in power circuit planning process To very big improvement.
This case is it is important to mention that refer to the surface model for representing land price height, transmission line of electricity is needed in erection, rebuilding construction Repair schedule to be completed, the inspection of the scene of a crime, machine account verification, organiztion measure, technical measures, safety measure, Risk Pre-control, job step Suddenly, operation or work standard, personnel depaly, go into operation the tasks such as management, the end of job, closed loop management, the laying of circuit, the position of line bar are received Geographical position affects huge, is all to be made decision according to landform temporarily, and it is intermittent thus to cause construction, impact construct into Degree.Authorization Notice No. CN204143759 U, the patent of application number 201420379738.9 disclose a kind of ultra-high-tension power transmission line mould Type, including terrain model, high tower model, line bar model and corner rod model, but the structure cannot be met in traditional planning During, need artificial exploration to obtain topography and geomorphology, cities and towns village, scissors crossing of power circuit etc., consider it is various because Element, the purpose such as integrated economics technical specification carries out planning, path is chosen.
Therefore, for the above, need reasonably to improve prior art.
Utility model content
For disadvantages described above, this utility model provides a kind of power circuit model based on geographic information data, according to this Assessment models are planted, the economic coefficient mesh modeling to planning region is completed, to solve many deficiencies of prior art.
For achieving the above object, this utility model is employed the following technical solutions:
A kind of power circuit model based on geographic information data, by the agricultural criteria range in soil, economic condition region, rule Criteria range, soil potential criteria range, control area composition are drawn, each region exterior is made up of and each stone or wooden unit Intra-zone carries rugged contact surface, and each contact surface both sides is respectively provided with high tower model, corner rod model, therein Alarm unit, corner rod model external connection concatenation module therein, the high tower of same contact surface are set on the outside of high tower model Line bar model is set between model and corner rod model;The earth's surface mould for meeting corresponding region condition is set above each contact surface Type, so as to form the model group of four sets of different topographical features;The centre setting control area surrounded by four model group, together The high tower model of one contact surface, line bar model and corner rod model are arranged on earth's surface according to the requirement of correspondence programme path respectively On model.
Control module is fixedly mounted inside the control area;The terrain model is spliced by concatenation module, its surface With simulation rock stratum and trees.
Power circuit model based on geographic information data described in the utility model has the beneficial effect that:By in land price On the basis of respectively according to land seizure, economic characteristics, soil potential compensation and four regions of planning construction classified, according to This model that can flexibly assess arrangement, is conducive to completing the economic coefficient mesh modeling to planning region.
Description of the drawings
This utility model is described in further detail below according to accompanying drawing.
Fig. 1 is the power circuit model structure schematic diagram described in this utility model embodiment based on geographic information data;
Fig. 2 is the standalone module composition of the power circuit model described in this utility model embodiment based on geographic information data Schematic diagram.
In figure:
1st, the agricultural criteria range in soil;2nd, economic condition region;3rd, planning condition region;4th, soil potential criteria range; 5th, control area;6th, control module;7th, high tower model;8th, alarm unit;9th, line bar model;10th, corner rod model;11st, splice Module;12nd, terrain model.
Specific embodiment
As shown in Figure 1-2, the power circuit model based on geographic information data described in this utility model embodiment, by soil The agricultural criteria range 1 in ground, economic condition region 2, planning condition region 3, soil potential criteria range 4, control area 5 constitute, Each region exterior is made up of stone or wooden unit and each intra-zone is with rugged contact surface, each contact surface two Side is respectively provided with high tower model 7, corner rod model 10, and alarm unit 8, corner therein are arranged on the outside of high tower model therein 7 10 external connection concatenation module 11 of rod model in order to connect with adjacent region, the high tower model of same contact surface 7 with turn Line bar model 9 is set between angular pole model 10;
Correspondingly, the terrain model 12 for meeting corresponding region condition is set above each contact surface, so as to define four sets The model group of different topographical features;The centre surrounded by four model group is arranged in control area 5 and the control area 5 Portion fixedly mounts control module 6, and the high tower model 7 of same contact surface, line bar model 9 and corner rod model 10 are respectively according to right The requirement of programme path is answered to be arranged on terrain model 12.Different terrain models 12 is repeated after the splicing of concatenation module 11 Utilize, its surface can also be provided with simulation rock stratum and trees.
The power circuit model based on geographic information data described in above this utility model embodiment, land classification condition During referring to power circuit planning construction, the safe distance and column foot according to required for the circuit of different electric pressures and turriform Soil can be divided into farming land, be built according to the classification in soil by the different types of land seizure reimbursement for expenses produced by area Three kinds of land used and unused land.
During economic characteristics condition refers to power circuit planning construction, according to the economic constituent in construction of line region Produced construction of line economic compensation expense.By common economic characteristics classification can by economic composition be divided into arable land crop, Cultivation, meadow, farmland, structures (referring to non-residential construction), fabrication (referring to residential housing), forest land, communal facility, military affairs set Apply, Tourism Economy composition and resources economy.
Planning construction condition refers to power circuit during planning construction, extra according to needed for grid cell data feature Erection expense is paid;The characteristics of being set up according to power circuit, can by planning construction condition be divided into soil condition, orographic condition, Crossing condition, meteorological condition and conditions of transportation.
During soil potential condition refers to power circuit planning construction, the erection region according to shared by layout of roads is not The reimbursement for expenses paid by the economic development potentialities for coming;With commercial economy, agricultural economy, industrial economy, population resource and nature Soil potential condition can be divided into output value potentiality, manpower potentiality and resource potential by the classification of resource.
The above-mentioned description to embodiment is it will be appreciated that and using this for the ease of those skilled in the art Case technology, person skilled in the art obviously can make various modifications easily to these examples, and described herein one As principle be applied in other embodiments without through performing creative labour.Therefore, this case is not limited to above example, ability Announcement of the technical staff in domain according to this case, the improvement made for this case and modification all should be in the protection domains of this case.

Claims (3)

1. a kind of power circuit model based on geographic information data, it is characterised in that by the agricultural criteria range in soil, economic bar Part region, planning condition region, soil potential criteria range, control area composition, each region exterior is by stone or wooden unit group Into and each intra-zone carry rugged contact surface, each contact surface both sides is respectively provided with high tower model, angle pole Model, arranges alarm unit on the outside of high tower model therein, corner rod model external connection concatenation module therein is same to connect Line bar model is set between the high tower model and corner rod model of contacting surface;Arrange above each contact surface and meet corresponding region condition Terrain model, so as to form the model group of four sets of different topographical features;The centre setting control surrounded by four model group Region processed, the high tower model of same contact surface, the requirement respectively according to correspondence programme path of line bar model and corner rod model It is arranged on terrain model.
2. the power circuit model based on geographic information data according to claim 1, it is characterised in that:The control zone Control module is fixedly mounted inside domain.
3. the power circuit model based on geographic information data according to claim 1, it is characterised in that:The earth's surface mould Type is spliced by concatenation module, and its surface is with simulation rock stratum and trees.
CN201620540443.4U 2016-06-07 2016-06-07 A kind of power circuit model based on geographic information data Expired - Fee Related CN206058757U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620540443.4U CN206058757U (en) 2016-06-07 2016-06-07 A kind of power circuit model based on geographic information data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620540443.4U CN206058757U (en) 2016-06-07 2016-06-07 A kind of power circuit model based on geographic information data

Publications (1)

Publication Number Publication Date
CN206058757U true CN206058757U (en) 2017-03-29

Family

ID=58373033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620540443.4U Expired - Fee Related CN206058757U (en) 2016-06-07 2016-06-07 A kind of power circuit model based on geographic information data

Country Status (1)

Country Link
CN (1) CN206058757U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107817757A (en) * 2017-11-03 2018-03-20 国家电网公司 Method for early warning, device and storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107817757A (en) * 2017-11-03 2018-03-20 国家电网公司 Method for early warning, device and storage medium

Similar Documents

Publication Publication Date Title
Yang et al. Digital twins for intelligent green buildings
CN109359350B (en) Wind power plant road intelligent design method for optimizing fine construction cost
CN103984997B (en) Power transmission engineering addressing selection method based on GIS spatial informations
CN111444568A (en) Engineering monitoring BIM cooperative platform based on Internet of things
CN111340394B (en) Environment management information system for drainage basin cascade power station
CN109658510B (en) Substation site selection method, device and server
CN115310806A (en) Flood disaster loss evaluation method based on spatial information grid
CN109658282A (en) A kind of wisdom system for forestry
CN105261067A (en) Overground and underground integrated modeling method based on true 3D volumetric display technique and system
Li et al. Construction of Smart City Street Landscape Big Data‐Driven Intelligent System Based on Industry 4.0
CN206058757U (en) A kind of power circuit model based on geographic information data
Nguyen et al. Gis-based simulation for solar farm site selection in south-central Vietnam
CN106503300A (en) A kind of pole and tower foundation bank protection automatic generative system of drawings
Ramesh Importance and Applications of GIS in Engineering
Cheng Significance of Digital Landscape Architecture
Zhang et al. Digital terrain interactive editing technology for landscape planning and design based on deep learning
Li et al. Research on Green Evaluation of Mountainous Highway Construction
CN108804086A (en) A kind of cities and towns geological disaster digital management system
CN109472106A (en) A kind of smart city planning and designing method
Chen [Retracted] Construction of a Large Visual Landscape Design Platform considering Low‐Carbon Environmental Protection Based on Nanomaterials
Wang [Retracted] Integrated Urban Design Methodology of “Planning‐Construction‐Management” and Intelligent Management and Control Based on Teaching Reproduction Robot
Xu Building the “Digital Earth”, Promoting China's and Global Sustainable Development
Zhang et al. The Construction Industry Has Injected New Blood Digitalization Creates the Future of the Industry
Nie et al. Mechanized construction technology of transmission line based on 3d visualization
Rahma et al. Ecological urban space

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20170607

CF01 Termination of patent right due to non-payment of annual fee