CN206057480U - A kind of ultra-high-tension power transmission line fault localization system - Google Patents

A kind of ultra-high-tension power transmission line fault localization system Download PDF

Info

Publication number
CN206057480U
CN206057480U CN201621096770.1U CN201621096770U CN206057480U CN 206057480 U CN206057480 U CN 206057480U CN 201621096770 U CN201621096770 U CN 201621096770U CN 206057480 U CN206057480 U CN 206057480U
Authority
CN
China
Prior art keywords
unit
column
annulus
connection
main control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621096770.1U
Other languages
Chinese (zh)
Inventor
马林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Minzu University
Original Assignee
Northwest Minzu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Minzu University filed Critical Northwest Minzu University
Priority to CN201621096770.1U priority Critical patent/CN206057480U/en
Application granted granted Critical
Publication of CN206057480U publication Critical patent/CN206057480U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of ultra-high-tension power transmission line fault localization system, including current transformer, current transformer connection filtering converting unit, filtering converting unit connection collecting unit, collecting unit connects main control unit, main control unit connection communication unit, power supply unit, memory element and clock unit, main control unit includes controller, controller connects two electric putters, two vertical columns are set between two electric putters, two root posts are fixedly mounted on pylon, mounting and fixing support on each column, fixed mount is fixedly connected electric putter, top between two columns is installed by the rotating shaft of level, cotton piece buff is installed in rotating shaft, rotating shaft connects wind through column, red cloth is wound in cotton piece buff, one annulus is set on column, the two ends of red cloth bottom connect the annulus of homonymy respectively, it is the push rod of electric putter below annulus, the bottom connection balancing weight of annulus.This utility model can ensure that maintainer can correctly find failure point, has effectively saved the time, has improve work efficiency.

Description

A kind of ultra-high-tension power transmission line fault localization system
Technical field
This utility model belongs to power equipment maintaining field, specifically a kind of ultra-high-tension power transmission line fault localization system.
Background technology
Although fault-signal can be passed to control centre by present ultra-high-tension power transmission line fault localization system, people is keeped in repair Go although have the help of alignment system to can determine that a scope during maintenance before member, but due to position error maintainer sometimes Judge wrong position, more lose time.There is presently no a kind of device and can solve this problem.
Utility model content
This utility model provides a kind of ultra-high-tension power transmission line fault localization system, to solve defect of the prior art.
This utility model is achieved by the following technical programs:
A kind of ultra-high-tension power transmission line fault localization system, including current transformer, current transformer connection filtering conversion are single Unit, filtering converting unit connection collecting unit, collecting unit connection main control unit, main control unit connection communication unit, power supply are single Unit, memory element and clock unit, communication unit include GPRS communication modules and Wifi communication modules, and clock unit includes north Bucket location receivers and high precision clock module, main control unit include controller, and controller connects the electric putter of two levels, two Two vertical columns are set between individual electric putter, and two root posts are fixedly mounted on the pylon of high voltage transmission line, each column Upper mounting and fixing support, fixed mount are fixedly connected electric putter, and the rotating shaft of level is installed at the top between two columns, and cloth is installed in rotating shaft Wheel, one end of rotating shaft connect wind through column, and red cloth is wound in cotton piece buff, and an annulus, annulus energy are respectively arranged on two columns Move on column, the two ends of red cloth bottom connect the annulus of homonymy respectively, below annulus for electric putter push rod, the bottom of annulus End connection balancing weight.
A kind of ultra-high-tension power transmission line fault localization system as above, the bottom of described column arrange base, base On be fixedly connected one end of vertical spring, the other end of spring is fixedly connected horizontal buffer board, and column passes through buffer board, delays Punching can be moved on column, and spring is arranged on the periphery of column.
The utility model has the advantages that:In this utility model when ultra-high-tension power transmission line failure breaks down, controller control Make and shrink installed in the electric putter on the pylon that failure goes out nearest high voltage transmission line, annulus is made by the gravity of balancing weight With tenesmus, red cloth is driven to launch, red cloth is bright-colored, and maintainer can be seen a long way off, be the circuit near which pylon Break down, it is ensured that maintainer can correctly find failure point, effectively save the time, improve work efficiency. After the completion of maintenance, red cloth is packed up by maintainer by wind, and electric putter recovers origin-location.
Description of the drawings
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or accompanying drawing to be used is briefly described needed for description of the prior art, it should be apparent that, drawings in the following description are Some embodiments of the present utility model, for those of ordinary skill in the art, in the premise for not paying creative labor Under, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is this utility model structured flowchart;Fig. 2 is this utility model structural representation.
Reference:4 main control unit 4-1 controllers of filtering 3 collecting unit of converting unit of 1 current transformer 2,5 communication unit 6 power supply unit of first 5-1GPRS communication modules 5-2Wifi communication module, 7 memory element, the 8 clock unit 8-1 Big Dippeves are positioned 14 wind 15 of receptor 8-2 and 13 cotton piece buff of high precision clock module 9 electric putter, 10 column, 11 fixed mount, 12 rotating shaft 19 spring of red cloth 16 annulus, 17 balancing weight, 18 base, 20 buffer board.
Specific embodiment
It is to make purpose, technical scheme and the advantage of this utility model embodiment clearer, new below in conjunction with this practicality Accompanying drawing in type embodiment, is clearly and completely described to the technical scheme in this utility model embodiment, it is clear that retouched The embodiment stated is a part of embodiment of this utility model, rather than the embodiment of whole.Based on the enforcement in this utility model Example, the every other embodiment obtained under the premise of creative work is not made by those of ordinary skill in the art are belonged to The scope of this utility model protection.
A kind of ultra-high-tension power transmission line fault localization system, including current transformer 1, current transformer connection filtering conversion are single Unit 2, the filtering connection collecting unit 3 of converting unit 2, the connection main control unit 4 of collecting unit 3,4 connection communication unit 5 of main control unit, Power supply unit 6, memory element 7 and clock unit 8, communication unit 5 include GPRS communication modules 5-1 and Wifi communication modules 5- 2, clock unit 8 includes Big Dipper location receivers 8-1 and high precision clock module 8-2, and main control unit 4 includes controller 4-1, control Device 4-1 processed connects the electric putter 9 of two levels, and two vertical columns 10 are arranged between two electric putters 9, and two root posts 10 are solid Dingan County is mounted on the pylon of high voltage transmission line, and mounting and fixing support 11 on each column 10, fixed mount 11 are fixedly connected electric putter 9, The rotating shaft 12 of level is installed at top between two columns 10, and cotton piece buff 13 is installed in rotating shaft 12, and one end of rotating shaft 12 passes through column 10 Connection wind 14, winds red cloth 15 in cotton piece buff 13, an annulus 16 is respectively arranged on two columns 10, and annulus 16 can be on column 10 Mobile, the two ends of 15 bottom of red cloth connect the annulus 16 of homonymy respectively, are the push rod of electric putter 9 below annulus 16, annulus 16 Bottom connects balancing weight 17.In this utility model when ultra-high-tension power transmission line failure breaks down, controller 4-1 controls are arranged on Electric putter 9 on the pylon that failure goes out nearest high voltage transmission line is shunk, action of gravity of the annulus 16 by balancing weight 17 Tenesmus, drives red cloth 15 to launch, and red cloth is bright-colored, and maintainer can be seen a long way off, is the circuit near which pylon Break down, it is ensured that maintainer can correctly find failure point, effectively save the time, improve work efficiency. After the completion of maintenance, red cloth 15 is packed up by maintainer by wind 14, and electric putter 9 recovers origin-location.
Specifically, as balancing weight 17 and ground distance are higher, when falling, impulsive force is larger, if directly fallen sometimes Part and balancing weight 17 can be damaged.In order to overcome the problems referred to above, the bottom of the column 10 described in the present embodiment arranges base 18, bottom One end of vertical spring 19 is fixedly connected on seat 18, the other end of spring 19 is fixedly connected horizontal buffer board 20, column 10 Through buffer board 20, buffer board 20 can be moved on column, and spring 19 is arranged on the periphery of column 10.Buffer board 20 and spring 19 Very big cushioning effect is played to balancing weight 17, it is to avoid when balancing weight 17 falls, damage part and balancing weight 17 itself.
Finally it should be noted that:Above example only to illustrate the technical solution of the utility model, rather than a limitation; Although being described in detail to this utility model with reference to the foregoing embodiments, it will be understood by those within the art that: Which still can be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc. With replacement;And these modifications or replacement, do not make the essence of appropriate technical solution depart from each embodiment technology of this utility model The spirit and scope of scheme.

Claims (2)

1. a kind of ultra-high-tension power transmission line fault localization system, it is characterised in that:Including current transformer(1), current transformer company Connect filtering converting unit(2), filter converting unit(2)Connection collecting unit(3), collecting unit(3)Connection main control unit(4), Main control unit(4)Connection communication unit(5), power supply unit(6), memory element(7)And clock unit(8), communication unit(5) Including GPRS communication modules(5-1)With Wifi communication modules(5-2), clock unit(8)Including Big Dipper location receivers(8-1)With High precision clock module(8-2), main control unit(4)Including controller(4-1), controller(4-1)The electricity of two levels of connection is pushed away Bar(9), two electric putters(9)Between arrange two vertical columns(10), two root posts(10)It is fixedly mounted on high voltage power transmission On the pylon of line, each column(10)Upper mounting and fixing support(11), fixed mount(11)It is fixedly connected electric putter(9), two columns (10)Between top install level rotating shaft(12), rotating shaft(12)Upper installation cotton piece buff(13), rotating shaft(12)One end through vertical Post(10)Connection wind(14), cotton piece buff(13)Upper winding red cloth(15), two columns(10)One annulus of upper each setting(16), circle Ring(16)Can be in column(10)Upper movement, red cloth(15)The two ends of bottom connect the annulus of homonymy respectively(16), annulus(16)Under Side is electric putter(9)Push rod, annulus(16)Bottom connection balancing weight(17).
2. a kind of ultra-high-tension power transmission line fault localization system according to claim 1, it is characterised in that:Described column (10)Bottom arrange base(18), base(18)On be fixedly connected vertical spring(19)One end, spring(19)It is another End is fixedly connected horizontal buffer board(20), column(10)Through buffer board(20), buffer board(20)Can move on column, bullet Spring(19)It is arranged on column(10)Periphery.
CN201621096770.1U 2016-09-30 2016-09-30 A kind of ultra-high-tension power transmission line fault localization system Expired - Fee Related CN206057480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621096770.1U CN206057480U (en) 2016-09-30 2016-09-30 A kind of ultra-high-tension power transmission line fault localization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621096770.1U CN206057480U (en) 2016-09-30 2016-09-30 A kind of ultra-high-tension power transmission line fault localization system

Publications (1)

Publication Number Publication Date
CN206057480U true CN206057480U (en) 2017-03-29

Family

ID=58366642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621096770.1U Expired - Fee Related CN206057480U (en) 2016-09-30 2016-09-30 A kind of ultra-high-tension power transmission line fault localization system

Country Status (1)

Country Link
CN (1) CN206057480U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107741553A (en) * 2017-11-28 2018-02-27 国网河南省电力公司商丘供电公司 A kind of Internet of Things high-tension line warning hinders system surely
CN109946568A (en) * 2019-04-12 2019-06-28 西京学院 A kind of detection device and detection method based on power circuit communication system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107741553A (en) * 2017-11-28 2018-02-27 国网河南省电力公司商丘供电公司 A kind of Internet of Things high-tension line warning hinders system surely
CN109946568A (en) * 2019-04-12 2019-06-28 西京学院 A kind of detection device and detection method based on power circuit communication system

Similar Documents

Publication Publication Date Title
CN104617868B (en) The device of solar generating of energy automatic snow dedusting
CN206057480U (en) A kind of ultra-high-tension power transmission line fault localization system
CN102290470A (en) Solar cell device
CN208609781U (en) A kind of active ADSS optical cable bird-scaring unit
CN102997160A (en) Solar street lamp
CN201570910U (en) Concentrated power distribution and monitoring system dedicated for oilfield well sites
CN206163248U (en) Prevent component damage and prevent antidetonation transformer that topples
CN202651135U (en) Integrated photovoltaic support foundation pile
CN101135292B (en) Perpendicular wind-driven generator
CN203066577U (en) Wind energy solar advertising tower
CN202599469U (en) Tunnel water level detecting device
CN204669284U (en) A kind of wind proof solar photovoltaic bracket
CN209293536U (en) A kind of electric force pole tower using I-shaped tower grounding device
CN204088985U (en) A kind of integrated 10kv Zhu Shang transformer station
CN204941786U (en) Delay wind scale without cruising without pendulum oar and drive multidigit wind generating unit
CN205490609U (en) Power consumption information collection system trouble analogue means
CN206573015U (en) A kind of target hydraulic motion mechanism
CN111293964A (en) Solar power generation device for building
CN206133873U (en) Geological disaster early warning device
CN210898168U (en) Transformer substation with damping effect
CN217010778U (en) Portable defect eliminating device of flat single-axis tracking system
CN105756985A (en) Testing platform for electric system
CN210469215U (en) Adjustable support of Y type photovoltaic solar cell panel
CN217930296U (en) Monitoring device for bridge inclination angle
CN210129837U (en) Flat single-axis tracking support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20170930