CN206056567U - Scaffold settlement monitoring and automatic alarm instrument - Google Patents
Scaffold settlement monitoring and automatic alarm instrument Download PDFInfo
- Publication number
- CN206056567U CN206056567U CN201620676797.1U CN201620676797U CN206056567U CN 206056567 U CN206056567 U CN 206056567U CN 201620676797 U CN201620676797 U CN 201620676797U CN 206056567 U CN206056567 U CN 206056567U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- settlement monitoring
- fixed
- automatic alarm
- cover plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Emergency Alarm Devices (AREA)
Abstract
Originally it is actually new to disclose a kind of scaffold settlement monitoring and automatic alarm instrument,The scaffold settlement monitoring and automatic alarm instrument are mainly by reader、Cover plate、Annular trigger switch、Spiral cable、Acousto-optic integrated alarm、Fixed mount、Fixed base plate、Fixed expansion bolt、Pendant、Nut and screw rod composition,Described reader is Steel Ruler,Described cover plate is steel plate,Reader socket is provided with described cover plate central position,On described fixed mount,Cover plate has installing hole,And red white oil paint eye-catcher is scribbled on steel pipe,On described fixed base plate, four angles are provided with four bolts hole,Described fixed mount is connected as being welded to connect with fixed base plate,The utility model fabrication and installation are simple,It is easy to use,It is convenient for settlement observation,Deformation data is provided in time,Automatically send alarm,Guiding construction is smoothed out,Ensure the safety of construction.
Description
Technical field
Originally it is actually new to belong to the measurement of scaffold settlement monitoring and automatic alarm instrument, more particularly, to tall and big support block handss
The settlement monitoring of frame and cantilevered structure formwork scaffold.
Background technology
In recent years, with the growth in the living standard of people, people in addition to the requirement for meeting material conditions, to oneself
Living conditions and environment space have higher requirement, with occurring space height and big structure of encorbelmenting in skyscraper, are this
Tall and big formwork scaffold construct to us and higher requirement is proposed with the structure formwork scaffold for encorbelmenting big, especially to support for shuttering
The settlement observation of body substantially goes to perform without according to scheme, this actually new monitoring instrument fabrication and installation and using very simple
Just, the material system job site material therefor for using and the inexpensive miniaturized electronics easily bought on the market.Construction usage
When can walk close to check, it is also possible to be observed by telescope at a distance, the sedimentation permissible value that specification specifies can also be set,
When scaffold sedimentation reaches warning numerical value, 12V acousto-optic integrateds alarm will send alarm.
This instrument is different from easy scaffold settlement monitoring instrument, except conventional construction inspection is checked, works as scaffold
Abnormal sinking or deflection occur can also carry out the double-reminding of light flash alarm and audio alarm automatically when reaching alarming value,
Even carry on construction work at night and be equally applicable, compensate for using easy scaffold settlement monitoring instrument because finding what is caused not in time
Safety and quality accident.
Utility model content
The utility model proposes a kind of scaffold settlement monitoring with the beneficial effect of automatic alarm instrument is:When scaffold is sent out
Raw abnormal sinking or deflection carry out the double-reminding of light flash alarm and audio alarm automatically when reaching alarming value, even
Carry on construction work at night and be equally applicable, compensate for using easy scaffold settlement monitoring instrument because find the safety that causes not in time and
Quality accident, fabrication and installation are simple, easy to use, are convenient for settlement observation, provide deformation data in time, send automatically police
Report, guiding construction are smoothed out, it is ensured that the safety of construction.
It is in order to realize the effect above, originally actually new to adopt as following structure:Scaffold settlement monitoring instrument is mainly by reading
Device, cover plate, fixed mount, fixed base plate, fixed expansion bolt, annular trigger switch, spiral cable, 12V lithium battery acousto-optic integrateds
Alarm, pendant, nut and screw rod composition, the Steel Ruler of described reader by the general 180mm length being measured as, described lid
Plate is thickness 3mm × long 60mm × wide 60mm steel plates, and cover plate includes upper cover plate and lower cover, the lower surface and lower cover of upper cover plate
Upper surface is respectively provided with an annular trigger switch, and upper cover plate 21 is fixed with the annular insulation of trigger switch 3, and lower cover 22 is touched with annular
Send out 3 insulation of switch to fix, the reader socket of long 2mm × wide 28mm, described fixation are reserved in described cover plate central position
Frame is that length is 1.5m, and 48 × 3.5 steel pipes of Ф, on described fixed mount, below lower cover are installed 12V acousto-optic integrateds and reported to the police
Device, and be connected with trigger switch for spiral cable, the installation of the reserved diameter 150mm of opposite side under alarm is installed in cover plate
Hole, the depth of cut of installing hole is 12mm, and the red white oil paint brushing eye-catcher on steel pipe, and red white interval 200mm is described
Fixed base plate is thickness 6mm × long 100mm × wide 100mm steel plates, and on described fixed base plate, four bolts hole, hole are opened in four angles
Footpath is 14mm, and fixed four sides of base plate of distance are 50mm, and described fixed mount is connected as being welded to connect with fixed base plate, described
Setscrew of the fixed expansion bolt for Ф 12, is first electric drill perforating on concrete flooring, be expansion bolt fix fixed base plate and
The bolt of fixed mount, the long 100mm of round steel of described pendant for Ф 25, described nut and screw rod by Ф 8, and two spiral shells
What cap was symmetrical is welded on pendant, and two nut clear spacings are controlled in 3mm.
During use, the reasonable position of intervisibility is selected, fixed mount is fixed on the concrete flooring immediately below settlement observation point, from
After installing hole connects pendant and reader, the settlement observation of Construction Scheme requirement is hung in the tied silk of assembling reinforcement
The position of point, is set scaffold sinking alarming value, just can be observed with walkaround inspection or by telescope at a distance, can be with
Automatically send audible and visible alarm.
This actually new proposed scaffold settlement monitoring and automatic alarm instrument, are not only simple in structure, easy to use
Easy-to-understand, material therefor is that the common material involved by job site and the inexpensive miniature electric easily bought on the market set
Standby, economy is higher.
Description of the drawings
Fig. 1 is the axonometric chart of this actually new proposed scaffold settlement monitoring and automatic alarm instrument.
Fig. 2 is the part 1 in Fig. 1;Part 11:Connection diagram.
Fig. 3 is the part 2 in Fig. 1;Part 3:Elevational schematic view.
Fig. 4 is the part 2 in Fig. 1;Part 3:Part 5;Part 6:Schematic top plan view.
Fig. 5 is the part 6 in Fig. 1;Part 7;Part 8:Schematic top plan view.
Fig. 6 is the part 9 in Fig. 2;Part 10;Part 11:Connection diagram.
Wherein:1st, reader 2, cover plate 21, upper cover plate 22, lower cover 3, annular trigger switch 4, spiral cable 5,
Acousto-optic integrated alarm 6, fixed mount 7, fixed base plate 8, fixed expansion bolt 9, nut 10, screw rod 11, pendant
Specific embodiment
Embodiment one
Can be seen that in Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6:Scaffold settlement monitoring and warning instrument, scaffold sedimentation
Monitoring instrument is mainly by reader 1, cover plate 2, annular trigger switch 3, spiral cable 4,12V acousto-optic integrateds alarm 5, fixed mount
6th, fixed base plate 7, fixed expansion bolt 8, nut 9, screw rod 10 and pendant 11 are constituted, and described reader 1 is range 180mm length
Steel Ruler, described cover plate 2 is thickness 3mm × long 60mm × wide 60mm steel plates, and cover plate 2 includes upper cover plate 21 and lower cover 22,
The upper surface of the lower surface and lower cover 2 of upper cover plate 2 is respectively mounted with an annular trigger switch 3, described upper cover plate 21 and ring
The insulation of shape trigger switch 3 is fixed, and lower cover 22 is fixed with the annular insulation of trigger switch 3, is provided with described 2 center of cover plate
1 socket of reader of long 2mm × wide 28mm, described fixed mount 6 is length 1.5m, 48 × 3.5 steel pipes of Ф, in described fixation
On frame 6,12V acousto-optic integrateds alarm 5 is installed below 22 in lower cover, and is connected with trigger switch by spiral cable 4,
The installing hole of diameter 150mm is provided with described 2 times installation alarm opposite sides of cover plate, the depth of installing hole is 12mm, steel pipe
On scribble red white oil paint eye-catcher, red white interval 200mm, described fixed base plate 7 are thickness 6mm × long 100mm × wide 100mm
Steel plate, on described fixed base plate 7, four angles are provided with four bolts hole, and aperture is 14mm, fixed 7 four sides of base plate of distance
For 50mm, described fixed mount 6 is connected with fixed base plate 7 to be adopted to be welded to connect, and described fixed expansion bolt 8 is the swollen of Ф 12
Swollen bolt, is first electric drill perforating on concrete flooring, is that expansion bolt fixes base plate 7 and fixed mount 6, and described pendant 11 is
The bolt of the long 100mm of round steel of Ф 25, described nut 9 and screw rod 10 for Ф 8, what two nuts 9 were symmetrical is welded on pendant 11
On, two 9 clear spacings of nut are 3mm.
During use, the reasonable position of intervisibility is selected, fixed mount 6 is fixed on the concrete flooring immediately below settlement observation point,
After pendant 11 and reader 1 being connected from installing hole, it is that the tied silk that assembling reinforcement is is hung in the heavy of Construction Scheme requirement
The position of drop observation station, is set scaffold sinking alarming value, just can be observed with walkaround inspection or by telescope at a distance,
Audible and visible alarm is sent automatically can also.
Claims (8)
1. scaffold settlement monitoring and automatic alarm instrument, it is characterised in that:Scaffold settlement monitoring and automatic alarm instrument by
Fixed mount (6), fixed base plate (7), fixed expansion bolt (8), cover plate (2), annular trigger switch (3), spiral cable (4), sound
Light one alarm (5), reader (1), pendant (11), nut (9) and screw rod (10) composition, the cover plate (2) is including upper lid
Plate (21) and lower cover (22), the upper surface of the lower surface and lower cover (22) of the upper cover plate (21) are respectively provided with an annular and touch
Switch (3) is sent out, the upper cover plate (21) is fixed with annular trigger switch (3) insulation, lower cover (22) and annular trigger switch (3)
Insulation is fixed, and upper cover plate (21) and reader (1) are affixed, is solid between fixed mount (6), lower cover (22) and fixed base plate (7)
Connect, fixed base plate (7) is affixed by fixed expansion bolt (8) with concrete building plate face, and reader (1) lower end is solid with nut (9)
Connect, nut (9) lower end is affixed with pendant (11), screw rod (10) is by the installing hole on fixed mount (6) and the nut (9)
It is connected, the acousto-optic integrated alarm (5) is fixed on fixed mount (6).
2. scaffold settlement monitoring according to claim 1 and automatic alarm instrument, it is characterised in that:The fixed mount
(6) be long 1.5m Ф 48 × 3.5 steel pipe.
3. scaffold settlement monitoring according to claim 1 and automatic alarm instrument, its feature exist:The fixed base plate
(7) it is thick 8mm × long 100mm × wide 100mm steel plates.
4. scaffold settlement monitoring according to claim 1 and automatic alarm instrument, it is characterised in that:The reader
(1) it is the Steel Ruler of range 180mm.
5. scaffold settlement monitoring according to claim 1 and automatic alarm instrument, it is characterised in that:The cover plate (2)
For thick 3mm × long 60mm × wide 60mm steel plates.
6. scaffold settlement monitoring according to claim 1 and automatic alarm instrument, it is characterised in that:The pendant (11)
For 25 spirals of Ф of length 100mm.
7. scaffold settlement monitoring according to claim 1 and automatic alarm instrument, it is characterised in that:The nut (9)
Internal diameter and screw rod (10) external diameter are Ф 8.
8. scaffold settlement monitoring according to claim 1 and automatic alarm instrument, it is characterised in that:The acousto-optic integrated
Alarm (5) is 12V lithium battery acousto-optic integrated alarms.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620676797.1U CN206056567U (en) | 2016-06-29 | 2016-06-29 | Scaffold settlement monitoring and automatic alarm instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620676797.1U CN206056567U (en) | 2016-06-29 | 2016-06-29 | Scaffold settlement monitoring and automatic alarm instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206056567U true CN206056567U (en) | 2017-03-29 |
Family
ID=58375479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620676797.1U Active CN206056567U (en) | 2016-06-29 | 2016-06-29 | Scaffold settlement monitoring and automatic alarm instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206056567U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107941271A (en) * | 2017-11-13 | 2018-04-20 | 中铁八局集团第六工程有限公司 | Full framing safe early warning construction technology |
CN113340284A (en) * | 2021-06-15 | 2021-09-03 | 中国电建集团贵州电力设计研究院有限公司 | Scaffold settlement monitoring system and using method |
-
2016
- 2016-06-29 CN CN201620676797.1U patent/CN206056567U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107941271A (en) * | 2017-11-13 | 2018-04-20 | 中铁八局集团第六工程有限公司 | Full framing safe early warning construction technology |
CN113340284A (en) * | 2021-06-15 | 2021-09-03 | 中国电建集团贵州电力设计研究院有限公司 | Scaffold settlement monitoring system and using method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109975893B (en) | Urban waterlogging early warning method and system based on Internet of things | |
CN206056567U (en) | Scaffold settlement monitoring and automatic alarm instrument | |
CN202974390U (en) | Water level monitoring and alarm display device for city culverts, tunnels and low-lying places | |
CN216116279U (en) | Hydrology water level early warning device for water resource | |
CN111609835A (en) | Intelligent monitoring and alarming device for settlement of inner support scaffold | |
CN206863913U (en) | A kind of intelligent building building site alarming device | |
CN210035092U (en) | Gas transmission pipeline detection device | |
CN206113946U (en) | A repeatedly usable monitoring point device for concrete structure component | |
CN202279651U (en) | Tower crane inclination warner | |
CN205230290U (en) | External damage's audible and visual alarm is prevented to circuit | |
CN201600126U (en) | Prism monitor | |
CN212561892U (en) | Steel structure box column connecting node | |
CN205563927U (en) | Intelligent alarm device is used to river levee | |
CN204551692U (en) | A kind of HDPE gutter manhole | |
CN212458337U (en) | Intelligent monitoring and alarming device for settlement of inner support scaffold | |
CN208293601U (en) | A kind of dedicated foundation bolt positioning and fixing device of construction | |
CN207780932U (en) | A kind of pattern foundation pit supporting structure displacement monitoring warning device | |
CN205230276U (en) | Earthquake alarm | |
CN206531982U (en) | Real-time rainfall measurement system | |
CN210180434U (en) | Storm surge warning tide level monitoring device | |
CN216246274U (en) | Formwork support settlement monitoring system | |
CN210421177U (en) | Underground cable wellhead safety cover device | |
CN202969368U (en) | Underground continuous wall display structure | |
CN204001673U (en) | Expanded metal lath fastening devices | |
CN210685387U (en) | Large-section inclined column template construction structure for constructional engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |