CN206053831U - A kind of novel electric power site operation ladder - Google Patents
A kind of novel electric power site operation ladder Download PDFInfo
- Publication number
- CN206053831U CN206053831U CN201621025757.7U CN201621025757U CN206053831U CN 206053831 U CN206053831 U CN 206053831U CN 201621025757 U CN201621025757 U CN 201621025757U CN 206053831 U CN206053831 U CN 206053831U
- Authority
- CN
- China
- Prior art keywords
- workbox
- construction ladder
- handrail
- construction
- ladder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of novel electric power site operation ladder, including workbox;The workbox is arranged on construction ladder landing slab left end face, is made up of Q235B iron plates;Tool case upper cover plate is provided with workbox;Workbox handle is installed on the upper cover plate;Tool-box lock is installed on the right side of the workbox handle;Two, hinge is provided with the left of the tool-box lock, which is symmetric on the left of upper cover plate;Workbox handle is arranged on the left of hinge;Construction ladder landing slab is welded with the right side of workbox, which is rectangle, is made up of iron plate material;The construction ladder landing slab right side is welded with handrail fix bar;Height adjustment knob is installed in the handrail fix bar;The height adjustment knob upper end is provided with handrail expansion link;Construction ladder rail is welded with the handrail expansion link, which is in strip, is symmetrically distributed in the middle of expansion link;This utility model is reasonable in design, simple structure, can effectively provide a kind of electric field construction ladder.
Description
Technical field
This utility model is related to a kind of electric power apparatus, specifically a kind of novel electric power site operation ladder.
Background technology
At present, in electric power overhaul, it is often necessary to which the aerial cable for being pointed to higher position is overhauled, especially right
Outdoor aerial cable carries out maintenance laying operation, and due to lacking necessary supporter, workmen will need to ascend a height in construction
Maintenance ladder is relied on electric power cable, then carries out construction operation, and so operation one side maintenance ladder fixes unstable, easily goes out
Now slip phenomenon, causes workmen injured.
Utility model content
The purpose of this utility model is to provide a kind of novel electric power site operation ladder, to solve to carry in above-mentioned background technology
The problem for going out.
For achieving the above object, this utility model provides following technical scheme:
A kind of novel electric power site operation ladder, including workbox;The workbox is arranged on construction ladder landing slab left-hand end
Face, is made up of Q235B iron plates;Tool case upper cover plate is provided with workbox;Workbox handle is installed on the upper cover plate;Institute
State and tool-box lock is installed on the right side of workbox handle;Two, hinge is provided with the left of the tool-box lock, which is symmetric
On the left of upper cover plate;Workbox handle is arranged on the left of hinge;Construction ladder landing slab is welded with the right side of workbox, which is rectangle,
It is made up of iron plate material;The construction ladder landing slab right side is welded with handrail fix bar;It is provided with the handrail fix bar
Height adjustment knob;The height adjustment knob upper end is provided with handrail expansion link;Construction ladder is welded with the handrail expansion link
Handrail, which is in strip, is symmetrically distributed in the middle of expansion link;Construction ladder lower limb two pairs is installed below construction ladder landing slab;It is described
Construction ladder pedal between two construction ladder lower limbs;Between two pairs of construction ladder lower limbs, top is provided with rotating shaft;On construction ladder lower limb, bottom is provided with
Moving caster two pairs.
As further program of the utility model:Lanyard is provided between the construction ladder lower limb.
As this utility model further scheme:Terraced lower limb slipmat is installed below the Moving caster, which is by rubbing
Wipe the big elastomeric material of power to make.
Compared with prior art, the beneficial effects of the utility model are:
The setting of this utility model construction ladder landing slab, construction ladder rail and height adjustment knob, can be by construction when institute
The instrument of needs is placed in workbox, and convenient taking is deposited, and this utility model simple structure, safe and reliable, it is easy to is carried and is stored up
Deposit, when workmen needs the ramp period of the day from 11 p.m. to 1 a.m, ladder can be packed up, directly be dragged away using Moving caster, applying beneficial to workpeople
Work and operation.
Description of the drawings
Fig. 1 is the structural representation of novel electric power site operation ladder.
Fig. 2 is the structural representation of side view in novel electric power site operation ladder.
Fig. 3 is the structural representation in workbox in novel electric power site operation ladder.
In figure:1- workboxes, 2- construction ladder landing slabs, 3- construction ladder rails, 4- handrail expansion links, the rotation of 5- altitude mixture control
Button, 6- handrail fix bars, 7- construction ladder lower limbs, 8- construction ladder pedals, 9- ladder lower limb slipmat, 10- movable rotation-shafts, 11- lanyards, 12-
Moving caster, 13- hinges, 14- tool case upper cover plates, 15- workboxes handle, 16- tool-box locks.
Specific embodiment
The technical scheme of this patent is described in more detail with reference to specific embodiment.
Refer to Fig. 1-3, a kind of novel electric power site operation ladder, including workbox 1;The workbox 1 is arranged on construction
2 left end face of terraced landing slab, is made up of Q235B iron plates, and the instrument required for workmen can be placed inside which;On workbox 1
It is provided with tool case upper cover plate 14;Workbox handle 15 is installed, its user-friendly workbox on the upper cover plate 14
1;Tool-box lock 16 is installed on the right side of the workbox handle 15, which provides safety guarantee for the instrument in workbox 1;It is described
13 two, hinge is provided with the left of tool-box lock 16, which is symmetric on the left of upper cover plate 14, which can be provided for upper cover plate 14
Rotate;Workbox handle 15 is arranged on the left of hinge 13;Construction ladder landing slab 2 is welded with the right side of workbox 1, which is rectangle,
It is made up of iron plate material, workmen can stand when constructing and operated above;2 right side of construction ladder landing slab is welded with
Handrail fix bar 6;Height adjustment knob 5 is installed in the handrail fix bar 6;5 upper end of the height adjustment knob is provided with to be helped
Handss expansion link 4;Construction ladder rail 3 is welded with the handrail expansion link 4, which is in strip, is symmetrically distributed in expansion link 4
Between, when user station is on ladder, handrail can be buttressed, it is more stable when making operation;Construction is installed below construction ladder landing slab 2
Terraced lower limb 7 two pairs;Construction ladder pedal 8 between two construction ladder lower limbs 7;Between two pairs of construction ladder lower limbs 7, top is provided with rotating shaft 10;Apply
On work ladder lower limb 7, bottom is provided with Moving caster 12 two pairs, and its convenient construction ladder is mobile;Ladder is installed below the Moving caster 12
Lower limb slipmat 9, which is made up of the larger elastomeric material of frictional force;Lanyard 11 is provided between construction ladder lower limb 7.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment party
Formula, in the ken that one skilled in the relevant art possesses, can be with the premise of without departing from this patent objective
Make a variety of changes.
Claims (3)
1. a kind of novel electric power site operation is terraced, including workbox;Characterized in that, the workbox is arranged on construction ladder platform
Plate left end face, is made up of Q235B iron plates;Tool case upper cover plate is provided with workbox;Instrument is installed on the upper cover plate
Case handle;Tool-box lock is installed on the right side of the workbox handle;Two, hinge is provided with the left of the tool-box lock, which is in right
Title is distributed on the left of upper cover plate;Workbox handle is arranged on the left of hinge;Construction ladder landing slab is welded with the right side of workbox, which is in
Rectangle, is made up of iron plate material;The construction ladder landing slab right side is welded with handrail fix bar;In the handrail fix bar
Height adjustment knob is installed;The height adjustment knob upper end is provided with handrail expansion link;It is welded with the handrail expansion link
Construction ladder rail, which is in strip, is symmetrically distributed in the middle of expansion link;Construction ladder lower limb two is installed below construction ladder landing slab
It is right;Construction ladder pedal between two construction ladder lower limbs;Between two pairs of construction ladder lower limbs, top is provided with rotating shaft;Bottom on construction ladder lower limb
It is provided with Moving caster two pairs.
2. novel electric power site operation according to claim 1 is terraced, it is characterised in that be provided with extension between the construction ladder lower limb
Rope.
3. novel electric power site operation according to claim 1 is terraced, it is characterised in that be provided with below the Moving caster
Terraced lower limb slipmat, which is made up of the big elastomeric material of frictional force.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621025757.7U CN206053831U (en) | 2016-08-31 | 2016-08-31 | A kind of novel electric power site operation ladder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621025757.7U CN206053831U (en) | 2016-08-31 | 2016-08-31 | A kind of novel electric power site operation ladder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206053831U true CN206053831U (en) | 2017-03-29 |
Family
ID=58374431
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621025757.7U Active CN206053831U (en) | 2016-08-31 | 2016-08-31 | A kind of novel electric power site operation ladder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206053831U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115247487A (en) * | 2022-09-22 | 2022-10-28 | 南京安特威建筑科技有限公司 | Auxiliary construction system for assembled suspended ceiling |
-
2016
- 2016-08-31 CN CN201621025757.7U patent/CN206053831U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115247487A (en) * | 2022-09-22 | 2022-10-28 | 南京安特威建筑科技有限公司 | Auxiliary construction system for assembled suspended ceiling |
CN115247487B (en) * | 2022-09-22 | 2023-01-03 | 南京安特威建筑科技有限公司 | Auxiliary construction system for assembled suspended ceiling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103147370B (en) | Device and method for replacing track slab of slab ballastless track | |
CN204627625U (en) | Automatic walking lining trolley | |
CN105735140B (en) | A kind of bridge side platform device for high-altitude operation | |
CN206053831U (en) | A kind of novel electric power site operation ladder | |
CN206279752U (en) | A kind of exterior wall finishing hanging basket of more safety and comfort | |
CN207700642U (en) | A kind of even husky equipment before construction floor tile | |
CN203188070U (en) | Plate-type ballast-less track plate replacing device | |
CN206298323U (en) | Automatically bar lowering or hoisting gear is climbed | |
CN205348009U (en) | Hanging flower basket device of bridge construction | |
CN206940278U (en) | A kind of O shapes gantry handling apparatus | |
CN204760871U (en) | Cable trench cover hoisting accessory | |
CN213141338U (en) | Electric construction elevating gear | |
CN201565002U (en) | Simple escape device | |
CN208235590U (en) | A kind of rectangle vertical shaft sliding sash turning-over | |
CN211714587U (en) | Assembled construction formwork of assembled building | |
CN211075946U (en) | Precast concrete board's reinforcing apparatus | |
CN202559678U (en) | Lifting operation platform device of electric hammer | |
CN210758496U (en) | Height drilling auxiliary equipment capable of adjusting drilling depth | |
CN209163415U (en) | A kind of low-rise building elevating platform for construction use | |
CN202448220U (en) | Demoulding device for fireproof foaming cement insulation board | |
CN206814362U (en) | A kind of multifunction combined electric apparatus installation tool | |
CN110917582A (en) | Single climbing device used during transformer maintenance | |
CN205892526U (en) | Hoist and mount platform of spinning corridor equipment | |
CN206256382U (en) | It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed | |
CN111017828B (en) | Lifting platform adaptable to different narrowness building facade repair |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: No. 3120, Dalian Road, Jinfeng District, Yinchuan, the Ningxia Hui Autonomous Region Patentee after: The Ningxia Hui Autonomous Region Electric Power Design Institute Co., Ltd. Address before: 750000 the Ningxia Hui Autonomous Region, Yinchuan Jinfeng District, Dalian Road, No. 3120 Patentee before: Ningxia Hui Autonomous Region Electric Power Design Institute |