CN206053203U - A kind of mould proof, heat-insulated Thistle board - Google Patents

A kind of mould proof, heat-insulated Thistle board Download PDF

Info

Publication number
CN206053203U
CN206053203U CN201620887591.3U CN201620887591U CN206053203U CN 206053203 U CN206053203 U CN 206053203U CN 201620887591 U CN201620887591 U CN 201620887591U CN 206053203 U CN206053203 U CN 206053203U
Authority
CN
China
Prior art keywords
parallel
layer
hole
warp
porous layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620887591.3U
Other languages
Chinese (zh)
Inventor
管国磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taishan Gypsum Xuancheng Co ltd
Original Assignee
Xuancheng Wanjia Building Materials Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuancheng Wanjia Building Materials Ltd By Share Ltd filed Critical Xuancheng Wanjia Building Materials Ltd By Share Ltd
Priority to CN201620887591.3U priority Critical patent/CN206053203U/en
Application granted granted Critical
Publication of CN206053203U publication Critical patent/CN206053203U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)
  • Finishing Walls (AREA)

Abstract

This utility model provides a kind of mould proof, heat-insulated Thistle board, which is made up of the first paper layer, the first porous layer, the first grid ribs layer, plasterboard body layer, the second grid ribs layer, the second porous layer, the second paper layer respectively, wherein, first porous layer is provided with the first through hole, and second porous layer is provided with the second through hole;The first grid ribs layer and the second grid ribs layer are prepared by the grid material being set in Gypsum Fibrosum.

Description

A kind of mould proof, heat-insulated Thistle board
Technical field
This utility model is related to a kind of Thistle board, is more related to a kind of mould proof, heat-insulated Thistle board, specifically Ground, is related to C09D fields.
Background technology
The raising required with the development of building industry and to construction quality, the performance requirement of related construction materials is also increasingly Height, particularly hospital, school, market, high-grade office building, high-end residential etc. to the exigent building of performance, to building The performance of performance, ornament materials is built, especially the security performance and endurance quality of material is put forward higher requirement.Here Under background, as more and more by the widely used Thistle board of all kinds of buildings, safety which uses, resistance to is improved Long property.
Meanwhile, Thistle board is the main material for indoor partition wall and ceiling system, due to different climatic provinces Where the different application position of domain difference and building, particularly humidity are higher, easily cause Signs of Mould on the surface of sheet material, Cause the generation and growth of mushroom, not only affect the effect of outward appearance, and easily cause health hazard.
Therefore, for the problems referred to above, this utility model provides a kind of mould proof, heat-insulated Thistle board.
Utility model content
For the problems referred to above, this utility model provides a kind of mould proof, heat-insulated Thistle board, and which is respectively by the first paper Layer, the first porous layer, the first grid ribs layer, plasterboard body layer, the second grid ribs layer, the second porous layer, the second paper layer group Into,
Wherein, first porous layer is provided with the first through hole, and second porous layer is provided with the second through hole;
The first grid ribs layer and the second grid ribs layer are prepared by the grid material being set in Gypsum Fibrosum;
The grid material is made up of multigroup warp group and multigroup parallel group, and every group of warp group is by the first warp, the 2nd Jing Line, the 3rd warp and the 4th warp composition, every group of parallel group is by the first parallel, the second parallel, the 3rd parallel and the 4th parallel group Into;First warp penetrates the lower section of the second parallel, the 3rd parallel and the 4th parallel, the 2nd Jing again after passing through from above the first parallel Line penetrates the top of the 3rd parallel and the 4th parallel again after passing through from the lower section of the first parallel, the second parallel, the 3rd warp is successively The top of lower section, the top of the second parallel, the lower section of the 3rd parallel and the 4th parallel through the first parallel, the 4th warp is successively Through the top of the first parallel, the lower section of the second parallel and the 3rd parallel and the 4th parallel.
Anti-fungus material is provided with the grid of the first grid ribs layer and the second grid ribs layer;
The gross area of first through hole is the 1/5~4/5 of the first porous layer area;
The gross area of second through hole is the 1/4~3/4 of the second porous layer area.
Used as a kind of embodiment of the present utility model, first through hole is square hole, circular port, regular hexagon One kind in hole.
Used as a kind of embodiment of the present utility model, second through hole is square hole, circular port, tri-angle-holed In one kind.
As a kind of embodiment of the present utility model, the first paper layer, the first porous layer, the first grid ribs layer, Plasterboard body layer, the second grid ribs layer, the second porous layer, the thickness ratio of the second paper layer are (0.01-0.1):(1-5):(5- 10):(5-20):(5-10):(1-5):(0.01-0.1).
As a kind of embodiment of the present utility model, the first paper layer, the first porous layer, the first grid ribs layer, Plasterboard body layer, the second grid ribs layer, the second porous layer, the thickness ratio of the second paper layer are 0.05:(1-5):(5-10): 20:(5-10):(1-5):0.05.
Used as a kind of embodiment of the present utility model, the gross area of first through hole is the first porous layer area 2/5~4/5.
Used as a kind of embodiment of the present utility model, the gross area of second through hole is the second porous layer area 1/2~3/4.
Used as a kind of embodiment of the present utility model, first through hole is square hole.
Used as a kind of embodiment of the present utility model, second through hole is circular port.
Used as a kind of embodiment of the present utility model, the plasterboard body layer is prepared by ardealite.
Description of the drawings
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or accompanying drawing to be used is briefly described needed for description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise for not paying creative work Under, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1:The schematic diagram of the Thistle board of embodiment 1;
Fig. 2:The longitude and latitude schematic diagram of the grid material of embodiment 1;
Symbol description:
1- the first paper layers
The first porous layers of 2-;The first through holes of 21-
3- the first grid ribs layers;31- grid materials;The first warps of 311-;The second warps of 312-;The 3rd warps of 313-; The 4th warps of 314-;The first parallels of 315-;The second parallels of 316-;The 3rd parallels of 317-;The 4th parallels of 318-;319- anti-fungus materials
4- plasterboard body layers;
5- the second grid ribs layers;
The second porous layers of 6-;The second through holes of 61-;
7- the second paper layers
Specific embodiment
In order to solve the above problems, this utility model provides a kind of mould proof, heat-insulated Thistle board, and which is respectively by first Paper layer, the first porous layer, the first grid ribs layer, plasterboard body layer, the second grid ribs layer, the second porous layer, the second paper Layer composition,
Wherein, first porous layer is provided with the first through hole, and second porous layer is provided with the second through hole;
The first grid ribs layer and the second grid ribs layer are prepared by the grid material being set in Gypsum Fibrosum;
The grid material is made up of multigroup warp group and multigroup parallel group, and every group of warp group is by the first warp, the 2nd Jing Line, the 3rd warp and the 4th warp composition, every group of parallel group is by the first parallel, the second parallel, the 3rd parallel and the 4th parallel group Into;First warp penetrates the lower section of the second parallel, the 3rd parallel and the 4th parallel, the 2nd Jing again after passing through from above the first parallel Line penetrates the top of the 3rd parallel and the 4th parallel again after passing through from the lower section of the first parallel, the second parallel, the 3rd warp is successively The top of lower section, the top of the second parallel, the lower section of the 3rd parallel and the 4th parallel through the first parallel, the 4th warp is successively Through the top of the first parallel, the lower section of the second parallel and the 3rd parallel and the 4th parallel;
Anti-fungus material is provided with the grid of the first grid ribs layer and the second grid ribs layer;
The gross area of first through hole is the 1/5~4/5 of the first porous layer area;
The gross area of second through hole is the 1/4~3/4 of the second porous layer area.
Plasterboard
Described in this utility model, plasterboard is prepared by ardealite
The main component of ardealite is dihydrate gypsum, and chemical molecular formula is CaSO4·2H2O, accounts for 64%~96%, because of which In the water of constitution that contains account for 18%~20.2%, be in slurry shape during firm molding, but the method meeting stored up because of outdoor threshing ground Make ardealite powdered over time, generally canescence, partly Huang is presented because of the difference of impurity contained therein Color, lark, grey black, powder are thinner, and particle diameter is less, a diameter of 5~150 μm, and relative density is 2.22~2.37, is piled up close 0.7~0.85g/cm of degree3,
Ardealite is as containing acidic materials such as phosphoric acid, Fluohydric acid .s, pH value generally 3~4 can turn under certain conditions Chemical conversion anhydrous gypsum.Ardealite can form alpha-semi water plaster stone, alpha-semi water plaster stone in the case of 125 DEG C~230 DEG C steam under pressure α-anhydrous gypsum is formed at 230 DEG C or so;If ardealite is under dry air ambient, under 110 DEG C~170 DEG C parches β-semi-hydrated gypsum can be formed, β-semi-hydrated gypsum can form β-anhydrous gypsum at a temperature of 320~360 DEG C.Alpha-semi water plaster stone with β-semi-hydrated gypsum is compared, and can overcome the segmental defect of β-semi-hydrated gypsum, and more preferably, such as hardness is higher, and intensity is more for the performance for being presented Height, resistance to water are higher etc..
Thistle board
Common Thistle board has following four classes on the market:
Commonly:Ivory buff plate core, Lycoperdon polymorphum Vitt paper is the most economical with common kind.Suitable for without particular/special requirement Field of employment, the continuous relative humidity in field of employment are less than 65%.Many people are liked using 9.5mm thick common Thistle board To do furred ceiling or a wall, but as the common Thistle boards of 9.5mm are thinner, intensity is not high, easily send out in humid conditions Change shape, it is therefore proposed that from the plasterboard of more than 12mm.Meanwhile, it is also prevent gaping of joints one using thicker sheet material Effective means.
It is water-fast:Its plate core and mask paper have passed through water-proofing treatment, according to the requirement of GB, the paper of water-fast Thistle board Face and plate core must all reach certain waterproof requirement, and (water absorbent surface amount is not more than 160 grams, and water absorption rate is less than 10%).It is water-fast Thistle board is applied to field of employment of the continuous relative humidity less than 95%, such as toilet, bathroom etc..
Fire resisting:Refractory material and a large amount of glass fibre are increased in its plate core, if cutting plasterboard, can be from section part See many glass fibre.The alkali-free glass fiber that the measured refractory plasterboard of matter can select fire resistance good, general product Alkali or high-alkali glass in all selecting.
It is moistureproof:With higher surface humidity resistance, absorptivity is less than 160g/ ㎡, and moistureproof plasterboard is used for environment The larger room furred ceiling of moisture capacity, partition wall and veneer wall.
Used as a kind of embodiment of the present utility model, first through hole is square hole, circular port, regular hexagon One kind in hole.
Used as a kind of embodiment of the present utility model, second through hole is square hole, circular port, tri-angle-holed In one kind.
As a kind of embodiment of the present utility model, the first paper layer, the first porous layer, the first grid ribs layer, Plasterboard body layer, the second grid ribs layer, the second porous layer, the thickness ratio of the second paper layer are (0.01-0.1):(1-5):(5- 10):(5-20):(5-10):(1-5):(0.01-0.1).
As a kind of embodiment of the present utility model, the first paper layer, the first porous layer, the first grid ribs layer, Plasterboard body layer, the second grid ribs layer, the second porous layer, the thickness ratio of the second paper layer are 0.05:(1-5):(5-10): 20:(5-10):(1-5):0.05.
Used as a kind of embodiment of the present utility model, the gross area of first through hole is the first porous layer area 2/5~4/5.
Used as a kind of embodiment of the present utility model, the gross area of second through hole is the second porous layer area 1/2~3/4.
Used as a kind of embodiment of the present utility model, first through hole is square hole.
Used as a kind of embodiment of the present utility model, second through hole is circular port.
Used as a kind of embodiment of the present utility model, the plasterboard body layer is prepared by ardealite.
As shown in figure 1, mould proof to this utility model, heat-insulated Thistle board is described:
A kind of mould proof, heat-insulated Thistle board, which is respectively by the first paper layer 1, the first porous layer 2, the first grid ribs Layer 3, plasterboard body layer 4, the second grid ribs layer 5, the second porous layer 6, the second paper layer 7 are constituted, wherein, first porous Layer 2 is provided with the first through hole 21, and second porous layer 6 is provided with the second through hole 61;The first grid ribs layer 3 and Two grid ribs layers 5 are prepared by the grid material 31 being set in Gypsum Fibrosum;The grid material 31 has multigroup warp group and many Group parallel group composition, every group of warp group is by 314 groups of the first warp 311, the second warp 312, the 3rd warp 313 and the 4th warp Into every group of parallel group is made up of the first parallel 315, the second parallel 316, the 3rd parallel 317 and the 4th parallel 318;First warp 311 pass through from above the first parallel 315 after penetrate the lower section of the second parallel 316, the 3rd parallel 317 and the 4th parallel 318 again, Two warps 312 penetrate the 3rd parallel 317 and the 4th parallel 318 after passing through from the lower section of the first parallel 315, the second parallel 316 again Top, the 3rd warp 313 sequentially passes through the lower section of the first parallel 315, the top of the second parallel 316, under the 3rd parallel 317 Side and the top of the 4th parallel 318, the 4th warp 314 sequentially pass through the first parallel 315, the second parallel 316 and the 3rd parallel 317 Lower section and the 4th parallel 318 top;It is provided with the grid of the first grid ribs layer 3 and the second grid ribs layer 5 mould proof Material 319;The gross area of first through hole 21 is the 1/5~4/5 of 2 area of the first porous layer;Second through hole 61 The gross area be the 1/4~3/4 of 6 area of the second porous layer.First through hole 21 is square hole, circular port, positive six side One kind in shape hole.Second through hole 61 be square hole, circular port, it is tri-angle-holed in one kind.First paper The 1, first porous layer 2 of layer, the first grid ribs layer 3, plasterboard body layer 4, the second grid ribs layer 5, the second porous layer 6, the second paper The thickness ratio of surface layer 7 is (0.01-0.1):(1-5):(5-10):(5-20):(5-10):(1-5):(0.01-0.1).The stone Cream plate body layer is prepared by ardealite.
This utility model is further described below by specific embodiment.
Embodiment 1:A kind of mould proof, heat-insulated Thistle board, its respectively by the first paper layer 1, the first porous layer 2, One grid ribs layer 3, plasterboard body layer 4, the second grid ribs layer 5, the second porous layer 6, the second paper layer 7 are constituted, wherein, it is described First porous layer 2 is provided with the first through hole 21, and second porous layer 6 is provided with the second through hole 61;First grid Muscle layer 3 and the second grid ribs layer 5 are prepared by the grid material 31 being set in Gypsum Fibrosum;The grid material 31 has multigroup Jing Line group and multigroup parallel group composition, every group of warp group is by the first warp 311, the second warp 312, the 3rd warp 313 and the 4th Jing Line 314 is constituted, and every group of parallel group is made up of the first parallel 315, the second parallel 316, the 3rd parallel 317 and the 4th parallel 318;The One warp 311 penetrates the second parallel 316, the 3rd parallel 317 and the 4th parallel 318 again after passing through from above the first parallel 315 Lower section, the second warp 312 penetrate the 3rd parallel 317 and the 4th again after passing through from the lower section of the first parallel 315, the second parallel 316 The top of parallel 318, the 3rd warp 313 sequentially pass through the lower section of the first parallel 315, the top of the second parallel 316, the 3rd parallel 317 lower section and the top of the 4th parallel 318, the 4th warp 314 sequentially pass through the first parallel 315, the second parallel 316 and the 3rd The lower section of parallel 317 and the top of the 4th parallel 318;Arrange in the grid of the first grid ribs layer 3 and the second grid ribs layer 5 There is anti-fungus material 319;The gross area of first through hole 21 is the 1/5 of 2 area of the first porous layer;Second through hole 61 The gross area be the 1/4 of 6 area of the second porous layer.First through hole 21 is square hole.Second through hole 61 is Square hole.The first paper layer 1, the first porous layer 2, the first grid ribs layer 3, plasterboard body layer 4, the second grid ribs layer 5th, the second porous layer 6, the thickness ratio of the second paper layer 7 are 0.01:1:5:5:5:1:0.01.The plasterboard body layer is by phosphorus stone Cream is prepared.
Embodiment 2:A kind of mould proof, heat-insulated Thistle board, its respectively by the first paper layer 1, the first porous layer 2, One grid ribs layer 3, plasterboard body layer 4, the second grid ribs layer 5, the second porous layer 6, the second paper layer 7 are constituted, wherein, it is described First porous layer 2 is provided with the first through hole 21, and second porous layer 6 is provided with the second through hole 61;First grid Muscle layer 3 and the second grid ribs layer 5 are prepared by the grid material 31 being set in Gypsum Fibrosum;The grid material 31 has multigroup Jing Line group and multigroup parallel group composition, every group of warp group is by the first warp 311, the second warp 312, the 3rd warp 313 and the 4th Jing Line 314 is constituted, and every group of parallel group is made up of the first parallel 315, the second parallel 316, the 3rd parallel 317 and the 4th parallel 318;The One warp 311 penetrates the second parallel 316, the 3rd parallel 317 and the 4th parallel 318 again after passing through from above the first parallel 315 Lower section, the second warp 312 penetrate the 3rd parallel 317 and the 4th again after passing through from the lower section of the first parallel 315, the second parallel 316 The top of parallel 318, the 3rd warp 313 sequentially pass through the lower section of the first parallel 315, the top of the second parallel 316, the 3rd parallel 317 lower section and the top of the 4th parallel 318, the 4th warp 314 sequentially pass through the first parallel 315, the second parallel 316 and the 3rd The lower section of parallel 317 and the top of the 4th parallel 318;Arrange in the grid of the first grid ribs layer 3 and the second grid ribs layer 5 There is anti-fungus material 319;The gross area of first through hole 21 is the 4/5 of 2 area of the first porous layer;Second through hole 61 The gross area be the 3/4 of 6 area of the second porous layer.First through hole 21 is the one kind in regular hexagon hole.Described second Through hole 61 is the one kind in tri-angle-holed.The first paper layer 1, the first porous layer 2, the first grid ribs layer 3, plasterboard sheet Body layer 4, the second grid ribs layer 5, the second porous layer 6, the thickness ratio of the second paper layer 7 are 0.1:5:10:20:10:5:0.1.Institute State plasterboard body layer to be prepared by ardealite.
Embodiment 3:A kind of mould proof, heat-insulated Thistle board, its respectively by the first paper layer 1, the first porous layer 2, One grid ribs layer 3, plasterboard body layer 4, the second grid ribs layer 5, the second porous layer 6, the second paper layer 7 are constituted, wherein, it is described First porous layer 2 is provided with the first through hole 21, and second porous layer 6 is provided with the second through hole 61;First grid Muscle layer 3 and the second grid ribs layer 5 are prepared by the grid material 31 being set in Gypsum Fibrosum;The grid material 31 has multigroup Jing Line group and multigroup parallel group composition, every group of warp group is by the first warp 311, the second warp 312, the 3rd warp 313 and the 4th Jing Line 314 is constituted, and every group of parallel group is made up of the first parallel 315, the second parallel 316, the 3rd parallel 317 and the 4th parallel 318;The One warp 311 penetrates the second parallel 316, the 3rd parallel 317 and the 4th parallel 318 again after passing through from above the first parallel 315 Lower section, the second warp 312 penetrate the 3rd parallel 317 and the 4th again after passing through from the lower section of the first parallel 315, the second parallel 316 The top of parallel 318, the 3rd warp 313 sequentially pass through the lower section of the first parallel 315, the top of the second parallel 316, the 3rd parallel 317 lower section and the top of the 4th parallel 318, the 4th warp 314 sequentially pass through the first parallel 315, the second parallel 316 and the 3rd The lower section of parallel 317 and the top of the 4th parallel 318;Arrange in the grid of the first grid ribs layer 3 and the second grid ribs layer 5 There is anti-fungus material 319;The gross area of first through hole 21 is the 3/5 of 2 area of the first porous layer;Second through hole 61 The gross area be the 1/2 of 6 area of the second porous layer.First through hole 21 is circular hole.Second through hole 61 is Circular port.The first paper layer 1, the first porous layer 2, the first grid ribs layer 3, plasterboard body layer 4, the second grid ribs layer 5, Second porous layer 6, the thickness ratio of the second paper layer 7 are 0.05:3:8:20:8:3:0.05.The plasterboard body layer is by phosphorus stone Cream is prepared.

Claims (10)

1. a kind of mould proof, heat-insulated Thistle board, it is characterised in that its respectively by the first paper layer, the first porous layer, first Grid ribs layer, plasterboard body layer, the second grid ribs layer, the second porous layer, the second paper layer composition,
Wherein, first porous layer is provided with several first through holes, and second porous layer is provided with several second to be run through Hole;
The first grid ribs layer and the second grid ribs layer are prepared by the grid material being set in Gypsum Fibrosum;
The grid material is made up of multigroup warp group and multigroup parallel group, every group of warp group by the first warp, the second warp, Three warps and the 4th warp composition, every group of parallel group are made up of the first parallel, the second parallel, the 3rd parallel and the 4th parallel;The One warp penetrates the lower section of the second parallel, the 3rd parallel and the 4th parallel again after passing through from above the first parallel, the second warp from First parallel, the lower section of the second parallel penetrate the top of the 3rd parallel and the 4th parallel again after passing through, the 3rd warp is sequentially passed through The top of the lower section of the first parallel, the top of the second parallel, the lower section of the 3rd parallel and the 4th parallel, the 4th warp sequentially pass through The top of the first parallel, the lower section of the second parallel and the 3rd parallel and the 4th parallel;
Anti-fungus material is provided with the grid of the first grid ribs layer and the second grid ribs layer;
The gross area of first through hole is the 1/5~4/5 of the first porous layer area;
The gross area of second through hole is the 1/4~3/4 of the second porous layer area.
2. mould proof, the heat-insulated Thistle board described in claim 1, it is characterised in that first through hole is square Hole, circular port, the one kind in regular hexagon hole.
3. mould proof, the heat-insulated Thistle board described in claim 1, it is characterised in that second through hole is square Hole, circular port, it is tri-angle-holed in one kind.
4. mould proof, the heat-insulated Thistle board described in claim 1, it is characterised in that the first paper layer, the first porous Layer, the thickness ratio of the first grid ribs layer, plasterboard body layer, the second grid ribs layer, the second porous layer, the second paper layer are (0.01-0.1):(1-5):(5-10):(5-20):(5-10):(1-5):(0.01-0.1).
5. mould proof, the heat-insulated Thistle board described in claim 1, it is characterised in that the first paper layer, the first porous Layer, the thickness ratio of the first grid ribs layer, plasterboard body layer, the second grid ribs layer, the second porous layer, the second paper layer are 0.05:(1-5):(5-10):20:(5-10):(1-5):0.05.
6. mould proof, the heat-insulated Thistle board described in claim 1, it is characterised in that the gross area of first through hole For the 2/5~4/5 of the first porous layer area.
7. mould proof, the heat-insulated Thistle board described in claim 1, it is characterised in that the gross area of second through hole For the 1/2~3/4 of the second porous layer area.
8. mould proof, the heat-insulated Thistle board described in claim 1, it is characterised in that first through hole is square Hole.
9. mould proof, the heat-insulated Thistle board described in claim 1, it is characterised in that second through hole is circular port.
10. mould proof, the heat-insulated Thistle board described in claim 1, it is characterised in that the plasterboard body layer is by phosphorus stone Cream is prepared.
CN201620887591.3U 2016-08-16 2016-08-16 A kind of mould proof, heat-insulated Thistle board Active CN206053203U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620887591.3U CN206053203U (en) 2016-08-16 2016-08-16 A kind of mould proof, heat-insulated Thistle board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620887591.3U CN206053203U (en) 2016-08-16 2016-08-16 A kind of mould proof, heat-insulated Thistle board

Publications (1)

Publication Number Publication Date
CN206053203U true CN206053203U (en) 2017-03-29

Family

ID=58380617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620887591.3U Active CN206053203U (en) 2016-08-16 2016-08-16 A kind of mould proof, heat-insulated Thistle board

Country Status (1)

Country Link
CN (1) CN206053203U (en)

Similar Documents

Publication Publication Date Title
CN106242457B (en) A kind of long-acting mud
CN101109194B (en) Wood-construction one-way ventilating heat preserving wall
US7914914B2 (en) Low embodied energy sheathing panels with optimal water vapor permeance and methods of making same
US20100101457A1 (en) Low embodied energy sheathing panels and methods of making same
CN104060498B (en) A kind of environmental-protection flame-retardant wallpaper
WO2009007971A3 (en) Flame- retardants for building elements
US11873261B2 (en) Gypsum panels, systems, and methods
WO2016156506A1 (en) Element for mineral synthetic surface covering
CN206053203U (en) A kind of mould proof, heat-insulated Thistle board
CN207739575U (en) A kind of water proof type solid wooden floor board
CN207177072U (en) A kind of novel heat insulation fire proof construction sheet material
CN206053204U (en) A kind of Thistle board with superior acoustic effect
CN207714658U (en) A kind of etch-proof Wood-plastic composite wallboard
CN206048906U (en) A kind of easy processing, sound insulation, heat-insulated Thistle board
CN206048928U (en) A kind of good Thistle board of lightweight, soundproof effect
CN202380610U (en) Indoor wallboard structure
CN204456486U (en) A kind of cellular sandwich nano-thermal-insulating composite plate
CN207194204U (en) A kind of fire-proof glass fiber and magnesia plate
CN107903005A (en) A kind of preparation method of thermal insulation material
CN210454041U (en) Composite glass magnesium board
CN201424773Y (en) Architectural decorative material veneered with PVC membrane
CN205189329U (en) Composite plasterboard
CN206053011U (en) The Thistle board of high sound insulation value
CN203821618U (en) Newly-built fireproof heat-insulation plate
CN201933513U (en) Porous moisture-proof moisture discharging pipe for indoor floors and pipe network of same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 242000 Qilin Village, Xuancheng Xuanzhou Economic Development Zone, Anhui Province

Patentee after: Mengpai New Materials (Xuancheng) Co.,Ltd.

Address before: 242000 Qilin Village, Xuancheng Xuanzhou Economic Development Zone, Anhui Province

Patentee before: Xuancheng Wanjia Building Materials Co.,Ltd.

Address after: 242000 Qilin Village, Xuancheng Xuanzhou Economic Development Zone, Anhui Province

Patentee after: Xuancheng Wanjia Building Materials Co.,Ltd.

Address before: 242000 Qilin Village, Xuancheng Xuanzhou Economic Development Zone, Anhui Province

Patentee before: XUANCHENG WANJIA BUILDING MATERIAL CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240104

Address after: 242000 North of South Ring Road in Xuancheng Xuanzhou Economic Development Zone, Anhui Province

Patentee after: TAISHAN GYPSUM (XUANCHENG) Co.,Ltd.

Address before: 242000 Qilin Village, Xuancheng Xuanzhou Economic Development Zone, Anhui Province

Patentee before: Mengpai New Materials (Xuancheng) Co.,Ltd.