CN206052725U - A kind of preventer of underground utilities exploration drilling cutting - Google Patents
A kind of preventer of underground utilities exploration drilling cutting Download PDFInfo
- Publication number
- CN206052725U CN206052725U CN201620713259.5U CN201620713259U CN206052725U CN 206052725 U CN206052725 U CN 206052725U CN 201620713259 U CN201620713259 U CN 201620713259U CN 206052725 U CN206052725 U CN 206052725U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- steel
- preventer
- underground utilities
- exploration drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a kind of preventer of underground utilities exploration drilling cutting, pipeline surrounding soil is supported by two steel plates of left and right, prevent from cob wall from digging to collapse when cutting off and build pipeline breach by laying bricks or stones, the geological conditions such as rich water and quicksand are particularly solved well easily digs the hidden danger collapsed, ensure that the safety of workmen while the construction method eliminates pipeline digs out the process for being backfilled again, personnel, equipment and material are all saved, shorten the duration, economic benefit is improve, this utility model is used for underground pipeline construction field.
Description
Technical field
This utility model is related to construction of diaphragm wall field, more particularly to a kind of protection of underground utilities exploration drilling cutting
Device.
Background technology
With modern city rapid economic development, underground utilities are more and more and increasingly deeper, the demand of diaphragm wall
Increasing, but the geological conditions of construction of diaphragm wall become increasingly complex.
When downtown area carries out deep foundation pit construction, generally requiring the pipeline to periphery carries out changing moving.Particularly to enclosing
Deep foundation pit construction of the protection structure for diaphram wall, if adopting original construction technology cut and cover method, by the pipe through whole foundation ditch
Line digs out and is backfilled again, and in secure context, easily causing foundation pit collapse makes workmen in larger danger, especially
It is the environment to some complex geologic conditions;In economic aspect, equipment leasing expense, fee of material and labour cost increase is caused finally to be made
Into cost overrun;In terms of personnel equipment, can also increase more manpower and materials and more heavy mechanical equipments;In duration side
Face, workload are big, expend the time long.
Utility model content
The purpose of this utility model is to provide a kind of safe, economic, protection dress of efficient underground utilities exploration drilling cutting
Put.
The technical scheme that utility model solves technical problem employing is as follows:
A kind of preventer of underground utilities exploration drilling cutting, including steel plate, the inner support component of two steel plates of support and difference
Steel plate door on two steel plates, two steel plates are respectively equipped with opening, and two steel plate doors are arranged on the bottom of steel plate, and two steel plate doors can
Opening and closing opening, the installation site on steel plate of inner support component avoid steel plate door switching range.
Improvement of the present utility model is further used as, inner support component includes seamless steel pipe, and seamless steel pipe is using quincunx
It is arranged between two steel plates, seamless steel pipe is provided with the reinforcement for being connected seamless steel pipe and steel plate with steel plate weld.
Improvement of the present utility model is further used as, steel plate door includes two pieces of sliding doors, and two sliding doors are fixed by chute
In the inner side of steel plate, sliding door bottom has a pair roller.
Improvement of the present utility model is further used as, chute is setting up and down to support two pieces of sliding doors to horizontally slip, chute bag
Include the two groups of angle steel for being welded on steel plate and being formed groove or projection.
It is further used as improvement of the present utility model, top chute is the groove that two angle steel are welded to form, bottom chute is
The angle steel with roller contoured fit being welded on another angle steel.
Improvement of the present utility model is further used as, steel plate is assembled by more than two pieces of Member Welding, two steel plates are thick
1.5m, high 3m, long 4.5m, opening size 1.5m × 1m, open bottom is away from steel plate bottom 0.3m.
The beneficial effects of the utility model:The preventer of the underground utilities exploration drilling cutting is by two steel plate support tubes of left and right
Line surrounding soil, prevents when cutting off and build pipeline breach by laying bricks or stones cob wall from digging and collapses, particularly solve the geology bar such as rich water and quicksand
Part easily digs the hidden danger collapsed, it is ensured that the safety of workmen is while the construction method eliminates pipeline and digs out the mistake for being backfilled again
Journey, personnel, equipment and material are all saved, and shorten the duration, improve economic benefit.
Description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the preventer front view of this utility model embodiment;
Fig. 2 is the preventer left view of this utility model embodiment;
Fig. 3 is the A-A sectional views of the preventer left view of this utility model embodiment.
Specific embodiment
With reference to Fig. 1~Fig. 3, this utility model is a kind of preventer of underground utilities exploration drilling cutting, and preventer includes
Two pieces of steel plates 1, the inner support component of support both sides steel plate 1 and two steel plate doors being arranged on the inside of two steel plates 1, also include using
In the hanger 2 of boom hoisting.
Steel plate 1 is main assembled by more than two pieces of steel plate member, and weld seam adopts two-sided welding, finally makes monoblock steel plate
1 long 4.5m, high 3m and thickness 10mm.Then in two blocks of steel plates 1 away from the opening that cut lengths at the 0.3m of bottom are 1.5m × 1m
3;3 in the vertical directions that are open are placed in the middle, make preventer symmetrical, and center of gravity is placed in the middle, are easy to preventer stable by deadweight
Sink.Hanger 2 is symmetrical along central vertical axis simultaneously, welds with steel plate 1.
Inner support component is mainly made up of the seamless steel pipe 4 of external diameter 48mm, wall thickness 3.5mm, for supporting two steel plates of left and right
1, steel plate 1 or so withstands leads inner wall and prevents digging from collapsing.Seamless steel pipe 4 between two steel plates 1, the quincunx cloth in spacing 1m
Put, but be 0.4m in preventer both sides spacing, as shown in Figure 3;Ensure that the installation site of seamless steel pipe 4 is avoided steel plate door and opened
Close scope, i.e. seamless steel pipe 4 to be mainly disposed to above the left and right edges and steel plate door of steel plate 1.To improve steel plate 1 and seamless steel pipe
Installation strength between 4, is bent into rectangular shaped using the reinforcing bar of diameter 16mm, as reinforcement welded lap steel plate 1 with it is seamless
Steel pipe 4.
Steel plate door is opened and closed by the way of horizontally slipping, it is ensured that steel plate door covers opening completely.Four pieces of 5 sizes of sliding door are
0.85m × 1.2m, each sliding door 5 is provided with a pair roller 7 and one group of handle is easy to drag;In 1 top and the bottom of steel plate correspondence position
The chute 6 for being equipped with that guiding sliding door 5 slides is installed, top chute 6 is the gap of two angle steel composition, acts primarily as the effect of guiding;
Bottom chute 6 raises up for angle steel rib, the contoured fit with roller 7, plays a part of to support, guides.
A kind of underground utilities exploration drilling cutting method using above-mentioned preventer, its methods && steps of implementation are as follows:
1), according to plan construction lead wall, its reach design concrete strength before, using reinforced concrete structure covering curing
And temporary support is done with the lumps of wood;
2), preventer be put into reach leading within the walls for prescribed strength, workmen is uniformly excavated in preventer or so,
Preventer is made to sink with deadweight;
3), when exposing at the top of pipeline, abolish pipeline, evacuate gas in liquid in pipe and drain, continue thereafter with excavation
To pipeline bottom;
4), open preventer sliding door 5, using air determinator determine abolish after pipeline in air, it is determined that nothing
After harmful gass are present, workmen blocks pipeline according to design requirement;
5), treat pipeline closure after the completion of take out preventer, diaphram wall of next constructing.
The high 1.7m of wall is led in design and construction, leads clear distance 0.8m between wall, using C20 reinforced concrete structures.Above-mentioned size is
It is corresponding with preventer size.Certainly, after preventer size is changed, which is led wall size and is also required to redesign.Leading wall
After concrete reaches prescribed strength, preventer is put into by hanger 2 using wheeled crane and is led within the walls, and each is anti-
Protection unit matches somebody with somebody two workmens.
Workmen removes and leads at the top of pipeline within the walls after earthing, and left and right is uniformly excavated, and enables preventer uniformly to sink;
Ensure that preventer two ends soil face is higher than intermediate line simultaneously, excavated after pipeline again the two ends earthwork to abolish below.Work as protection
When device sinks to touching at the top of pipeline, select after distinguishing pipeline material and abolish instrument:Mix if brick or armored concrete knot
Structure is directly abolished using pneumatic pick;Then cut using acetylene cutting machine if steel-tube construction.Gas in liquid in pipe and drain is evacuated,
With excavating and cutting advanced depth, preventer meeting nature sinks until pipeline bottom.
The sliding door 5 of preventer bottom after the completion of pipeline box culvert is abolished, is opened, gap is firstly appeared out from, is determined using air
Device determines inner air tube, it is determined that workmen could enter pipeline after existing without harmful gass.Plugging material is hung by loop wheel machine
Enter to lead within the walls, the mouth of pipe is blocked according to design requirement, it is ensured that serosity does not outflow during subsequent construction diaphram wall, prevents mud from passing through
Pipeline outflow polluted underground water resource.Treat that pipeline closure is completed, hang out preventer, guide pours into the mud for having prepared within the walls
Slurry, diaphram wall of constructing.
This utility model can realize pipeline safety cutting and the closure led in the range of 4.5m within the walls of constructing.
Certainly, this utility model is created and is not limited to above-mentioned embodiment, and those of ordinary skill in the art are not disobeying
Equivalent variations or replacement can also be made on the premise of back of the body this utility model spirit, the modification of these equivalents or replacement are all contained in this
In application claim limited range.
Claims (6)
1. the preventer that a kind of underground utilities exploration drilling is cut, it is characterised in that:Including steel plate(1), support two steel plates(1)It is interior
Support component and it is separately mounted to two steel plates(1)On steel plate door, steel plate described in two(1)It is respectively equipped with opening(3), steel described in two
Plate door is arranged on steel plate(1)Bottom, steel plate door described in two can be opened and closed opening(3), the inner support component on steel plate
Installation site avoids steel plate door switching range.
2. the preventer that underground utilities exploration drilling according to claim 1 is cut, it is characterised in that:The inner support component
Including seamless steel pipe(4), the seamless steel pipe(4)Using quincuncial arrangement in two steel plates(1)Between, the seamless steel pipe(4)With
Steel plate(1)Weld is provided with connection seamless steel pipe(4)And steel plate(1)Reinforcement.
3. the preventer that underground utilities exploration drilling according to claim 1 is cut, it is characterised in that:The steel plate door includes
Two pieces of sliding doors(5), sliding door described in two(5)By chute(6)It is fixed on steel plate(1)Inner side, the sliding door(5)Bottom
With a pair roller(7).
4. the preventer that underground utilities exploration drilling according to claim 3 is cut, it is characterised in that:The chute(6)On
Lower setting supports two pieces of sliding doors(5)Horizontally slip, the chute(6)Including being welded on steel plate(1)Go up and formed groove or
Two groups of raised angle steel.
5. the preventer that underground utilities exploration drilling according to claim 4 is cut, it is characterised in that:Chute described in top
(6)For the groove that two angle steel are welded to form, chute described in bottom(6)To be welded on another angle steel and roller(7)Profile is matched somebody with somebody
The angle steel of conjunction.
6. the preventer that underground utilities exploration drilling according to claim 1 is cut, it is characterised in that:The steel plate(1)By
More than two pieces of Member Welding is assembled, steel plate described in two(1)Thick 1.5m, high 3m, long 4.5m, the opening(3)Size
1.5m × 1m, the opening(3)Bottom is away from the steel plate(1)Bottom 0.3m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620713259.5U CN206052725U (en) | 2016-07-07 | 2016-07-07 | A kind of preventer of underground utilities exploration drilling cutting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620713259.5U CN206052725U (en) | 2016-07-07 | 2016-07-07 | A kind of preventer of underground utilities exploration drilling cutting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206052725U true CN206052725U (en) | 2017-03-29 |
Family
ID=58375586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620713259.5U Active CN206052725U (en) | 2016-07-07 | 2016-07-07 | A kind of preventer of underground utilities exploration drilling cutting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206052725U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049502A (en) * | 2016-07-07 | 2016-10-26 | 中铁三局集团广东建设工程有限公司 | Protection device for underground pipeline digging exploring cutting and digging exploring cutting method |
-
2016
- 2016-07-07 CN CN201620713259.5U patent/CN206052725U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049502A (en) * | 2016-07-07 | 2016-10-26 | 中铁三局集团广东建设工程有限公司 | Protection device for underground pipeline digging exploring cutting and digging exploring cutting method |
CN106049502B (en) * | 2016-07-07 | 2018-05-01 | 中铁三局集团广东建设工程有限公司 | A kind of underground utilities exploration drilling cutting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106049502B (en) | A kind of underground utilities exploration drilling cutting method | |
CN101343868B (en) | Underground continuous wall construction method of city-across pipeline | |
CH615236A5 (en) | ||
CN104675405B (en) | Rectangular pipe jacking machine tunnel entering auxiliary structure and construction method | |
CN104480929B (en) | A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement | |
CN103114609A (en) | Connection device of new and old underground diaphragm walls and construction method | |
CN102535490A (en) | Method for dewatering foundation pit by using bored cast-in-place pile | |
WO2021203679A1 (en) | Slurry wall trenching comprehensive construction method for pipelines | |
CN104863183B (en) | Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction | |
CN107956220A (en) | A kind of prefabricated construction method for diaphragm walls based on TRD grooving | |
CN206052725U (en) | A kind of preventer of underground utilities exploration drilling cutting | |
CN209538258U (en) | A kind of construction equipment for replacing bored concrete pile | |
CN110318388A (en) | Diaphram wall milling slot method | |
CN104047607A (en) | Construction method for lifting out shield tunneling machine under condition of envelop enclosure | |
CN211312489U (en) | High rich water faces sea area diaphragm wall and connects sealing device | |
CN114737979B (en) | Construction method for continuously passing large-diameter water conveying pipeline downwards in shield region | |
CN206070541U (en) | Upper-soft lower-hard ground Metro station excavation support system | |
CN108775036A (en) | A kind of construction method for replacing bored concrete pile | |
CN107975376A (en) | Tunneling shield push pipe and vertical duct connection structure and construction method | |
CN210658411U (en) | Waterproof leaking stoppage structure used in cooperation with SMW construction method pile enclosure wall | |
CN209585081U (en) | The Yield rainfall relation device of catch pit in a kind of subway station foundation pit | |
CN207775897U (en) | A kind of supporting construction of rectangle interlocking pile | |
CN105442528A (en) | Cement grouting sheet pile with sealing ring | |
CN112228121A (en) | Be applicable to tunnel corrosive water matter slip casting water shutoff reinforced structure | |
CN106640137B (en) | Shallow buried and underground excavated engineering project construction suspension device and its method for protecting support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |