CN206038476U - Modified slurry shield mud infiltration film forming analogue test device - Google Patents

Modified slurry shield mud infiltration film forming analogue test device Download PDF

Info

Publication number
CN206038476U
CN206038476U CN201621048579.XU CN201621048579U CN206038476U CN 206038476 U CN206038476 U CN 206038476U CN 201621048579 U CN201621048579 U CN 201621048579U CN 206038476 U CN206038476 U CN 206038476U
Authority
CN
China
Prior art keywords
film forming
test cylinder
test
cylinder
test device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621048579.XU
Other languages
Chinese (zh)
Inventor
陈家康
刘陕南
汤沁
吴俊�
汪磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai University of Engineering Science
Original Assignee
Shanghai University of Engineering Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai University of Engineering Science filed Critical Shanghai University of Engineering Science
Priority to CN201621048579.XU priority Critical patent/CN206038476U/en
Application granted granted Critical
Publication of CN206038476U publication Critical patent/CN206038476U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a modified slurry shield mud infiltration film forming analogue test device, including test cylinder, permeable stone, baffle, biography power piston and gas outlet, the permeable stone is placed bottom in the test cylinder, baffle longitudinal sliding motion connects on the permeable stone, will test cylinder separates the part that is two bilateral symmetry, it is in to pass power piston sliding connection in the test cylinder, the gas outlet sets up on the test cylinder lateral wall, each part test cylinder is respectively including setting up the delivery port at the bobbin base to and tubule and the overflow mouth of setting at section of thick bamboo lateral wall.

Description

A kind of improved slurry shield slurry permeates film forming simulation test device
Technical field
The utility model is related to a kind of improved slurry shield slurry and permeates film forming simulation test device, belongs to measurement test Equipment technical field.
Background technology
Mud water pressurization equilibration shield is more and more used for city underground and highway tunnel because of its good ground adaptability Road is built.During shield-tunneling construction, often because excavation face unstability causes engineering accident, the such as soil body to cave in or surface uplift.Mud Slurry penetrates into stratum and forms mud film, and mud pressure is acted on soil skeleton by mud film, so mud film quality is to maintain excavation face steady Fixed principal element.The adaptability of mud film forming process and mud to Different Strata is specified, is to realize excavation face stability contorting With the key for preventing excavation face unstability accident.
At present in Practical Project driving, the situation of compound stratum is often run into, and existing conventional mud film forms mould Plan experimental rig be single soil layer experimental provision, can not analog composite stratum situation, it is therefore desirable to by conventional model Experimental rig carries out certain improvement, so as to reach following test requirements document and target:Specify mud film of the mud in different soil Quality of forming film difference, including film forming speed, film forming thickness, into film type, and in two soil layers under the effect of different mud pressures The difference of slurry infiltration speed.
Utility model content
For the problems referred to above that prior art is present, the purpose of this utility model is to provide a kind of improved slurry shield mud Slurry infiltration film forming simulation test device, obtains the difference of mud film quality of forming film, mud in compound stratum and Different Strata is fitted Answer sex differernce.
For achieving the above object, the technical solution adopted in the utility model is as follows:
A kind of improved slurry shield slurry permeates film forming simulation test device, including test cylinder, permeable stone, dividing plate, biography Power piston and gas outlet, the permeable stone are placed on the bottom in the test cylinder, and the dividing plate longitudinal sliding motion is connected to institute State on permeable stone, the test cylinder is divided into into two symmetrical parts, the force-transmitting piston is slidably connected at the examination Test in cylinder, the gas outlet is arranged on the wall of the test cylinder side;The test cylinder of each section includes being arranged on cylinder respectively The delivery port at bottom, and it is arranged on tin tubule of side wall and an overfall.
As a kind of embodiment, in positioned at the relative Tong Di centers in position of two delivery ports of the test cylinder bottom being in The heart is symmetrical, and respectively close to the marginal position of respective side.
Used as a kind of embodiment, the side surrounding of the force-transmitting piston is provided with sealing strip.
Used as a kind of embodiment, the slurry shield slurry infiltration film forming simulation test device also includes bearing, described Bearing is connected to the bottom of the test cylinder, it is to avoid the delivery port contacts ground.
Used as a kind of embodiment, the bearing is by the three pieces of plate groups in 120 ° of angles each other for being connected in a bottom Into.
As a kind of embodiment, on the test cylinder and the tubule, graduation mark is provided with.
Used as a kind of embodiment, the maximum allowable stress size of the test cylinder is not less than limit otch pressure value 0.35MPa。
Compared to prior art, Advantageous Effects of the present utility model are:
The slurry shield slurry infiltration film forming simulation test device provided using the utility model, in identical simulated mud Under the conditions of tested, the otherness of different soil mud film film forming can be investigated, by once test can obtain Different Strata Film forming speed, film forming thickness, into the difference of film type, and it is poor to measure the different soil mud membrane filtration water yield under identical mud pressure Not, test number (TN) is greatly reduced, the conclusion for obtaining is more directly perceived, is had compared with the past common single soil layer experimental provision Significant superiority.
Description of the drawings
Fig. 1 is the section that a kind of improved slurry shield slurry that the utility model is provided permeates film forming simulation test device Figure;
Fig. 2 is the solid that a kind of improved slurry shield slurry that the utility model is provided permeates film forming simulation test device Figure;
Fig. 3 is the side-looking that a kind of improved slurry shield slurry that the utility model is provided permeates film forming simulation test device Figure;
In figure, label is schematically as follows:1- test cylinders;2- permeable stones;3- dividing plates;4- force-transmitting pistons;5- delivery ports;6- tubules; 7- overfalls;8- gas outlets;9- bearings.
Specific embodiment
The technical solution of the utility model is described in further detail below in conjunction with accompanying drawing.
As shown in Figure 1 to Figure 3, the slurry shield slurry infiltration film forming simulation test device that the utility model is provided includes examination Test cylinder 1, permeable stone 2, dividing plate 3, force-transmitting piston 4 and gas outlet 8.
Test cylinder 1 is cylinder, is made using lucite, for holding compound soil sample layer and test mud, with one Fixed bearing capacity, can guarantee that test is smoothly completed under an increased pressure, and maximum allowable stress size should be cut not less than the limit Mouth pressure value 0.35MPa.The cylinder bottom of test cylinder 1 offers two delivery ports 5, and permeable stone 2 is placed on the bottom in test cylinder 1. 3 longitudinal sliding motion of dividing plate is connected on permeable stone 2, and test cylinder 1 is divided into two symmetrical parts, for placing two respectively Different soil samples are planted, soil sample is placed above mud, and force-transmitting piston 4 is slidably connected in test cylinder 1, is pressed on mud, by power transmission Piston 4 is pressurizeed step by step.Gas outlet 8 carries valve, is arranged on the side wall of test cylinder 1, for discharging test in pressurization Gas in cylinder 1.
The test cylinder 1 of each section includes the delivery port 5 for being arranged on a bottom respectively, and is arranged on a tubule for side wall 6 With overfall 7.The position of two delivery ports 5 is centrosymmetric with respect to Tong Di centers, and respectively close to the margin location of respective side Put so that the measured value of two kinds of soil sample layer drainage amounts is more accurate.Permeable stone 2 can ensure that lower section delivery port 5 is unlikely to native Particle is blocked.In the present embodiment, the tubule 6 of 1 side wall of test cylinder totally four, each section two, on test cylinder 1 and tubule 6 Graduation mark is provided with, can reflect the pore water pressure size inside any time soil sample in process of the test in real time, cylinder and thin Scale, the convenient change for measuring mud film thickness and head height are set on pipe.It is every that two overfalls 7 are opened in test cylinder 1 respectively On the side wall of a part.
The bottom of test cylinder 1 is additionally provided with bearing 9, and bearing 9 will have certain height, it is ensured that landing when delivery port 5 not As for contact ground, in the present embodiment, bearing 9 is made up of the three blocks of plates in 120 ° of angles each other for being connected in a bottom. Permeate the air-tightness of film forming simulation test device simultaneously in order to increase slurry shield slurry, the side surrounding of force-transmitting piston 4 is arranged There is sealing strip.
Workflow of the present utility model is as follows:
The bearing for first test cylinder device being put in certain altitude and two delivery port of bottom being completely exposed before test On, for the collecting work of the drainage amount in experimentation.
Permeable stone is positioned over a bottom at first, and filter paper is arranged in gap and tubule mouth prevents soil particle from blocking;Will be every Plate is vertically placed on permeable stone and ensures that two delivery port of bottom is substantially symmetric relative to dividing plate;
Soil sample A is placed in dividing plate side, and compacting filling of vibrating is to test height, then soil sample B, side is added in dividing plate opposite side Slowly extract dividing plate out and ensure that A and B is fully contacted and equally vibrates compacting until soil sample B height also reaches the test specified in filling side Height is substantially flush with A;
Instrument drainage is used, slowly toward water filling saturation stratum in device;Configuration mud, stands aquation after stirring;Treat thin The water level of pipe is risen to after being flushed with priming charge position, then waits two hours saturations, device for opening overfall and delivery port, will dress Put middle moisture to discharge, after draining only, close overfall and delivery port, water level is flushed with ground layer height in tubule;
After ready mud stirring uniform, slowly poured on test stratum, until assigned scale using drainage tool; Gas outlet is opened, force-transmitting piston is placed into into mud surface full contact, is discharged in test cylinder and gas is closed gas outlet;
Put graduated cylinder under two delivery ports respectively well, open delivery port, apply constant weight step by step at the top of force-transmitting piston Counterweight, carry out timing, simultaneously record once two graduated cylinder drainage values per 2 minutes;In noting both sides tubule in process of the test Water level rise situation, record begin to ramp up time and final rising value;
Represent that mud film has been formed after the water yield in amount graduated cylinder increases value stabilization;Close after both sides mud film is all formed All valves, take out counterweight, force-transmitting piston and the mud on mud film top, and by the mud film formed in two kinds of soil sample layers, stripping and slicing takes respectively Go out, observe the difference that mud film forms form, difference in thickness;
Then after testing, soil layer is removed, and test is completed, and after cleaning up device, can carry out next stage applied voltage test.
The utility model is tested under the conditions of identical simulated mud, can investigate the difference of different soil mud film film forming The opposite sex, by once test can obtain Different Strata film forming speed, film forming thickness, into the difference of film type, and measure phase With different soil mud membrane filtration water yield difference under mud pressure, greatly reduce test number (TN), the conclusion for obtaining is more directly perceived, with Compare with significant superiority toward common single soil layer experimental provision.
Finally be necessary it is pointed out here that be:The foregoing is only the utility model preferably specific embodiment, but this The protection domain of utility model is not limited thereto, and any those familiar with the art is disclosed in the utility model In technical scope, the change or replacement that can be readily occurred in should all be covered within protection domain of the present utility model.

Claims (6)

1. a kind of improved slurry shield slurry permeates film forming simulation test device, it is characterised in that:Including test cylinder, permeable Stone, dividing plate, force-transmitting piston and gas outlet, the permeable stone are placed on the bottom in the test cylinder, and the dividing plate is longitudinally sliding It is dynamic to be connected on the permeable stone, the test cylinder is divided into into two symmetrical parts, the force-transmitting piston slides and connects It is connected in the test cylinder, the gas outlet is arranged on the wall of the test cylinder side;The test cylinder of each section is wrapped respectively The delivery port for being arranged on a bottom is included, and is arranged on tin tubule of side wall and an overfall.
2. slurry shield slurry according to claim 1 permeates film forming simulation test device, it is characterised in that:Positioned at described The position of two delivery ports of test cylinder bottom is centrosymmetric with respect to Tong Di centers, and respectively close to the margin location of respective side Put.
3. slurry shield slurry according to claim 1 permeates film forming simulation test device, it is characterised in that:The power transmission The side surrounding of piston is provided with sealing strip.
4. slurry shield slurry according to claim 1 permeates film forming simulation test device, it is characterised in that:The muddy water Shield slurry infiltration film forming simulation test device also includes bearing, and the bearing is connected to the bottom of the test cylinder.
5. slurry shield slurry according to claim 4 permeates film forming simulation test device, it is characterised in that:The bearing It is made up of the three blocks of plates in 120 ° of angles each other for being connected in a bottom.
6. slurry shield slurry according to claim 1 permeates film forming simulation test device, it is characterised in that:The test Graduation mark is provided with cylinder and the tubule.
CN201621048579.XU 2016-09-08 2016-09-08 Modified slurry shield mud infiltration film forming analogue test device Expired - Fee Related CN206038476U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621048579.XU CN206038476U (en) 2016-09-08 2016-09-08 Modified slurry shield mud infiltration film forming analogue test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621048579.XU CN206038476U (en) 2016-09-08 2016-09-08 Modified slurry shield mud infiltration film forming analogue test device

Publications (1)

Publication Number Publication Date
CN206038476U true CN206038476U (en) 2017-03-22

Family

ID=58300064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621048579.XU Expired - Fee Related CN206038476U (en) 2016-09-08 2016-09-08 Modified slurry shield mud infiltration film forming analogue test device

Country Status (1)

Country Link
CN (1) CN206038476U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109932499A (en) * 2019-03-21 2019-06-25 上海工程技术大学 A kind of experimental rig and method for studying mud film support action
CN111122338A (en) * 2020-01-07 2020-05-08 河海大学 Mud shield mud splitting mud escape test device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109932499A (en) * 2019-03-21 2019-06-25 上海工程技术大学 A kind of experimental rig and method for studying mud film support action
CN109932499B (en) * 2019-03-21 2024-04-26 上海工程技术大学 Test device and method for researching mud film supporting effect
CN111122338A (en) * 2020-01-07 2020-05-08 河海大学 Mud shield mud splitting mud escape test device

Similar Documents

Publication Publication Date Title
CN105486840B (en) A kind of consolidation infiltration Collaborative experiment device
CN206470272U (en) Pneumatic slurry dehydration tester
CN104897539B (en) Suitable for the horizontal permeation instrument of soil body horizontal contact surface detrusion
CN103760320B (en) The method of testing of swelled ground water cut and bulging force relation under tunnel support condition
CN203981507U (en) A kind of novel planar strain consolidation testing device
CN109342150A (en) A kind of experimental rig and method for gassiness soil sample consolidation test and permeability test
CN108318401A (en) One kind being suitable for anisotropy permeability coefficient test device under soil solidifying stress
CN104914028B (en) False three axle high pressure infiltration experiment instrument
CN106814016A (en) The analogy method of slurry filling imitation device
CN105973782A (en) Determination instrument and determination method for osmotic coefficients of drilling and coring test part
CN103398933A (en) Constant-pressure concrete permeability testing device
CN106840977A (en) Slurry filling imitation device
CN107941604A (en) A kind of consolidation testing device and test method of gassiness soil
CN105043960A (en) Improved soil mass combined consolidation permeameter
CN110702564B (en) Horizontal type simulation stratified formation mud infiltration and soil body mechanical property change testing arrangement
CN204789260U (en) A one -dimensional infiltration appearance for testing soil body osmotic coefficient
CN206038476U (en) Modified slurry shield mud infiltration film forming analogue test device
CN103175949B (en) Device and method for directly testing coarse-grained soil rubber membrane penetration on volume change
CN205665144U (en) Core test piece infiltration coefficient measurement appearance is got in drilling
CN205484324U (en) Concrete joint experimental apparatus of infiltration
CN106092849A (en) A kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method
CN209327074U (en) A kind of experimental rig for gassiness soil sample consolidation test and permeability test
CN106353224A (en) Slurry shielding mud permeation film forming simulation test apparatus
CN108801875B (en) Device and method for demonstrating rainfall infiltration of unsaturated soil adjacent to different types transversely
CN110146418A (en) A kind of slurry penetration film forming simple experimental device and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322

Termination date: 20200908