CN206035058U - Assembled stay wire tower of activity that borne tension force is big - Google Patents
Assembled stay wire tower of activity that borne tension force is big Download PDFInfo
- Publication number
- CN206035058U CN206035058U CN201620895944.4U CN201620895944U CN206035058U CN 206035058 U CN206035058 U CN 206035058U CN 201620895944 U CN201620895944 U CN 201620895944U CN 206035058 U CN206035058 U CN 206035058U
- Authority
- CN
- China
- Prior art keywords
- tower
- big
- reinforced bar
- assembled
- installing hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses an assembled stay wire tower of activity that borne tension force is big, including base, tower body and top of the tower, the upper surface four corners of base is equipped with the second mounting hole, and the tower body comprises interconnect about being no less than the different assembled element of three size, parallel arrangement's annular slab about assembled element includes two, two rings shaped plate pass through the spliced pole in four corners to be connected, is equipped with horizontal stiffener between four spliced poles. This assembled stay wire tower of activity that borne tension force is big, adopt the base, tower body and top of the tower swing joint's mode is assembled, the equipment is convenient when using, because of its package assembly, the volume of part is less, convenient to carry in the time of the equipment, adopt horizontal stiffener and vertical stiffener to fix and consolidate among the assembled element of tower body, horizontal and vertical on guaranteed that the pulling force that the stayed pole bore is great, avoid leading to the emergence of tower body deformation or rupture phenomenon because of pressure is great, the life of stayed pole has been increased.
Description
Technical field
This utility model is related to Guywire tower technical field, specially a kind of to bear the big Moveable assembled formula Guywire tower of pulling force.
Background technology
Power transmission line when transmission of electricity needs to be fixed using Guywire tower, as Guywire tower system is soft, is bearing
When than larger pressure, tower body displacement is larger, is easily deformed or even fractures, and causes service life shorter using inconvenience, and
Existing Guywire tower is mostly integral type structure, and volume is larger, assembling inconvenience when installing, and because can not group
Dress, carries relatively difficult, causes to install and use inconvenience, for this purpose, it is proposed that a kind of big Moveable assembled formula of pulling force of bearing is drawn
Transmission tower.
Utility model content
The purpose of this utility model is that offer is a kind of bears the big Moveable assembled formula Guywire tower of pulling force, to solve the above-mentioned back of the body
The problem proposed in scape technology.
For achieving the above object, this utility model provides following technical scheme:It is a kind of to bear the big Moveable assembled formula of pulling force
Guywire tower, including base, tower body and tower top, the upper surface corner of the base is provided with the second installing hole, and the tower body is by many
Composition is connected with each other up and down in three different assembled units of size, and the assembled unit includes about two rings be arrangeding in parallel
Shape plate, two annular slabs are connected by the connecting pole of corner, are provided with transverse reinforced bar between four connecting poles, transverse reinforced bar and
Two annular slabs are connected by longitudinally reinforced bar, and the annular plate surface corner of upper end is provided with the first installing hole, the annular slab of lower end
Bottom corner is provided with the first mounting post used cooperatively with the first installing hole, and the lower end of the tower top is installed by the second mounting post
On the first installing hole of the annular slab of upper end, at the top of the tower top, link is provided with.
Preferably, the two sides of the tower top and the upper end of base are connected by drawstring.
Preferably, the transverse reinforced bar being provided between the connecting pole is two, and two transverse reinforced bar interconnections
In cross.
Preferably, the longitudinally reinforced bar is provided with eight, and one end of the four longitudinally reinforced bars in top is fixed on and laterally adds
The cross junction top of strong bar, the other end of the four longitudinally reinforced bars in top connect with the lower end corner of upper, annular plate respectively
Connect;One end of the four longitudinally reinforced bars in bottom is fixed on the cross junction bottom of transverse reinforced bar, and the longitudinal direction of bottom four adds
The other end of strong bar connects with the upper end corner of lower annular plate respectively.
Preferably, the aperture of the diameter and the first installing hole and the second installing hole of first mounting post and the second mounting post
It is equal in magnitude.
Compared with prior art, the beneficial effects of the utility model are:This bears the big Moveable assembled formula Guywire tower of pulling force,
Assembled by the way of base, tower body and tower top are flexibly connected, it is easy to assembly when in use, because of its package assembly,
The small volume of part, it is easy to carry when assembling, adopt transverse reinforced bar and longitudinally reinforced bar to enter in the assembled unit of tower body
Row is fixed and reinforces, and ensure that the pulling force that stay rod bears is larger on horizontal and vertical, it is to avoid cause tower body because pressure is larger
Deformation or the generation of breakage phenomenon, increased the service life of stay rod.
Description of the drawings
Fig. 1 is this utility model structural representation;
Structural representations of the Fig. 2 for this utility model base;
Structural representations of the Fig. 3 for this utility model assembled unit;
Fig. 4 is this utility model connecting pole and transverse reinforced bar attachment structure schematic diagram;
Front views of the Fig. 5 for this utility model assembled unit internal structure;
Structural representations of the Fig. 6 for this utility model tower top.
In figure:1 base, 11 second installing holes, 2 tower bodies, 3 assembled units, 31 annular slabs, 32 first installing holes, 33 connections
Post, 34 first mounting posts, 4 tower tops, 41 second mounting posts, 5 links, 6 drawstrings, 7 transverse reinforced bars, 8 longitudinally reinforced bars.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only this utility model a part of embodiment, rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment for being obtained, belongs to the scope of this utility model protection.
Fig. 1-6 are referred to, this utility model provides a kind of technical scheme:It is a kind of to bear the big Moveable assembled formula bracing wire of pulling force
Tower, is connected by drawstring 6 including the upper end of base 1, tower body 2 and tower top 4, the two sides of tower top 4 and base 1, and drawstring 6 makes base
1 and tower top 4 be connected firmly, the upper surface corner of base 1 is provided with the second installing hole 11, and tower body 2 is by no less than three size differences
Assembled unit be connected with each other composition about 3, structure of the tower body 2 using the assembling of multiple assembled units 3, assembled unit 3 include two
The individual annular slab 31 be arrangeding in parallel up and down, two annular slabs 31 are connected by the connecting pole 33 of corner, between four connecting poles 33
Transverse reinforced bar 7 is provided with, the transverse reinforced bar 7 being provided between connecting pole 33 is two, and two 7 interconnections of transverse reinforced bar
In cross, 7 laterally reinforcing to stay rod of criss-cross transverse reinforced bar, transverse reinforced bar 7 and two annular slabs 31
Connected by longitudinally reinforced bar 8, longitudinally reinforced bar 8 is reinforced to the longitudinal direction of stay rod, drawing is ensure that on horizontal and vertical
The pulling force that line bar is born is larger, it is to avoid causes the generation of deformation of the body of coke drum or breakage phenomenon because pressure is larger, increased stay rod
Service life, longitudinally reinforced bar 8 are provided with eight, and one end of the four longitudinally reinforced bars 8 in top is fixed on the ten of transverse reinforced bar 7
Font junction top, the other end of the four longitudinally reinforced bars 8 in top connect with the lower end corner of upper, annular plate 31 respectively;Under
One end of the four longitudinally reinforced bars 8 in portion is fixed on the cross junction bottom of transverse reinforced bar 7, the longitudinally reinforced bar in bottom four
8 other end connects with the upper end corner of lower annular plate 31 respectively, and the 31 surface corner of annular slab of upper end is provided with the first installation
Hole 32, the 31 bottom corner of annular slab of lower end are provided with the first mounting post 34 used cooperatively with the first installing hole 32, under tower top 4
On first installing hole 32 of the annular slab 31 that end is arranged on upper end by the second mounting post 41, using base 1, tower body 2 and tower top 4
The mode of flexible connection is assembled, easy to assembly when in use, because of its package assembly, the small volume of part, assembling
When it is easy to carry, the top of tower top 4 is provided with link 5, and link 5 is fixed to power transmission line, the first mounting post 34 and the second peace
The diameter of dress post 41 is equal with the pore size of the first installing hole 32 and the second installing hole 11 so that the versatility of Guywire tower part
It is stronger.
Operation principle:Multiple assembled units 3 pass through the first mounting post 34 and the connection composition tower body 2 of the first installing hole 32, and
And tower body 2 is combined by the first mounting post 34 of assembled unit 3 and the connection of the second installing hole 11 of base 1, tower top 4 passes through
First installing hole 32 of 3 upper end of the second mounting post 41 and assembled unit of lower end is attached, while passing through inside assembled unit 3
Transverse reinforced bar 7 and longitudinally reinforced bar 8 are reinforced.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
Be appreciated that these embodiments can be carried out various changes in the case of without departing from principle of the present utility model and spirit, repair
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of to bear the big Moveable assembled formula Guywire tower of pulling force, including base (1), tower body (2) and tower top (4), its feature exists
In:The upper surface corner of base (1) is provided with the second installing hole (11), and tower body (2) are by no less than three size differences
Assembled unit (3) be connected with each other composition up and down, described assembled unit (3) include about two annular slabs be arrangeding in parallel
(31), two annular slabs (31) are connected by the connecting pole (33) of corner, are provided with transverse reinforced bar between four connecting poles (33)
(7), transverse reinforced bar (7) and two annular slabs (31) are connected by longitudinally reinforced bar (8), annular slab (31) surface four of upper end
Angle is provided with the first installing hole (32), and annular slab (31) the bottom corner of lower end is provided with use cooperatively with the first installing hole (32)
One mounting post (34), the lower end of tower top (4) are arranged on the first of the annular slab (31) of upper end by the second mounting post (41)
On installing hole (32), link (5) at the top of tower top (4), is provided with.
It is 2. according to claim 1 a kind of to bear the big Moveable assembled formula Guywire tower of pulling force, it is characterised in that:The tower top
(4) two sides and the upper end of base (1) are connected by drawstring (6).
It is 3. according to claim 1 a kind of to bear the big Moveable assembled formula Guywire tower of pulling force, it is characterised in that:The connection
The transverse reinforced bar (7) being provided between post (33) is two, and the interconnection of two transverse reinforced bars (7) is in cross.
It is 4. according to claim 1 a kind of to bear the big Moveable assembled formula Guywire tower of pulling force, it is characterised in that:The longitudinal direction
Bracing piece (8) is provided with eight, and the one end of four, top longitudinally reinforced bar (8) is fixed on the cross company of transverse reinforced bar (7)
Place top is connect, the other end of four, top longitudinally reinforced bar (8) connects with the lower end corner of upper, annular plate (31) respectively;Bottom
The one end of four longitudinally reinforced bar (8) is fixed on the cross junction bottom of transverse reinforced bar (7), and bottom four is longitudinally reinforced
The other end of bar (8) connects with the upper end corner of lower annular plate (31) respectively.
It is 5. according to claim 1 a kind of to bear the big Moveable assembled formula Guywire tower of pulling force, it is characterised in that:Described first
The diameter of mounting post (34) and the second mounting post (41) and the first installing hole (32) and the pore size phase of the second installing hole (11)
Deng.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620895944.4U CN206035058U (en) | 2016-08-11 | 2016-08-11 | Assembled stay wire tower of activity that borne tension force is big |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620895944.4U CN206035058U (en) | 2016-08-11 | 2016-08-11 | Assembled stay wire tower of activity that borne tension force is big |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206035058U true CN206035058U (en) | 2017-03-22 |
Family
ID=58306831
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620895944.4U Expired - Fee Related CN206035058U (en) | 2016-08-11 | 2016-08-11 | Assembled stay wire tower of activity that borne tension force is big |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206035058U (en) |
-
2016
- 2016-08-11 CN CN201620895944.4U patent/CN206035058U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202559571U (en) | Net rack roof with siphon rainwater pipeline | |
CN203222919U (en) | Circular-arc-shaped coal storage steel shed of net rack structure | |
CN210467126U (en) | High stability plug-in type LED display screen frame structure | |
CN207846810U (en) | A kind of novel ceiling applied on steel construction ceiling framework | |
CN202520043U (en) | Transmission tower | |
CN201704950U (en) | Building column formwork | |
CN219499262U (en) | Photovoltaic system with floating rope structure | |
CN206035058U (en) | Assembled stay wire tower of activity that borne tension force is big | |
CN218416246U (en) | Rigid and flexible shared photovoltaic support structure | |
CN205935194U (en) | Many steel structural framework for high -rise building | |
CN116054691A (en) | Flexible cable type photovoltaic support system | |
CN111379319A (en) | Assembled light steel building anti-seismic structure and anti-seismic system | |
CN214739106U (en) | Curtain wall steel frame node | |
CN205986726U (en) | Tension elasticity photovoltaic support device | |
CN203222891U (en) | Spherical coal storage shed of grid structure | |
CN204967730U (en) | Photovoltaic solar panel frame | |
CN203859400U (en) | Bus framework for 110kV outdoor power distribution unit | |
CN204212261U (en) | Post and curved beam horizontal flexibility connection space structural system | |
CN210917763U (en) | Steel sheet assembled beam column connected node | |
CN209685126U (en) | A kind of steel vestibule integrally promotes lifting lug device | |
CN203225074U (en) | Advertising board of net rack structure | |
CN201850699U (en) | Oblique-pulling overhanging space folded plate grid structure system with reinforced trusses | |
CN202732240U (en) | Transition section structure between tower barrel and supporting tower frame of wind driven generator | |
CN206220472U (en) | A kind of bracing means for improving bracing members stability of strutting system | |
CN207244453U (en) | A kind of suspension bridge light anchorage mast apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170322 Termination date: 20190811 |
|