CN206034897U - Split type panel for concrete placement - Google Patents
Split type panel for concrete placement Download PDFInfo
- Publication number
- CN206034897U CN206034897U CN201620900141.3U CN201620900141U CN206034897U CN 206034897 U CN206034897 U CN 206034897U CN 201620900141 U CN201620900141 U CN 201620900141U CN 206034897 U CN206034897 U CN 206034897U
- Authority
- CN
- China
- Prior art keywords
- panel
- fixed block
- block
- split type
- block body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a split type panel for concrete placement, include: pouring panel, panel and pressing from both sides tight piece and panel fixed block, two panels press from both sides tight piece locates the both sides of pouring the panel respectively, and the panel fixed block presss from both sides tight piece installation cooperation with the panel. The utility model discloses a split type panel for concrete placement can carry out the aggregate erection according to actual conditions, and it is fibre reinforcement composite plastics board to pour the panel, has that light in weight, easy cutting resize, easy demoulding, need not advantage such as secondary face clearance, and it not only can carry out the dismouting with the panel fixed block each other to press from both sides tight piece through the panel, can strengthen the power of weighing of pouring the panel moreover for it is nimble more convenient to use in actual job site, thus effectual improvement work efficiency.
Description
Technical field
This utility model is related to field of engineering building, more particularly to a kind of split type concreting panel.
Background technology
With the continuous development of building trade so that the proportion of casting concrete structure increasingly increases, labour cost is not yet
Disconnected growth.In concreting, traditional wooden form low intensity, can the number of turnover it is few, need to consume substantial amounts of timber
And human resourcess so that cost increase and also not environmentally.And the template of steel then steel product quality is too heavy, it is flexible for installation degree it is low, take off
Mould is difficult, and job site cutting is difficult, poor corrosion resistance.Aluminum alloy building template is a kind of new building template on market, he
With light weight, the number of turnover is more, and repeatedly the advantages of turnover cost bottom, but aluminum dipping form cost is too high, and general rate is low, secondary to clear up into
Ben Taigao, the problems such as yielding.Although the template of unlike material has respective pluses and minuses, but all as volume is relatively large,
Use and not enough facilitate.Very big manpower and materials are generally required when being built at the construction field (site), and due to construction
The different needs in place carry out cutting adjustment to pouring panel, therefore cause secondary utilization rate not high, and improve cost.Cause
This, the template for how providing a kind of intensity height, light weight, low cost and being easy to combine the concreting installed is this area
Technical staff needs the problem for solving.
Utility model content
The purpose of this utility model is to overcome weak point of the prior art, there is provided a kind of split type concreting is used
Panel so that install and use convenient.
The purpose of this utility model is achieved through the following technical solutions:
A kind of split type concreting panel, including:Pour panel, panel gripping block and panel fixed block, two pieces
The panel gripping block is respectively arranged on the both sides for pouring panel, and the panel fixed block is installed with the panel gripping block and matched somebody with somebody
Close;
The panel gripping block includes clamping block body, and the side of the clamping block body offers multiple installation and connects logical
Hole, the clamping block body are provided with panel support projection, the bottom of the clamping block body with the side for pouring panel cooperation
Portion is provided with installation base, and the panel support projection is arranged in parallel with the installation base;
The panel fixed block includes fixing block body, and the side of the fixed block body is provided with convex with the panel support
The fixed support block that block is engaged, the opposite side of the fixed block body are provided with the fixation being engaged with the installation base
Mounting blocks, the two ends of the fixed block body are provided with the fixed block protruding end coordinated with the gripping block body contacts.
Used as a kind of preferred scheme of this utility model, the side of the fixed block body offers multiple fixed block connections
Through hole.
As a kind of preferred scheme of this utility model, on the panel support projection, installation through-hole is offered.
Used as a kind of preferred scheme of this utility model, the installation through-hole is provided with two, is respectively arranged on the panel
The two ends of support projection.
It is as a kind of preferred scheme of this utility model, described to pour panel for fibre-reinforced plastics plate.
Used as a kind of preferred scheme of this utility model, the panel gripping block is aluminum gripping block.
Used as a kind of preferred scheme of this utility model, the panel fixed block is aluminum fixed block.
Compared with prior art, this utility model has advantages below:
Split type concreting panel of the present utility model can be combined installation according to practical situation, pour panel
For fibre-reinforced plastics plate, have the advantages that lightweight, easy cutting is sized, easy mold release, clears up without the need for secondary plate face,
Not only can mutually be dismounted with panel fixed block by panel gripping block, and the power of weighing for pouring panel can be strengthened so that
It is more flexible and convenient in practice of construction onsite application, so as to effectively improve work efficiency.
Description of the drawings
Structure charts of the Fig. 1 for the split type concreting panel of one embodiment of this utility model;
Structure charts of the Fig. 2 for the panel gripping block of the split type concreting panel in Fig. 1;
Structure charts of the Fig. 3 for the panel fixed block of the split type concreting panel in Fig. 1.
Specific embodiment
For the ease of understanding this utility model, this utility model is more fully retouched below with reference to relevant drawings
State.Better embodiment of the present utility model is given in accompanying drawing.But, this utility model can come in many different forms
Realize, however it is not limited to embodiments described herein.On the contrary, the purpose for providing these embodiments is to make to this practicality newly
It is more thorough comprehensive that the disclosure of type understands.
It should be noted that when element is referred to as " being fixed on " another element, it can directly on another element
Or can also there is element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or may be simultaneously present centering elements.Term as used herein " vertical ", " level ", " left side ",
For illustrative purposes only, it is unique embodiment to be not offered as " right side " and similar statement.
Unless otherwise defined, all of technology used herein and scientific terminology are led with technology of the present utility model is belonged to
The implication that the technical staff in domain is generally understood that is identical.In term used in the description of the present utility model it is simply herein
The purpose of description specific embodiment, it is not intended that in limiting this utility model.Term as used herein " and/or " bag
Include the arbitrary and all of combination of one or more related Listed Items.
As shown in figure 1, the structure chart of the split type concreting panel 10 for one embodiment of this utility model.It is a kind of
Split type concreting panel 10, including:Pour panel 100, panel gripping block 200 and panel fixed block 300, two pieces of faces
Board clamping block 200 is respectively arranged on the both sides for pouring panel 100, and panel fixed block 300 is installed with panel gripping block 200 and coordinated.
It is noted that pour panel 100 being fixedly clamped by two pieces of panel gripping blocks 200, then panel 100 is being poured
Other two ends panel fixed block 300 is arranged between two pieces of panel gripping blocks 200, so as to enter to advance to pouring panel 100
The fixation of one step.
In one embodiment of this utility model, it is fibre-reinforced plastics plate to pour panel 100, so that pouring face
100 light weight of plate, it is easy to cutting and installation, panel gripping block 200 are aluminum gripping block, and panel fixed block 300 is aluminum fixed block, from
And the bearing capacity for pouring panel 100 can be increased, intensity is higher.
As shown in Fig. 2 panel gripping block 200 include clamp block body 210, clamp block body 210 side offer it is many
Individual to install connection through hole 211, clamping block body 210 is provided with panel support projection 212 with the side for pouring the cooperation of panel 100, presss from both sides
The bottom of tight block body 210 is provided with installation base 213, and panel support projection 212 is arranged in parallel with installation base 213.
Further, two installation through-hole 212a, two installation through-hole 212a difference are offered on panel support projection 212
Located at the two ends of panel support projection 212.
It is noted that two pieces of panel gripping blocks 200 pairs pour panel 100 and are clamped fixation, it is convex by panel support
Block 212 carries out smooth placement by can pouring panel 100, after completing to clamp, by installation through-hole 212a with connector (such as
Screw) cooperating, panel gripping block 200 is combined and installed together with panel 100 is poured.
When needing polylith split type concreting panel 10 links together, it is only necessary to which two pieces of panels are clamped
Installation connection through hole 211 on block 200 is mutually combined by being fixed with connector (such as screw).
As shown in figure 3, panel fixed block 300 includes fixing block body 310, the side of fixed block body 310 is provided with and face
The fixed support block 311 that plate supporting lug 212 is engaged, the opposite side of fixed block body 310 are provided with and are connect with installation base 213
The fixed installation block 312 for coordinating is touched, the two ends of fixed block body 310 are provided with and clamp the fixed block that block body 210 is engaged
Protruding end 313.
Further, the side of fixed block body 310 offers multiple fixed block connection through holes 314.
It is noted that while two pieces of panel gripping blocks 200 pairs pour panel 100 and are clamped fixed, respectively will
Two pieces of panel fixed blocks 300 are arranged on the other two ends for pouring panel 100.Panel fixed block 300 passes through fixed block protruding end 313
It is installed between panel support projection 212 and installation base 213, so as to be engaged, fixed support block 311 is convex with panel support
Block 212 is engaged, and so as to further be supported to pouring panel 100, fixed installation block 312 is contacted with installation base 213
Coordinate so that fixed block protruding end 313 can engage well is installed between panel support projection 212 and installation base 213,
After complete combination, then panel gripping block 200 is combined and installed together with panel 100 is poured by connector.
In the same manner, the fixed block connection through hole 314 on fixed block body 310 is solid for two pieces of different panels are combined
It is fixed.
Compared with prior art, this utility model has advantages below:
Split type concreting panel of the present utility model 10 can be combined installation according to practical situation, pour face
Plate 100 be fibre-reinforced plastics plate, with it is lightweight, it is easy cutting be sized, easy mold release, without the need for secondary plate face cleaning etc.
Advantage, not only mutually can be dismounted with panel fixed block 300 by panel gripping block 200, and can strengthen and pour panel 100
Power of weighing so that it is more flexible and convenient in practice of construction onsite application, so as to effectively improve work efficiency.
The above embodiment only expresses several embodiments of the present utility model, and its description is more concrete and detailed
Therefore carefully, but the restriction to this utility model the scope of the claims can not be interpreted as.It should be pointed out that general for this area
For logical technical staff, without departing from the concept of the premise utility, some deformations and improvement can also be made, these are all
Belong to protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be defined by claims.
Claims (7)
1. a kind of split type concreting panel, it is characterised in that include:Pour panel, panel gripping block and panel solid
Determine block, two pieces of panel gripping blocks are respectively arranged on the both sides for pouring panel, and the panel fixed block is pressed from both sides with the panel
Tight block is installed and is coordinated;
The panel gripping block includes clamping block body, and the side of the clamping block body offers multiple installation and connects through hole,
The block body that clamps is provided with panel support projection with the side for pouring panel cooperation, and the bottom of the clamping block body sets
There is installation base, the panel support projection is arranged in parallel with the installation base;
The panel fixed block includes fixing block body, and the side of the fixed block body is provided with and is connect with the panel support projection
The fixed support block for coordinating is touched, the opposite side of the fixed block body is provided with the fixed installation being engaged with the installation base
Block, the two ends of the fixed block body are provided with the fixed block protruding end coordinated with the gripping block body contacts.
2. split type concreting panel according to claim 1, it is characterised in that the side of the fixed block body
Face offers multiple fixed block connection through holes.
3. split type concreting panel according to claim 1, it is characterised in that on the panel support projection
Offer installation through-hole.
4. split type concreting panel according to claim 3, it is characterised in that the installation through-hole is provided with two
It is individual, it is respectively arranged on the two ends of the panel support projection.
5. split type concreting panel according to claim 1, it is characterised in that described to pour panel for fiber
Strengthen composite plastic plate.
6. split type concreting panel according to claim 1, it is characterised in that the panel gripping block is aluminum
Gripping block.
7. split type concreting panel according to claim 1, it is characterised in that the panel fixed block is aluminum
Fixed block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620900141.3U CN206034897U (en) | 2016-08-17 | 2016-08-17 | Split type panel for concrete placement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620900141.3U CN206034897U (en) | 2016-08-17 | 2016-08-17 | Split type panel for concrete placement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206034897U true CN206034897U (en) | 2017-03-22 |
Family
ID=58306895
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620900141.3U Expired - Fee Related CN206034897U (en) | 2016-08-17 | 2016-08-17 | Split type panel for concrete placement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206034897U (en) |
-
2016
- 2016-08-17 CN CN201620900141.3U patent/CN206034897U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206053324U (en) | A kind of curved adjustable securing member of building template list | |
CN209194991U (en) | A kind of novel rapid-installation building template | |
CN201857750U (en) | Moulding plate for building construction | |
CN201738577U (en) | Aluminum alloy template stair | |
CN207048321U (en) | A kind of aluminum dipping form board connecting equipment | |
CN206034897U (en) | Split type panel for concrete placement | |
CN108385973A (en) | A kind of concrete-pouring moulding template | |
CN205804758U (en) | Steel construction plate | |
CN205046851U (en) | Building template | |
CN207863217U (en) | A kind of splicing construction of the modern designs of plastics wallboard | |
CN210917962U (en) | Steel bar truss floor support plate framework | |
CN209538717U (en) | A kind of precast concrete assembly auxiliary device | |
CN206034891U (en) | Pour and use panel | |
CN203684672U (en) | Column template clamp | |
CN202627275U (en) | Keel structure for dry-hanging stone curtain walls | |
CN220539028U (en) | Reinforcing bar positioning mechanism for building | |
CN204389495U (en) | The die trial of a kind of asphalt rut plate | |
CN206034896U (en) | Panel for concrete placement | |
CN207074835U (en) | A kind of energy-saving steel crane span structure of large span | |
CN205497752U (en) | Novel shearing seepage flow mould | |
CN217098204U (en) | Reinforced concrete U-shaped aqueduct pouring template without butt-pin bolts | |
CN204850425U (en) | Aluminum alloy template | |
CN221481380U (en) | Building template for building construction | |
CN216067961U (en) | Strenghthened type magnetism box is used in production of quick assembly disassembly component | |
CN208502380U (en) | A kind of new glass fibre reinforced plastic arched cover board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170322 Termination date: 20190817 |