CN206034467U - Drainage device - Google Patents

Drainage device Download PDF

Info

Publication number
CN206034467U
CN206034467U CN201621061482.2U CN201621061482U CN206034467U CN 206034467 U CN206034467 U CN 206034467U CN 201621061482 U CN201621061482 U CN 201621061482U CN 206034467 U CN206034467 U CN 206034467U
Authority
CN
China
Prior art keywords
main body
fixed
pull bar
drain body
drainage arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621061482.2U
Other languages
Chinese (zh)
Inventor
田敬尚
操海滨
王�义
黄英才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Geological And Mineral Construction Co Ltd
Original Assignee
Zhejiang Geological And Mineral Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Geological And Mineral Construction Co Ltd filed Critical Zhejiang Geological And Mineral Construction Co Ltd
Priority to CN201621061482.2U priority Critical patent/CN206034467U/en
Application granted granted Critical
Publication of CN206034467U publication Critical patent/CN206034467U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a drainage device, be in including drainage main part and setting pull rod device in the drainage main part, the drainage main part is hollow structure drainage main part upper end is provided with the water inlet that is used for getting into water, is provided with relative with the water inlet outlet that is used for the drainage at drainage main part lower extreme be provided with the fixed bolster that is used for the fixing pull rod device in the drainage main part be provided with the fixed sleeving on the fixed bolster, pull rod device includes pull rod main part, connecting plate and closing plate, pull rod main part upper end is provided with the connecting plate that is used for connecting drive arrangement, pull rod main part lower extreme stretches out the outlet, the closing plate sets up pull rod main part lower extreme. The utility model discloses can realize the quick discharge to the water in the steel sleeve, solve the water in the unable normal use water pump discharge steel sleeve, influence construction progress and construction quality's problem.

Description

Drainage arrangement
Technical field
This utility model is related to engineering drainage equipment technical field, more particularly, to a kind of drainage arrangement.
Background technology
Bored concrete pile system to refer to and the means such as excavate in foundation soil in engineering site by machine drilling, steel pipe soil compaction or manpower Stake holes is formed, and places steel reinforcement cage, concrete perfusion and the stake made in which, different according to forming hole method, bored concrete pile again may be used It is divided into a few classes such as driven cast-in-place pile, cast-in-situ bored pile and digging hole filling pile.
Fully-sleeved filled pile machine (also known as mill stake machine) is a kind of good mechanical property, into hole depth, aperture is big, vibrate little, noise It is low, without the need for mud off, adapt to various types of soil layers, embedding rock operation can be carried out, the stable in-site pouring of pile quality Pile driving construction machinery.The bore forming method (full-sleeve construction method) adopted by it, is to fetch earth Drilling Method with pipe, i.e., with the liquid of the machine Pressure agitating device is simultaneously aided with pressurization, makes steel thimble make to be pressed into when circumference shakes repeatedly, so as to greatly reduce steel thimble Frictional resistance between soil layer, while hammer grab bucket is uninterruptedly fetched earth, such drilling to completion;Hole depth is determined after continuous, steel is put into Muscle cage, supplying by suitable technological requirement perfusion can pile.
In fully-sleeved filled pile construction technology, when steel sleeve pipe passes through the water content such as sandy soil layer, gravel layer, mud rich During the stratum of richness, subsoil water can be from the soil layer sleeve pipe of sleeve bottom, at this moment often because the port of steel thimble is than ground Table or operating surface will be higher by several rice and normally (cannot be substantially the scale of 6-8 rice because of steel thimble using pumping drainage It is very little), if cannot discharge water cause grab bucket fetch earth, and then affect construction speed and construction quality.
Accordingly, it would be desirable to a kind of device that can be discharged the subsoil water in steel sleeve pipe.
Utility model content
The purpose of this utility model is to provide drainage arrangement, to solve present in prior art in fully-sleeved filled pile In construction, the subsoil water in sleeve pipe discharges inconvenient technical problem.
The drainage arrangement that this utility model is provided, including drain body and the pull bar being arranged in drain body dress Put;
The drain body is hollow structure, is provided with for the water inlet into water in the drain body upper end, Drain body lower end is provided with the discharge outlet for draining relative with water inlet;
The fixed support for steady brace device is provided with the drain body, is arranged on the fixed support There is fixed sleeving;
The pull rod device includes pull bar main body, connecting plate and sealing plate;The pull bar main body upper end be provided with for The connecting plate of connection driving means, the pull bar main body lower end stretch out the discharge outlet, and the sealing plate is arranged on the pull bar Main body lower end;
Fixed sleeving on the fixed support is set in the pull bar main body, in the fixed support and described close In the pull bar main body between shrouding, set is provided with spring.
Further, the fixed support includes fixed sleeving and the linking arm being arranged on the fixed sleeving;It is described Linking arm one end is connected with fixed sleeving, and the other end is connected on the drain body inwall.
Further, multiple fixed supports are provided with the drain body, in the fixed support near the discharge outlet Lower end is provided with gripper shoe, is arranged with the spring in the pull bar main body between the gripper shoe and the sealing plate.
Further, it is provided with the pull bar main body for limiting pull bar main body with fixed support range of relative motion Locating part;
At least one spacing hole is set in the pull bar main body, and the locating part is arranged in the spacing hole.
Further, the drain body lower end is provided with supporting table, and the supporting table is provided with around the discharge outlet One week.
Further, the drain body lower end is provided with fixing device, the fixing device be it is multiple, uniform ring around The supporting table is provided with one week.
Further, the supporting table overcoat is provided with sealing ring, the sealing ring is fixed on by the fixing device In the supporting table.
Further, the fixing device includes the fixture fixed platform He be arranged in the fixed platform, in institute State and in fixed platform, be provided with screwed hole, the fixture is threaded in the fixed platform.
Further, the sealing plate is provided with the annular fixed station matched with supporting table towards drain body side, The sealing ring lower end is relative with the annular fixed station top.
Further, the drain body lower end is provided with the supporting leg for supporting drain body.
The drainage arrangement that this utility model is provided, using the supporting crane in job site by chain cylinder lever connecting rod device Connecting plate, connecting plate drive pull bar main body move upwards, sealing plate with diameter greater than discharge outlet diameter, such sealing plate is not Can enter in drain body from discharge outlet;Pull bar main body is fixed by fixed sleeving, so ensure that pull rod device above-below direction Movement;Run-off the straight when drain body is moved is prevented, drainage effect is reduced;
Whole drainage arrangement is put in steel bushing using crane, with overhead crane control lifting rope, drainage arrangement relies on itself Action of gravity slowly sink under the water, sealing plate keeps a quota space under the action of the spring with discharge outlet, and water energy is enough from entering The mouth of a river and discharge outlet are entered in drain body, and after drain body fills water, crane pulls pull rod device, in pull rod device Sealing plate blocks discharge outlet, and holds up drain body and move upwards, and drainage arrangement is removed from steel bushing;
When drainage arrangement moves to offtake, after drainage arrangement is steadily placed, as pull rod device does not have the pulling force of lifting rope, The gravity of itself downwards, sealing plate away from discharge outlet at, water is flowed out from discharge outlet;So repeatedly, realize to the water in steel bushing Quick discharge, solve normally to discharge the water in steel bushing using water pump, affect the problem of construction speed and construction quality.
Description of the drawings
In order to be illustrated more clearly that this utility model specific embodiment or technical scheme of the prior art, below will be right Needed for specific embodiment or description of the prior art, accompanying drawing to be used is briefly described, it should be apparent that, describe below In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, can be with according to these other accompanying drawings of accompanying drawings acquisition.
The axonometric chart of the drainage arrangement that Fig. 1 is provided for this utility model embodiment;
Fig. 2 is the right view of the drainage arrangement shown in Fig. 1;
Fig. 3 is the vertical section structure schematic diagram of the drainage arrangement shown in Fig. 1;
Fig. 4 is the upward view of the drain body of the drainage arrangement shown in Fig. 1;
Fig. 5 is the partial enlarged drawing of the drain body shown in Fig. 4;
The vertical section structure schematic diagram of the drainage arrangement that Fig. 6 is provided for another embodiment of this utility model;
Fig. 7 is the vertical section structure schematic diagram partial enlarged drawing of the drainage arrangement shown in Fig. 6.
Reference:
1- drain bodies;2- fixed supports;3- pull bar main bodys;
4- sealing plates;5- connecting plates;6- locating parts;
7- supporting legs;8- springs;9- gripper shoes;
10- linking arms;11- fixed sleevings;12- water inlets;
13- discharge outlet;14- supporting tables;15- sealing rings;
16- fixes platform;17- fixtures;18- annular fixed stations.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described Embodiment is a part of embodiment of this utility model, rather than the embodiment of whole.Based on the embodiment in this utility model, this The every other embodiment obtained under the premise of creative work is not made by field those of ordinary skill, belongs to practical Novel protected scope.
In description of the present utility model, it should be noted that term " " center ", " on ", D score, "left", "right", " perpendicular Directly ", the orientation of the instruction such as " level ", " interior ", " outward " or position relationship are, based on orientation shown in the drawings or position relationship, to be only For the ease of describe this utility model and simplify description, rather than indicate or imply indication device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.Additionally, term " the One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relative importance.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited, term " peace Dress ", " being connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or integratedly Connection;Can be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in this utility model.
As Figure 1-3, the drainage arrangement that this utility model that the present embodiment is provided is provided, including drain body 1 and sets Put the pull rod device in drain body 1;
Drain body 1 is hollow structure, is provided with for the water inlet 12 into water in 1 upper end of drain body, in row 1 lower end of water main body is provided with the discharge outlet 13 for draining relative with water inlet 12;
The fixed support 2 for steady brace device is provided with drain body 1, is provided with solid on fixed support 2 Determine sleeve pipe 11;
Pull rod device includes pull bar main body 3, connecting plate 5 and sealing plate 4;It is provided with for connecting in 3 upper end of pull bar main body The connecting plate 5 of driving means, 3 lower end of pull bar main body stretch out discharge outlet 13, and sealing plate 4 is arranged on 3 lower end of pull bar main body;
Fixed sleeving 11 on fixed support 2 is set in pull bar main body 3, between fixed support 2 and sealing plate 4 In pull bar main body 3, set is provided with spring 8.
In the present embodiment, drain body 1 be hollow structure, drain body 1 can be any shape, such as square, Cuboid or polygon prism etc..
In order to increase the drainability of drainage arrangement to greatest extent, drain body 1 is using the shape matched with steel bushing Shape, columnar drain body 1 are provided with the very big water inlet 12 of opening in 1 upper end of drain body, and the discharge outlet 13 of lower end is straight Footpath is less than sealing plate 4, so when crane pulls pull bar main body 3 by connecting plate 5, is that sealing plate 4 blocks discharge outlet 13, and holds in the palm Play drain body 1 so as in the case of water being filled in drain body 1, do not move away.
On above-described embodiment basis, further, fixed support 2 includes fixed sleeving 11 and is arranged on fixed cover Linking arm 10 on pipe 11;10 one end of linking arm is connected with fixed sleeving 11, and the other end is connected on 1 inwall of drain body.
In the present embodiment, the fixed sleeving 11 of fixed support 2 is enclosed within pull bar main body 3, and linking arm 10 is fixed on draining On 1 inwall of main body, three linking arms 10 on fixed sleeving 11, are uniformly arranged, such fixed sleeving 11 stably can be firmly fixed In 1 center of drain body, pull bar main body 3 is passed through from fixed sleeving 11, and fixed sleeving 11 is capable of steady brace main body 3 The direction for moving up and down, so as to, when pull bar main body 3 is pulled by lifting rope, drain body 1 is not inclined, maximum using holding Moisture storage capacity ability.
On above-described embodiment basis, further, multiple fixed supports 2 are provided with drain body 1, close 2 lower end of fixed support of discharge outlet 13 is provided with gripper shoe 9, is arranged with the pull bar main body 3 between gripper shoe 9 and sealing plate 4 Spring 8.
In the present embodiment, multiple fixed supports 2 can be set in drain body 1, for pull bar main body 3 and drainage arrangement Keep relative stable and firmly, arrange a fixed support 2 can also, more than 2 pull bar main body 3 of fixed support is more stable, but It is that the space that multiple fixed supports more than 2 are occupied in drain body 1 is more, drainability can be reduced, optimum number is solid for two Fixed rack 2, in the case where optimal drainability is ensured, also just has good stability.
Gripper shoe 9 is provided with the drain body 1 inside nearest fixed support 2 of discharge outlet 13, spring 8 is set in pull bar In main body 3, when pull bar main body 3 is moved upwards, 4 compression spring 8 of sealing plate, gripper shoe 9 give spring 8 support force, when When needing draining, when pull bar main body 3 is no longer influenced by lifting rope and pulls, the elastic force of spring 8 is by sealing plate 4 from discharge outlet 13 Go out and flick downwards, such water energy is enough to flow out from discharge outlet 13.
On above-described embodiment basis, further, be provided with pull bar main body 3 for limit pull bar main body 3 with The locating part 6 of 2 range of relative motion of fixed support;
At least one spacing hole is set in pull bar main body 3, and locating part 6 is arranged in spacing hole.
In the present embodiment, multiple spacing holes are provided with pull bar main body 3, by arranging locating part 6 in spacing hole, this Sample when pull bar main body 3 declines from fixed sleeving 11 by self gravitation, as locating part 6 can be stuck in fixed sleeving On 11, the decline of pull bar main body 3 is limited;Prevent the sealing plate 4 of 3 lower end of pull bar main body from contacting with ground, also prevent connection Plate 5 and 11 impact several times of fixed sleeving, cause that connecting plate 5 is ruptured with pull bar main body 3 or fixed support 2 ftractures.
Spacing hole can be interior threaded hole, and locating part 6 can be screw rod, and it is interior with regard to rising that such screw rod is screwed onto spacing hole To spacing function;Or locating part 6 is the bolt with nut, bolt is installed top nut after spacing hole and can also play limit The effect of position.
As shown in Figure 4, Figure 5, further, 1 lower end of drain body is provided with supporting table 14, and supporting table 14 surrounds discharge outlet 13 are provided with one week.
In the present embodiment, one week supporting table 14 is provided with the outside of the discharge outlet 13 of 1 lower end of drain body, so in pull bar When main body 3 drives sealing plate 4 to move up and down, sealing plate 4 is contacted with supporting table 14, not with 1 directly contact of drain body.
On above-described embodiment basis, further, 1 lower end of drain body is provided with fixing device, fixed dress It is set to multiple, uniform ring is provided with one week around supporting table 14.
On above-described embodiment basis, further, 14 overcoat of supporting table is provided with sealing ring 15, fixing device Sealing ring 15 is fixed in supporting table 14.
Sealing ring 15 is enclosed within outside supporting table 14, sealing ring 15 is fixed on outside supporting table 14 by fixing device, so close Shrouding 4 is contacted with supporting table 14, and sealing ring 15 can play a part of sealing, when filling water, is reduced in drainage arrangement Water is flowed out between sealing plate 4 and supporting table 14 so as to which drainage arrangement drainage effect is more preferable.
The lower end of sealing ring 15 can less than supporting table 14 lower end, such sealing plate 4 contact with supporting table 14 when Wait, can sealing ring 15 be carried out extruding makes the effect of its sealing more preferable.
On above-described embodiment basis, further, fixing device includes fixing platform 16 and is arranged on fixed Fixture 17 on platform 16, is provided with screwed hole in fixed platform 16, and fixture 17 is threaded in fixed platform 16.
In the present embodiment, fixed platform 16 is arc, is threaded hole, fixture 17 in the fixed platform 16 of arc For bolt, bolt passes through screwed hole, end count seal 15 to be fixed in fixed platform 16, is achieved in that sealing discharge outlet 13, prevents Water is flowed out from the discharge outlet 13 of drain body 1.
With reference to Fig. 6, Fig. 7, further, sealing plate 4 is provided with towards 1 side of drain body and is matched with supporting table 14 Annular fixed station 18,15 lower end of sealing ring are relative with annular 18 top of fixed station.
In the present embodiment, annular fixed station 18 is provided with sealing plate 4, and the cavity volume that annular fixed station 18 is formed can hold Receive supporting table 14, the sealing ring 15 outside supporting table 14 is relative with annular fixed station 18, and annular fixed station 18 being capable of crush seal Circle 15, can so play better seal effect.
At the construction field (site), using the supporting crane of job site, connecting plate is connected by lifting rope, drainage arrangement is put into In steel bushing, when drainage arrangement is entered in steel bushing, loosen the lifting rope on crane, drainage arrangement can be in the gravity of itself In the presence of, slowly sink under the water, while the sealing plate 4 of 1 lower end of drain body is opened in the presence of spring 8, water energy it is enough from Discharge outlet 13 and enter drain body 1 into swelling.
When water inlet 12 of the water level in steel bushing less than drainage arrangement top, the water in steel bushing can also be from draining Bottom of device discharge outlet 13 enters drainage arrangement.
When water fills thickness in drain body 1, lift drainage arrangement using crane, pull bar main body 3 is in the presence of crane, close Discharge outlet 13 can be blocked by shrouding 4, thus can walk the water transport in drain body 1;When drainage arrangement is hung out steel bushing by crane Pipe, is turned back to and sluices out, after drainage arrangement is steady on the ground, loosens lifting rope, by the effect of the pressure and spring 8 of water, Sealing plate 4 is made to depart from discharge outlet 13, water is released from discharge outlet 13;Repeat the above steps are capable of achieving Quick drainage.
With reference to Fig. 1, Fig. 2 and Fig. 3, further, 1 lower end of drain body is provided with the support for supporting drain body 1 Lower limb 7.
In the present embodiment, 1 lower end of drain body arranges three supporting legs 7, and three supporting legs 7 are uniformly arranged drain body Below 1, there is a certain distance on 4 lower end of sealing plate and ground, so ensure drain body 1 when draining, sealing plate 4 with arrange The mouth of a river 13 can space out, and so facilitate the discharge of water;Prevent sealing plate 4 with discharge outlet 13 apart from too short, 13 row of discharge outlet Water is not smooth.
Ribs is provided with sealing plate 4, can so strengthen the intensity of sealing plate 4, while can also increase sealing The gravity of plate 4;When draining, sealing plate 4 can be detached rapider with discharge outlet 13, and drainage effect is more preferable.
The drainage arrangement that this utility model is provided, using the supporting crane in job site by chain cylinder lever connecting rod device Connecting plate 5, connecting plate 5 drives pull bar main body 3 to move upwards, and the diameter with diameter greater than discharge outlet 13 of sealing plate 4 is so close Shrouding 4 will not be entered in drain body 1 from discharge outlet 13;Pull bar main body 3 is fixed by fixed sleeving 11, so ensure that pull bar The movement of device above-below direction;Run-off the straight when drain body 1 is moved is prevented, drainage effect is reduced;
Whole drainage arrangement is put in steel bushing using crane, with overhead crane control lifting rope, drainage arrangement relies on itself Action of gravity slowly sink under the water, sealing plate 4 and discharge outlet 13 keep a quota space under the action of the spring, water energy it is enough from Water inlet 12 and discharge outlet 13 are entered in drain body 1, and after drain body 1 fills water, crane pulls pull rod device, pull bar Sealing plate 4 on device blocks discharge outlet 13, and holds up drain body 1 and move upwards.
Drainage arrangement is removed from steel bushing;When drainage arrangement moves to offtake, after drainage arrangement is steadily placed, with Pull rod device does not have the pulling force of lifting rope, the gravity of itself downwards, sealing plate 4 away from discharge outlet 13 at, water is flowed out from discharge outlet 13; So repeatedly, the quick discharge to the water in steel bushing is realized, solves normally the water in steel bushing, shadow cannot be discharged using water pump Ring the problem of construction speed and construction quality.
Finally it should be noted that:Various embodiments above is only illustrating the technical solution of the utility model, rather than which is limited System;Although being described in detail to this utility model with reference to foregoing embodiments, one of ordinary skill in the art should Understand:Which still can be modified to the technical scheme described in foregoing embodiments, or to which part or whole Technical characteristic carries out equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from this practicality new The scope of each embodiment technical scheme of type.

Claims (10)

1. a kind of drainage arrangement, it is characterised in that including drain body and the pull rod device being arranged in the drain body;
The drain body is hollow structure, is provided with for the water inlet into water in the drain body upper end, in row Water main body lower end is provided with the discharge outlet for draining relative with water inlet;
The fixed support for steady brace device is provided with the drain body, is provided with solid on the fixed support Determine sleeve pipe;
The pull rod device includes pull bar main body, connecting plate and sealing plate;It is provided with for connecting in the pull bar main body upper end The connecting plate of driving means, the pull bar main body lower end stretch out the discharge outlet, and the sealing plate is arranged on the pull bar main body Lower end;
Fixed sleeving on the fixed support is set in the pull bar main body, in the fixed support and the sealing plate Between the pull bar main body on set be provided with spring.
2. drainage arrangement according to claim 1, it is characterised in that the fixed support includes fixed sleeving and is arranged on Linking arm on the fixed sleeving;Described linking arm one end is connected with fixed sleeving, and the other end is connected to the drain body On inwall.
3. drainage arrangement according to claim 1, it is characterised in that be provided with multiple fixations in the drain body Frame, is provided with gripper shoe, the drawing between the gripper shoe and the sealing plate in the fixed support lower end near the discharge outlet The spring is arranged with bar main body.
4. drainage arrangement according to claim 1, it is characterised in that be provided with for limiting pull bar in the pull bar main body The locating part of main body and fixed support range of relative motion;
At least one spacing hole is set in the pull bar main body, and the locating part is arranged in the spacing hole.
5. drainage arrangement according to claim 1, it is characterised in that the drain body lower end is provided with supporting table, institute State supporting table and the discharge outlet is provided with one week.
6. drainage arrangement according to claim 5, it is characterised in that the drain body lower end is provided with fixed dress Put, the fixing device is multiple, and uniform ring is provided with one week around the supporting table.
7. drainage arrangement according to claim 6, it is characterised in that the supporting table overcoat is provided with sealing ring, institute State fixing device the sealing ring is fixed in the supporting table.
8. drainage arrangement according to claim 7, it is characterised in that the fixing device includes fixing platform and is arranged on Fixture in the fixed platform, is provided with screwed hole in the fixed platform, and the fixture is threaded in described In fixed platform.
9. drainage arrangement according to claim 7, it is characterised in that the sealing plate is provided with towards drain body side The annular fixed station matched with supporting table, the sealing ring lower end are relative with the annular fixed station top.
10. the drainage arrangement according to any one of claim 1-9, it is characterised in that the drain body lower end is provided with For supporting the supporting leg of drain body.
CN201621061482.2U 2016-09-19 2016-09-19 Drainage device Withdrawn - After Issue CN206034467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621061482.2U CN206034467U (en) 2016-09-19 2016-09-19 Drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621061482.2U CN206034467U (en) 2016-09-19 2016-09-19 Drainage device

Publications (1)

Publication Number Publication Date
CN206034467U true CN206034467U (en) 2017-03-22

Family

ID=58295706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621061482.2U Withdrawn - After Issue CN206034467U (en) 2016-09-19 2016-09-19 Drainage device

Country Status (1)

Country Link
CN (1) CN206034467U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245665A (en) * 2016-09-19 2016-12-21 浙江省地矿建设有限公司 Drainage arrangement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245665A (en) * 2016-09-19 2016-12-21 浙江省地矿建设有限公司 Drainage arrangement

Similar Documents

Publication Publication Date Title
CN101638891B (en) Construction method of all casing precessing isolation pile
CN2934352Y (en) Root key type drilling perfusion stake construction device
CN108086340A (en) Open caisson construction structure and construction method thereof
WO2009049470A1 (en) A bored pile drilling machine
CN104912065B (en) Dowel pile construction method under water
CN211898338U (en) Device for preventing bored concrete pile steel reinforcement cage come-up
CN103243740B (en) Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN206034467U (en) Drainage device
CN109183790A (en) A kind of Screw Pile and its construction tool and construction method
CN102605788A (en) Double-tube-sinking and inner-tube-drawing bored cast-in-place pile construction method and application
CN106284311A (en) A kind of rotary drilling rig dry pore-forming efficient construction technology of cast-in-place concrete pile
CN109140047B (en) Submarine pipeline for reducing influence of wave action in sandy soil seabed
CN107724392A (en) Steel-pipe pile drawing out soil equipment and soil basketing method
CN209538258U (en) A kind of construction equipment for replacing bored concrete pile
CN106968596B (en) Controllable compaction grouting pile driving construction equipment
CN107842033A (en) A kind of composite screw anchor foundation and its construction method
CN206647046U (en) A kind of PHC pipe piles core device native clearly
CN104929108A (en) Construction method of hard soil field PCC pile
CN106761772A (en) Shallow buried and underground excavated engineering project construction fixing device and its fixing means
CN106245665A (en) Drainage arrangement
CN102660957A (en) Foundation pit supporting construction method for soft soil zone
CN202530447U (en) Bored cast-in-place pile structure formed by sinking double pipes and drawing inner pipe
CN101831910B (en) Construction method of reinforced concrete flange reaming type filling pile
CN108316288A (en) Half casing guncreting pile construction equipment and construction method
CN114855774A (en) Frame type anti-slide pile and pouring device thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170322

Effective date of abandoning: 20180921

AV01 Patent right actively abandoned