CN206033075U - A hoisting accessory for christmas tree or production tree hoist device - Google Patents
A hoisting accessory for christmas tree or production tree hoist device Download PDFInfo
- Publication number
- CN206033075U CN206033075U CN201620661340.3U CN201620661340U CN206033075U CN 206033075 U CN206033075 U CN 206033075U CN 201620661340 U CN201620661340 U CN 201620661340U CN 206033075 U CN206033075 U CN 206033075U
- Authority
- CN
- China
- Prior art keywords
- support piece
- roller
- boom hoisting
- guide wheel
- horizontal support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to an oil recovery, gas recovery device technical field, concretely relates to a hoisting accessory for christmas tree or production tree hoist device, be in including vertical braces spare and setting transverse supporting part on the vertical braces spare, vertical braces spare sets up on hoist device's base, the last assembly pulley that is provided with of transverse supporting part, the assembly pulley includes fixed pulley and movable pulley, the fixed pulley sets up transverse supporting part is last, be provided with on the movable pulley and hang the part. The utility model provides a hoisting accessory, when certain component damage of christmas tree or production tree needed to be changed, the damage component was lifted by crane through the assembly pulley to hanging the part and damaging the structrual joint on the movable pulley to hang into new component, so supplementary change work improves and changes efficiency, has reduced workman's intensity of labour, has replaced professional crane, has reduced manufacturing cost.
Description
Technical field
The utility model is related to oil recovery, gas recovery facility technical field, and in particular to a kind of to hang for christmas tree or production tree
The boom hoisting of assembling device.
Background technology
Recover the oil and gas production industry in, production tree and christmas tree are widely used, be Oil/gas Well topmost control and
Adjust the capital equipment of production of hydrocarbons, it is intended to isolation oil, gas and other fluids, and guiding and control oil, gas and other fluids
Flow out gas well or oil well.Current production tree and christmas tree, for its structure, mainly including some valves, are connected to
Connecting pipe and some pipe fittings between valve, for example:Threeway, four-way and bend pipe etc., it is by the combinative movement of each valve, real
The now control and collection to oil or gas.
As the valve of production tree or christmas tree, connecting pipe and various pipe fittings all have heavier weight, so, when certain
Individual valve, pipeline or pipe fitting are damaged when needing to change, and more change jobs extremely inconvenience, not only time-consuming longer, and also needs to big
The artificial input of amount, labour intensity greatly, if carrying out auxiliary construction using truck crane, not only greatly improved maintenance cost,
And also need to it is longer enter field time, increased maintenance time.
It is therefore desirable to design a kind of for production tree and the hanging apparatus of christmas tree, in certain valve, pipeline or pipe fitting
When damage needs to change, auxiliary more changes jobs, and improves and changes efficiency, reduces the labour intensity of workman.
The content of the invention
The purpose of this utility model is:For current production tree and christmas tree during later period maintenance, unit replacement
Difficulty is big, the deficiency that time-consuming, there is provided a kind of to be used for production tree and christmas tree, during later period maintenance, can replace crane
Auxiliary completes more to change jobs, and reduces production cost, improves and changes efficiency, reduces the hanging apparatus of labor strength.
To achieve these goals, the technical solution adopted in the utility model is:
It is a kind of for christmas tree or the boom hoisting of production tree hanging apparatus, including vertical support piece and be arranged on described perpendicular
To the horizontal support piece on support member, the vertical support piece is arranged on the base of hanging apparatus, on the horizontal support piece
Assembly pulley is provided with, the assembly pulley includes fixed pulley and movable pulley, and the fixed pulley is arranged on the horizontal support piece, institute
State.The boom hoisting of the application, when certain component damage of christmas tree or production tree is needed
When to be changed, the sprung parts on movable pulley is connected with damaged member, is lifted by crane damaged member by assembly pulley, and is hung in new structure
Part, so auxiliary more change jobs, and improve and change efficiency, reduce the labour intensity of workman.
Preferably, between the vertical support piece and the base it is dismountable connection.Facilitate the storage of hanging apparatus
With move transport.
Preferably, carriage is provided with the horizontal support piece, the assembly pulley is arranged on the carriage.
Preferably, the boom hoisting also includes driving means, and the driving means are used to drive the carriage edge
The horizontal support piece slides.By arranging carriage so that assembly pulley transversely support member can slide, further side
Replacing to damaged member, facilitate the use of hanging apparatus.
Preferably, the carriage includes the first roller being oppositely arranged on the horizontal support piece and the second rolling
Wheel, is connected with rotating shaft between first roller and the second roller, first roller, the second roller and rotating shaft are coaxial cloth
Put, in the rotating shaft, be provided with the connector being connected with driving means.Carriage includes the first roller and the second roller, is driving
During dynamic device drive shaft, rotating shaft promotes the first roller and the second roller to roll on horizontal support piece, and then has realized lifting
Put the lifting scope of the transversely mobile raising hanging apparatus of support member.
Preferably, first roller is provided with first baffle, second roller away from the side of second roller
The side of first roller is provided with second baffle, the first baffle and second baffle are respectively at the cross-brace
Part both sides along its length are engaged, and between the first baffle and second baffle form chute.By arranging first gear
Plate and second baffle, form chute between first baffle and second baffle, it is ensured that the cunning of carriage transversely support member
It is dynamic, it is to avoid carriage shifts when mobile and two falls from horizontal support piece, and then improves the application lifting dress
The safety and reliability put.
Preferably, the driving means include the first guide wheel, the second guide wheel, the 3rd guide wheel, driving wheel and drag-line, the drawing
Suo Yiduan is fixedly connected with the rotating shaft, the other end bypass successively after the first guide wheel, the second guide wheel, driving wheel and the 3rd guide wheel with
The rotating shaft is fixedly connected.By rotating driving wheel, and then drag-line is driven, drag-line pulls rotating shaft again, and then realizes to the dress that slides
The driving put so that the driving of carriage is convenient, it is easy to operate.
Preferably, the driving wheel and the mating surface of the drag-line are frosting.Reduce beating between driving wheel and drag-line
Sliding phenomenon, it is ensured that driving wheel drives drag-line in rotation process.
Preferably, the drag-line is cable wire.Cable wire surface has some grooves and projection, further guarantees driving wheel
Drag-line is driven in rotation process.
Preferably, first guide wheel is arranged on end of the horizontal support piece away from the vertical support piece.Expand
Big moving range of the carriage on horizontal support piece, and then the further lifting scope for improving hanging apparatus.
Preferably, second guide wheel and the 3rd guide wheel are arranged on the horizontal support piece near the vertical support piece
On end.Further expand moving range of the carriage on horizontal support piece, and then further improve hanging apparatus
Lifting scope.
Preferably, the driving wheel is arranged on the latter half of the vertical support piece.
Preferably, it is additionally provided with the driving wheel for rotating the handle of the driving wheel.Operating personnel are facilitated to rotate
Driving wheel.
Preferably, between the horizontal support piece and the vertical support piece to be hinged, the vertical support piece with it is described
Bracing element is additionally provided between horizontal support piece.By bracing element, the steadiness supported by horizontal support piece is improved, this Shen is improved
Please hanging apparatus safety and reliability.
Preferably, the bracing element is removably dismountable with the horizontal support piece and/or the vertical support piece
Connection.
Preferably, the accommodating groove being engaged with the horizontal support piece is provided with the vertical support piece.Do not using
When, bracing element can be removed, and vertical support piece is rotated in accommodating groove, facilitated the storage of the application hanging apparatus, move and transport
It is defeated.
In sum, as a result of above-mentioned technical proposal, the beneficial effects of the utility model are:
The boom hoisting of the application, when certain component damage of christmas tree or production tree needs to change, on movable pulley
Sprung parts be connected with damaged member, damaged member is lifted by crane by assembly pulley, and new component is hung in, so auxiliary changes work
Make, improve and change efficiency, reduce the labour intensity of workman.
Description of the drawings
Fig. 1 is the structural representation of the christmas tree or production tree hanging apparatus that employ the application boom hoisting;
Fig. 2 is the structural representation of drag-line arrangement;
Split type structural representations of the Fig. 3 for base;
Fig. 4 is accommodated in the partial structural diagram in vertical support piece for horizontal support piece,
Mark in figure:1- christmas trees or production tree, 2- vertical support pieces, 3- horizontal support pieces, 4- fixed pulleys, 5- is dynamic to be slided
Wheel, 6- sprung partses, the first rollers of 7-, the second rollers of 8-, 9- rotating shafts, 10- connectors, 11- first baffles, 12- second baffles,
The first guide wheels of 13-, the second guide wheels of 14-, the 3rd guide wheels of 15-, 16- driving wheels, 17- drag-lines, 18- handles, 19- bracing elements, 20- are received
Receive groove, 21- outer tube, 22- inner cores, 23- bottoms, 24- top covers, 25- balls, 26- bearings, 27- are raised, the first joints of 28-, 29-
Second joint.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing and enforcement
Example, is further elaborated to the utility model.It should be appreciated that specific embodiment described herein is only to explain this
Utility model, is not used to limit the utility model.
Embodiment 1, as Figure 1-4,
A kind of christmas tree for employing the application boom hoisting or production tree hanging apparatus, including with christmas tree or adopt
The base of 1 connection of oil tree, is provided with boom hoisting on the base, the boom hoisting includes vertical support piece 2 and is arranged on
Horizontal support piece 3 in the vertical support piece 2, the vertical support piece 2 are arranged on the base, the horizontal support piece
Assembly pulley is provided with 3, the assembly pulley includes fixed pulley 4 and movable pulley 5, and the fixed pulley 4 is arranged on the cross-brace
On part 3, sprung parts 6 on the movable pulley 5, is provided with.The hanging apparatus of the present embodiment, base are arranged on christmas tree or adopt
Sprung parts 6 and damage on oil tree 1, when certain component damage of christmas tree or production tree 1 needs to change, on movable pulley 5
Bad component connects, and lifts by crane damaged member by assembly pulley, and hangs in new component, and so auxiliary more changes jobs, and improves and changes effect
Rate, reduces the labour intensity of workman.
In the present embodiment, it is removably to connect between the vertical support piece 2 and the base, the cross-brace
Carriage is provided with part 3, the assembly pulley is arranged on the carriage.Facilitate the storage of hanging apparatus and move fortune
Defeated, the boom hoisting also includes driving means, and the driving means are used to drive the carriage along the cross-brace
Part 3 slides, and the carriage includes the first roller 7 being oppositely arranged on the horizontal support piece 3 and the second roller 8, institute
State and between the first roller 7 and the second roller 8, be connected with rotating shaft 9, first roller 7, the second roller 8 and rotating shaft 9 are coaxial cloth
Put, in the rotating shaft 9, be provided with the connector 10 being connected with driving means.By arranging carriage so that assembly pulley can
Transversely support member 3 slides, and further facilitates the replacing to damaged member, facilitates the use of hanging apparatus;Slide dress
Put including the first roller 7 and the second roller 8, in driving means drive shaft 9, rotating shaft 9 promotes the first roller 7 and the second roller
8 roll on horizontal support piece 3, and then realize the lifting model of boom hoisting transversely mobile raising hanging apparatus of support member 3
Enclose.
Further, first roller 7 is provided with first baffle 11 away from the side of second roller 8, and described the
Second wheel 8 is provided with second baffle 12 away from the side of first roller 7, and the first baffle 11 and second baffle 12 are distinguished
It is engaged in the both sides along its length of the horizontal support piece 3, is formed between the first baffle 11 and second baffle 12
Chute.By arranging first baffle 11 and second baffle 12, chute is formed between first baffle 11 and second baffle 12, it is ensured that
The slip of carriage transversely support member 3, it is to avoid carriage shifts two from horizontal support piece 3 when mobile
Fall, and then improve the safety and reliability of the present embodiment hanging apparatus.
Further, the driving means include the first guide wheel 13, the second guide wheel 14, the 3rd guide wheel 15,16 and of driving wheel
Drag-line 17,17 one end of the drag-line are fixedly connected with the rotating shaft 9, the other end bypass successively the first guide wheel 13, the second guide wheel 14,
It is fixedly connected with the rotating shaft 9 after driving wheel 16 and the 3rd guide wheel 15.By rotating driving wheel 16, and then drag-line 17 is driven, drawn
Rope 17 pulls rotating shaft 9 again, and then realizes the driving to carriage so that the driving of carriage is convenient, it is easy to operate.
Further, the driving wheel 16 and the mating surface of the drag-line 17 are frosting.Reduce driving wheel 16 and drag-line
Skidding between 17, it is ensured that driving wheel 16 drives drag-line 17 in rotation process.
Further, the drag-line 17 is cable wire.Cable wire surface has some grooves and raised 27, further guarantees
Driving wheel 16 drives drag-line 17 in rotation process.
Further, first guide wheel 13 is arranged on end of the horizontal support piece 3 away from the vertical support piece 2
On.Expand moving range of the carriage on horizontal support piece 3, and then the further lifting scope for improving hanging apparatus.
Further, second guide wheel 14 and the 3rd guide wheel 15 are arranged on the horizontal support piece 3 near described vertical
On the end of support member 2.Further expand moving range of the carriage on horizontal support piece 3, and then further raising
The lifting scope of hanging apparatus.
Further, the driving wheel 16 is arranged on the latter half of the vertical support piece 2.
Further, it is additionally provided with the driving wheel 16 for rotating the handle 18 of the driving wheel 16.It is convenient to operate
Personnel rotate driving wheel 16.
Further, between the horizontal support piece 3 and the vertical support piece 2 to be hinged, the vertical support piece 2 with
Bracing element 19 is additionally provided between the horizontal support piece 3.By bracing element 19, it is firm that raising horizontal support piece 3 is supported
Property, improve the safety and reliability of the present embodiment hanging apparatus.
Further, the bracing element 19 removably can with the horizontal support piece 3 and/or the vertical support piece 2
The connection of dismounting.
Further, the accommodating groove 20 being engaged with the horizontal support piece 3 is provided with the vertical support piece 2.
When not using, bracing element 19 can be removed, vertical support piece 2 is rotated Dao accommodating groove 20 in, facilitate the present embodiment hanging apparatus
Deposit, move and transport.
Further, the base includes outer tube 21 and the inner core 22 being set in the outer tube 21, the outer tube 21 with
Christmas tree or production tree 1 connect, and the inwall of the inner core 22 is coordinated with 2 gap of the vertical support piece.Vertical support piece 2 is straight
Patch in inner core 22, that is, realize the connection of vertical support piece 2 and base so that connection and separation all extremely convenients, enter one
What is walked facilitates use.
Further, the bottom of the inner core 22 is provided with pivoting part, and the pivoting part includes bottom 23 and top cover
24, annular groove is relatively set with the bottom 23 and the top cover 24, some balls are provided with the annular groove
25, coordinate for gap between the top cover 24 and the inwall of the outer tube 21, the inner core 22 is arranged on the top cover 24.Will
Inner core 22 is arranged on the top cover 24 of slewing equipment so that inner core 22 can be turned round, and also allowing for vertical support piece 2 can return
Turn, and then adjust the position of boom hoisting in a circumferential direction, the further lifting scope for expanding the present embodiment hanging apparatus.
Further, the bottom 23 is arranged on the christmas tree 1 or production tree.Guarantee pivoting part support can
By property.
Further, bearing 26, the bearing 26 and the rotating part are additionally provided between the inner core 22 and outer tube 21
Part is spaced apart, and the inwall of 26 inner ring of the bearing is set on the outer wall of the inner core 22, and 26 outer ring of the bearing is arranged on
On the inwall of the outer tube 21.Further guarantee the revolution of inner core 22, and improve the reliability of 22 inner support of inner core.
Further, the bearing 26 is arranged on the top half of the outer tube 21.Further improve inner core 22 to be supported
Reliability.
Further, it is provided with the inwall of the outer tube 21 for supporting the projection 27 of the bearing 26.Facilitate bearing
The fixation of 26 positions, and then further improve the reliability supported by inner core 22.
Further, the first joint 28 is provided with the corresponding production tree of the outer tube 21 or christmas tree 1, it is described outer
It is to be detachably matched between cylinder 21 and first joint 28.First joint 28 of the application, in christmas tree or production tree 1 just
When often working, plug or pressure gauge can be set thereon, when needing to change 1 component of christmas tree or production tree, by plug or
Person's pressure gauge is pulled down, and then loads onto the other parts of outer tube 21 and the application hanging apparatus, thus, facilitating the application to hang
The mounting arrangements of assembling device.
Further, coordinate for screw thread between the outer tube 21 and first joint 28.Outer tube 21 is facilitated to connect with first
Installation and removal between 28.
Further, first joint 28 is hollow tubular, the lower end of first joint 28 and the christmas tree or
Person production tree 1 is fixedly connected, and is to be threadedly coupled between first joint 28 and the outer wall of the outer tube 21.
Further, the second joint 29 is additionally provided between first joint 28 and the outer tube 21, described second connects
29 is hollow tubular structure, is detachable between the inwall of 29 top half of the second joint and the outer wall of the outer tube 21
Threaded connection, be dismountable spiral shell between the inwall of the outer wall and first joint 28 of 29 the latter half of the second joint
Line connects.
In such scheme, by arranging the second joint 29, play a part of crossover sub, when outer tube 21 and the first joint
When size between 28 is mismatched, outer tube 21 can be installed by arranging the second joint 29, further be improve
The applicability of the application hanging apparatus.
Preferred embodiment of the present utility model is the foregoing is only, it is not to limit the utility model, all at this
Any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (10)
1. a kind of for christmas tree or the boom hoisting of production tree hanging apparatus, it is characterised in that:Including vertical support piece and setting
The horizontal support piece in the vertical support piece is put, the vertical support piece is arranged on the base of hanging apparatus, the horizontal stroke
Assembly pulley is provided with support member, the assembly pulley includes fixed pulley and movable pulley, and the fixed pulley is arranged on described horizontal
On support member, on the movable pulley, sprung parts is provided with.
2. boom hoisting as claimed in claim 1, it is characterised in that:Carriage, institute are provided with the horizontal support piece
State assembly pulley to be arranged on the carriage.
3. boom hoisting as claimed in claim 2, it is characterised in that:The boom hoisting also includes driving means, the drive
Dynamic device is used to drive the carriage to slide along the horizontal support piece.
4. boom hoisting as claimed in claim 3, it is characterised in that:The carriage include being oppositely arranged on it is described laterally
The first roller and the second roller on support member, is connected with rotating shaft, first rolling between first roller and the second roller
Wheel, the second roller and rotating shaft are coaxially arranged, and the connector being connected with driving means is provided with the rotating shaft.
5. boom hoisting as claimed in claim 4, it is characterised in that:First roller is away from the side of second roller
First baffle is provided with, second roller is provided with second baffle, the first baffle away from the side of first roller
It is engaged with both sides of the second baffle respectively at the horizontal support piece along its length, in the first baffle and second baffle
Between form chute.
6. boom hoisting as claimed in claim 5, it is characterised in that:The driving means include the first guide wheel, the second guide wheel,
3rd guide wheel, driving wheel and drag-line, described drag-line one end are fixedly connected with the rotating shaft, the other end bypass successively the first guide wheel,
It is fixedly connected with the rotating shaft after second guide wheel, driving wheel and the 3rd guide wheel.
7. boom hoisting as claimed in claim 6, it is characterised in that:It is remote that first guide wheel is arranged on the horizontal support piece
On the end of the vertical support piece, second guide wheel and the 3rd guide wheel are arranged on the horizontal support piece near described perpendicular
To on the end of support member.
8. boom hoisting as claimed in claim 6, it is characterised in that:The driving wheel is arranged under the vertical support piece
In half part.
9. the boom hoisting as described in claim 1-8 any one, it is characterised in that:The horizontal support piece is vertical with described
To be hinged between support member, between the vertical support piece and the horizontal support piece, bracing element is additionally provided with.
10. boom hoisting as claimed in claim 9, it is characterised in that:The bracing element removably with the cross-brace
Part and/or the vertical support piece removably connect, and be provided with and match with the horizontal support piece in the vertical support piece
The accommodating groove of conjunction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620661340.3U CN206033075U (en) | 2016-06-29 | 2016-06-29 | A hoisting accessory for christmas tree or production tree hoist device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620661340.3U CN206033075U (en) | 2016-06-29 | 2016-06-29 | A hoisting accessory for christmas tree or production tree hoist device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206033075U true CN206033075U (en) | 2017-03-22 |
Family
ID=58309666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620661340.3U Active CN206033075U (en) | 2016-06-29 | 2016-06-29 | A hoisting accessory for christmas tree or production tree hoist device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206033075U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110759220A (en) * | 2019-10-09 | 2020-02-07 | 姜松 | Transportation support device for Christmas tree group |
-
2016
- 2016-06-29 CN CN201620661340.3U patent/CN206033075U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110759220A (en) * | 2019-10-09 | 2020-02-07 | 姜松 | Transportation support device for Christmas tree group |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203685052U (en) | Hoisting derrick special for coiled tubing equipment | |
CN103711437A (en) | Hoisting derrick specially for coiled tubing equipment | |
CN104030170A (en) | Hoisting mechanism of crane for engines | |
CN205892583U (en) | A base for christmas tree or production tree hoist device | |
CN105366567A (en) | Intelligent assisting platform for dismounting and mounting of GIS (Gas Insulated Substation) | |
CN206033075U (en) | A hoisting accessory for christmas tree or production tree hoist device | |
CN202449788U (en) | Special crane device for wall bricks | |
CN201027495Y (en) | Drill floor base of oil-well rig | |
CN207483220U (en) | A kind of suspension apparatus during the exacerbation for oil drilling scene jumbo bag | |
CN206033064U (en) | A hoist device for christmas tree or production tree | |
CN105971530B (en) | Workover treatment integration apparatus | |
CN205382484U (en) | Pile -drawing machine for hydraulic engineering | |
CN105645291A (en) | Mechanical equipment lifting frame and lifting method | |
CN209163736U (en) | A kind of pile frame | |
CN110253267A (en) | It is a kind of large size pin shaft detaching equipment and its application | |
CN104047553B (en) | Workover treatment well head synthetic operation device | |
CN104340882B (en) | Foldable arm rack and crane | |
CN203392733U (en) | Pipeline hanging tool and engineering machinery | |
CN205477440U (en) | Calandria mechanism | |
CN213569142U (en) | High lifting machine of security for civil engineering | |
CN208200206U (en) | A kind of boom hoisting used in culvert pipe | |
CN208327192U (en) | Rotor, the main shaft boom hoisting of a kind of steam turbine or generator | |
CN203569875U (en) | Operation umbrella jump used for restricted space | |
CN207099703U (en) | A kind of integrated harvester header being easy for installation and removal | |
CN207774692U (en) | A kind of portable crane boom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |