CN105971530B - Workover treatment integration apparatus - Google Patents

Workover treatment integration apparatus Download PDF

Info

Publication number
CN105971530B
CN105971530B CN201610396782.4A CN201610396782A CN105971530B CN 105971530 B CN105971530 B CN 105971530B CN 201610396782 A CN201610396782 A CN 201610396782A CN 105971530 B CN105971530 B CN 105971530B
Authority
CN
China
Prior art keywords
tubing string
guide
drive part
telescopic drive
mounting bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610396782.4A
Other languages
Chinese (zh)
Other versions
CN105971530A (en
Inventor
焦伟刚
胡颖
刘仁树
潘晓春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Group Co Ltd Hunan Branch
Original Assignee
Hunan Sany Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Sany Petroleum Technology Co Ltd filed Critical Hunan Sany Petroleum Technology Co Ltd
Priority to CN201610396782.4A priority Critical patent/CN105971530B/en
Publication of CN105971530A publication Critical patent/CN105971530A/en
Application granted granted Critical
Publication of CN105971530B publication Critical patent/CN105971530B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/02Rod or cable suspensions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/16Connecting or disconnecting pipe couplings or joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of workover treatment integration apparatus, including workbench, the workbench is equipped with tubing string gathering hole, the tubing string that be equipped with above the tubing string gathering hole to move in the vertical direction lifts device, device and tubing string supporting device are disconnected equipped with tubing string close to the tubing string gathering hole on the workbench, the tubing string supporting device, tubing string lift device and tubing string disconnects device cooperation for helping, lifting at tubing string gathering hole and disconnect tubing string.The present invention disconnects the cooperating of device and tubing string supporting device by tubing string handling device, tubing string, the full automation operation of workover treatment can be achieved, whole process is without manually participating in, realize automated job truly, greatly reduce hand labor intensity, it improves work efficiency, reduces security risk.

Description

Workover treatment integration apparatus
Technical field
The present invention relates to petroleum drillings to repair equipment technical field, is specifically related to a kind of workover treatment integration apparatus.
Background technology
Oil well, it is possible that the problems such as blocking, casing collapse, oil well pump damage, needs at this time after a period of time is exploited Carry out workover treatment, workover treatment needs to carry the tubing strings such as oil pipe, lift decentralization, to disconnect upper lower tubular column etc. a series of Operation.
Traditional workover treatment relies on substantially manually to be operated manually entirely, needs 4-5 people's compounding practice, working strength Greatly, efficiency is low, and operating environment is severe, and security risk is more.With advances in technology, mechanized equipment is gradually appeared instead of part Manually, tubing string is manually transported between tubing string box and workbench as dynamic catwalk substitutes, manual elevator is substituted under artificial lifting Tubing string etc. is put, realizes partial automation operation, but during whole operation, part operation still needs to manually participate in, automatically Change degree is still waited to improve.
Invention content
In view of this, the purpose of the present invention is to provide a kind of integration apparatus for realizing workover treatment automation mechanized operation.
A kind of workover treatment integration apparatus provided by the invention, including workbench, the workbench is equipped with pipe Column operation mouth, the tubing string gathering hole top are equipped with the tubing string that can be moved in the vertical direction and lift device, the workbench Upper to disconnect device and tubing string supporting device equipped with tubing string close to the tubing string gathering hole, the tubing string supporting device, tubing string lift Device and tubing string disconnect device cooperation for helping, lifting at tubing string gathering hole and disconnect tubing string.
Further, the tubing string handling device includes elevator, and the elevator both sides are connected with hanging ring, connect on the hanging ring Be connected to for adjust the elevator opposed vertical direction angle of inclination deflection mechanism;The deflection mechanism includes the first beat Stent and the second beat stent, described first beat stent one end are connect with the hanging ring of the elevator side, and the other end is connected with First telescopic drive part, described second beat stent one end are connect with the hanging ring of the elevator opposite side, and the other end is connected with Two telescopic drive parts.
Further, the tubing string disconnects device and includes mounting bracket and be installed on the mounting bracket by hoisting mechanism Caliper, the caliper include the turnbuckle clamp and clamping clip of arrangement setting up and down, and the hoisting mechanism includes slide bar and third is stretched Actuator, the mounting bracket both sides are respectively equipped with the first sliding rail and the second sliding rail, and the slide bar both ends are respectively arranged on described first In sliding rail and the second sliding rail, the caliper is installed on the slide bar, the third telescopic drive part be installed in the slide bar and Between the mounting bracket.
Further, the mounting bracket bottom is equipped with guide assembly, and the guide assembly is led including the first guide rail and second Rail, the mounting bracket are installed between first guide rail and the second guide rail, and pass through driving mechanism along first guide rail and Second guide rail slides.
Further, guiding mechanism is also installed on the slide bar, the guiding mechanism includes the first guide groove and second Guide groove, first guide groove and the second guide groove are oppositely arranged, and the first of first guide groove and the second guide groove End is hinged, and the second end of first guide groove is cut with scissors by the first guide link and the 4th telescopic drive part with the slide bar It connects, the second end of second guide groove is hinged by the second guide link and the 5th telescopic drive part with the slide bar;It is described The upper end slot diameter of first guide groove and the second guide groove is more than lower end slot diameter.
Further, also it is installed with pollution discharge mechanism on the mounting bracket, the pollution discharge mechanism includes the first dirt discharge groove and the Two dirt discharge grooves, first dirt discharge groove and the second dirt discharge groove are oppositely arranged, and first dirt discharge groove passes through the 6th telescopic drive Part is connected to the first side of the mounting bracket, and second dirt discharge groove is connected to the mounting bracket by the 7th telescopic drive part The second side, first dirt discharge groove and the second blowdown trench bottom are connected with blow-off pipe.
Further, the tubing string supporting device includes pedestal, the telescopic arm being installed on pedestal, the telescopic arm end Equipped with handgrip, handgrip include fixed seat and in fixed seat and sequentially connected 8th telescopic drive part, link assembly and Bar assembly is grabbed, is also connected with being equipped with length adjustment mechanism on the 8th telescopic drive part, the length adjustment mechanism has at least Two extension positions so that the bar assembly of grabbing is corresponded to at least two work opening degrees.
Further, the link assembly includes connecting seat, first connecting rod and second connecting rod, and the bar assembly of grabbing includes handing over The first of fork hinge arrangement grabs bar and second and grabs bar, and the first end of the length adjustment mechanism is connected in fixed seat, second end It being connect with the first end of the 8th telescopic drive part, the second end of the 8th telescopic drive part is connect with the connecting seat, The first end of the first connecting rod and second connecting rod is articulated on the connecting seat, the second end of the first connecting rod with it is described Second end for grabbing bar is hinged, and the second connecting rod is hinged with first end for grabbing bar.
Further, the length adjustment mechanism includes transition sleeve and screw rod, and the first end of the screw rod is connected to described In fixed seat, the first end of the transition sleeve and the second end of the screw rod pass through the threaded connection of first direction, the transition The first end of the second end of set and the 8th telescopic drive part by the threaded connection of second direction, the transition sleeve with it is described Stop nut is equipped between screw rod.
Further, the both sides of the fixed seat are respectively equipped with the first guide plate and the second guide plate, in the fixed seat Guide roller is equipped between the first guide plate and the second guide plate.
The workover treatment integration apparatus of the present invention lifts device by tubing string, tubing string disconnects device and tubing string helps dress The cooperating put is, it can be achieved that the full automation operation of workover treatment, whole process realize real meaning without manually participating in Automated job in justice, greatly reduces hand labor intensity, improves work efficiency, and reduces security risk.
Description of the drawings
The attached drawing for forming the part of the present invention is used to provide further understanding of the present invention, schematic reality of the invention Example and its explanation are applied for explaining the present invention, is not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the structure diagram of workover treatment integration apparatus of the embodiment of the present invention;
Fig. 2 is the structure diagram that tubing string of the embodiment of the present invention lifts device;
Fig. 3 is that tubing string of the embodiment of the present invention lifts structure diagram of the device under beat state;
Fig. 4 is the structure diagram that tubing string disconnects device first direction in the embodiment of the present invention;
Fig. 5 is the structure diagram that tubing string disconnects device second direction in the embodiment of the present invention;
Fig. 6 is the structure diagram of tubing string supporting device in the embodiment of the present invention;
Fig. 7 is the structure diagram of handgrip in Fig. 6;
Fig. 8 is the internal structure schematic diagram of Fig. 6 handgrips.
Reference sign:1st, workbench;11st, tubing string gathering hole;2nd, tubing string lifts device;21st, elevator;22nd, hanging ring; 231st, the first beat stent;232nd, the second beat stent;233rd, the first telescopic drive part;234th, the second telescopic drive part;3rd, it manages Column disconnects device;31st, mounting bracket;311st, the first sliding rail;312nd, the second sliding rail;321st, slide bar;322nd, third telescopic drive part; 331st, turnbuckle clamp;332nd, clamping clip;341st, the first guide rail;342nd, the second guide rail;343rd, driving mechanism;351st, the first guide groove; 352nd, the second guide groove;353rd, the first guide link;354th, the second guide link;355th, the 4th telescopic drive part;356th, Five telescopic drive parts;361st, the first dirt discharge groove;362nd, the second dirt discharge groove;363rd, the 6th telescopic drive part;364th, the 7th flexible drive Moving part;365th, blow-off pipe;4th, tubing string supporting device;41st, pedestal;42nd, telescopic arm;43rd, handgrip;431st, fixed seat;432nd, the 8th Telescopic drive part;433rd, connecting seat;434th, first connecting rod;435th, second connecting rod;436th, first bar is grabbed;437th, second bar is grabbed; 438th, transition sleeve;439th, screw rod;440th, stop nut;441st, the first guide plate;442nd, the second guide plate;443rd, guide roller.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In the present invention, term " first ", " second " are mainly used for distinguishing different components, but do not limit component specifically System.
As shown in Figure 1, the workover treatment integration apparatus of the present embodiment, including workbench 1, workbench 1 is equipped with Tubing string gathering hole 11, tubing string gathering hole 11 are connected with oil/gas well well head by pipeline, are risen and put into well by tubing string gathering hole 11 Tubing string, carries out workover treatment, and 11 top of tubing string gathering hole is equipped with the tubing string that can be moved in the vertical direction and lifts device 2, work Device 3 and tubing string supporting device 4 are disconnected equipped with tubing string close to tubing string gathering hole 11 on platform 1, tubing string supporting device 4, tubing string carry It puts device 2 and tubing string disconnects device 3 and coordinates to help, lift at tubing string gathering hole 11 and disconnect tubing string.
Specifically, as shown in Figure 2,3, tubing string handling device 2 includes elevator 21, and 21 both sides of elevator are connected with hanging ring 22, hang 22 upper end of ring is connected on the hook block of the existing drilling and repairing well equipment in well site, by moving up and down for hook block, realizes elevator 21 move up and down.
It is flexibly connect for ease of elevator 21 and puts tubing string, be connected with to adjust 21 opposed vertical direction of elevator on hanging ring 22 Angle of inclination deflection mechanism;Deflection mechanism includes the first beat stent 231 and the second beat stent 232, the first beat branch 231 one end of frame is connect with the hanging ring 22 of 21 side of elevator, and the other end is connected with the first telescopic drive part 233, the second beat stent 232 one end are connect with the hanging ring 22 of 21 opposite side of elevator, and the other end is connected with the second telescopic drive part 234, the first telescopic drive 233 and second telescopic drive part 234 of part is all connected with being fixed on hook block.
As shown in Figure 4,5, tubing string disconnects device 3 and includes mounting bracket 31 and be installed on mounting bracket 31 by hoisting mechanism Caliper, caliper include the turnbuckle clamp 331 and clamping clip 332 of arrangement setting up and down, and hoisting mechanism includes slide bar 321 and third is stretched Actuator 322,31 both sides of mounting bracket are respectively equipped with the first sliding rail 311 and the second sliding rail 312, and 321 both ends of slide bar are respectively arranged on In one sliding rail 311 and the second sliding rail 312, caliper is installed on slide bar 321, and third telescopic drive part 322 is installed in 321 He of slide bar Between mounting bracket 31.
The operating position of device 3 is disconnected flexibly and easily to adjust tubing string, 31 bottom of mounting bracket is equipped with guide assembly, guide rail group Part includes the first guide rail 341 and the second guide rail 342, and mounting bracket 31 is installed between the first guide rail 341 and the second guide rail 342, and It is slided by driving mechanism 343 along the first guide rail 341 and the second guide rail 342.In the present embodiment, driving mechanism 343 can specifically adopt With gear-rack drive mechanism, it is, of course, also possible to be other driving mechanisms such as oil cylinder, cylinder, turbine and worm, the present embodiment is not It is limited to this.
Centering accuracy during to improve tubing string connection, further improves working efficiency, guiding is also installed on slide bar 321 Mechanism, guiding mechanism include the first guide groove 351 and the second guide groove 352,352 phase of the first guide groove 351 and the second guide groove To setting, and the first end of the first guide groove 351 and the second guide groove 352 is hinged, the second end of the first guide groove 351 Hinged with slide bar 321 by the first guide link 353 and the 4th telescopic drive part 355, the second end of the second guide groove 352 passes through Second guide link 354 and the 5th telescopic drive part 356 and slide bar 321 are hinged;First guide groove 351 and the second guide groove 352 Upper end slot diameter be more than lower end slot diameter.
When tubing string is risen, the sewage in well can flow out therewith, to prevent the pollution of the environment, be also installed on mounting bracket 31 Pollution discharge mechanism, pollution discharge mechanism include the first dirt discharge groove 361 and the second dirt discharge groove 362, the first dirt discharge groove 361 and the second dirt discharge groove 362 are oppositely arranged, and the first dirt discharge groove 361 is connected to the first side of mounting bracket 31, second row by the 6th telescopic drive part 363 Dirty slot 362 is connected to the second side of mounting bracket 31, the first dirt discharge groove 361 and the second dirt discharge groove by the 7th telescopic drive part 364 362 bottoms are connected with blow-off pipe 365.
As shown in Figure 6,7, tubing string supporting device 4 includes pedestal 41, the telescopic arm 42 being installed on pedestal 41, telescopic arm 42 ends are equipped with handgrip 43, and handgrip 43 is including fixed seat 431 and in fixed seat 431 and the sequentially connected 8th stretches Actuator 432, link assembly and grab bar assembly.
Specifically, as shown in figure 8, link assembly include connecting seat 433, first connecting rod 434 and second connecting rod 435, grab bar Component grabs bar 436 and second including cross-articulation is arranged first and grabs bar 437, and the first end of length adjustment mechanism is connected to fixation On seat 431, second end is connect with the first end of the 8th telescopic drive part 432, the second end of the 8th telescopic drive part 432 and connection Seat 433 connects, and the first end of first connecting rod 434 and second connecting rod 435 is articulated on connecting seat 433, and the of first connecting rod 434 The end that bar 437 is grabbed at two ends with second is hinged, and the end that second connecting rod 435 grabs bar 436 with first is hinged.
It is applicable in enable to grab bar assembly and helps the tubing strings of different tube diameters, be also connected with being equipped on the 8th telescopic drive part 432 and use The length adjustment mechanism of bar assembly work opening degree is grabbed in adjusting, length adjustment mechanism has at least two extension positions so that Grabbing bar assembly and corresponding to has at least two work opening degrees.Length adjustment mechanism includes transition sleeve 438 and screw rod 439, screw rod 439 First end be connected in fixed seat 431, the spiral shell that the first end of transition sleeve 438 and the second end of screw rod 439 pass through first direction Line connects, and the second end of transition sleeve 438 and the first end of the 8th telescopic drive part 432 pass through the threaded connection of second direction, mistake It crosses and stop nut 440 is equipped between set 438 and screw rod 439.
For enable tubing string smoothly into first grab bar 436 and second grab bar 437 between, further promote working efficiency, Gu The both sides of reservation 431 are respectively equipped with the first guide plate 441 and the second guide plate 442, are located at the first guide plate in fixed seat 431 441 and second are equipped with guide roller 443 between guide plate 442.
The present embodiment workover treatment integration apparatus lifts device 2 by tubing string, tubing string disconnects device 3 and tubing string helps dress 4 cooperation is put, tubing string can be automatically completed and lift, disconnect and support of the tubing string during handling, concrete operations are as follows:
When needing well workover, tubing string need to be connected in decentralization to oil well, lifting the elevator 21 of device by tubing string first will send Tubing string on to workbench 1 is caught, and is hoisted in the air, and elevator 21 need to adjust operating angle by deflection mechanism during this, It is specifically stretched by the first telescopic drive part 233 and the second telescopic drive part 234, drives the first beat stent 231 and the second beat Stent 232 adjusts the angle of inclination on the hanging ring opposed vertical direction of both sides, so as to adjusting the operating angle of elevator 21.
While 21 handling tubing string of elevator, to prevent tubing string lower end from arbitrarily shaking, it is ensured that can be relatively accurate by tubing string It send to pithead position, the cooperation of tubing string supporting device 4 helps tubing string to be moved.Telescopic arm 42 drives handgrip 43 close to tubing string, together When the 8th telescopic drive part 432 extend, link assembly is pushed to move forward, drives first to grab bar 436 and second and grabs bar 437 and open It opens, by the guiding of the first guide plate 441 and the second guide plate 442, tubing string can smoothly be slipped into the orienting roll among handgrip 43 On wheel 443, then the 8th telescopic drive part 432 is driven to retract, make first to grab bar 436 and second and grab bar 437 and close up until reach Scheduled work opening degree, then handgrip 43 is driven to move, tubing string is helped to be moved.
Then the operation that device 3 carries out tubing string connection is disconnected by tubing string, in this course of work, pollution discharge mechanism need not participate in work Make, opening state can be always maintained at, without being operated.First, driving mechanism 343 pushes mounting bracket 31 to be operated to close to tubing string The direction movement of mouth 11, when the center centering of caliper center and tubing string gathering hole 11, stops movement.The of guiding mechanism simultaneously Four telescopic drive parts 355 and the 5th telescopic drive part 356 push the first guide groove 351 and the second guide groove 352 to centre respectively Close up closure, due to funneling shape after the first guide groove 351 and the second guide groove 352 closure, thus can be to upper lower tubular column Good guiding role is played in docking, and tubing string lifts device 2 and transfers tubing string at this time, by the guiding of guiding mechanism, with lower square tube Column centering;Next, driving clamping clip 332 clamps lower section tubing string, turnbuckle clamp 331 clamps top tubing string and applies spinner torsion to it Square makes top tubing string be tightened with respect to lower section tubing string, the connection of lower tubular column in realization.
In completion after the connection of lower tubular column, the 4th telescopic drive part 355 and the 5th telescopic drive part 356 push respectively One guide groove 351 and the second guide groove 352 are opened, and driving mechanism 343 pushes mounting bracket 31 to the side far from tubing string gathering hole 11 To movement, until returning to initial position.
Tubing string needed for well workover is sequentially connected according to above-mentioned steps and is sent into well, to carry out workover treatment.
Conversely, after well workover, when needing to go out tubing string from oil well simultaneously shackle recycling, tubing string lifts device first 2 elevator 21 drops to 11 top of tubing string gathering hole, catches tubing string and is lifted up, when the junction for being promoted to upper lower tubular column goes out When on present tubing string gathering hole 11, stop being promoted.
Then the disassembling section that device 3 carries out tubing string being disconnected by tubing string, this course of work guiding mechanism need not participate in work, Therefore the 4th telescopic drive part 355 and the 5th telescopic drive part 356 respectively drive the first guide groove 351 and the second guide groove 352 It opens, guiding mechanism is made to be in opening state, other component is not interfered to work normally.First, it is driven and pacified by driving mechanism 343 It shelves 31 to move to close to the direction of tubing string gathering hole 11 along the first guide rail 341 and the second guide rail 342, until caliper center and pipe The 11 center centering of column operation mouth;And the link position of upper and lower 2-section pipe column is made to be between turnbuckle clamp 331 and clamping clip 332, this When driving clamping clip 332 clamp lower section tubing string, turnbuckle clamp 331 clamp top tubing string simultaneously break-out torque is applied to it, make square tube Column unscrews out in tubing string from below, lower tubular column shackle in realization.After the completion of shackle, mounting bracket 31 is in the drive of driving mechanism 343 It is moved a certain distance under dynamic to the direction far from tubing string gathering hole 11, makes the center of pollution discharge mechanism and the center of tubing string gathering hole 11 It overlaps, at this point, the 6th telescopic drive part 363 and the 7th telescopic drive part 364 respectively drive the first dirt discharge groove 361 and second row Dirty slot 362 closes up to centre, and upper lower tubular column is embraced, and receives the greasy dirt in tubing string, and the blow-off pipe 365 for passing through its bottom is discharged into To specified storage device, so as to fulfill blowdown blowout prevention function.After the completion of blowdown, pollution discharge mechanism, which resets, to be opened, and driving mechanism 343 pushes away Dynamic mounting bracket 31 is further moved to the direction far from tubing string gathering hole 11, until returning to initial position.
Next, tubing string lifts device 2 lifts top tubing string, and will be upper with tubing string supporting device 4 further up Square tube column is sent to other conveying mechanisms such as dynamic catwalk, and tubing string is sent to tubing string box.So far primary complete is completed to go out The shackle operation of tubing string.Tubing string needed for well workover is dismantled successively according to above-mentioned steps and sends tubing string box back to, to complete workover treatment Tubing string reclaimer operation afterwards.
It should be noted that in the present embodiment, eight telescopic drive parts of use, specifically using oil cylinder, but this field skill For art personnel it is to be understood that cylinder isoline driving mechanism can also be used, the present embodiment is not limited to this.
Workover treatment integration apparatus provided in an embodiment of the present invention lifts device 2 by tubing string, tubing string disconnects device 3 Cooperating with tubing string supporting device 4 is, it can be achieved that the full automation operation of workover treatment, whole process is without manually joining With realizing automated job truly, greatly reducing hand labor intensity, improve work efficiency, reduce Security risk.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (9)

1. a kind of workover treatment integration apparatus, including workbench (1), the workbench (1) is equipped with tubing string gathering hole (11), it is characterised in that:The tubing string that be equipped with above the tubing string gathering hole (11) to move in the vertical direction lifts device (2), device (3) and tubing string supporting device are disconnected equipped with tubing string close to the tubing string gathering hole (11) on the workbench (1) (4), the tubing string supporting device (4), tubing string handling device (2) and tubing string disconnect device (3) cooperation in tubing string gathering hole (11) it helped at, lift and disconnect tubing string;
The tubing string supporting device (4) includes pedestal (41), the telescopic arm (42) being installed on pedestal (41), the telescopic arm (42) end is equipped with handgrip (43), and the handgrip (43) is including fixed seat (431) and in fixed seat (431) and successively 8th telescopic drive part (432) of connection and grabs bar assembly at link assembly, is also connected on the 8th telescopic drive part (432) Equipped with length adjustment mechanism, the length adjustment mechanism has at least two extension positions so that the bar assembly of grabbing corresponds to tool There are at least two work opening degrees.
2. workover treatment integration apparatus according to claim 1, it is characterised in that:The tubing string lifts device (2) and wraps Elevator (21) is included, elevator (21) both sides are connected with hanging ring (22), are connected with to adjust described hang on the hanging ring (22) Block the deflection mechanism at the angle of inclination in (21) opposed vertical direction;The deflection mechanism includes the first beat stent (231) and the Two beat stents (232), described first beat stent (231) one end are connect with the hanging ring (22) of the elevator (21) side, separately One end is connected with the first telescopic drive part (233), described second beat stent (232) one end and the elevator (21) opposite side Hanging ring (22) connects, and the other end is connected with the second telescopic drive part (234).
3. workover treatment integration apparatus according to claim 1, it is characterised in that:The tubing string disconnects device (3) packet It includes mounting bracket (31) and the caliper on the mounting bracket (31) is installed on by hoisting mechanism, the caliper is installed including upper and lower cloth The turnbuckle clamp (331) and clamping clip (332) put, the hoisting mechanism include slide bar (321) and third telescopic drive part (322), Mounting bracket (31) both sides are respectively equipped with the first sliding rail (311) and the second sliding rail (312), slide bar (321) the both ends difference In first sliding rail (311) and the second sliding rail (312), the caliper is installed on the slide bar (321), the third Telescopic drive part (322) is installed between the slide bar (321) and the mounting bracket (31).
4. workover treatment integration apparatus according to claim 3, it is characterised in that:Mounting bracket (31) bottom is equipped with Guide assembly, the guide assembly include the first guide rail (341) and the second guide rail (342), and the mounting bracket (31) is installed in institute It states between the first guide rail (341) and the second guide rail (342), and passes through driving mechanism (343) along first guide rail (341) and Two guide rails (342) slide.
5. workover treatment integration apparatus according to claim 3, it is characterised in that:It is also installed on the slide bar (321) There is guiding mechanism, the guiding mechanism includes the first guide groove (351) and the second guide groove (352), first guide groove (351) it is oppositely arranged with the second guide groove (352), and the first end of first guide groove (351) and the second guide groove (352) It is hinged, the second end of first guide groove (351) passes through the first guide link (353) and the 4th telescopic drive part (355) hinged with the slide bar (321), the second end of second guide groove (352) passes through the second guide link (354) and the Five telescopic drive parts (356) are hinged with the slide bar (321);First guide groove (351) and the second guide groove (352) it is upper End slot diameter is more than lower end slot diameter.
6. workover treatment integration apparatus according to claim 3, it is characterised in that:It is also installed on the mounting bracket (31) There is pollution discharge mechanism, the pollution discharge mechanism includes the first dirt discharge groove (361) and the second dirt discharge groove (362), first dirt discharge groove (361) it is oppositely arranged with the second dirt discharge groove (362), and first dirt discharge groove (361) is connected by the 6th telescopic drive part (363) The first side of the mounting bracket (31) is connected to, second dirt discharge groove (362) is connected to institute by the 7th telescopic drive part (364) The second side of mounting bracket (31) is stated, first dirt discharge groove (361) and the second dirt discharge groove (362) bottom are connected with blow-off pipe (365)。
7. workover treatment integration apparatus according to claim 1, it is characterised in that:The link assembly includes connecting seat (433), first connecting rod (434) and second connecting rod (435), the bar assembly of grabbing grab bar including cross-articulation is arranged first (436) and second grabs bar (437), and the first end of the length adjustment mechanism is connected in fixed seat (431), second end with it is described The first end connection of 8th telescopic drive part (432), second end and the connecting seat of the 8th telescopic drive part (432) (433) it connecting, the first end of the first connecting rod (434) and second connecting rod (435) is articulated on the connecting seat (433), The end that the second end of the first connecting rod (434) grabs bar (437) with described second is hinged, the second connecting rod (435) and institute The first end for grabbing bar (436) is stated to be hinged.
8. the workover treatment integration apparatus according to claim 1 or 7, it is characterised in that:The length adjustment mechanism packet Transition sleeve (438) and screw rod (439) are included, the first end of the screw rod (439) is connected in the fixed seat (431), the mistake It crosses the first end of set (438) and passes through the threaded connection of first direction, the transition sleeve with the second end of the screw rod (439) (438) second end and the first end of the 8th telescopic drive part (432) pass through the threaded connection of second direction, the transition It covers and stop nut (440) is equipped between (438) and the screw rod (439).
9. workover treatment integration apparatus according to claim 8, it is characterised in that:The both sides of the fixed seat (431) The first guide plate (441) and the second guide plate (442) are respectively equipped with, is located at the first guide plate (441) on the fixed seat (431) And second be equipped with guide roller (443) between guide plate (442).
CN201610396782.4A 2016-06-07 2016-06-07 Workover treatment integration apparatus Expired - Fee Related CN105971530B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610396782.4A CN105971530B (en) 2016-06-07 2016-06-07 Workover treatment integration apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610396782.4A CN105971530B (en) 2016-06-07 2016-06-07 Workover treatment integration apparatus

Publications (2)

Publication Number Publication Date
CN105971530A CN105971530A (en) 2016-09-28
CN105971530B true CN105971530B (en) 2018-06-08

Family

ID=57010974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610396782.4A Expired - Fee Related CN105971530B (en) 2016-06-07 2016-06-07 Workover treatment integration apparatus

Country Status (1)

Country Link
CN (1) CN105971530B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318692B (en) * 2018-03-30 2020-08-25 杨志英 Device for unmanned lifting and lowering oil pipe at well head in well repairing operation
CN111472697B (en) * 2019-01-24 2023-09-22 江苏如通石油机械股份有限公司 Automatic operation device for small workover
CN110397411B (en) * 2019-06-20 2021-01-29 中国石油天然气股份有限公司 Hanging ring swing assisting device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101672168A (en) * 2009-10-23 2010-03-17 大庆石油学院 Workover operation mechanization system replacing well mouth manual operation
CN201738846U (en) * 2010-08-02 2011-02-09 四川宏华石油设备有限公司 Connection mechanism
CN103437724A (en) * 2013-08-28 2013-12-11 宝鸡石油机械有限责任公司 Pipe column supporting device for drilling platform
CN104405304A (en) * 2014-01-13 2015-03-11 中国石油化工股份有限公司 Workover operation system and process capable of realizing unattended operation at wellhead
CN105064936A (en) * 2015-08-12 2015-11-18 马剑虹 Multifunctional righting device for workover operation
CN205840811U (en) * 2016-06-07 2016-12-28 湖南三一石油科技有限公司 Workover treatment integration apparatus and tubing string handling device thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2014204515B2 (en) * 2014-07-18 2017-12-21 Exploration Drill Masters Chile S.A. Semiautomated drill rod handling apparatus and method, hand-held haul plug spinner and haul plug combination and drill rod handling system with both

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101672168A (en) * 2009-10-23 2010-03-17 大庆石油学院 Workover operation mechanization system replacing well mouth manual operation
CN201738846U (en) * 2010-08-02 2011-02-09 四川宏华石油设备有限公司 Connection mechanism
CN103437724A (en) * 2013-08-28 2013-12-11 宝鸡石油机械有限责任公司 Pipe column supporting device for drilling platform
CN104405304A (en) * 2014-01-13 2015-03-11 中国石油化工股份有限公司 Workover operation system and process capable of realizing unattended operation at wellhead
CN105064936A (en) * 2015-08-12 2015-11-18 马剑虹 Multifunctional righting device for workover operation
CN205840811U (en) * 2016-06-07 2016-12-28 湖南三一石油科技有限公司 Workover treatment integration apparatus and tubing string handling device thereof

Also Published As

Publication number Publication date
CN105971530A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
US20230048765A1 (en) Drilling rig with a top drive system operable in a drilling mode and a tripping mode
US7726929B1 (en) Pipe handling boom pretensioning apparatus
US4652195A (en) Casing stabbing and positioning apparatus
US7353880B2 (en) Method and apparatus for connecting tubulars using a top drive
CA2535610C (en) Automated arm for positioning of drilling tools such as an iron roughneck
US11988059B2 (en) Dual activity top drive
BRPI0920302B1 (en) TUBE HANDLING APPARATUS, AND, METHOD FOR TRACING A MAIN ROTARY STRUCTURAL MEMBER OF A TUBE HANDLING APPARATUS.
MX2010004535A (en) Pipe handling apparatus and method.
US9500049B1 (en) Grip and vertical stab apparatus and method
US20090101361A1 (en) Tubular running system
US8419335B1 (en) Pipe handling apparatus with stab frame stiffening
US20040045703A1 (en) Apparatus for positioning and stabbing pipe in a drilling rig derrick
CN105971530B (en) Workover treatment integration apparatus
MX2011004400A (en) Telescoping jack for a gripper assembly.
US8408334B1 (en) Stabbing apparatus and method
CN111594073B (en) Land off-line operation drilling machine
US20170167208A1 (en) Semiautomated drill rod handling apparatus and method, hand-held haul plug spinner and haul plug combination and drill rod handling system with both
CN106368629B (en) Workover automation equipment
CN109138897A (en) Well head centralising device and with its well workover equip
CN212389281U (en) Operation machine with pressure
CN107869315B (en) Automatic change workover rig
CN105937371B (en) Workover rig integration apparatus and its tubing string disconnect device
CN205840811U (en) Workover treatment integration apparatus and tubing string handling device thereof
CN213039223U (en) Land drilling machine capable of off-line operation
US20040035573A1 (en) Power tong frames

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181207

Address after: 410600 Room 101, Unit 1, East of East Third Line and South of Liangtang Road, Changsha Economic and Technological Development Zone, Hunan Province

Patentee after: Sany Group Co Ltd Hunan branch

Address before: 410100 31 industrial city, Changsha economic and Technological Development Zone, Hunan

Patentee before: HUNAN SANY PETROLEUM TECHNOLOGY CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180608

Termination date: 20190607