CN206023368U CN201620617332.9U CN201620617332U CN206023368U CN 206023368 U CN206023368 U CN 206023368U CN 201620617332 U CN201620617332 U CN 201620617332U CN 206023368 U CN206023368 U CN 206023368U
Authority
CN
China
Prior art keywords
monitoring system
module
communication
communication module
low
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620617332.9U
Other languages
Chinese (zh)
Inventor
刘明慧
李冬花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jilin Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
State Grid Jilin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jilin Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201620617332.9U priority Critical patent/CN206023368U/en
Application granted granted Critical
Publication of CN206023368U publication Critical patent/CN206023368U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Telephonic Communication Services (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

Low-voltage platform area user power utilization information monitoring system, it is related to low-voltage platform area user power utilization information monitoring system, solve existing distributing monitoring system and there is maintenance and debugging complexity, price is high and there is monitoring effect, including electric energy meter, concentrator, main website and multiple mobile terminals;The electric energy meter includes central processing unit, and be connected with central processing unit stops/incoming information identification circuit and first communication module;Memory module is provided with the concentrator, the second communication module being connected with the first communication module and the third communication module being connected with the main website and mobile terminal.Waiting type Service change is advance formula service by the utility model.Monitoring construction operation teams and groups power failure range guarantees construction safety.The economic loss that user produces is reduced because of temporary interruption, it is to avoid power supply enterprise and user's power failure dispute.

Description

Low-voltage platform area user power utilization information monitoring system
Technical field
The utility model is related to low-voltage platform area user power utilization information monitoring system.
Background technology
AMRS is the expression number for making a copy of all resident's electric energy meters under transformer platform area.Electric power collection is copied System has two kinds of equipment:One is concentrator, and one is have the electric energy meter with concentrator communication function.Concentrator a collection of have logical The data of communication function electric energy meter, first pass through the mode such as carrier wave or 485 communications and collect on oneself memory, then by wired or The mode such as person's radio CDMA or GPRS network is transferred to main website up, so as to realize centralized automatic meter-reading function.
In existing low-voltage platform area, power supply enterprise cannot monitor the electric power thus supplied of user side, and low voltage electric network regulation and control are present , often there is electrician and have a power failure privately and user's operation power facility phenomenon without authorization in a lot of blind zone problems, above-mentioned to whole power supply network All there is threat in the safety of network, security incident easily occur.In addition, in above-mentioned supply network, power supply enterprise is only connected to user and stops Work could be sent after electric repair call to rush to repair, the economic loss that user is produced because of temporary interruption often causes power supply enterprise and use Family produces power failure dispute.
There is problems in the prior art:Intelligent electric meter is both provided with the function of short of electricity prompting, for example, say predetermined When the amount of money that prestores is arranged on less than 10 yuan, the warning lamp on electric energy meter can dodge red light and remind user's continuous electricity charge, but As electric energy meter is all in electric well or in stairs port, most of users can not easily see such prompting message, use Family remains to be used up in electricity, the electricity payment of just reacting after the unexpected power-off of family, has a power failure to household electrical appliance ice suddenly The damage of the powerful electrical equipment such as case, washing machine, air-conditioning is very big, and this also brings inconvenience to user.
But seldom, particularly monitoring means and mode are even more phoenix feathers and unicorn horns to domestic existing monitoring system for power distribution networks, existing Monitor mode be all that terminal device is directly accessed 10kV electrical networks to be operated, monitoring device electric pressure is high, insulating requirements By force, safeguard and debug complicated, cause relevant device expensive, the whole system market price in ten thousand RMB of 50-100, per platform Monitor terminal market price unit at most up to ten thousand of thousand of units at least, also wants the equipment such as the existing switch of removable parts in process of construction, Not only cause to waste but also the construction period is long, and monitor and user is let alone monitored less than 0.4kV circuits.Cannot realize Electricity consumption is reminded when Sorry, your ticket has not enough value.
Utility model content
Complexity, price height and presence monitoring are safeguarded and debugged to the utility model in order to solve existing distributing monitoring system presence A kind of the problems such as effect difference, there is provided low-voltage platform area user power utilization information monitoring system.
Low-voltage platform area user power utilization information monitoring system, including electric energy meter, concentrator, main website and multiple mobile terminals;Institute Stating electric energy meter includes central processing unit, and be connected with central processing unit stops/incoming information identification circuit and first communication module;? Memory module is provided with the concentrator, the second communication module that is connected with the first communication module and with the main website Third communication module with mobile terminal connection.
The beneficial effects of the utility model:
First, this new described power information monitoring system be provided with electric energy meter stop/incoming information identification circuit and Pre- power failure prompting module, increases on concentrator and is provided with pre- prompting value input module and increases in existing memory module The storage region of mobile terminal number and corresponding electric energy meter numbering is stored, using existing communication mould on concentrator Block will stop/incoming information notifies main website or each user so that main website and user can recognize in time stop/carry out telecommunications Breath, solves power supply enterprise centering, low power grid regulation blind zone problem, prevent electrician have a power failure privately, user's operation power facility without authorization Behavior, changes and work could be sent to rush to repair after power supply enterprise is only connected to user's power failure repair call, be pre- by waiting type Service change First formula service.Monitoring construction operation teams and groups power failure range guarantees construction safety.The economy that user produces is reduced because of temporary interruption Loss, it is to avoid power supply enterprise and user's power failure dispute.
2nd, when this new described electric energy meter monitoring dump energy or remaining sum reach pre- power failure prompting value, electric energy Table sends mobile terminal of the prompting message to user, and user can supplement the amount of money to electric energy meter in time, it is to avoid power-off pair suddenly Electric equipment causes to damage.
3rd, in order to meet the pre- power failure prompting value input demand of different clients, user can pass through mobile terminal and concentration The communication of device independently arranges pre- power failure prompting value, can also be provided with pre- prompting value input module on the mobile terminal.
Description of the drawings
Fig. 1 is the theory diagram of user power utilization information monitoring system in low-voltage platform area described in the utility model;
In figure:1st, electric energy meter;2nd, concentrator;3rd, main website;4th, mobile terminal;1-1, central processing unit;1-2, stop/carry out telecommunications Breath identification circuit;1-3, in advance power failure prompting module;1-3-1, pre- prompting value setup module;1-3-2, comparison circuit;1-4, first Communication module;2-1, second communication module;2-2, third communication module;2-3, pre- prompting value input module;2-4, memory module.
Specific embodiment
Specific embodiment one, combine Fig. 1 illustrate present embodiment, low-voltage platform area user power utilization information monitoring system, should System includes electric energy meter 1, concentrator 2, main website 3 and some mobile terminals 4;The electric energy meter 1 include central processing unit 1-1 and What central processing unit 1-1 signals connected stops/incoming information identification circuit 1-2, pre- power failure prompting module 1-3 and first communication module 1-4;Described stop/incoming information identification circuit 1-2 gathers information from the voltage detecting circuit being linked in supply line;Described Concentrator 2 is provided with the second communication module 2-1 with first communication module 1-4 communication connections and the main website 3 and movement Third communication module 2-2 of the communication connection of terminal 4, pre- prompting value input module 2-3 and for memory mobile terminal number Memory module 2-4.
Pre- power failure prompting module 1-3 described in present embodiment includes pre- with what the central processing unit 1-1 signals were connected Prompting value setup module 1-3-1 and comparison circuit 1-3-2;Between the first communication module 1-4 and second communication module 2-1 Communication mode is that carrier communication, or RS485 communicate;Third communication module 2-2 is gsm communication module, it is also possible to It is any one in cdma communication module and GPRS communication modules.
The second pre- prompting value input module is also equipped with mobile terminal 4 described in present embodiment.
The course of work of present embodiment:The central processing unit 1-1 of electric energy meter 1 is by first communication module 1-4 to concentration Device 2 sends power-off signal, after concentrator 2 receives first power-off signal, waits 30 seconds, to judge whether this time point also has Power-off signal sent by other electric energy meters, resumes waiting for 30 seconds after often receiving a new power-off signal, so as to judge it is indivedual electricity Table has a power failure or whole platform area has a power failure.Sent after signal without electric energy meter after waiting 30 seconds again, concentrator 2 is by outage information by the Three communication modules 2-2 are sent in prescribed master and the mobile terminal 4 corresponding to each electric energy meter, while passing through the 3rd module 2-2 Outage information store in memory module;When 1 supply line of electric energy meter sends a telegram here, electric energy meter central processing unit 1-1 is by the One communication module 1-4 sends incoming telephone signal to concentrator 2, is often connected to one come telecommunications by the second communication module of concentrator 2 Wait 30 seconds after number, sent after signal without electric energy meter after waiting 30 seconds again, incoming information is passed through third communication module by concentrator 2-2 is sent in prescribed master 3 and the mobile terminal 4 corresponding to each electric energy meter, so as to realize to transformer platform area customer power supply The monitoring of situation.The above 30 second time of wait can arrange and adjust.
Each user can be communicated with concentrator 2 the pre- power failure prompting value that independently arrange by mobile terminal 4, and concentrator 2 is simultaneously The pre- power failure prompting value of user setup is sent in 1 pre- power failure prompting module 1-3 of corresponding electric energy meter, also can be existed by concentrator Main website is downloaded after user power utilization value sets the calculating of prompting value with user and is sent to 1 pre- power failure prompting module 1-3 of corresponding electric energy meter In.When the monitoring dump energy of electric energy meter 1 or remaining sum reach pre- power failure prompting value, electric energy meter 1 sends prompting message to collection Middle device 2, then by 2 photos and sending messages of concentrator to user mobile terminal 4, user can in time give electric energy meter supplement the amount of money, it is to avoid Suddenly power-off causes to damage to electric equipment.
Can also include stopping/sending a telegram here alarm module in the electric energy meter of the information monitoring system described in present embodiment, this mould Block and pre- two function of power failure prompting module need not be present simultaneously, can independent function presence.
Power information monitoring system described in present embodiment will be before not changing existing line structure, not increasing new equipment Put, 10kV and following power distribution network operation monitoring system was built using 3-5 month in any power supply unit, after building up be System is monitored the ruuning situation of full area under one's jurisdiction 10kV and following distribution line, monitored object mainly power failure (telegram in reply) letter for 24 hours Breath, monitoring range include that 10kV circuits, 10kV become platform, 0.4kV circuits and all 10kV and 0.4kV terminals power consumers, are A set of small investment, construction are soon, covering is wide, run steady, non-maintaining, in many ways benefited advanced monitoring system for power distribution networks.

Claims (5)

1. low-voltage platform area user power utilization information monitoring system, including electric energy meter (1), concentrator (2), main website (3) and multiple movements Terminal (4);It is characterized in that;Described electric energy meter (1) include central processing unit (1-1), be connected with central processing unit (1-1) stop/ Incoming information identification circuit (1-2) and first communication module (1-4);Memory module (2- is provided with the concentrator (2) 4) second communication module (2-1) that, is connected with the first communication module (1-4) and with the main website (3) and mobile terminal (4) third communication module (2-2) for connecting.
2. user power utilization information monitoring system in low-voltage platform area according to claim 1, it is characterised in that first communication Communication mode between module (1-4) and second communication module (2-1) is that carrier communication or RS485 communicate.
3. user power utilization information monitoring system in low-voltage platform area according to claim 1, it is characterised in that the third communication Module (2-2) is wire communication, gsm communication, cdma communication or GPRS communication.
4. user power utilization information monitoring system in low-voltage platform area according to claim 1, it is characterised in that the electric energy meter is also Including pre- power failure prompting module (1-3), pre- power failure prompting module (1-3) includes being connected with the central processing unit (1-1) Pre- prompting value setup module (1-3-1) and comparison circuit (1-3-2).
5. user power utilization information monitoring system in low-voltage platform area according to claim 1, it is characterised in that the concentrator (2) pre- prompting value input module (2-3) is additionally provided with.
CN201620617332.9U 2016-06-21 2016-06-21 Low-voltage platform area user power utilization information monitoring system Active CN206023368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620617332.9U CN206023368U (en) 2016-06-21 2016-06-21 Low-voltage platform area user power utilization information monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620617332.9U CN206023368U (en) 2016-06-21 2016-06-21 Low-voltage platform area user power utilization information monitoring system

Publications (1)

Publication Number Publication Date
CN206023368U true CN206023368U (en) 2017-03-15

Family

ID=58242067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620617332.9U Active CN206023368U (en) 2016-06-21 2016-06-21 Low-voltage platform area user power utilization information monitoring system

Country Status (1)

Country Link
CN (1) CN206023368U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108303616A (en) * 2017-12-29 2018-07-20 国网北京市电力公司 Taiwan area outage information determines method and device
CN109557498A (en) * 2018-12-21 2019-04-02 中国电力科学研究院有限公司 A kind of electric energy meter stops the processing method of telegram in reply event
CN110674158A (en) * 2019-10-15 2020-01-10 广东电网有限责任公司 Method and system for automatically updating local area for low-voltage user

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108303616A (en) * 2017-12-29 2018-07-20 国网北京市电力公司 Taiwan area outage information determines method and device
CN109557498A (en) * 2018-12-21 2019-04-02 中国电力科学研究院有限公司 A kind of electric energy meter stops the processing method of telegram in reply event
CN110674158A (en) * 2019-10-15 2020-01-10 广东电网有限责任公司 Method and system for automatically updating local area for low-voltage user
CN110674158B (en) * 2019-10-15 2022-02-15 广东电网有限责任公司 Method and system for automatically updating local area for low-voltage user

Similar Documents

Publication Publication Date Title
CN103595136A (en) Energy management system of micro-grid
CN206023368U (en) Low-voltage platform area user power utilization information monitoring system
CN204044202U (en) A kind of power failure changes the Apparatus and system of electric energy meter
CN202712975U (en) Distribution automation system
CN104269040A (en) Power utilization information acquisition and orderly power utilization management system
CN204408024U (en) A kind of 10kV circuit operation information acquisition system
CN204855672U (en) Electric energy quality evaluation system based on intelligence photovoltaic power generation system
CN207232252U (en) A kind of dual power supply electric quantity collector
CN206559140U (en) A kind of monitoring power saving apparatus in real time
CN107632198A (en) A kind of dual power supply electric quantity collector and its application method
CN201918003U (en) Wireless low-voltage meter-reading monitoring concentrator
CN204287858U (en) A kind of intelligent agriculture row table
CN202533503U (en) Single-phase multi-rate electric energy metering unit
CN104460459A (en) Intelligent agricultural drainage meter
CN107491013A (en) A kind of wireless remote timing control switch
CN209472440U (en) A kind of intelligent checking system of more equipment networks
CN208334458U (en) A kind of intelligent electric meter clock synchronization and power alarm system
CN204374261U (en) A kind of batch meter for low pressure distributed photovoltaic power generation
CN206146980U (en) Novel multi -functional power consumption monitoring system
CN203911498U (en) Distributed photovoltaic grid-connected protective equipment
CN205791807U (en) Itellectualized uptown power load supervising device
CN112865111A (en) Intelligent power distribution load balancing system
CN203086030U (en) Full intelligent distributed 35kV opening/closing station
CN207882351U (en) A kind of intelligent power real-time monitoring system based on mobile Internet
CN207053251U (en) A kind of grid entry point supervising device of family expenses photovoltaic generating system