CN206016850U - Integral composite material evacuation platform - Google Patents

Integral composite material evacuation platform Download PDF

Info

Publication number
CN206016850U
CN206016850U CN201620909171.0U CN201620909171U CN206016850U CN 206016850 U CN206016850 U CN 206016850U CN 201620909171 U CN201620909171 U CN 201620909171U CN 206016850 U CN206016850 U CN 206016850U
Authority
CN
China
Prior art keywords
platform
base
connecting rod
composite material
evacuation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620909171.0U
Other languages
Chinese (zh)
Inventor
米垚
张红元
佘新光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Sunrui Rubber and Plastic Technology Co Ltd
Original Assignee
Luoyang Sunrui Rubber and Plastic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Sunrui Rubber and Plastic Technology Co Ltd filed Critical Luoyang Sunrui Rubber and Plastic Technology Co Ltd
Priority to CN201620909171.0U priority Critical patent/CN206016850U/en
Application granted granted Critical
Publication of CN206016850U publication Critical patent/CN206016850U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model is related to a kind of integral composite material evacuation platform, the evacuation platform includes platform panel, multiple connects bearings and multiple baffle plates, described connects bearing is made up of the connecting rod that base is fixedly connected with base with one end, the base is provided with the anchor hole matched with crab-bolt, the other end of the connecting rod is fixedly connected with baffle plate, described platform panel there is the section bar of through hole to be set in outside connecting rod by some sides to be spliced to form, and the both sides of platform panel are clamped by base and baffle plate respectively;The utility model simple structure, the pre-assembled of early stage can be carried out in factory, only need to fix connects bearing on the chemical anchor bolts for fixing at the scene during site operation, engineering time, reduction of erection time can be greatly decreased;The quantity of the chemical anchor bolts required for installing greatly reduces, and only original half has preferable economic benefit.

Description

Integral composite material evacuation platform
Technical field
The utility model is related to urban rail transit technology field, and specifically a kind of integral composite material is evacuated flat Platform.
Background technology
Domestic subway line is required to arrange longitudinal evacuation platform at present, when there is the accidents such as fire in subway, passenger Can be evacuated by evacuation platform.Existing evacuation platform can be divided into concrete evacuation platform, cement base by material and evacuate Platform and composite material evacuation platform, wherein composite material evacuation platform are obtained the advantages of simple with its high-strength light, installation Wider application.
The composite material evacuation platform of country's subway application at present mainly includes two types, in Application No. 201220259867.5《Evacuation platform for tunnel》With Application No. 201220385853.8《Life-saving evacuation platform》Two practicalities In new patent, a kind of composite material evacuation platform is disclosed, its flat surface and platform support are composite manufacture, even Place is met with the use of metalwork.Flat surface is made up of through some drawing and extruding section bars many connecting rods, and platform support is by crossbeam and cant beam Composition, is gusseted;Crossbeam one end is fixed in tunnel wall, and the other end is hanging;Cant beam one end is fixed in tunnel wall, another End is connected with the middle part of crossbeam by metalwork.When evacuation platform being installed in the subway, first one end of crossbeam, cant beam is fixed on In tunnel wall, then cant beam is connected with crossbeam, after adjustment level, flat surface is fixed on by platform support by metal button member On.
In Application No. 201420008996《Composite material evacuation platform》Utility model patent in, disclose another kind Composite material evacuation platform, its flat surface manufactured by composite and steel structure support are constituted, between flat surface and platform support Connected with metalwork.Flat surface is made up of through some drawing and extruding section bars many connecting rods, and platform support is cantilever bracing members;Bracing members One end is fixed in tunnel wall, and the other end is hanging.During in-site installation, first cantilever bracing members one end is fixed in tunnel wall, After adjustment level, flat surface is fixed on bracing members by metalwork.
Existing evacuation platform is by platform panel peace platform support composition, if platform panel is by dry type by many connecting rods Material connects and constitutes, and platform support is generally A-frame, pole bracket or T-shaped support.Wherein, profile material assembling is into platform panel Usually carry out in factory, during site operation, platform support is fixed on by tunnel wall or railway roadbed by chemical anchoring bolt first On, then platform panel is placed on platform support, platform panel is solid with platform support finally by fastener or alternate manner Fixed.In the state of the art, the construction procedure of in-site installation evacuation platform is more, and the set-up time is long, using A-frame one As need to consume 4 chemical anchor bolts, more chemical anchor bolts may be consumed using pole bracket or T-shaped support.
Utility model content
For the field erected construction procedure of above-mentioned existing evacuation platform is more, set-up time length, need to consume compared with polyvoltine The problems such as learning crab-bolt, the utility model provide a kind of integral composite material evacuation platform.
For solving above-mentioned technical problem, the technical solution adopted in the utility model is:
A kind of integral composite material evacuation platform, the evacuation platform include platform panel, multiple connects bearings and multiple Baffle plate, described connects bearing are made up of the connecting rod that base is fixedly connected with base with one end, and the base is provided with and crab-bolt The anchor hole for matching, the other end of the connecting rod are fixedly connected with baffle plate, and described platform panel is had by some sides The section bar of through hole is set in outside connecting rod and is spliced to form, and the both sides of platform panel are clamped by base and baffle plate respectively.
The platform panel is constituted very close to each other between the adjacent profiles of platform panel in tabular.
The platform panel is constituted and be arranged with sleeve on the connecting rod between the adjacent profiles of platform panel in grid-like.
The baffle plate is fixedly connected with connecting rod by welding or being threadedly coupled.
Described connects bearing is made up of the connecting rod that base is fixedly connected with base with Duo Gen one end.
The section bar is made up of composite.
The connects bearing and baffle plate are made up of metal material, and sleeve is made up of metal material or composite.
The connecting rod is fixed by welding on base.
The upper surface of the baffle plate is concordant with the upper surface of platform panel.
The beneficial effects of the utility model:
The integral composite material evacuation platform that the utility model is provided, simple structure, the pre-assembled of early stage can be in work Factory is carried out, and is only needed to fix connects bearing on the chemical anchor bolts for fixing at the scene during site operation, can be greatly decreased and apply Between man-hour, the reduction of erection time;The quantity of the chemical anchor bolts required for installing greatly reduces, only original half, has preferably warp Ji benefit;As platform support is integrated with platform panel, it is not necessary to fastener of the prior art connecting the two, with more High intensity, more can adapt to the environment of tunnel Piston Action Wind.
Description of the drawings
Fig. 1 integral composite material evacuation platform structure charts(Flat);
Fig. 2 integral composite material evacuation platform side views(Flat);
Fig. 3 connects bearing structure charts;
Fig. 4 integral composite material evacuation platform side views(Grating type);
Fig. 5 integral type evacuation platform whole structure figures(Grating type);
Reference:1st, platform panel, 2, connects bearing, 3, baffle plate, 4, crab-bolt, 5, sleeve, 101, section bar, 201, bottom Seat, 202, connecting rod.
Specific embodiment
The utility model is further elaborated with reference to specific embodiment.
Embodiment 1
Structure charts of the Fig. 1 for integral type composite material evacuation platform, Fig. 2 are integral type composite material evacuation platform side-looking Figure, Fig. 3 are connects bearing structure chart, as shown in the figure:Integral composite material evacuation platform, the evacuation platform include platform panel 1st, multiple connects bearings 2 and multiple baffle plates 3, described connects bearing 2 are passed through with base 201 by base 201 and two one end The connecting rod 202 for being welded and fixed connection is constituted, and the base 201 is provided with the anchor hole matched with crab-bolt 4, the connecting rod 202 The other end be threadedly coupled with baffle plate 3, described platform panel 1 is had 101 company of being set in of section bar of through hole by some sides Be spliced to form outside bar 202, and the both sides of platform panel 1 clamped by base 201 and baffle plate 3 respectively, the upper surface of the baffle plate 3 with The upper surface of platform panel 1 is concordant.The platform panel 1 does not have between the adjacent profiles 101 for constituting platform panel 1 in tabular There is gap;The section bar 101 is made up of composite;The connects bearing 2 and baffle plate 3 are made up of metal material;
The side of section bar 101 is provided with some through holes, if the connecting rod 202 in connects bearing 2 is through 101 side of dry shaped material Hole, outermost are fixed by baffle plate 3, if dry shaped material 101 is connected composition platform panel 1.Connecting rod in multiple connects bearings 2 202 holes for passing through 101 side of section bar, multiple connects bearings 2 and section bar 101 are linked together, and constitute evacuation platform.Scene peace During dress, chemical anchor bolts 4 are installed on predetermined position, evacuation platform is fixed on by crab-bolt 4 through the anchor hole on base 201 In tunnel wall.
Embodiment 2
Integral type evacuation platform shown in Fig. 4, Fig. 5 is grating type evacuation platform, and integral composite material evacuation platform should Evacuation platform includes platform panel 1, multiple connects bearings 2 and multiple baffle plates 3, and described connects bearing 2 is by base 201 and two The connecting rod 202 that one end is fixedly connected by welding with base 201 is constituted, and the base 201 is provided with and is matched with crab-bolt 101 Anchor hole, the other end of the connecting rod 202 is threadedly coupled with baffle plate 3, and described platform panel 1 is had logical by some sides The section bar 101 in hole is set in outside connecting rod 202 and is spliced to form, and the both sides of platform panel 1 are clamped by base 201 and baffle plate 3 respectively, The upper surface of the baffle plate 3 is concordant with the upper surface of platform panel 1.The platform panel 1 constitutes platform panel 1 in grid-like Adjacent profiles 101 between connecting rod 202 on be arranged with sleeve, sleeve 5 is annular shape, is enclosed within connecting rod 202, makes section bar 101 Can not be brought into close contact with section bar 101, with certain gap, so that platform panel 1 is grid-like, the section bar 101 is by multiple Condensation material is made;The connects bearing 2 and baffle plate 3 are made up of metal material;Sleeve 5 is made up of metal material or composite;
The side of section bar 101 is provided with some through holes, if the connecting rod 202 in connects bearing 2 is through 101 side of dry shaped material Hole, is arranged with sleeve on the connecting rod between adjacent profiles, and outermost section bar is fixed by baffle plate 3, if dry shaped material 101 is connected Composition platform panel 1.Hole of the connecting rod 202 in multiple connects bearings 2 through 101 side of section bar, by multiple connects bearings 2 and type Material 101 links together, and constitutes evacuation platform.During in-site installation, chemical anchor bolts 4 are installed on predetermined position, crab-bolt 4 is passed through Anchor hole on base 201, evacuation platform is fixed in tunnel wall.
The utility model simple structure, the pre-assembled of early stage can be carried out in factory, only need to connect during site operation Bearing is fixed on the chemical anchor bolts for fixing at the scene, and engineering time, reduction of erection time can be greatly decreased;Change required for installing The quantity for learning crab-bolt greatly reduces, and only original half has preferable economic benefit;As platform support is closed with platform panel It is integrated, it is not necessary to which fastener of the prior art with higher intensity, more can adapt to tunnel Piston Action Wind connecting the two Environment.

Claims (9)

1. a kind of integral composite material evacuation platform, it is characterised in that:The evacuation platform includes platform panel(1), Duo Gelian Connect bearing(2)With multiple baffle plates(3), described connects bearing(2)By base(201)With one end and base(201)It is fixedly connected Connecting rod(202)Composition, the base(201)It is provided with and crab-bolt(4)The anchor hole for matching, the connecting rod(202)Another One end is and baffle plate(3)It is fixedly connected, described platform panel(1)The section bar that there is through hole by some sides(101)It is set in Connecting rod(202)It is spliced to form outward, and platform panel(1)Both sides respectively by base(201)And baffle plate(3)Clamp.
2. integral composite material evacuation platform as claimed in claim 1, it is characterised in that:The platform panel(1)In flat Tabular, constitutes platform panel(1)Adjacent profiles(101)Between very close to each other.
3. integral composite material evacuation platform as claimed in claim 1, it is characterised in that:The platform panel(1)It is in lattice Palisade, constitutes platform panel(1)Adjacent profiles(101)Between connecting rod(202)On be arranged with sleeve(5).
4. integral composite material evacuation platform as claimed in claim 1, it is characterised in that:The baffle plate(3)By welding Or threaded connection and connecting rod(202)It is fixedly connected.
5. integral composite material evacuation platform as claimed in claim 1, it is characterised in that:Described connects bearing(2)By Base(201)With many one end and base(201)The connecting rod being fixedly connected(202)Composition.
6. integral composite material evacuation platform as claimed in claim 1, it is characterised in that:The section bar(101)By being combined Material is made.
7. integral composite material evacuation platform as claimed in claim 3, it is characterised in that:The connects bearing(2)And gear Plate(3)It is made up of metal material, sleeve(5)It is made up of metal material or composite.
8. integral composite material evacuation platform as claimed in claim 1, it is characterised in that:The connecting rod(202)By weldering Connect and be fixed on base(201)On.
9. integral composite material evacuation platform as claimed in claim 1, it is characterised in that:The baffle plate(3)Upper surface With platform panel(1)Upper surface concordant.
CN201620909171.0U 2016-08-22 2016-08-22 Integral composite material evacuation platform Withdrawn - After Issue CN206016850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620909171.0U CN206016850U (en) 2016-08-22 2016-08-22 Integral composite material evacuation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620909171.0U CN206016850U (en) 2016-08-22 2016-08-22 Integral composite material evacuation platform

Publications (1)

Publication Number Publication Date
CN206016850U true CN206016850U (en) 2017-03-15

Family

ID=58249365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620909171.0U Withdrawn - After Issue CN206016850U (en) 2016-08-22 2016-08-22 Integral composite material evacuation platform

Country Status (1)

Country Link
CN (1) CN206016850U (en)

Similar Documents

Publication Publication Date Title
CN110593419B (en) Node structure of assembled type through bolt unequal-altitude beam-square steel tube concrete column and manufacturing method
CN101787732B (en) Cable-stayed multi-layer framework structure and construction control method thereof
CN105256917A (en) Prestressed shear wall and vertical joint combining-connecting structure and construction method thereof
CN104727476B (en) The light body 3D steel bar girders floor plates of assembled and its manufacture method
CN104032854B (en) Assembled T-shaped mixing coupled wall and construction method thereof
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
AU2018282313A1 (en) Assembled building structure with combination of steel structure and concrete structure and construction method thereof
CN207499427U (en) Assembly integrated precast superimposed sheet support system
CN108468378B (en) Prefabricated node of concrete structure
CN107524251B (en) Prestress steel strip masonry faced wall
CN210086553U (en) Dry-type connected precast concrete wall and foundation connection node
CN204551848U (en) Assembling light body 3D steel bar girder floor plates
CN106089294B (en) Integral composite material evacuation platform
CN103806538B (en) A kind of precast reinforced concrete structure
CN206016850U (en) Integral composite material evacuation platform
CN210439301U (en) Foundation section steel concrete waist rail supporting structure
CN203499259U (en) Tool type cantilevered unloading platform
CN203924656U (en) A kind of high-altitude overlength cable-stayed type shaped steel job platform structure
CN104032862B (en) Assembled girder steel seam line L shape mixing coupled wall and construction method thereof
CN207959911U (en) A kind of builder's jack gusseted
CN104047380B (en) Assembled girder steel seam T-shaped mixing coupled wall and construction method thereof
CN209975752U (en) Integrated prefabricated wallboard house structure
CN106088398A (en) A kind of combined wall board
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN110512639A (en) A kind of no floor steel structure tower crane foundation construction method and constructing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170315

Effective date of abandoning: 20180424

AV01 Patent right actively abandoned

Granted publication date: 20170315

Effective date of abandoning: 20180424