CN206015653U - A kind of pipe of reinforced soft soil ground is rammed - Google Patents
A kind of pipe of reinforced soft soil ground is rammed Download PDFInfo
- Publication number
- CN206015653U CN206015653U CN201620599884.1U CN201620599884U CN206015653U CN 206015653 U CN206015653 U CN 206015653U CN 201620599884 U CN201620599884 U CN 201620599884U CN 206015653 U CN206015653 U CN 206015653U
- Authority
- CN
- China
- Prior art keywords
- pipe
- soil
- rammed
- hammer
- pincerlike
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
This utility model is related to a kind of pipe of reinforced soft soil ground and rams, combined with vibration hammer by pipe will be rammed, pipe both sides are rammed, vacuum dehydration pipe is set, charging aperture is set on pipe is rammed, rams pipe built-in pipe hammer ram, the lifting of pipe hammer ram is made using the opening and closing of pincerlike detacher and is come off, the tamping energy and reinforcement criteria needed for reaching;During ramming, draw water when ramming, reach the purpose of super quiet pore pressure after rapid dispersion is rammed;To the current-formed silt soil that cannot be rammed, the preferable soil of soil property is injected by charging aperture and enters line replacement, the place after reinforced process reaches the bearing capacity index of preferable compactness.This utility model construction procedure is simple, cycle is short, low cost, by compacting from deep to shallow, significantly improves can the bearing eigenvalue of foundation soil in reinforcing scope, change significantly the mechanics index of physics of weak soil;Consolidation process can be carried out to the weak soil of any property by controlling the displacement of tamping energy and required thickness, which reinforces thickness up to 20~30m.
Description
Technical field
This utility model is related to a kind of pipe of reinforced soft soil ground and rams, it is adaptable to can not meet design to place and hold
The weak soil soil stabilization for carrying power and compactness is processed, possession base processing technology field.
Background technology
At present, reinforced soft soil ground is widely applied strong tamping technology, by heavy tamping energy pair by dewatering measure
The soil body is rammed procedure coercion compression or hits close, can reach the discharge of gas and the rising of pore water pressure in the soil body;Cause the soil body
Liquefaction or soil structures destruction;Soil mass crack development is produced, changes the infiltration coefficient of the soil body, as pore pressure disappears after rammer
Dissipate, soil strength is improved, thixotroping recovers to reach consolidation.
In substantial amounts of soft soil foundation dynamic consolidation construction case, the principle of " hit multipass, first light rear weight less, add energy step by step " is soft
Native foundation dynamic consolidation successful Application is laid a good foundation;According to tamping energy and reinforcement depth and the relation of level of ground water, soft soil foundation
Strong rammer effective reinforcement depth is usually the 1/4 of tamping energy, it is contemplated that the drawdown of level of ground water adds 1~2m be effectively reinforce deep
Degree.
With the development of China's manufacturing industry, determine that the super-tonnage crane of strong rammer tamping energy is applied to the strong of high-energy
Construction is rammed, maximum tamping energy can reach 12,000,000 Ns of rice at present, but show through high-energy dynamic compaction Construction practices, soft soil foundation
Using the tamping energy of high-energy, the reinforcement depth of weak soil is not extended, and is easily caused " spring soil " on the contrary, is caused weak soil
Ground cannot recover foundation strength after ramming, or even destroy soil structures.Trace it to its cause, the soil condition of soft soil foundation and underground
Water level and hammer ram act on every thixotroping mechanism of weak soil and heavy tamping energy is rammed procedure coercion compression or hits Mi Qiguan to the soil body
Being extremely complex, being not effective reinforcement depth to be reached by raising tamping energy merely, the maximum that can be born in weak soil is rammed
Can, that is, optimum tamping energy, it is necessary to just right, cross and can then produce punch-through, form shape in " spring soil " engineering practice
This is likened to elephant " battering down ".
Thus, the reinforcement depth in soft soil foundation strong rammer rests on shallow layer reinforcement to the application of strong rammer technique always, typically
Strong rammer effective reinforcement depth is adopted for 4~6m, after dewatering measure is set, carries out strong rammer, its effective reinforcement depth also with regard to 6~
8m, adopts Dewatering dynamic compaction in the preferable soft soil foundation of soil structure, and tamping energy is in 12,000,000 ns/m of practice there be its maximum
Effect reinforcement depth reaches 14m.But its cost is high, work efficiency is slow, it is impossible to suitable for large scale application.
In order to reach the purpose of weak soil deep-layer reinforcing, engineers and technicians adopt deep layer explosion, backfill Building wood after explosion
Material, then adopts strong rammer technique, final result namely to be replaced deep layer weak soil, cannot still solve the difficulty of deep-layer reinforcing
Topic.
The effective reinforcement depth of strong rammer always perplexs the subject matter of the deep-layer reinforcing of soft soil foundation, engineers and technicians
By steel pipe being built in desired depth, carry out strong rammer by hanging hammer ram, but meet the full deep layer of silt soil or level of ground water, warp
Experiment soil strength is improved seldom, and the soil body is longer for recovery time, such as backfills its effect after the preferable earth material of live soil property is rammed
Not substantially, key is that tamping point water content is too high, directly affects the consolidation effect of strong rammer.
In sum, soft soil foundation adopts strong rammer technique, and reinforcement depth is limited;Even if adopting high-energy dynamic compaction, due to into
This height, long in time limit, and easily batter down the soil body;Hang to ram after steel pipe being inserted in weak soil and strong rammer is carried out to deep layer, due to underground
Water level and water content of soil are too high, and after rammer, soil strength is improved seldom, and effect is not obvious, and recovery time is long.
Utility model content
For solving above-mentioned technical problem, the purpose of this utility model is to provide a kind of pipe of reinforced soft soil ground and rams, profit
With the construction method of evacuation after strong rammer, rammer in pipe, convection current is moulded shape weak soil and is replaced by local and be aided with dewatering measure, to reach
Quick change weak soil intensity, quickly raising foundation bearing capacity, eliminate the purpose of settlement after construction.
The pipe of reinforced soft soil ground of the present utility model is rammed, by tip, rammer pipe and vibration hammer, the pincers be made up of steel pipe
Shape detacher, the assembling of pipe hammer ram are constituted, and the both sides for ramming pipe are disposed with vacuum dehydration pipe, outer wall of the rammer pipe near the mouth of pipe
On be provided with and described ram the charging aperture that connects inside pipe;Water strainer is provided with the vacuum dehydration pipe, is wrapped on the water strainer
It is wrapped with filter screen.
Further, the vibration hammer is connected on the mouth of pipe for ramming pipe, and the vibration hammer includes absorbing frame and vibration
Device, is connected by vibrator spring between the absorbing frame and vibrator, and the absorbing frame is provided with pulley and crampon, institute
State pulley to connect steel cable and be connected with the pincerlike detacher by wearing.
Further, the pincerlike detacher includes that the U-shaped shackle being connected with steel cable, the shackle end are connected with shackle
Pin, is connected with two semicircular pincerlike tripping gears on the shackle pin, arrange on one of them described pincerlike tripping gear
Control steel cable tightens up/loosens, make described in two the fixing point that pincerlike tripping gear opens or close, described unload to buckle also be covered with cone
Shape cover.
Further, the pipe hammer ram includes the first hammer body for connecting from top to bottom and the second hammer body, first hammer body
The hook that end is provided with several passages and is connected with for the pincerlike tripping gear, the diameter of second hammer body are little
In first hammer body diameter with to the pipe hammer ram position.
Further, overcoat is arranged with also on the water strainer, outer the putting is provided with some through holes.
Further, the filter screen is the nylon leaching net of 100 mesh, is enclosed with 2~3 layers of the nylon on the water strainer
Filter screen.
By such scheme, this utility model at least has advantages below:
1st, pass through vacuum dehydration pipe to be arranged on pipe is rammed, can ram deep soil Binding in vivo water when pipe rammer is carried out
Effect is lower to discharge the soil body, can deep layer Dewatering dynamic compaction, and can rapid dispersion ram after the soil body super quiet pore pressure;
2nd, pass through to arrange charging aperture on pipe is rammed, the soil property little to interlayer soil infiltration coefficient can be by charging aperture input preferably
Soil property enter line replacement, reach change soil nature effect, solve the deficiency of existing traditional handicraft soft soil foundation deep-layer reinforcing;
3rd, tip can block up stream modeling shape soil absolutely and enter in rammer pipe, and mitigate the soil body to ramming the frictional force of pipe;
4th, pipe hammer ram is arranged in rammer pipe, freely falling body mode of the pipe hammer ram in rammer pipe, can compared with hook strong rammer
Reach thing half and cross effect again;
5th, the structure of pipe hammer ram can prevent hammer partially.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand skill of the present utility model
Art means, and being practiced according to the content of description, with preferred embodiment of the present utility model and coordinate accompanying drawing detailed below
Describe in detail bright as after.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation for ramming pipe and tip in this utility model;
Fig. 3 is vibration hammer pulley attachment structure schematic diagram in this utility model;
Fig. 4 is the structural representation of pincerlike detacher in this utility model;
Fig. 5 is the structural representation of pipe hammer ram in this utility model;
Fig. 6 is pipe hammer ram top plane view.
In figure:1st, crampon, 2, vibration hammer, 21, pulley, 22, absorbing frame, 23, spring, 24, vibrator, 3, pincerlike de-
Hook device, 31, steel cable, 32, cone-shaped hood, 33, shackle, 34, shackle pin, 35, pincerlike tripping gear, 36, fixing point, 4, pipe hammer ram,
41st, passage, 42, hook, the 43, first hammer body, the 44, second hammer body, 5, ram pipe, 51, the mouth of pipe, 52, charging aperture, 53, vacuum inhales
Water pipe, 54, water strainer, 55, overcoat, 56, through hole, 57, ram pipe reinforcement, 6, tip, 61, tip item, 62 tip bottoms.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below
Embodiment is used for this utility model to be described, but is not limited to scope of the present utility model.
As shown in Figures 1 to 6, the pipe of reinforced soft soil ground of the present utility model is rammed, by the tip being made up of steel pipe
6th, ram pipe 5 to constitute with vibration hammer 2, pincerlike detacher 3, the assembling of pipe hammer ram 4.
Ramming pipe 5 and adopting steel pipe manufacturing, vacuum dehydration pipe 53 is arranged in the both sides of pipe shaft outer wall, 53 bottom of vacuum dehydration pipe sets
Water strainer 54 is put, and 2~3 layers is wrapped up with the nylon leaching net of 100 mesh;For preventing the abrasion of water strainer 54 in work progress, in filter
Water strainer overcoat 55, holes drilled through 56 on 54 overcoat 55 of water strainer are set on hydrophone 54(Aperture 0.05cm), institute is sunk to when pipe 5 is rammed
Depth is needed, vacuum pump is opened and is carried out in vacuum-dewatering work progress and under conditions of vacuum is drawn water during ramming, because of vacuum
Suction function, in the soil body substantial amounts of Free water and the pore pressure water after ramming in the soil body by overcoat 55, nylon leaching net through drainage
Device 54 enters vacuum dehydration pipe 53, and discharges the soil body by vacuum dehydration pipe 53.5 mouth of pipe 51 of pipe is being rammed, lower end also sets up charging
Mouth 52, when, in work progress, chance current-formed silt cannot be tamped or meet generation " cavity " after clay is rammed, then can pass through the charging
Mouth pours into live preferably earth material, reaches the effect of displacement, different so as to ensure that the utility model can be suitably used for different thickness
The consolidation process of soil property.
Ram pipe 5 bottom and be provided with rammer pipe reinforcement 57, it is to avoid be that tip 6 is caused to damage ramming, tip item 61 straight
Footpath is the internal diameter for ramming pipe 5, tip 6 is inserted in rammer pipe 5, and tip bottom 62 is buried portion for tip, can be according to pipe tamping point before construction
Arrangement grid, bury pre-buried for tip portion, during construction need only will ram pipe box on tip can open vibration hammer by ram pipe beat
Enter desired depth.It is to block up stream modeling shape soil absolutely to enter in rammer pipe which acts on, and mitigates frictional force of the soil body to steel pipe.Tip belongs to one
Secondary property, buries with steel pipe when reaching certain depth and carrying out strong rammer, under hammer ram effect, is rammed into the soil body, can use certain proportioning
Concrete, or be made with other materials.
The connection vibration hammer 2 of the mouth of pipe 51 of pipe 5 is rammed, vibration hammer adopts electronic or hydraulic pressure, the vibration hammer that pipe is rammed to select root
Determine according to soil condition and the diameter for ramming pipe, according to Theoretical Calculation:Improve excited frequency soil not only can be reduced to ramming pipe
Side frictional resistance, and the acceleration of motion for ramming pipe can be more effectively improved than improving amplitude, so as to improve the speed of immersed tube.
But excited frequency is too high to cause power to increase excessively, therefore, should also consider when excited frequency is determined.Vibration hammer connects
On the mouth of pipe for ramming pipe, vibration hammer includes absorbing frame 22 and vibrator 24, passes through vibrator between absorbing frame 22 and vibrator 24
Spring 23 connects, and absorbing frame 22 is provided with pulley 21 and crampon 1, and pulley 21 connects steel cable 31 with pincerlike detacher 3 by wearing
Connection, hoisting winding make pincerlike detacher 3 or upper or lower motion by the steel cable forward or reverse.
Strong rammer adopts traditional freely falling body form, the safety of main consideration equipment and consolidation effect, freely falling body side
Formula compared with hook strong rammer can reach thing half and cross effect again, as the freely falling body mode of pipe hammer ram 4 is realized in rammer pipe
, it is in rammer pipe 5 to realize, therefore, suspension hook and hammer handle with the hammer that rises that existing strong rammer difference is exactly pipe hammer ram 4 with hook
Combination using pincerlike mode, and its opening and closing is controlled by steel cable.Pincerlike detacher 3 is by 31 joining shackle 33 of steel cable, shackle
Two semicircular pincerlike tripping gears 35 are installed at pin 34, control are provided with the pincerlike tripping gear of one piece of semicircle wherein
The fixing point 36 of steel cable, by tightening up or loosening the steel cable, can make pincerlike tripping gear 35 open or close, so that pipe hammer ram
Disengagement steel cable or lift pipe hammer ram.Pincerlike detacher also sets up a cone-shaped hood 32, and it is the pincerlike detacher 3 of protection and pipe which acts on
The junction of hammer ram 4, while also have the guide effect for making the crawl pipe of pincerlike detacher 3 hammer ram 4 link up with 42.
Pipe hammer ram 4 is made using cast steel, and diameter is less than and rams pipe 10cm, to ensure that pipe hammer ram is not touched during free-falling
Rammer pipe 5 is hit, its tamping energy is affected.The determination of tamping energy according to:Hammer weight × height determines.Pipe hammer ram top is provided with passage
41, it is to reduce suction of the soil body to pipe hammer ram after rammer which acts on, and the number of passage is determined according to the diameter of pipe hammer ram, generally
2~4;First hammer body 43 of pipe hammer ram is provided with hook 42, the connection of hook 42 and pincerlike tripping gear by steel cable control,
When pincerlike detacher opens, pipe hammer ram is not controlled by pincerlike detacher, and is fallen automatically, and the soil body is rammed;Pipe is rammed
Second hammer body, the 44 hammer ram position portion of hammer, it is when weak soil soil property is rammed which acts on, and can prevent hammer partially, when to weak soil soil
When body is rammed, the second hammer body 44 is introduced into the soil body and weak soil is extruded, and then the first hammer body 43 is again in compacted soil
Rammed on body, be ram after pincerlike detacher quickly capture pipe hammer ram and create conditions.
Rammed using above-mentioned pipe as follows to the method for reinforced soft soil ground:
1st, position:According to soil condition and reinforcement depth, determine the diameter and length for ramming pipe, after being connected with vibration hammer, carry
Rise and ram pipe, arrangement rams point on tamping point, pipe box will be rammed on the shoe for ramming point, vibration hammer is then turned on, will ram needed for pipe squeezes into
Depth.
2nd, connect vacuum dehydration pipe, using the pincerlike detacher of the lifting pulley connection increased on vibration hammer, pincerlike detacher
Sling hammer ram.
21st, the vacuum dehydration pipe of pipe both sides is rammed in connection, and is connected by soft rubber tube with vacuum pump, confirms to be tightly connected
Afterwards, open vacuum pump to draw water;
22nd, at the same time, the pincerlike detacher of lifting pulley connection, is sling by pincerlike detacher and rams pipe, and pipe hammer ram is inserted
Ram after desired depth being reached in pipe, gently ram 2~3 and hit(Under conditions of pincerlike detacher keeps connection status with hammer ram)Open afterwards and shake
Dynamic hammer, vibration lift rammer pipe, and now in ttom of pipe, pincerlike detacher is hooked on the hook handle of hammer ram pipe hammer ram in closure state;
23rd, vibration hammer puies forward the distance for ramming pipe, is determined according to soil condition, is 2~3m of lifting to the maximum, closes vibration hammer, stops
Only lifted, the distance of slinging of pipe hammer ram controls distance of slinging by pincerlike detacher control steel cable, carries out a rammer, ram for 2~3m
Several according to soil condition determine, the last straw ramming volume control in 10cm scopes;
24th, by carrying rammer pipe step by step, the method that tamps step by step, until earth's surface.During actual pipe is rammed, such as silt soil
Layer, pipe ram tamping energy grasp " hit less carry less, first light after weight " principle, also scene preferably soil property can be added to carry out in charging aperture
Displacement compacting, for argillic horizon produces " cavity " phenomenon, then also can add scene preferably soil property in charging aperture, be tamped;
25th, during carrying rammer pipe or ramming, vacuum dehydration is kept, can not only reduces the water content of the soil body, Er Qiejia
The pore pressure dissipation of the soil body, the consolidation effect needed for reaching after fast rammer;
26th, after the completion of pipe tamping point, can shift carries out the construction of next pipe tamping point;
27th, pipe tamping point arrangement grid according to geological conditions and rams pipe diameter determination, to the preferable soil property of infiltration coefficient, layouts
Network is 4.0m equilateral triangles, to the less soil property of infiltration coefficient, then can arrange by 2.0m equilateral triangles;
28th, such as muck soil body construction, after ramming pipe and being driven into desired depth in the presence of vibration hammer, you can open vacuum
Pumping takes the subsoil water of subjacent bed certain depth, while putting into scene preferably soil property in charging aperture, notices that pipe is rammed in charging
Hammer must be promoted to the mouth of pipe, allow the earth material of addition to be rammed after pouring into desired location;
29th, such as argillic horizon, " cavity " phenomenon after rammer, can be then produced, when the situation is found, pipe hammer ram is promoted to the mouth of pipe,
Soil property is put in charging aperture, earth material is rammed after pouring into desired location.
3rd, dewatering measure is aided in
31st, for guaranteeing to need reinforcing area not affected by peripheral water, further improve downcomer and ram method for strengthening effect, needing
Peripheral seal wall is set up outside reinforcing area sideline at 3~5m.
Method of the peripheral seal wall by Dust Deep Stir stake, stake footpath 70cm, stake overlap 20cm, stake embedded depth root with stake
According to need reinforcement depth determine, wherein it should be specifically noted that need reinforcement depth scope intraformational bed soil infiltration coefficient, to infiltration coefficient compared with
Big soil layer, needs stir is sprayed more more.Stirring material can be gathered materials on the spot, and typically with mud or clay, wherein yellow clay is optimal, mixes
Measure as 15%~20%.
32 while need reinforcing area efficiency of construction and construction quality to improve, and needs reinforcing area arrange certain pipe
Well precipitation network, precipitation pipe well adopt PVC ripple chimney filters, and caliber is 25cm~60cm, arranges filter in PVC ripple chimney filters tube wall
Press the nylon after 0.2m~0.5 spacing etc. divides arrangement, filter opening to be provided with 80 mesh of tube wall outer wrapping from top to bottom and filter in hole, filter opening
2~3 layers of net, or generation is arranged with geotechnique.Tubes welding can be determined according to the infiltration coefficient of geological conditions and soil, generally 15m ×
15m, pipe well bury deep according to needing reinforcement depth to determine.
Tube well dewatering releases weight principle using waterpower, can quick lowering of watertable, and drawdown buries depth up to pipe well
The 2/3 of degree.As large area soft foundation processing, its application is quite varied, and effect is fairly obvious.Reduced by tube well dewatering
Level of ground water, is that downcomer quickly drawing water for method for strengthening of rammer creates conditions.
4th, shallow-layer dynamic compaction
The soft soil foundation that need to be reinforced, rams set up peripheral seal, pipe well network precipitation ancillary method downcomer is met
Under, deep soil its soil bearing capacity eigenvalue under conditions of pipe is rammed and drawn water is significantly improved, and level of ground water is then reduced to pipe
The 2/3 of well embedded depth.On this basis, shallow-layer is aided with dynamic consolidation again, not only can improve soil bearing capacity eigenvalue, more may be used
Settlement after construction, relative settlement and the rate of settling are further eliminated.
Above-mentioned reinforcement means has the advantages that:
1st, implement simply, applied widely
The method that pipe rammer is carried out to the soft soil foundation for needing reinforcing area is rammed by pipe, forces deep soil Binding in vivo water ramming
The soil body is discharged under the effect of hitting, the vacuum dehydration bank of tubes for being arranged on tube wall goes out, and has both reached deep layer Dewatering dynamic compaction, quickly can disappear again
The super quiet pore pressure of the soil body after ramming is dissipated, is to accelerate soil stabilization to have established solid foundation;The soil property little to interlayer soil infiltration coefficient
By replacing preferable soil property, the effect for changing soil nature is reached, existing traditional handicraft soft soil foundation deep-layer reinforcing is solved not
Foot;Method for strengthening is rammed by downcomer, during the consolidation process to large-area soft ground, coefficient of permeability K is applicable not only to
The soil layer of the hypotonicities such as the soil property of≤0.1m/d such as very soft sill clay, the solid reinforcement for hypotonicity provide one kind
Brand-new reinforcing and processing method;But also it is applied to the preferable soil property of the infiltration coefficient such as soil property such as hydraulic fill sand, interlayer flour sand;Through this
After technique consolidation process, the characteristic load bearing capacity of the soil body can be significantly improved.
2nd, the engineering time is short, and speed is fast, low cost, and cost performance is high
Directly by deep layer Dewatering dynamic compaction, deep-layer reinforcing equipment and technology is initiated, can be rammed by changing according to design requirement
Hit and can reach technical specification, its settlement after construction of reinforcement means and the rate of settling from deep to shallow do not become with the change of working load
Change, the impact of settlement after construction and the rate of settling can be substantially eliminated;Due to being rammed with reference to pipe by precipitation, consolidation time is short, reinforces speed
Degree is fast, and integrated cost is low, is that other techniques are beyond one's reach.
3rd, deep layer precipitation, efficiency high, consolidation effect are obvious
Ram in Precipitation Process in pipe in the invention, be aided with precipitation envelope wall, tube well dewatering and shallow-layer dynamic consolidation, make the soil body
Mechanics index of physics is greatly changed, particularly the consolidation process to interlayer soil, the method by replacing, so that need to add
Gu soil body shape all-in-one-piece depth hard formation;Its reinforcement depth can pass through the placed-depth control for ramming pipe, be easy to the prison of work progress
Superintend and direct and manage, reach and reinforce closely knit effect, while for reducing settlement after construction, improve soft soil foundation bearing capacity established solid
Basis, therefore, the method is applied to the consolidation process of road, place, underground piping etc..
The above is only preferred implementation of the present utility model, is not limited to this utility model, it is noted that
For those skilled in the art, on the premise of without departing from this utility model know-why, can also do
Go out some improvement and modification, these improvement and modification also should be regarded as protection domain of the present utility model.
Claims (6)
1. a kind of pipe of reinforced soft soil ground is rammed, it is characterised in that:By the tip be made up of steel pipe, ram pipe and vibration hammer,
Pincerlike detacher, the assembling of pipe hammer ram are constituted, and the both sides for ramming pipe are disposed with vacuum dehydration pipe, and the rammer pipe is near the outer of the mouth of pipe
It is provided with wall and the charging aperture for ramming and connecting inside pipe;Water strainer is provided with the vacuum dehydration pipe, on the water strainer
It is enclosed with filter screen.
2. the pipe of reinforced soft soil ground according to claim 1 is rammed, it is characterised in that:The vibration hammer is connected to described
Ram on the mouth of pipe of pipe, the vibration hammer includes absorbing frame and vibrator, between the absorbing frame and vibrator, pass through vibrator bullet
Spring connects, and the absorbing frame is provided with pulley and crampon, and the pulley connects steel cable with the pincerlike detacher company by wearing
Connect.
3. the pipe of reinforced soft soil ground according to claim 2 is rammed, it is characterised in that:The pincerlike detacher include with
The U-shaped shackle of steel cable connection, the shackle end is connected with shackle pin, is connected with two semicircular pincers on the shackle pin
Tripping gear, arranges control steel cable and tightens up/loosen, makes pincerlike tripping gear described in two on one of them described pincerlike tripping gear
The fixing point for opening or closing, described unload to buckle also be covered with cone-shaped hood.
4. the pipe of reinforced soft soil ground according to claim 1 is rammed, it is characterised in that:The pipe hammer ram include from upper and
First hammer body and the second hammer body of lower connection, the first hammer body end be provided with several passages and with for the pincer
The hook of tripping gear connection, the diameter of second hammer body are less than the diameter of first hammer body with fixed to the pipe hammer ram
Position.
5. the pipe of reinforced soft soil ground according to claim 1 is rammed, it is characterised in that:Also it is arranged with the water strainer
Overcoat, outer the putting are provided with some through holes.
6. the pipe of reinforced soft soil ground according to claim 5 is rammed, it is characterised in that:The filter screen is the Buddhist nun of 100 mesh
Imperial filter screen, is enclosed with 2~3 layers of the nylon leaching net on the water strainer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620599884.1U CN206015653U (en) | 2016-06-20 | 2016-06-20 | A kind of pipe of reinforced soft soil ground is rammed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620599884.1U CN206015653U (en) | 2016-06-20 | 2016-06-20 | A kind of pipe of reinforced soft soil ground is rammed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206015653U true CN206015653U (en) | 2017-03-15 |
Family
ID=58242757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620599884.1U Expired - Fee Related CN206015653U (en) | 2016-06-20 | 2016-06-20 | A kind of pipe of reinforced soft soil ground is rammed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206015653U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013042A (en) * | 2016-06-20 | 2016-10-12 | 叶吉 | Soft soil foundation reinforcing method and pipe ram for reinforcement |
CN109296018A (en) * | 2018-10-25 | 2019-02-01 | 广州博昊勘测技术有限公司 | A kind of earth working material is implanted into the later maintenance construction machinery of required pit-hole |
CN110319739A (en) * | 2017-12-01 | 2019-10-11 | 浙江宏宇工程勘察设计有限公司 | A kind of explosion strong rammer linkage |
-
2016
- 2016-06-20 CN CN201620599884.1U patent/CN206015653U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013042A (en) * | 2016-06-20 | 2016-10-12 | 叶吉 | Soft soil foundation reinforcing method and pipe ram for reinforcement |
CN106013042B (en) * | 2016-06-20 | 2019-01-01 | 叶吉 | A kind of soft soil foundation reinforcing method and the pipe of reinforcing ram |
CN110319739A (en) * | 2017-12-01 | 2019-10-11 | 浙江宏宇工程勘察设计有限公司 | A kind of explosion strong rammer linkage |
CN110319739B (en) * | 2017-12-01 | 2021-10-01 | 浙江宏宇工程勘察设计有限公司 | Blasting dynamic compaction linkage device |
CN109296018A (en) * | 2018-10-25 | 2019-02-01 | 广州博昊勘测技术有限公司 | A kind of earth working material is implanted into the later maintenance construction machinery of required pit-hole |
CN109296018B (en) * | 2018-10-25 | 2021-05-25 | 南京溧水高新产业股权投资有限公司 | Later maintenance construction machinery for implanting required pits in geotechnical materials |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013042B (en) | A kind of soft soil foundation reinforcing method and the pipe of reinforcing ram | |
CN105275381B (en) | Impact drill drilling construction method in rich water pebble layer | |
CN106120702B (en) | High roadbed artificial foundation back-filling in layers is layered strong rammer composite reinforcement method | |
CN206015653U (en) | A kind of pipe of reinforced soft soil ground is rammed | |
CN101392527B (en) | Method for processing soft foundation by earthwork fabric granular pile | |
CN104727308B (en) | Immersed tube compaction pile or cast-in-place concrete pile construction device and method | |
CN105970900A (en) | Offshore wind turbine gravity type foundation installation seabed treatment process | |
CN107100182A (en) | Soft foundation cluster type layering precipitation no-arbitrary pricing pipe rams system and its construction method | |
CN107524141A (en) | A kind of construction method of piece of stone soil base cast-in-situ bored pile | |
CN112281857A (en) | Deep foundation pit excavation construction method | |
CN104047280B (en) | Soft foundation sharp separation compacting method | |
CN106978801A (en) | The construction method of its progress reinforced soft soil ground of multifunction vibration air-pressure tube and application | |
CN207003459U (en) | Soft foundation cluster type layering precipitation no-arbitrary pricing pipe rams system | |
CN102888847A (en) | Construction method free from lowering water level for local deep foundation pit of elevator shaft | |
CN212001106U (en) | Hole cleaning system for cast-in-place pile | |
CN206706774U (en) | Larsen steel plate matches somebody with somebody i shaped steel foundation ditch sealing support system | |
CN105672309A (en) | Encasing method for hole forming of socketed piles at karst terrain through recoverable extra-long steel pile casings | |
CN104790376A (en) | Soft foundation modified rapid separation and tamping method | |
CN105133568A (en) | Improved dynamic compaction hammer | |
CN105735253B (en) | A kind of construction method of enlarged footing resistance to compression uplift pile | |
CN111236234A (en) | Hole cleaning system and hole cleaning method for cast-in-place pile | |
CN207004431U (en) | Soft soil foundation exciting drilling device | |
CN103132511A (en) | Pile-forming method and pile-forming device for static pressure immersed tube expanded-base cast-in-place pile | |
CN106930274A (en) | The a full set of cylinder rotatory boring castinplace pile construction method that a kind of reinforcing bar cage location is fixed | |
CN114961336B (en) | Protective demolition construction method for foundation pile of basement close to existing subway line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170315 Termination date: 20180620 |