CN205990798U - Etching room for steel-structure factory building - Google Patents

Etching room for steel-structure factory building Download PDF

Info

Publication number
CN205990798U
CN205990798U CN201620972481.7U CN201620972481U CN205990798U CN 205990798 U CN205990798 U CN 205990798U CN 201620972481 U CN201620972481 U CN 201620972481U CN 205990798 U CN205990798 U CN 205990798U
Authority
CN
China
Prior art keywords
room
factory building
support system
etching
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620972481.7U
Other languages
Chinese (zh)
Inventor
罗健明
黄家德
莫积朝
余翔宇
梁秀冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Huadian Intelligent Equipment Co.,Ltd.
Original Assignee
Guangxi Transmission And Substation Construction Co Ltd Iron Tower Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Transmission And Substation Construction Co Ltd Iron Tower Factory filed Critical Guangxi Transmission And Substation Construction Co Ltd Iron Tower Factory
Priority to CN201620972481.7U priority Critical patent/CN205990798U/en
Application granted granted Critical
Publication of CN205990798U publication Critical patent/CN205990798U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Preventing Corrosion Or Incrustation Of Metals (AREA)

Abstract

The utility model discloses a kind of etching room for steel-structure factory building, it is using steelframe support system, covers PVC plastic buckling plate and the acid resistance lightweight tension film being arranged on this steelframe support system surface, Suan Chi area, driving beam-and-rail and driving are closed in interior totally-enclosed room structure;The two ends in this closing room are provided with entry/exit bin gate and travelling crane inspection door;It is additionally provided with air entry on the room body in this closing room.This utility model etching room closure is good, less to outside Factory Building and the supporting crane gear extent of corrosion of production;Crane gear can need not be customized using tradition driving;It is applied to new plant designing to select, be also applied for original old factory rehabilitation and enlarging;Compared with prior art, cost relatively lower, install/using/safeguard more convenient.

Description

Etching room for steel-structure factory building
Technical field
This utility model is related to the design of commercial production acid-washing region, is especially for the pickling of steel-structure factory building Between.
Background technology
Pickling is one of galvanization production line important procedure it is therefore an objective to make steel beam column keep clean before galvanizing Pure iron active surface.Acid-washing region is generally made up of several sour ponds and clear water reserviors, quickening liquid pond(As shown in Figure 1), pickle adopts It is 4% ~ 25% technical hydrochloric acid;Although with the addition of acid fog inhibitor, because hydrochloric acid has certain volatility, still can be right Place Factory Building produces corrosiveness.
Existing galvanization production line Factory Building generally uses reinforced concrete structure or steel construction, both can be subject to The corrosion of acid-washing region acid mist:Reinforced concrete structure corrosion fatigue life is longer, but corrosion condition is hidden, is difficult to assess and keeps in repair; Corrosion of steel structure situation is more come to the surface it is easy to assess maintenance.Due to steel-structure factory building, also to have easy for installation, cost low excellent Point, therefore, as long as anti-corrosion measure is proper, galvanization production line Factory Building selects can be more preferably using steel-structure factory building.
Acid-washing region anti-corrosion measure at present relatively current, effective galvanization production line Factory Building is to be designed as acid-washing region entirely Enclosed construction, i.e. so-called " room in room " scheme as shown in Figure 2.The program is by the main body of supporting for workpiece crane gear(As indulged To lifting guide rail and hoist crane)Be located at " room in room " outward, only suspension hook in " room ", therefore this acid-washing region closure relatively Good, less to outside Factory Building and crane gear extent of corrosion;But the program also has the disadvantage that:
1st, because a whole set of tackling system can only be suspended in the overarm on Factory Building top, in the case of big Factory Building, big workpiece This overarm span is larger, and stress is larger simultaneously, therefore needs COMPREHENSIVE CALCULATING stressing conditions in plant designing;If to existing When old factory rehabilitation or enlarging, the program is most probably inapplicable;
2nd, the program is due to needing using longitudinally(Factory Building direction)The tackling system of guide rail, and cannot be using traditional/existing Bridge type vehicle-driving, therefore crane gear will put into again, and must be particularly customized;
3rd, due to the larger reason of above-mentioned stress, the steel beam column size in " room in room " and weight are also larger, therefore cost height, peace Dress difficulty is also larger;
4th, in the program, crane gear only has suspension hook in " room ", and therefore equipment manipulation needs extreme care, and, occur Keep in repair relatively difficult during fault.
Content of the invention
In order to effectively overcome above deficiency, this utility model provides a kind of etching room for steel-structure factory building, its feature Be closure good, to outside Factory Building and produce supporting crane gear extent of corrosion less, and cost relatively lower, install/using/ Safeguard more convenient.
This utility model is used for the etching room of steel-structure factory building, is particularly suited for Factory Building top and is provided with driving beam-and-rail and configures There is the situation of driving, concrete technical scheme is as follows:Whole etching room is to be arranged on this steelframe and propped up using steelframe support system, covering The PVC plastic buckling plate on support system surface and acid resistance lightweight tension film, by Suan Chi area, driving beam-and-rail and driving be closed in complete Closing room structure;Wherein, the assembly that described steelframe support system is adopted is in a pre-installation through anti-corrosion pretreatment;Additionally, this closing The two ends in room are provided with entry/exit bin gate and travelling crane inspection door;Be additionally provided with air entry in this closing room body, for by aspirating air pipe with Outside acid mist processing system is connected.
In such scheme, described closing room can specifically build in the following way:Build steelframe to support around sour pond System, covered with PVC plastic buckle and be arranged in described steelframe support system formation metope, and, using acid resistance lightweight tension Film is fixed on and forms roof between factory roof and driving beam-and-rail.
In such scheme, described lightweight tension film can be led by Factory Building column and the adjusting yoke extending from back timber Draw fixation.
As preferably a kind of embodiment, described entry/exit bin gate and travelling crane inspection door are to adopt to resist with acid resistance lightweight Membrane is as the rolling screen door of main material matter.
With respect to prior art, the etching room that this utility model is used for steel-structure factory building has following features and advantage:
1st, Suan Chi area, driving beam-and-rail and driving are closed in etching room, closure is good, material lifting is convenient, is meeting While pickling process, less to outside Factory Building and the supporting crane gear extent of corrosion of production;
2nd, using light section steel structure, PVC plastic buckling plate, lightweight tension film, sour pond district's groups are become " room in room " in Factory Building, Cost is relatively lower;It is applied to new plant designing to select, be also applied for original old factory rehabilitation and enlarging;To traditional steel structure Factory Building Speech, increase stress is little, and construction investment is few, and construction volume and difficulty of construction are little;
3rd, the two ends in etching room closing room are provided with roller shutter type entry/exit bin gate and travelling crane inspection door, produce and overhaul of the equipments dimension Shield is more convenient;
4th, crane gear can need not be customized using tradition driving, equipment investment is less.
Brief description
Fig. 1 is the internal process layout floor map of the common steel-structure factory building being provided with acid-washing region.
Fig. 2 is existing steel-structure factory building and the layout structure schematic diagram of " room in room " therein formula etching room.
Fig. 3 is the structural representation one of the etching room that this utility model is used for steel-structure factory building(Omit rane trolley portion Point).
Fig. 4 is the structural representation two of the etching room that this utility model is used for steel-structure factory building.
Specific embodiment
The etching room being used for steel-structure factory building to this utility model below in conjunction with accompanying drawing is further described.
Fig. 3,4 be this utility model for steel-structure factory building etching room structural representation(For making expression in map more Clearly, omit rane trolley part in Fig. 3).As shown in Figure 3,4, it is provided with Suan Chi area 5 in Factory Building, Factory Building top is provided with driving Beam-and-rail(It is erected on factory building columns bracket 6)And it is configured with driving 1.This utility model is used for the etching room of steel-structure factory building, is to adopt With steelframe support system 2, cover PVC plastic buckling plate 3 and the acid resistance lightweight tension film being arranged on this steelframe support system 2 surface 4, Suan Chi area 5, driving beam-and-rail and driving 1 are closed in interior totally-enclosed room structure;Specifically, can be by using around sour pond Steel column and steel cross bar build steelframe support system 2, form wall in described steelframe support system 2 with PVC plastic buckle 3 covering spiral-lock Face, and, it is fixed between factory roof and driving beam-and-rail using acid resistance lightweight tension film 4 and form roof realization.Wherein, institute State lightweight tension film 4 and traction fixation can be carried out by Factory Building column and the adjusting yoke 11 extending from back timber.
As shown in figure 4, the two ends of this totally enclosed type etching room are additionally provided with entry/exit bin gate 7 and travelling crane inspection door 8;Meanwhile, seal Close and in room body, be additionally provided with air entry 9, for by aspirating air pipe and outside acid mist processing system 10(Containing suction fan)It is connected. Described entry/exit bin gate 7 and travelling crane inspection door 8, it is preferred to use using acid resistance lightweight tension film as the rolling screen door of main material matter.
In this programme, driving 1 and the assembly that adopted of steelframe support system 2 must be through preservative treatments(For example zinc-plated and plus apply Multi-layer anticorrosion paint).
The galvanizing factory that the present inventor is located employs the etching room of above technical scheme.Below in conjunction with concrete Acid cleaning process this utility model etching room is described further in my application of unit:
1)Treat galvanized workpiece to hang in hanging box and steep in sour pond(0.5 ~ 8 hour), due to being added with acid fog inhibitor, And now all rolling screen door(Bin gate containing entry/exit 7 and travelling crane inspection door 8)Put down, when therefore static, acid solution face seldom produces acid Mist, suction fan can be shut down;
2)Only dynamic(There is the sour pond of workpiece turnover)When acid solution face just produce more acid mist, now suction fan open, enter/ Discharge door 7 rises, and falls after track flat car 12 completes input and output material, then with driving 1 in room, hanging box shifts between each pond work Industry;
3)When driving 1 need to be overhauled, travelling crane inspection door 8 rises, and driving 1 is outputed etching room and overhauled.
The technical scheme of this utility model etching room shows in the application practice of the new galvanizing factory of my unit:This Utility model technical scheme etching room construction investment is few, and construction volume and difficulty are little;Closure is good, material lifting is convenient, produce and Equipment repair and maintenance are more convenient;While meeting pickling process, journey is corroded to outside Factory Building and the supporting crane gear of production Degree is less.
Some better embodiment of the present utility model that above content only enumerates are it is impossible to be considered as limiting this practicality New form of implementation.Equivalent variations and improvement that all one of ordinary skill in the art can make according to technical solutions of the utility model, All should belong within the covering scope of technical solutions of the utility model.

Claims (5)

1. it is used for the etching room of steel-structure factory building, this Factory Building top is provided with driving beam-and-rail and is configured with driving;It is characterized in that:This Etching room is using steelframe support system, covers and be arranged on the PVC plastic buckling plate on this steelframe support system surface and acid resistance is light Matter tension film, Suan Chi area, driving beam-and-rail and driving are closed in interior totally-enclosed room structure;Wherein, described steelframe support system The assembly being adopted is in a pre-installation through anti-corrosion pretreatment;Additionally,
The two ends in this closing room are provided with entry/exit bin gate and travelling crane inspection door;It is additionally provided with air entry in this closing room body, be used for passing through Aspirating air pipe is connected with outside acid mist processing system.
2. etching room according to claim 1 it is characterised in that:Described closing room is specifically mainly built by around sour pond Steelframe support system, with PVC plastic buckle cover be arranged in described steelframe support system formed metope, and, using resistance to Acid lightweight tension film is fixed on the roof composition between factory roof and driving beam-and-rail.
3. etching room according to claim 1 and 2 it is characterised in that:Described lightweight tension film pass through Factory Building column and from The adjusting yoke that back timber extends carries out traction to be fixed.
4. according to claim require 1 or 2 described in etching room it is characterised in that:Described entry/exit bin gate and travelling crane inspection door, It is the rolling screen door adopting using acid resistance lightweight tension film as main material matter.
5. according to claim require 3 described in etching room it is characterised in that:Described entry/exit bin gate and travelling crane inspection door, are to adopt In order to acid resistance lightweight tension film as main material matter rolling screen door.
CN201620972481.7U 2016-08-30 2016-08-30 Etching room for steel-structure factory building Active CN205990798U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620972481.7U CN205990798U (en) 2016-08-30 2016-08-30 Etching room for steel-structure factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620972481.7U CN205990798U (en) 2016-08-30 2016-08-30 Etching room for steel-structure factory building

Publications (1)

Publication Number Publication Date
CN205990798U true CN205990798U (en) 2017-03-01

Family

ID=58104689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620972481.7U Active CN205990798U (en) 2016-08-30 2016-08-30 Etching room for steel-structure factory building

Country Status (1)

Country Link
CN (1) CN205990798U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610247A (en) * 2018-11-26 2019-04-12 任震环 A kind of solid elastomer vibration damping band
CN113275353A (en) * 2021-06-03 2021-08-20 成都同华天环保设备有限公司 Acid mist collecting equipment for hot galvanizing production and process flow thereof
CN114850165A (en) * 2022-04-08 2022-08-05 徐州鑫泰镀锌设备有限公司 Hot galvanizing acid mist treatment is with sealing with automatically cleaning structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610247A (en) * 2018-11-26 2019-04-12 任震环 A kind of solid elastomer vibration damping band
CN113275353A (en) * 2021-06-03 2021-08-20 成都同华天环保设备有限公司 Acid mist collecting equipment for hot galvanizing production and process flow thereof
CN114850165A (en) * 2022-04-08 2022-08-05 徐州鑫泰镀锌设备有限公司 Hot galvanizing acid mist treatment is with sealing with automatically cleaning structure

Similar Documents

Publication Publication Date Title
CN205990798U (en) Etching room for steel-structure factory building
CN104152977B (en) Full automatic electroplating production line
CN103643246A (en) Hot-dip galvanizing production line pretreatment acid mist sealing, collecting and treating system
CN205570980U (en) Effluent water sump deodorization cover
CN107557712A (en) Galvanizing system and the method that side goes out are entered in a kind of end
CN212923108U (en) Production line for closed galvanizing pretreatment
CN103361568B (en) A kind of fire-resistant and weather-resistant structural steel and manufacture method thereof
CN207686345U (en) A kind of light steel villa of assembled
CN103950098B (en) A kind of energy-conserving and environment-protective controllable constant-temperature curing system
CN207452226U (en) Hold the galvanizing system gone out into side
CN214782161U (en) Take pickling room of business turn over material structure
CN211311606U (en) Metal surface treatment pool
CN204974671U (en) Safe energy -conserving perchloric acid fume chamber
CN208965827U (en) A kind of Curtain wall with open frame leakage-resistant device
CN209817220U (en) Cast-in-situ hollow floor system of multi-layer industrial factory building
CN207538504U (en) A kind of Two bors d's oeuveres channel steel structure of riveted type
CN103821394B (en) There is sand blasting room and the construction method thereof of movable roof
CN207713359U (en) Lifting device between being closed for galvanizing
CN205776917U (en) Steel house rain-proof structure
CN106284883A (en) A kind of antirust outdoor metal hand rail
CN209309462U (en) A kind of novel integrated suspension and support high strength alumin ium alloy C-shaped channel
CN203569196U (en) Novel acid mist collecting device
CN210152722U (en) Be attached to near water support device of section of jurisdiction
CN204563927U (en) A kind of oxidation air pipe network for desulfurizing tower
CN210367871U (en) Environment-friendly hot galvanizing device

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221103

Address after: No. 99 Shiyuan Road, Wuwei Town, Jiangnan District, Nanning City, Guangxi Zhuang Autonomous Region 530031

Patentee after: Guangxi Huadian Intelligent Equipment Co.,Ltd.

Address before: 530000 No. 99, Shiyuan Road, Wuwei Town, Jiangnan District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee before: TOWER FACTORY, GUANGXI POWER TRANSMISSION CONSTRUCTION CO.,LTD.

TR01 Transfer of patent right