CN205990738U - Node is installed between unpowered blast cap and exhaust duct - Google Patents

Node is installed between unpowered blast cap and exhaust duct Download PDF

Info

Publication number
CN205990738U
CN205990738U CN201620227639.8U CN201620227639U CN205990738U CN 205990738 U CN205990738 U CN 205990738U CN 201620227639 U CN201620227639 U CN 201620227639U CN 205990738 U CN205990738 U CN 205990738U
Authority
CN
China
Prior art keywords
blast cap
stone
unpowered blast
stone slab
exhaust duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620227639.8U
Other languages
Chinese (zh)
Inventor
鲍喜臣
郭瑞敏
牛晓生
翟春
尹建楠
刘金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201620227639.8U priority Critical patent/CN205990738U/en
Application granted granted Critical
Publication of CN205990738U publication Critical patent/CN205990738U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Node is installed between a kind of unpowered blast cap and exhaust duct, node includes one block of granite building material plate, stone plate center is provided with the installing hole of unpowered blast cap, and stone plate lower surface is provided with four bolt heeling-in holes along installing hole outer rim, and bolt heeling-in in the hole is fixed with screw rod by cloud stone glue.The bottom of unpowered blast cap passes through installing hole, unpowered blast cap is fixed on stone slab by screw rod and nut by connector.It is mounted with that the stone slab of unpowered blast cap is bonded in building roof exhausting duct top by cloud stone glue.Stone slab, the screw rod being fixed on stone slab, nut and cloud stone glue collectively form installation node between unpowered blast cap of the present utility model and exhaust duct.Install between unpowered blast cap of the present utility model and exhaust duct that node structure is simple, aesthetic appearance is strong.Convenient using installing node construction between unpowered blast cap of the present utility model and exhaust duct, unpowered blast cap is installed simple and direct, quick, it is possible to decrease construction cost.

Description

Node is installed between unpowered blast cap and exhaust duct
Technical field
This utility model is related to a kind of mounting structure of unpowered blast cap on building house exhaust passage, installs node between more particularly to a kind of unpowered blast cap and exhaust duct.
Background technology
The unpowered blast cap of finished product, the features such as because of attractive in appearance, practical and easy construction, is increasingly widely applied in building engineering construction.Unpowered blast cap is installed, unpowered blast cap is mainly fixed on the top of building house exhaust passage by traditional construction using concrete.Traditional construction technology, complex process, long construction period, unsightly and construction cost is higher.
Utility model content
The purpose of this utility model be provide that a kind of structure is simple, aesthetic appearance strong, easy construction, mounting process is simple and direct, can reduce installation node between the unpowered blast cap of construction cost and exhaust duct.
The purpose of this utility model is that by.This utility model is unpowered between blast cap and exhaust duct installs node diagnostic and is:One piece of stone slab of setting, described stone slab is rectangular, stone slab center is provided with the installing hole of a unpowered blast cap, if the lower surface of stone slab is in the uniform bolt stem heeling-in hole of installing hole outer rim, described bolt heeling-in in the hole is perfused with cloud stone glue, described bolt heeling-in in the hole is provided with screw rod, described screw rod is fixed on bolt heeling-in in the hole by cloud stone glue, the bottom of described unpowered blast cap passes through the installing hole of stone slab, unpowered blast cap is fixed on screw rod by nut by fixture, described stone slab lower surface is coated with cloud stone glue at installing hole outer rim, described stone slab lower surface is bonded in building roof exhausting duct top by cloud stone glue, described stone slab, it is fixed on the screw rod on stone slab, nut and cloud stone glue collectively form installation node between unpowered blast cap and exhaust duct.
This utility model is unpowered to install node between blast cap and exhaust duct, wherein said stone slab is granite slabstone, bolt heeling-in hole on stone plate is provided with four, the installing hole concentric of the annular that four bolt heeling-in holes are formed and stone slab, described stone slab four when being provided with Rome.
This utility model is unpowered to install node between blast cap and exhaust duct, is provided with fluid sealant between the installing hole joining place of wherein said unpowered blast cap and stone plate and gap.
This utility model is unpowered between blast cap and exhaust duct installs node difference from prior art and is between the unpowered blast cap of this utility model and exhaust duct that installing node includes one block of granite building material plate, stone plate center is provided with the installing hole of unpowered blast cap, stone plate lower surface is provided with four bolt heeling-in holes along installing hole outer rim, and bolt heeling-in in the hole is fixed with screw rod by cloud stone glue.The bottom of unpowered blast cap passes through installing hole, unpowered blast cap is fixed on stone slab by screw rod and nut by connector.It is mounted with that the stone slab of unpowered blast cap is bonded in building roof exhausting duct top by cloud stone glue.Stone slab, the screw rod being fixed on stone slab, nut and cloud stone glue collectively form installation node between unpowered blast cap of the present utility model and exhaust duct.Install between unpowered blast cap of the present utility model and exhaust duct that node structure is simple, aesthetic appearance is strong.Convenient using installing node construction between unpowered blast cap of the present utility model and exhaust duct, unpowered blast cap is installed simple and direct, quick, it is possible to decrease construction cost.
Below in conjunction with the accompanying drawings this utility model is installed between unpowered blast cap and exhaust duct with node be described further.
Brief description
Fig. 1 is the configuration state schematic diagram installing node between unpowered blast cap and exhaust duct.
Fig. 2 is the structure schematic top plan view installing stone plate in node between unpowered blast cap and exhaust duct.
Fig. 3 is the a-a cross-sectional view of stone plate in Fig. 2.
Fig. 4 is I detail drawing in Fig. 1.
Specific embodiment
As shown in Figure 1, Figure 2, Figure 3, Figure 4, node is installed between the unpowered blast cap of this utility model and exhaust duct and includes one piece of rectangular stone slab 2.Stone slab 2 center is provided with the installing hole 2.1 of a unpowered blast cap 1, if the lower surface of stone slab 2 is in the uniform bolt stem heeling-in hole 2.2 of installing hole 2.1 outer rim.It is perfused with cloud stone glue 7 in bolt heeling-in hole 2.2, in bolt heeling-in hole 2.2, is provided with screw rod 5, screw rod 5 is fixed in bolt heeling-in hole 2.2 by cloud stone glue 5.The bottom of unpowered blast cap 1 passes through the installing hole 2.1 of stone slab 2, and the bottom of unpowered blast cap 1 is fixed on screw rod 5 by nut 6 by fixture 1.1.Stone slab 2 lower surface is coated with cloud stone glue 7 at installing hole 2.1 outer rim, and stone slab 2 lower surface is bonded in building roof exhausting duct 4 top by cloud stone glue 7.Stone slab 2, the screw rod 5 being fixed on stone slab 2, nut 6 and cloud stone glue 7 collectively form installation node between unpowered blast cap and exhaust duct.
As shown in Figure 2 and Figure 3, stone slab 2 is granite slabstone, and the bolt heeling-in hole 2.2 on stone plate 2 is provided with four, installing hole 2.1 concentric of the annular that four bolt heeling-in holes 2.2 are formed and stone slab 2.The four of stone slab 2 are when being provided with Rome 2.3.
As shown in figure 4, being provided with fluid sealant 3 between installing hole 2.1 joining place of unpowered blast cap 1 and stone plate 2 and gap.
Construction procedure of the present utility model is as follows:
Step one, the length and width size of granite building material plate 2 is determined according to building house exhaust passage outlet size;The size of stone plate 2 upper installing hole 2.1 is determined according to the unpowered blast cap of finished product 1 bottom barrel radius size and opens up installing hole 2.1;Determine the position in four bolt heeling-in holes 2.2 of stone plate 2 bottom surface, size and open up its hole.
Step 2, in four holes 2.2 of stone plate 2 bottom surface perfusion cloud stone glue 7 being adhesively fixed screw rod 5 by cloud stone glue 7.
Unpowered blast cap 1 is fixed on stone plate 2 for step 3, the fixture 1.1 using unpowered blast cap 1 and screw rod 5 and nut 6.
Break fluid sealant 3 between step 4, the installation joining place in unpowered blast cap 1 and stone plate 2 and gap and carry out anti-drain process of obturaging.
Step 5, whole stone plate 2 and unpowered blast cap 1 are pasted on the top of building roof exhausting duct 4 using cloud stone glue 7.
Embodiment described above is only that preferred implementation of the present utility model is described; not scope of the present utility model is defined; on the premise of without departing from this utility model design spirit; various modifications and improvement that those of ordinary skill in the art make to the technical solution of the utility model, all should fall in the protection domain of this utility model claims determination.

Claims (3)

1. between a kind of unpowered blast cap and exhaust duct install node it is characterised in that:One piece of stone slab of setting(2), described stone slab(2)Rectangular, stone slab(2)Center is provided with a unpowered blast cap(1)Installing hole(2.1), stone slab(2)Lower surface in installing hole(2.1)If the uniform bolt stem heeling-in hole of outer rim(2.2), described bolt heeling-in hole(2.2)Inside it is perfused with cloud stone glue(7), described bolt heeling-in hole(2.2)Inside it is provided with screw rod(5), described screw rod(5)By cloud stone glue(7)It is fixed on bolt heeling-in hole(2.2)Interior, described unpowered blast cap(1)Bottom pass through stone slab(2)Installing hole(2.1), unpowered blast cap(1)By fixture(1.1)By nut(6)It is fixed on screw rod(5)On, described stone slab(2)Lower surface is in installing hole(2.1)It is coated with cloud stone glue at outer rim(7), described stone slab(2)Lower surface passes through cloud stone glue(7)It is bonded in building roof exhausting duct(4)Top, described stone slab(2), be fixed on stone slab(2)On screw rod(5), nut(6)And cloud stone glue(7)Collectively form installation node between unpowered blast cap and exhaust duct.
2. between unpowered blast cap according to claim 1 and exhaust duct install node it is characterised in that:Described stone slab(2)For granite slabstone, stone plate(2)On bolt heeling-in hole(2.2)It is provided with four, four bolt heeling-in holes(2.2)The annular being formed and stone slab(2)Installing hole(2.1)Concentric, described stone slab(2)Four when being provided with Rome(2.3).
3. between unpowered blast cap according to claim 1 and 2 and exhaust duct install node it is characterised in that:Described unpowered blast cap(1)With stone plate(2)Installing hole(2.1)It is provided with fluid sealant between joining place and gap(3).
CN201620227639.8U 2016-03-23 2016-03-23 Node is installed between unpowered blast cap and exhaust duct Expired - Fee Related CN205990738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620227639.8U CN205990738U (en) 2016-03-23 2016-03-23 Node is installed between unpowered blast cap and exhaust duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620227639.8U CN205990738U (en) 2016-03-23 2016-03-23 Node is installed between unpowered blast cap and exhaust duct

Publications (1)

Publication Number Publication Date
CN205990738U true CN205990738U (en) 2017-03-01

Family

ID=58101487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620227639.8U Expired - Fee Related CN205990738U (en) 2016-03-23 2016-03-23 Node is installed between unpowered blast cap and exhaust duct

Country Status (1)

Country Link
CN (1) CN205990738U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109424071A (en) * 2017-08-31 2019-03-05 上海宝冶集团有限公司 The connection method of blast cap and wall
CN113062561A (en) * 2021-04-02 2021-07-02 上海申标建筑设计有限公司 Building ventilation system and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109424071A (en) * 2017-08-31 2019-03-05 上海宝冶集团有限公司 The connection method of blast cap and wall
CN113062561A (en) * 2021-04-02 2021-07-02 上海申标建筑设计有限公司 Building ventilation system and construction method thereof

Similar Documents

Publication Publication Date Title
CN205990738U (en) Node is installed between unpowered blast cap and exhaust duct
WO2008143225A1 (en) Process for producing ceramic honeycomb structure and ceramic honeycomb structure
CN203961172U (en) Folded-edge dry-hang stone
CN205259531U (en) Exempt from basic level treatment vitrified tile , sheet metal stone cladding process structure
CN202672592U (en) Stone anchoring structure
CN205185151U (en) Take window frame prefabricated component special mould
CN207003896U (en) A kind of decorative panel suspension member and decorative panel install node
CN206346356U (en) A kind of curtain wall of energy-conserving and environment-protective installs aluminium sheet
CN206360263U (en) A kind of stainless steel pattern-etched decorative plate
CN201794244U (en) Dry-hanging fireproof wood veneer
CN209293335U (en) A kind of pottery clay plates brick mounting structure
CN203097199U (en) Conveniently-mounted tile
CN203145398U (en) Marble interior wall hanging plate
CN202878446U (en) Coating device of diatom ooze
CN206233504U (en) A kind of back hanging type inner wall crystalline substance calcium board mounting structure
CN207144359U (en) A kind of exquisite log wall decorative cover structure
CN202745306U (en) Heat insulation and decoration integrating plate
CN206385770U (en) Simple ceramic tile suspension member
CN202672671U (en) Novel imitation brick adhesive tape
CN205297164U (en) Aerated concrete window wrap panel fixed establishment
CN202731205U (en) Slate partial thickening and mounting structure for architectural ornament
CN201288382Y (en) Embedded glass structure of movable house
CN203257036U (en) External wall tile
CN204081370U (en) Building heat preservation decorative panel connects securing member
CN207228420U (en) Compound stone curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170301