CN109424071A - The connection method of blast cap and wall - Google Patents

The connection method of blast cap and wall Download PDF

Info

Publication number
CN109424071A
CN109424071A CN201710771248.1A CN201710771248A CN109424071A CN 109424071 A CN109424071 A CN 109424071A CN 201710771248 A CN201710771248 A CN 201710771248A CN 109424071 A CN109424071 A CN 109424071A
Authority
CN
China
Prior art keywords
blast cap
wall
upvc
casing
outer end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710771248.1A
Other languages
Chinese (zh)
Inventor
程博
张军
刘�东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201710771248.1A priority Critical patent/CN109424071A/en
Publication of CN109424071A publication Critical patent/CN109424071A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids

Abstract

The present invention relates to the connection methods of a kind of blast cap and wall, comprising steps of one: structure sealant being applied to the lateral surface and inner end of UPVC casing at shape of threads, it is made to be adhesively fixed with wall and common steel sleeve outer end;Two: exposing wall part smearing structure sealant in UPVC casing outer end;The casing outer end three: UPVC exposes wall part and is closed up with cement mortar, and squeezes into plastic dowel sleeve on the wall of UPVC casing two sides;Four: pasting double-sided adhesive in blast cap cylinder neck lower part and inside the brim of a hat;Five: blast cap cylinder neck blank space is at shape of threads smearing structure sealant, then to break fixation clamp on blast cap at 45 ° and be inserted into UPVC inside pipe casing, and squeezes into self-tapping screw and fix;Six: twice waterproof gasket cement is uniformly applied at the blast cap the brim of a hat, second waterproof gasket cement is wider than first of waterproof gasket cement, and the present invention is fixed for improving exterior wall blast cap with wall connecting, and blast cap is enable to have in the fixation of exterior wall compared with stiff stability, waterproofness.

Description

The connection method of blast cap and wall
Technical field
The present invention relates to a kind of blast cap connection methods, the specifically connection method of blast cap and wall.
Background technique
Connection between traditional stainless steel blast cap and steel sleeve, it is pre-buried or the later period punches and places common steel bushing using early period Pipe;Blast cap is directly placed into steel sleeve, breaks a circle silica gel in the brim of a hat;Stainless steel blast cap supporting leg is directly contacted with steel sleeve, easily Stainless steel blast cap is caused to corrode.Former mounting means, blast cap is mounted in steel sleeve and installs loosely, while stainless steel and ordinary steel Galvano-cautery easily occurs at casing-contact.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, the connection method of a kind of blast cap and wall is provided, it is outer for improving The new technology that wall blast cap and wall connecting are fixed, enables blast cap to have in the fixation of exterior wall compared with stiff stability, waterproofness.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A kind of connection method of blast cap and wall, it is characterised in that it includes the following steps:
Structure sealant: being first applied to the lateral surface and inner end of UPVC casing by step 1 at shape of threads, make it with wall and Common steel sleeve outer end is adhesively fixed;
Step 2: and then expose wall part in UPVC casing outer end and smear one layer of structure sealant;
Step 3: UPVC casing outer end exposes wall part and is closed up with cement mortar, and beats on the wall of UPVC casing two sides Enter plastic dowel sleeve;
Step 4: one layer of double-sided adhesive is pasted in blast cap cylinder neck lower part and inside the brim of a hat;
Step 5: blast cap cylinder neck blank space is at shape of threads smearing structure sealant, then to break fixation clamp on blast cap at 45 ° and will It is inserted into UPVC inside pipe casing, and squeezes into self-tapping screw and fix;
Step 6: uniformly applying twice waterproof gasket cement at the blast cap the brim of a hat, after first of waterproof gasket cement is fixed, at first Second waterproof gasket cement is beaten on the surface of glue again, and is convex lonely shape section by its Adjusting Shape, is allowed to be wider than first of anti-watertight Sealing allows the both sides of second glue to be bonded on the blast cap the brim of a hat and wall of seam two sides.
The beneficial effects of the present invention are: double faced adhesive tape can play the role of engagement, sealing and filling, while there can be damping Effect, prevents blast cap from falling off;Structure sealant preferably uses neutral silicone structure sealant, easily uses, and neutrality solidify, excellent glues Knot property, splendid ageing-resistant stability, have greatly reinforced the stability of blast cap.Waterproof gasket cement increases waterproofness, beats simultaneously Glue mode enhances the stability of blast cap.It beats plastic expansion pipe and is fixed with self-tapping screw, further enhance the stability of blast cap. UPVC casing generally in 4cm or so, is conveniently adjusted blast cap position.Suitable for being difficult to replace, the replacement cycle is long and needs relatively strong anti- The regions such as aqueous and stability high level or Super High.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the structural diagram of the present invention.
Specific embodiment
The connection method of a kind of blast cap and wall as shown in Figure 1:, it includes the following steps:
Step 1: structure sealant is first applied to the lateral surface and inner end of UPVC casing 1 at shape of threads, makes itself and wall 5 It is adhesively fixed with common 2 outer end of steel sleeve;
Step 2: and then expose wall part in UPVC casing outer end and smear one layer of structure sealant;
Step 3: UPVC casing outer end exposes wall part and is closed up with cement mortar, and beats on the wall of UPVC casing two sides Enter plastic dowel sleeve;
Step 4: one layer of double-sided adhesive is pasted in 31 lower part of blast cap cylinder neck and inside the brim of a hat;
Step 5: blast cap cylinder neck blank space is at shape of threads smearing structure sealant, then the fixation clamp 32 broken on blast cap 3 is at 45 ° And it is inserted into UPVC inside pipe casing, and it is fixed to squeeze into self-tapping screw 4;
Step 6: uniformly applying twice waterproof gasket cement at the blast cap the brim of a hat 33, after first of waterproof gasket cement is fixed, first Second waterproof gasket cement is beaten on the surface of road glue again, and is convex lonely shape section by its Adjusting Shape, is allowed to be wider than first of waterproof Sealant allows the both sides of second glue to be bonded on the blast cap the brim of a hat and wall of seam two sides.

Claims (1)

1. the connection method of a kind of blast cap and wall, it is characterised in that it includes the following steps:
Structure sealant: being first applied to the lateral surface and inner end of UPVC casing by step 1 at shape of threads, make it with wall and Common steel sleeve outer end is adhesively fixed;
Step 2: and then expose wall part in UPVC casing outer end and smear one layer of structure sealant;
Step 3: UPVC casing outer end exposes wall part and is closed up with cement mortar, and beats on the wall of UPVC casing two sides Enter plastic dowel sleeve;
Step 4: one layer of double-sided adhesive is pasted in blast cap cylinder neck lower part and inside the brim of a hat;
Step 5: blast cap cylinder neck blank space is at shape of threads smearing structure sealant, then to break fixation clamp on blast cap at 45 ° and will It is inserted into UPVC inside pipe casing, and squeezes into self-tapping screw and fix;
Step 6: uniformly applying twice waterproof gasket cement at the blast cap the brim of a hat, after first of waterproof gasket cement is fixed, at first Second waterproof gasket cement is beaten on the surface of glue again, and is convex lonely shape section by its Adjusting Shape, is allowed to be wider than first of anti-watertight Sealing allows the both sides of second glue to be bonded on the blast cap the brim of a hat and wall of seam two sides.
CN201710771248.1A 2017-08-31 2017-08-31 The connection method of blast cap and wall Pending CN109424071A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710771248.1A CN109424071A (en) 2017-08-31 2017-08-31 The connection method of blast cap and wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710771248.1A CN109424071A (en) 2017-08-31 2017-08-31 The connection method of blast cap and wall

Publications (1)

Publication Number Publication Date
CN109424071A true CN109424071A (en) 2019-03-05

Family

ID=65504767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710771248.1A Pending CN109424071A (en) 2017-08-31 2017-08-31 The connection method of blast cap and wall

Country Status (1)

Country Link
CN (1) CN109424071A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2218356Y (en) * 1995-03-28 1996-01-24 赵宝善 Inserting nozzle button with sealing cushion
CN2585047Y (en) * 2002-09-25 2003-11-05 陆进 Combined funnel cap for circulation fluid-bed boiler
CN2620176Y (en) * 2002-12-23 2004-06-09 陆进 Bed surface jointed combine hood for circulation fluidized bed boiler
US20070012346A1 (en) * 2005-07-15 2007-01-18 Kwan-Jun Choi Snapping mechanism of telescoping tent pole
CN201434146Y (en) * 2009-04-10 2010-03-31 皇明太阳能集团有限公司 Supporting clip
CN204284742U (en) * 2014-11-30 2015-04-22 连云港远洋流体装卸设备有限公司 A kind of large oil filling riser automatic telescopic nanubrium
CN204922963U (en) * 2015-09-14 2015-12-30 济南永泉节能环保科技有限公司 Circulating fluidized bed boiler hood structure
CN105525723A (en) * 2016-01-18 2016-04-27 江苏沪宁钢机股份有限公司 Steel column internally provided with stainless steel downpipes and installing method of steel column
CN205977937U (en) * 2016-06-21 2017-02-22 徐建野 From flexible pipe of rapping bar
CN205990738U (en) * 2016-03-23 2017-03-01 中建一局集团第二建筑有限公司 Node is installed between unpowered blast cap and exhaust duct

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2218356Y (en) * 1995-03-28 1996-01-24 赵宝善 Inserting nozzle button with sealing cushion
CN2585047Y (en) * 2002-09-25 2003-11-05 陆进 Combined funnel cap for circulation fluid-bed boiler
CN2620176Y (en) * 2002-12-23 2004-06-09 陆进 Bed surface jointed combine hood for circulation fluidized bed boiler
US20070012346A1 (en) * 2005-07-15 2007-01-18 Kwan-Jun Choi Snapping mechanism of telescoping tent pole
CN201434146Y (en) * 2009-04-10 2010-03-31 皇明太阳能集团有限公司 Supporting clip
CN204284742U (en) * 2014-11-30 2015-04-22 连云港远洋流体装卸设备有限公司 A kind of large oil filling riser automatic telescopic nanubrium
CN204922963U (en) * 2015-09-14 2015-12-30 济南永泉节能环保科技有限公司 Circulating fluidized bed boiler hood structure
CN105525723A (en) * 2016-01-18 2016-04-27 江苏沪宁钢机股份有限公司 Steel column internally provided with stainless steel downpipes and installing method of steel column
CN205990738U (en) * 2016-03-23 2017-03-01 中建一局集团第二建筑有限公司 Node is installed between unpowered blast cap and exhaust duct
CN205977937U (en) * 2016-06-21 2017-02-22 徐建野 From flexible pipe of rapping bar

Similar Documents

Publication Publication Date Title
CN202935355U (en) Built-in integral side window for urban rail vehicle
CN202298952U (en) Fixing device for installation of heat-insulating plate of outer wall
CN109424071A (en) The connection method of blast cap and wall
CN106760612A (en) A kind of low influence energy-conserving reconstruction method and structure of concealed frame glass curtain wall
CN103603473A (en) Decorative plate construction process and decorative plate thereof
CN206269340U (en) Cold-prevention bridge air-conditioning box
CN205402053U (en) Hold solid water -drainage tube part of tight plugging fast convenient to dismantle
CN207296010U (en) The connection structure of blast cap and wall
CN108193767B (en) Organ plate type annular air corridor daylighting roof system
CN203223143U (en) Connecting device with waterproof function and window with connecting device
CN106677393A (en) Stand column structure adaptable to radian variation and curtain wall unit adopting column structure
CN108018970A (en) Fast installation glass curtain wall system
CN203810128U (en) Exposed LED lamp with through hole
CN207831279U (en) A kind of waterproof construction of outdoor lamp
CN209101125U (en) A kind of easy-to-mount LED underground lamp structure
CN203965681U (en) A kind of multiple-grooved waterproof sealing cable splice closure
CN205604970U (en) Piece together door frame frame
CN205807960U (en) A kind of slip-off preventing refrigerator decorative adhesive tape
CN207837510U (en) Endoscope housing cavity sealing structure
CN204571345U (en) A kind of construction work structure fills catheter needle
CN202577690U (en) Point-supported and fully-hidden energy-saving hollow glass curtain wall
CN207795133U (en) A kind of union connection Simple casing head
CN201485990U (en) Glass wall connecting device
CN106813043A (en) A kind of plugging device
CN204254080U (en) Feedwater pipe joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination