CN205985950U - 10kV live working insulating barrier - Google Patents
10kV live working insulating barrier Download PDFInfo
- Publication number
- CN205985950U CN205985950U CN201620745602.4U CN201620745602U CN205985950U CN 205985950 U CN205985950 U CN 205985950U CN 201620745602 U CN201620745602 U CN 201620745602U CN 205985950 U CN205985950 U CN 205985950U
- Authority
- CN
- China
- Prior art keywords
- insulating
- loop bar
- insulating barrier
- partition
- insulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型涉及10kV架空配电线路绝缘技术领域,特别涉及一种10kv带电作业绝缘隔板,用于解决现有技术中绝缘隔板不易拆装,以及安全性低的问题。包括:绝缘隔板本体、绝缘操作杆和绝缘防滑挡板;绝缘操作杆固定连接在绝缘隔板本体上;绝缘防滑挡板通过其上设置的安装孔与绝缘操作杆相接;绝缘隔板本体呈四边形,一边设置方形开口,开口内设置绝缘凹槽;绝缘防滑挡板对着绝缘凹槽;绝缘操作杆包括外套杆、第一内套杆和第二内套杆。与原有绝缘隔板相比,本实用新型不用在安装前对带电设备进行绝缘遮蔽,且不用安装插销,易于拆装,提高了作业效率,同时因不使用金属插销,提高了作业安全性。
The utility model relates to the technical field of insulation of 10kV overhead power distribution lines, in particular to a 10kV live working insulation partition, which is used to solve the problems of difficult disassembly and low safety of the insulation partition in the prior art. Including: insulating partition body, insulating operating rod and insulating non-slip baffle; the insulating operating rod is fixedly connected to the insulating partition body; the insulating non-slip baffle is connected to the insulating operating rod through the installation hole set on it; It is quadrilateral, with a square opening on one side, and an insulating groove inside the opening; the insulating anti-skid baffle faces the insulating groove; the insulating operating rod includes an outer sleeve rod, a first inner sleeve rod and a second inner sleeve rod. Compared with the original insulating partition, the utility model does not need to insulate and shield the live equipment before installation, and does not need to install bolts, which is easy to disassemble and assemble, and improves the working efficiency.
Description
技术领域technical field
本实用新型涉及10kV架空配电线路绝缘技术领域,特别涉及一种10kv带电作业中能够固定于横担的绝缘隔板。The utility model relates to the technical field of insulation of 10kV overhead power distribution lines, in particular to an insulating partition plate that can be fixed to a cross arm in 10kV live work.
背景技术Background technique
10kV架空配电线路带电作业过程中,为保护作业人员的安全,需要对可触及的带电设备进行绝缘处理。绝缘处理包括使用绝缘毯对带电设备进行包裹,或者用绝缘隔板对带电设备进行隔挡,限制作业人员的活动空间。现有的绝缘隔板是采用插销固定的方式将其固定在横担上,由于现有绝缘隔板需手动拆装插销,作业人员需要在横担、电杆和带电设备间直接穿戴绝缘手套对插销进行拆装,因此为防止横担、电杆与带电设备间通过人体形成通路,造成人体相地短路,人员电击伤亡,需要在拆装插销前对可能触及的带电设备和接地体进行绝缘遮蔽,所以要耗费大量作业时间。同时由于绝缘手套采用三层手套穿戴,手指与手套间隔层极厚,极难从绝缘隔板狭窄缝隙中安装插销,也造成绝缘隔板拆装耗时。另外,由于插销是金属材质,在带电作业中存在安全隐患。因此,亟需一种新型绝缘隔板,以改善原有绝缘隔板不易拆装,以及安全性低的问题。During the live operation of 10kV overhead distribution lines, in order to protect the safety of workers, it is necessary to insulate the accessible live equipment. Insulation treatment includes wrapping live equipment with insulating blankets or blocking live equipment with insulating partitions to limit the movement space of workers. The existing insulating partitions are fixed on the cross arm by means of bolts. Since the existing insulating partitions need to be manually disassembled and assembled, the operators need to wear insulating gloves directly between the cross arms, poles and live equipment. Therefore, in order to prevent the cross arm, pole and live equipment from forming a path through the human body, causing a short circuit between the human body and the electric shock, it is necessary to insulate and shield the live equipment and grounding body that may be touched before disassembling the pin. , so it takes a lot of work time. At the same time, because the insulating gloves are worn with three layers of gloves, the space between the fingers and the gloves is extremely thick, and it is extremely difficult to install the pins from the narrow gap of the insulating partition, which also results in time-consuming disassembly of the insulating partition. In addition, because the bolt is made of metal, there are potential safety hazards in live work. Therefore, there is an urgent need for a new type of insulating partition to improve the problems of difficult disassembly and low safety of the original insulating partition.
发明内容Contents of the invention
为解决现有技术中10kV架空配电线路带电作业用绝缘隔板不易拆装,且因采用金属插销带来的安全性低的技术问题,本实用新型特别提供一种易于拆装,适于固定在横担上的10kv带电作业绝缘隔板,以提高带电作业的效率和安全性。In order to solve the technical problems that the insulating partitions used for live work of 10kV overhead power distribution lines are not easy to disassemble, and the technical problems of low safety caused by the use of metal bolts in the prior art, the utility model particularly provides an easy-to-disassemble, suitable for fixing The 10kv live working insulation partition on the cross arm improves the efficiency and safety of live working.
为解决上述技术问题,本实用新型提供一种10kv带电作业绝缘隔板,包括:绝缘隔板本体、绝缘操作杆和绝缘防滑挡板;绝缘操作杆固定连接在绝缘 隔板本体上;绝缘防滑挡板上设置安装孔,绝缘操作杆通过安装孔与绝缘防滑挡板相接;绝缘隔板本体呈四边形,一边设置方形开口,开口内设置绝缘凹槽,绝缘凹槽的开口宽度与横担水平面厚度相匹配,绝缘凹槽的深度大于横担水平面宽度的1/2;绝缘防滑挡板与绝缘凹槽位于绝缘隔板本体的同一边,位置对着绝缘凹槽;绝缘操作杆包括外套杆、第一内套杆和第二内套杆,外套杆呈空心管状,外套杆套装在第一内套杆和第二内套杆外部,第一内套杆和第二内套杆相对的两端分别与弹簧的两端相连。In order to solve the above technical problems, the utility model provides a 10kv live working insulating partition, including: an insulating partition body, an insulating operating rod and an insulating non-slip baffle; the insulating operating rod is fixedly connected to the insulating partition body; the insulating non-slip barrier Mounting holes are set on the board, and the insulating operating rod connects with the insulating anti-slip baffle through the mounting holes; the body of the insulating partition is quadrilateral, with a square opening on one side, and an insulating groove in the opening. The opening width of the insulating groove is the same as the thickness of the horizontal plane of the cross arm Matching, the depth of the insulating groove is greater than 1/2 of the width of the horizontal plane of the cross arm; the insulating anti-slip baffle and the insulating groove are located on the same side of the insulating partition body, and the position is opposite to the insulating groove; the insulating operating rod includes the outer rod, the second An inner sleeve rod and a second inner sleeve rod, the outer sleeve rod is hollow tubular, the outer sleeve rod is set outside the first inner sleeve rod and the second inner sleeve rod, and the opposite ends of the first inner sleeve rod and the second inner sleeve rod are respectively Connect to both ends of the spring.
较佳的,绝缘防滑挡板上可以设置开口,开口位置与绝缘凹槽(11)位置相对,开口宽度与绝缘凹槽开口宽度相同。Preferably, an opening can be provided on the insulating anti-skid baffle, the position of the opening is opposite to that of the insulating groove (11), and the width of the opening is the same as that of the opening of the insulating groove.
较佳的,外套杆上可以设置绝缘把手,绝缘把手呈空心管状,套装在外套杆露出绝缘隔板本体的部分。Preferably, an insulating handle can be provided on the outer casing rod, and the insulating handle is in the shape of a hollow tube, and is fitted on the part of the outer casing rod exposed to the main body of the insulating partition.
较佳的,绝缘隔板本体两侧可以设置绝缘夹具,绝缘夹具的形状与绝缘凹槽相匹配,固定安装在绝缘凹槽外围。Preferably, insulation clamps can be provided on both sides of the insulation partition body, the shape of the insulation clamps matches the insulation groove, and they are fixedly installed on the periphery of the insulation groove.
与原有的插销固定式绝缘隔板相比,本实用新型绝缘隔板的安装,不用在安装前对带电设备进行绝缘遮蔽,且省去了在穿戴绝缘手套情况下安装插销的麻烦,提高了作业效率。另外,由于不再使用金属插销,也提高了带电作业的安全性。在绝缘防滑挡板上设置开口,作业人员可以从靠近固定电线杆抱箍的横担一侧时将绝缘隔板固定在横担上,使用更加灵活。在外套杆上套装绝缘把手,相当于局部加粗了外套杆,使作业人员握持更加方便,且能免去整体加粗外套杆而带来的重量增加的问题。绝缘夹具的设置间接增大了绝缘凹槽与绝缘隔板本体的接触面积,增强了绝缘凹槽与绝缘隔板本体连接的稳固性。Compared with the original bolt-fixed insulation partition, the installation of the insulation partition of the utility model does not need to insulate and shield the live equipment before installation, and saves the trouble of installing the bolt under the condition of wearing insulating gloves, which improves the work efficiency. In addition, since metal pins are no longer used, the safety of live working is also improved. Openings are provided on the insulating non-slip baffle, and the operator can fix the insulating partition on the cross arm from the side close to the cross arm where the hoop of the utility pole is fixed, so the use is more flexible. Putting an insulating handle on the jacket rod is equivalent to partially thickening the jacket rod, which makes it easier for the operator to hold it, and can avoid the problem of increased weight caused by the overall thickening of the jacket rod. The setting of the insulation clamp indirectly increases the contact area between the insulation groove and the insulation partition body, and enhances the stability of the connection between the insulation groove and the insulation partition body.
附图说明Description of drawings
图1为本实用新型实施例中绝缘隔板的主视结构示意图;Fig. 1 is the schematic diagram of the front view structure of the insulating partition in the embodiment of the utility model;
图2为图1中绝缘隔板本体的第一侧视结构示意图;Fig. 2 is a schematic diagram of the first side view of the insulating partition body in Fig. 1;
图3为图1中绝缘隔板本体的第二侧视结构示意图;Fig. 3 is a second side structural schematic diagram of the insulating partition body in Fig. 1;
图4为图1中绝缘防滑块C-C面剖视图;Fig. 4 is a cross-sectional view of the C-C plane of the insulating anti-skid block in Fig. 1;
图5为本实用新型中横担结构示意图。Fig. 5 is a schematic diagram of the structure of the cross arm in the utility model.
附图标记说明:1绝缘隔板本体;11绝缘凹槽;12绝缘夹具;2绝缘操作杆;21外套杆;22第一内套杆;23第二内套杆;24绝缘把手;25弹簧;26绝缘卡扣;27绝缘螺钉;3绝缘防滑挡板;31安装孔;4横担;41横担水平面;42横担竖直面;5电线杆;6抱箍。Explanation of reference signs: 1 insulating partition body; 11 insulating groove; 12 insulating clamp; 2 insulating operating rod; 21 outer rod; 22 first inner rod; 23 second inner rod; 24 insulating handle; 25 spring; 26 insulating clips; 27 insulating screws; 3 insulating non-slip baffles; 31 mounting holes; 4 cross arms; 41 horizontal planes of cross arms;
具体实施方式detailed description
下面结合附图和具体实施方式对本实用新型进行详细描述。The utility model is described in detail below in conjunction with the accompanying drawings and specific embodiments.
参阅图1和图5所示,10kV带电作业绝缘隔板包括绝缘隔板本体1、绝缘操作杆2和绝缘防滑挡板3;其中,绝缘操作杆2通过绝缘卡扣26和绝缘螺钉27固定连接在绝缘隔板本体1上,且部分露出绝缘隔板本体1,以便握持操作;绝缘防滑挡板3上设置安装孔31,绝缘操作杆2通过安装孔31与绝缘防滑挡板3相接,可以用绝缘胶粘接;绝缘隔板本体1呈四边形,一边设置方形开口,开口内设置有绝缘凹槽11,绝缘凹槽11的开口宽度与横担水平面41厚度相匹配,为能使横担水平面41插入绝缘凹槽11中,绝缘凹槽11的深度大于横担水平面宽度的1/2,保证绝缘隔板安装后重心落于横担上;其中,绝缘凹槽11的开口,在与绝缘操作杆2垂直的方向为宽,与绝缘操作杆2平行的方向为深,横担水平面41在较短的方向为宽;绝缘防滑挡板3与绝缘凹槽11位于绝缘隔板本体1的同一边,位置对着绝缘凹槽11;绝缘操作杆2包括外套杆21、第一内套杆22和第二内套杆23,外套杆21呈空心管状,外套杆21套装在第一内套杆22和第二内套杆23外部,第一内套杆22和第二内套杆23相对的两端分别与弹簧25的两端相连,可以用绝缘胶粘接,也可以通过在第一内套杆21和第二内套杆22的端头设置与弹簧25匹配的螺纹使之相连。Referring to Fig. 1 and Fig. 5, the 10kV live working insulating partition includes an insulating partition body 1, an insulating operating rod 2 and an insulating anti-slip baffle 3; wherein, the insulating operating rod 2 is fixedly connected by an insulating buckle 26 and an insulating screw 27 On the insulation partition body 1, and part of the insulation partition body 1 is exposed, so as to hold and operate; the insulating non-slip baffle 3 is provided with a mounting hole 31, and the insulating operating rod 2 is connected to the insulating non-slip baffle 3 through the mounting hole 31, It can be bonded with insulating glue; the insulating partition body 1 is quadrangular, and a square opening is arranged on one side, and an insulating groove 11 is arranged in the opening. The horizontal plane 41 is inserted into the insulating groove 11, and the depth of the insulating groove 11 is greater than 1/2 of the horizontal plane width of the cross arm to ensure that the center of gravity falls on the cross arm after the insulating partition is installed; wherein, the opening of the insulating groove 11 is connected with the insulating The vertical direction of the operating rod 2 is wide, the direction parallel to the insulating operating rod 2 is deep, and the horizontal plane 41 of the cross arm is wide in the shorter direction; the insulating anti-skid baffle 3 and the insulating groove 11 are located at the same On one side, the position faces the insulating groove 11; the insulating operating rod 2 includes an outer sleeve rod 21, a first inner sleeve rod 22 and a second inner sleeve rod 23, the outer sleeve rod 21 is in the shape of a hollow tube, and the outer sleeve rod 21 is set on the first inner sleeve rod 22 and the outside of the second inner sleeve rod 23, the opposite ends of the first inner sleeve rod 22 and the second inner sleeve rod 23 are respectively connected to the two ends of the spring 25, which can be bonded with insulating glue, or through the first inner sleeve rod 23. The ends of the sleeve rod 21 and the second inner sleeve rod 22 are provided with threads matched with the spring 25 to connect them.
与原有的插销固定式绝缘隔板相比,本绝缘隔板在使用时,作业人员可以从远离固定电线杆抱箍的横担一侧,使横担水平面插入绝缘凹槽中,并通过拉 紧绝缘操作杆使得绝缘防滑挡板卡紧横担竖直面,由于绝缘防滑板位置对着绝缘凹槽,使用时正好挡住绝缘凹槽,使绝缘隔板利用自重和绝缘防滑挡板实现在横担上的安装。因此,本实用新型绝缘隔板的安装,不用在安装前对带电设备进行绝缘遮蔽,且省去了在穿戴绝缘手套情况下安装插销的麻烦,提高了作业效率。另外,由于不再使用金属插销,也提高了带电作业的安全性。Compared with the original bolt-fixed insulation partition, when this insulation partition is in use, the operator can insert the horizontal plane of the cross-arm into the insulation groove from the side of the cross-arm far away from the hoop of the fixed utility pole, and pull Tighten the insulating operating rod so that the insulating anti-skid baffle is clamped to the vertical surface of the cross arm. Since the position of the insulating anti-skid plate is facing the insulating groove, it just blocks the insulating groove during use, so that the insulating partition can be realized in the horizontal direction by using its own weight and the insulating anti-skid baffle. Take on the installation. Therefore, the installation of the insulating partition of the utility model does not need to insulate and shield the live equipment before installation, and saves the trouble of installing the plug when wearing insulating gloves, thereby improving the working efficiency. In addition, since metal pins are no longer used, the safety of live working is also improved.
参阅图1和图4所示,10kV带电作业绝缘隔板的绝缘防滑挡板31上可以设置开口,开口位置与绝缘凹槽11位置相对,开口宽度与绝缘凹槽11开口宽度相同。此设置的有益效果是,当作业人员在靠近固定电线杆抱箍的横担一侧时,可以使横担水平面插入绝缘防滑挡板上的开口中,并通过拉紧绝缘操作杆使得绝缘隔板本体卡紧横担竖直面从而将绝缘隔板固定在横担上。Referring to Fig. 1 and Fig. 4, an opening can be provided on the insulating anti-skid baffle 31 of the 10kV live working insulating partition, the opening position is opposite to the insulating groove 11, and the opening width is the same as the insulating groove 11 opening width. The beneficial effect of this setting is that when the operator is on the side of the cross arm close to the fixed pole hoop, the horizontal plane of the cross arm can be inserted into the opening on the insulating non-slip baffle, and the insulating partition can be made The body clamps the vertical surface of the cross arm so as to fix the insulating partition on the cross arm.
参阅图1所示,10kv带电作业绝缘隔板的外套杆21上可以设置绝缘把手24,绝缘把手24呈空心管状,套装在外套杆21露出绝缘隔板本体1的部分。此设置的有益效果是,在外套杆上套装绝缘把手,相当于局部加粗了外套杆,对于穿戴绝缘手套的作业人员来说,握持更加方便,且能免去整体加粗外套杆而带来的重量增加的问题。Referring to Fig. 1, an insulating handle 24 can be provided on the outer casing rod 21 of the insulation partition for 10kv live work. The beneficial effect of this setting is that the insulating handle is set on the jacket rod, which is equivalent to partially thickening the jacket rod. For the workers wearing insulating gloves, it is more convenient to hold, and the overall thickening of the jacket rod can be avoided. Comes the problem of weight gain.
参阅图1、图2和图3所示,10kV带电作业绝缘隔板的绝缘隔板本体1两侧可以设置绝缘夹具12,绝缘夹具12呈U形,形状与绝缘凹槽11相匹配,可以通过绝缘胶粘接在绝缘凹槽11外围。此绝缘夹具间接增大了绝缘凹槽与绝缘隔板本体的接触面积,增强了绝缘凹槽与绝缘隔板本体连接的稳固性。Referring to Fig. 1, Fig. 2 and Fig. 3, insulating clamps 12 can be provided on both sides of the insulating barrier body 1 of the 10kV live working insulating barrier. The insulating glue is bonded on the periphery of the insulating groove 11 . The insulating clamp indirectly increases the contact area between the insulating groove and the insulating partition body, and enhances the stability of the connection between the insulating groove and the insulating partition body.
本实用新型的工作原理及过程如下:Working principle and process of the present utility model are as follows:
在带电作业时,一只手握持绝缘操作杆外套杆或者绝缘把手,另一只手推动第一内套杆,通过弹簧的联动,使得与第二内套杆相连的绝缘防滑挡板离开绝缘隔板本体有一个横担水平面宽度的距离,使横担水平面插入绝缘凹槽中,然后拉紧第一内套杆,通过绝缘防滑挡板卡紧横档竖直面使得绝缘隔板安装在横担上。或者,使横担水平面插入绝缘防滑挡板的开口中,然后拉紧第一内套杆,通过绝缘隔板本体卡紧横担竖直面使得绝缘隔板安装在横担上。During live work, one hand holds the outer rod of the insulating operating rod or the insulating handle, and the other hand pushes the first inner rod, and through the linkage of the spring, the insulating non-slip baffle connected to the second inner rod leaves the insulation The partition body has a distance of the width of the horizontal plane of the cross arm, so that the horizontal plane of the cross arm is inserted into the insulating groove, and then the first inner sleeve rod is tightened, and the vertical surface of the cross rail is clamped by the insulating non-slip baffle so that the insulating partition is installed on the horizontal plane. take on. Alternatively, the horizontal plane of the cross arm is inserted into the opening of the insulating anti-skid baffle, and then the first inner sleeve rod is tightened, and the vertical surface of the cross arm is clamped by the insulating partition body so that the insulating partition is installed on the cross arm.
显然,本领域的技术人员可以对本实用新型进行各种改动和变型而不脱离本实用新型的精神和范围。这样,倘若本实用新型的这些修改和变型属于本实用新型权利要求及其等同技术的范围之内,则本实用新型也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the utility model without departing from the spirit and scope of the utility model. In this way, if these modifications and variations of the utility model fall within the scope of the claims of the utility model and equivalent technologies thereof, the utility model is also intended to include these modifications and variations.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620745602.4U CN205985950U (en) | 2016-07-15 | 2016-07-15 | 10kV live working insulating barrier |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620745602.4U CN205985950U (en) | 2016-07-15 | 2016-07-15 | 10kV live working insulating barrier |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205985950U true CN205985950U (en) | 2017-02-22 |
Family
ID=58025633
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620745602.4U Expired - Fee Related CN205985950U (en) | 2016-07-15 | 2016-07-15 | 10kV live working insulating barrier |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205985950U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110797800A (en) * | 2019-12-10 | 2020-02-14 | 国网青海省电力公司海北供电公司 | an insulating barrier |
| CN113839344A (en) * | 2021-09-10 | 2021-12-24 | 国网山东省电力公司枣庄供电公司 | An insulating drain wire fixing device |
-
2016
- 2016-07-15 CN CN201620745602.4U patent/CN205985950U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110797800A (en) * | 2019-12-10 | 2020-02-14 | 国网青海省电力公司海北供电公司 | an insulating barrier |
| CN113839344A (en) * | 2021-09-10 | 2021-12-24 | 国网山东省电力公司枣庄供电公司 | An insulating drain wire fixing device |
| CN113839344B (en) * | 2021-09-10 | 2023-03-10 | 国网山东省电力公司枣庄供电公司 | Insulating drainage wire fixing device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103457214B (en) | Ground potential work non-bearing splicing clamp | |
| CN204230457U (en) | Universal connector earth wire operation rod | |
| CN205092507U (en) | Multi -functional insulating drainage line support frame | |
| CN104967055A (en) | Insulation cover shielding air live line | |
| CN205985950U (en) | 10kV live working insulating barrier | |
| CN204760896U (en) | Shield aerial live -line line's insulating boot | |
| CN204258161U (en) | Support for replacing post insulator | |
| CN105356368A (en) | Installation tool for insulated shield | |
| CN102185267B (en) | 66KV ground potential hot-line make-and-break bypassing method | |
| CN204046062U (en) | The unsettled fixed support instrument of a kind of power transmission line overhead ground wire | |
| CN207765880U (en) | The combined and spliced formula masking device of 10kV hard | |
| CN208589713U (en) | A kind of insulating tool, which is hung up, is fixed to integration device with lead | |
| CN208337014U (en) | A kind of charged for replacement Voltage for Insulators on HV Lines lifting block hanging point heightening device | |
| CN203553671U (en) | Auxiliary support for insulation operating lever | |
| CN203932760U (en) | Isolating switch insulating barrier on a kind of post | |
| CN203312090U (en) | Vacuum arc-extinguishing chamber assembling apparatus | |
| CN203932348U (en) | A kind of clamp-type earthing clamp | |
| CN203445264U (en) | Low voltage grounding wire device for compact electrical structure | |
| CN105514868A (en) | Insulated fixing support of upper lead of fuse wire | |
| CN112117555A (en) | a grounding device | |
| CN113839344B (en) | Insulating drainage wire fixing device | |
| CN103457213B (en) | The wire clip body of earth potential working non-bearing connecting clip | |
| CN206960512U (en) | A kind of electric power detects protection device | |
| CN110797800B (en) | Insulating isolation baffle | |
| CN205159909U (en) | Change extra -high voltage earthing pole circuit dead end insulator's instrument with electricity |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 Termination date: 20170715 |