CN205977767U - Float formula dredge pump and dredge pump flotation device - Google Patents

Float formula dredge pump and dredge pump flotation device Download PDF

Info

Publication number
CN205977767U
CN205977767U CN201620828244.3U CN201620828244U CN205977767U CN 205977767 U CN205977767 U CN 205977767U CN 201620828244 U CN201620828244 U CN 201620828244U CN 205977767 U CN205977767 U CN 205977767U
Authority
CN
China
Prior art keywords
dredge pump
floating
floating bin
bin
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620828244.3U
Other languages
Chinese (zh)
Inventor
高辉
裴鸿斌
唐祖锡
杨晨
郝涛
范志强
张仕宇
姚健
范少兴
杨明龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620828244.3U priority Critical patent/CN205977767U/en
Application granted granted Critical
Publication of CN205977767U publication Critical patent/CN205977767U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model provides a float formula dredge pump and dredge pump flotation device, the dredge pump flotation device include: float the storehouse with accomodate in float the floating body in the storehouse, be equipped with the assembly structure who is used for the be assembled between/be connected between dredge pump on the showy storehouse, it includes the pump body and the dredge pump flotation device of assembly on the body to float the formula dredge pump. The utility model discloses reducible dredge pump and grout precipitate contact time reduce the destruction of grout precipitate solidification to the dredge pump. Not only can effectively save the labour of manual cleaning or maintenance blowdown pump, reduce construction cost, can also lengthen equipment life.

Description

Floatation type dredge pump and dredge pump flotation gear
Technical field
This utility model is related to building engineering field and in particular to a kind of floatation type dredge pump and dredge pump flotation gear.
Background technology
With the development of Building technology, high-rise more and more with high-rise building.Pour work high-rise with superelevation layer main body In journey construction, the application of Super High concrete pumping system is also more and more frequent.Concrete pumping system using after complete, if not Cleaning concrete conveyance conduit in time, can cause residual concrete in conveyance conduit to condense, conveyance conduit will be led to when serious to block up Plug.At present, concrete pumping system cleaning typically has air purge and washing.Wherein, a large amount of waste residues can be produced in water-washing process and give up The mixture of water.For environmental protection, by after waste residue and waste water mixture separating treatment, cement mortar can be introduced in sedimentation tank further Precipitation, the sewage being settled out can be using the conveyance conduit of blowdown pumped cleaning concrete pumping system again.
When extracting sewage using dredge pump, cement mortar precipitation solidification can cause to dredge pump to damage.In order to not affect to arrange The service life of dirty pump, needs labor cleaning or maintenance dredge pump, improves construction cost, and affect the duration.
Utility model content
For overcoming the defect existing for prior art, now provide a kind of floatation type dredge pump and dredge pump flotation gear, with Solve cement mortar precipitation solidification and dredge pump is caused with the problems such as damage.
For achieving the above object, this utility model adopts the following technical scheme that:
In a first aspect, providing a kind of dredge pump flotation gear to include:Floating bin and the floating body being accommodated in floating bin, drift Floating warehouse is provided with the assembling structure for assembly connection dredge pump.
Further, floating bin includes at least first floating bin and the second floating bin.First floating bin and the second floating bin Assembly connection, assembling structure is the installation running-on being formed at the first floating bin and the second floating bin assembly connection.
Further, the first floating bin is formed with the first inner groovy, the second floating bin is formed with the second inner groovy.The One inner groovy and the second inner groovy surround formation and install running-on.
Further, the first floating bin and the second floating bin include warehouse respectively and are covered on the Cang Gai on warehouse.
Further, the warehouse of the first floating bin is provided with and locks hole positioned at the first of the first inner groovy opposite sides, the The warehouse of two floating bins be provided with corresponding to first lock hole and be located at the second inner groovy opposite sides second lock hole.Relatively First answering is locked hole and locks with second and be fixedly connected by fastening structure between hole.
Further, fastening structure includes being arranged in first and locks the screw piece that hole locks hole with second and being screwed together in and screws togather Securing member on part.
Further, floating body is extruded polystyrene board.
Second aspect, provides a kind of pump housing and is assemblied in the dredge pump flotation gear on the pump housing.
Dredge pump flotation gear includes:Floating bin and the floating body being accommodated in floating bin, floating bin is provided with for filling Join the assembling structure connecting the pump housing.
Further, floating bin includes at least first floating bin and the second floating bin.First floating bin and the second floating bin Assembly connection, assembling structure is the installation running-on being formed at the first floating bin and the second floating bin assembly connection.
Further, the first floating bin is formed with the first inner groovy, the second floating bin is formed with the second inner groovy.The One inner groovy and the second inner groovy surround formation and install running-on.
Further, the first floating bin and the second floating bin include warehouse respectively and are covered on the Cang Gai on warehouse.
Further, the warehouse of the first floating bin is provided with and locks hole positioned at the first of the first inner groovy opposite sides, the The warehouse of two floating bins be provided with corresponding to first lock hole and be located at the second inner groovy opposite sides second lock hole.Relatively First answering is locked hole and locks with second and be fixedly connected by fastening structure between hole.
Further, fastening structure includes being arranged in first and locks the screw piece that hole locks hole with second and being screwed together in and screws togather Securing member on part.
Further, floating body is extruded polystyrene board.
The beneficial effects of the utility model are, when largely decreasing dredge pump and contacting with cement mortar precipitate Between, reduce the destruction to dredge pump for the cement mortar precipitate solidification.Not only can effectively save labor cleaning or the labor of maintenance dredge pump Power, reduces construction cost moreover it is possible to extension device service life.
Brief description
Fig. 1 is the structural representation of this utility model floatation type dredge pump.
Fig. 2 is the structural representation of dredge pump flotation gear.
Fig. 3 is the first floating bin and floating body constitutional diagram.
Fig. 4 is floating bin warehouse structural representation.
Fig. 5 is floating bin warehouse top view.
Fig. 6 is partial enlarged drawing at C in Fig. 5.
Fig. 7 is floatation type dredge pump work sheet.
Specific embodiment
Below by way of specific instantiation, embodiment of the present utility model is described, those skilled in the art can be by this theory Content disclosed by bright book understands other advantages of the present utility model and effect easily.This utility model can also be by addition Different specific embodiments is carried out or applies, and the every details in this specification based on different viewpoints and can also be answered With carrying out various modifications and changes under without departing from spirit of the present utility model.
Fig. 1 is the structural representation of this utility model floatation type dredge pump.Fig. 2 is flotation gear structural representation.Fig. 3 is First floating bin and floating body constitutional diagram.Fig. 4 is floating bin warehouse structural representation.Fig. 5 is floating bin warehouse top view.Fig. 6 For partial enlarged drawing at C in Fig. 5.Fig. 7 is floatation type dredge pump work sheet.
With reference to Fig. 2 to Fig. 7, this utility model provides a kind of dredge pump flotation gear, including the first floating bin 21 and the Two floating bins 22, the first floating bin 21 and the second floating bin 22 assembly connection and formed for installing dredge pump at assembly connection 1 installation running-on 23.
Floating body 3 can select rubber pneumatic bag, or wooden unit, plastic foamboard isodensity are less than the material of water.In this enforcement In example, floating body 3 is extruded polystyrene board.
Floating bin 2 includes warehouse and Cang Gai.Storehouse lid can be made from galvanized iron sheet, and warehouse selects the waste and old steel of construction site Plate weld is formed.Cang Gai and warehouse are encircled into a closed space, are stuffed entirely with extruded polystyrene board in closed space.
Install for convenience, be provided with the first inner groovy 214 in a bulkhead of the first floating bin 21, the one of the second floating bin 22 Bulkhead relatively is provided with the second inner groovy 224.As shown in figure 5, the first inner groovy 214 and the second inner groovy 224 relative symmetry, close Enclose one installation running-on 23 of formation.The top running-on diameter installing running-on 23 should be less than the overall diameter of dredge pump 1 cover, and bigger Overall diameter in dredge pump 1 motor housing.When dredge pump 1 is in liquid down blow, dredge pump flotation gear is assemblied in dredge pump 1 machine With, it is stuck in the cover of dredge pump 1 with lower portion so that dredge pump 1 cannot skid off from installing running-on 23 simultaneously.
Further, in order to allow dredge pump flotation gear to be preferably assembled together with dredge pump 1, the first floating bin 21 He Second floating bin 22 can be fixedly connected by welding, or the opposite side hinge of the first floating bin 21 and the second floating bin 22 Chain connects, and opposite side iron wire locks.
In the present embodiment, as shown in figure 5, the first floating bin 21 is fixedly connected by fastening structure with the second floating bin 22 Together.Fastening structure includes screw piece and is screwed together in the securing member on screw piece.Screw piece is bolt 4, and securing member is nut 5.In conjunction with Fig. 4, for the ease of the installation of fastening structure, electric welding on the first floating bin warehouse 211 offers first and locks hole 215, spot welding on the second floating bin warehouse 221 opens up second and locks hole 225.First locks hole 215 and second locks hole 225 respectively Lock hole including two.First locks two that hole 215 opens up locks the opposite sides that hole is located at the first inner groovy 214 respectively, Second locks two that hole 225 opens up locks the opposite sides that hole is located at the second inner groovy 224 respectively.First locks hole 215 He Second lock hole 225 position mutually corresponding.Bolt 4 sequentially passes through first and locks hole 215, second locks hole 225 and nut 5 spiral shell It is connected together.
Further, in order to increase the connectivity robustness between the first floating bin 21 and the second floating bin 22, can also be The both sides of the first floating bin 21 and the second floating bin 22 are respectively welded one group of connection and pick up the ears.Open up on the picking up the ears of first floating bin 21 3rd locks hole, the picking up the ears of the second floating bin 22 opens up the 4th and locks hole.Screw bolt and nut locks hole and the 4th by the 3rd Lock hole the first floating bin 21 and the second being more firmly fixed from both sides of floating bin 22 link together.
When actually used, first the first floating bin warehouse 211 and the second floating bin warehouse 221 are enclosed within the machine of dredge pump 1 On body shell, the first floating bin warehouse 211 and the second floating bin warehouse 221 is allowed to be simultaneously in below the cover bottom of dredge pump 1 Position, with bolt 4 and nut 5 by the first floating bin warehouse 211 and the second floating bin warehouse 221 by locking hole 215 and lock Attached hole 225 is fixed together.Then the first floating bin warehouse 211 and the second floating bin warehouse 221 are filled up extruded polystyrene Plate.Finally the first floating bin storehouse lid 212 and the second floating bin storehouse lid 222 are covered respectively in the first floating bin warehouse 211 and second On floating bin warehouse 221.
Referring to figs. 1 to Fig. 7, this utility model provides a kind of floatation type dredge pump, including:Dredge pump 1 and the row of being assemblied in Dredge pump flotation gear on dirty pump 1.
Dredge pump flotation gear dredge pump flotation gear, including the first floating bin 21 and the second floating bin 22, the first floating Storehouse 21 and the second floating bin 22 assembly connection and form the installation running-on 23 for installing dredge pump 1 at assembly connection.
Floating body 3 can select rubber pneumatic bag, or wooden unit, plastic foamboard isodensity are less than the material of water.In this enforcement In example, floating body 3 is extruded polystyrene board.
Floating bin 2 includes warehouse and Cang Gai.Storehouse lid can be made from galvanized iron sheet, and warehouse selects the waste and old steel of construction site Plate weld is formed.Cang Gai and warehouse are encircled into a closed space, are stuffed entirely with extruded polystyrene board in closed space.
Install for convenience, be provided with the first inner groovy 214 in a bulkhead of the first floating bin 21, the one of the second floating bin 22 Bulkhead relatively is provided with the second inner groovy 224.As shown in figure 5, the first inner groovy 214 and the second inner groovy 224 relative symmetry, close Enclose one installation running-on 23 of formation.The top running-on diameter installing running-on 23 should be less than the overall diameter of dredge pump 1 cover, and bigger Overall diameter in dredge pump 1 motor housing.When dredge pump 1 is in liquid down blow, dredge pump flotation gear is assemblied in dredge pump 1 machine With, it is stuck in the cover of dredge pump 1 with lower portion so that dredge pump 1 cannot skid off from installing running-on 23 simultaneously.
Further, in order to allow dredge pump flotation gear to be preferably assembled together with dredge pump 1, the first floating bin 21 He Second floating bin 22 can be fixedly connected by welding, or the opposite side hinge of the first floating bin 21 and the second floating bin 22 Chain connects, and opposite side iron wire locks.
In the present embodiment, as shown in figure 5, the first floating bin 21 is fixedly connected by fastening structure with the second floating bin 22 Together.Fastening structure includes screw piece and is screwed together in the securing member on screw piece.Screw piece is bolt 4, and securing member is nut 5.In conjunction with Fig. 4, for the ease of the installation of fastening structure, electric welding on the first floating bin warehouse 211 offers first and locks hole 215, spot welding on the second floating bin warehouse 221 opens up second and locks hole 225.First locks hole 215 and second locks hole 225 respectively Lock hole including two.First locks two that hole 215 opens up locks the opposite sides that hole is located at the first inner groovy 214 respectively, Second locks two that hole 225 opens up locks the opposite sides that hole is located at the second inner groovy 224 respectively.First locks hole 215 He Second lock hole 225 position mutually corresponding.Bolt 4 sequentially passes through first and locks hole 215, second locks hole 225 and nut 5 spiral shell It is connected together.
Further, in order to increase the connectivity robustness between the first floating bin 21 and the second floating bin 22, can also be The both sides of the first floating bin 21 and the second floating bin 22 are respectively welded one group of connection and pick up the ears.Open up on the picking up the ears of first floating bin 21 3rd locks hole, the picking up the ears of the second floating bin 22 opens up the 4th and locks hole.Screw bolt and nut locks hole and the 4th by the 3rd Lock hole the first floating bin 21 and the second being more firmly fixed from both sides of floating bin 22 link together.
In floatation type blowdown pump work, as shown in fig. 7, sewage pump flotation gear is assemblied in outside the motor of dredge pump 1 On shell 11, it is stuck in dredge pump 1 cover bottom simultaneously.Then whole floatation type dredge pump is put into the cement mortar equipped with cement mortar In sedimentation tank 7, dredge pump 1 is floated on the first liquid level 8 using natural buoyancy by sewage pump flotation gear.With the operation of dredge pump 1, The supernatant liquid of cement mortar sedimentation tank 7 constantly reduces.When liquid level drops to the second liquid level 9, the bottom of dredge pump 1 and cement mortar The cement mortar precipitate 6 of sedimentation tank 7 bottom contacts, thus avoid long-time the contact with cement mortar precipitate 6 of dredge pump 1 and Damage is solidified by cement mortar precipitate 6.
It should be noted that structure depicted in this specification institute accompanying drawings, ratio, size etc., all only in order to coordinate Content disclosed in bright book, so that those skilled in the art understands and reads, being not limited to this utility model can implement Qualificationss, therefore do not have technical essential meaning, the adjustment of the modification of any structure, the change of proportionate relationship or size, Under not affecting this utility model effect that can be generated by and the purpose that can reach, all should still fall to disclosed in this utility model Technology contents obtain and can cover in the range of.Meanwhile, in this specification cited as " on ", D score, "left", "right", " in Between " and " one " etc. term, be merely convenient to describe understands, and is not used to limit the enforceable scope of this utility model, its Being altered or modified of relativeness, under no essence change technology contents, when being also considered as the enforceable category of this utility model.
Above in association with accompanying drawing embodiment, this utility model is described in detail, those skilled in the art can root According to described above, this utility model is made with many variations example.Thus, some details in embodiment should not be constituted to this practicality New restriction, this utility model is by the scope being defined using appended claims as protection domain.

Claims (8)

1. a kind of dredge pump flotation gear is it is characterised in that include:Floating bin and the floating body being accommodated in described floating bin, Described floating bin is provided with the assembling structure for assembly connection dredge pump.
2. dredge pump flotation gear according to claim 1 is it is characterised in that described floating bin includes at least first floating Storehouse and the second floating bin;Described first floating bin and described second floating bin assembly connection, described assembling structure is for being formed at State the installation running-on at the first floating bin and described second floating bin assembly connection.
3. dredge pump flotation gear according to claim 2 is it is characterised in that be formed with first on described first floating bin Inner groovy, described second floating bin is formed with the second inner groovy;Described first inner groovy and described second inner groovy surround shape Become described installation running-on.
4. dredge pump flotation gear according to claim 3 is it is characterised in that described first floating bin floats with described second Floating warehouse includes warehouse and the Cang Gai being covered on described warehouse respectively.
5. dredge pump flotation gear according to claim 4 is it is characterised in that the warehouse of described first floating bin is provided with Lock hole positioned at the first of described first inner groovy both sides, the warehouse of described second floating bin is provided with corresponding to the described first lock Attached hole and positioned at described second inner groovy both sides second locks hole;Corresponding described first locks hole and locks with described second It is fixedly connected by fastening structure between hole.
6. dredge pump flotation gear according to claim 5 it is characterised in that described fastening structure include being arranged in described First locks hole and described second locks the screw piece in hole and is screwed together in the securing member on described screw piece.
7. dredge pump flotation gear according to claim 1 is it is characterised in that described floating body is extruded polystyrene board.
8. a kind of floatation type dredge pump is it is characterised in that include:
Dredge pump;And
Be assemblied on described dredge pump, as any one of claim 1 to 7 dredge pump flotation gear.
CN201620828244.3U 2016-08-02 2016-08-02 Float formula dredge pump and dredge pump flotation device Active CN205977767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620828244.3U CN205977767U (en) 2016-08-02 2016-08-02 Float formula dredge pump and dredge pump flotation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620828244.3U CN205977767U (en) 2016-08-02 2016-08-02 Float formula dredge pump and dredge pump flotation device

Publications (1)

Publication Number Publication Date
CN205977767U true CN205977767U (en) 2017-02-22

Family

ID=58028758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620828244.3U Active CN205977767U (en) 2016-08-02 2016-08-02 Float formula dredge pump and dredge pump flotation device

Country Status (1)

Country Link
CN (1) CN205977767U (en)

Similar Documents

Publication Publication Date Title
CN1296575C (en) Engineering machinery counter weight
CN205977767U (en) Float formula dredge pump and dredge pump flotation device
CN103215917B (en) Rectangular square box breakwater structure and physical model testing device thereof
CN207972114U (en) A kind of novel tubular pile charge car
CN206752574U (en) Buried major axis pumping plant
CN206956542U (en) A kind of science of bridge building plastic composite drain tank
CN205427643U (en) Water -level switch mechanism and drainage
CN208949931U (en) A kind of villa basement inwall flow-guiding structure
CN2715520Y (en) Suspension type frame for aquaculture mesh cage
CN201276696Y (en) Pontoon type trash blocking fence
CN204174055U (en) Stem pressing glass reinforced plastics septic tank
CN214116907U (en) Anti-sedimentation plastic inspection well
CN201768407U (en) V-shaped groove in V-shaped filter tank
CN203497139U (en) Amphibious platform for mining vertical pump
CN208136058U (en) septic tank
CN206800190U (en) A kind of science of bridge building plastic composite tapping pipe
KR200475727Y1 (en) pontoon assembly
CN202644549U (en) Single-wall steel hanging box cofferdam
CN207073185U (en) The equipped inspection shaft for carrying mud basket
CN216401157U (en) Rotational molding oil tank for loader
CN206859164U (en) A kind of light concrete floating wharf
CN203452171U (en) Diversion pipe transmembrane structure between refuse landfill reservoir and regulating reservoir
CN213274444U (en) Intelligent oil quantity monitoring device for excavator
CN214123329U (en) Novel cement product stake
CN207284001U (en) A kind of switch board with double-deck cabinet lid

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant