CN205977767U - Float formula dredge pump and dredge pump flotation device - Google Patents
Float formula dredge pump and dredge pump flotation device Download PDFInfo
- Publication number
- CN205977767U CN205977767U CN201620828244.3U CN201620828244U CN205977767U CN 205977767 U CN205977767 U CN 205977767U CN 201620828244 U CN201620828244 U CN 201620828244U CN 205977767 U CN205977767 U CN 205977767U
- Authority
- CN
- China
- Prior art keywords
- dredge pump
- floating
- floating bin
- bin
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005188 flotation Methods 0.000 title claims abstract description 30
- 238000007667 floating Methods 0.000 claims abstract description 125
- 238000009434 installation Methods 0.000 claims description 10
- 239000004793 Polystyrene Substances 0.000 claims description 8
- 229920002223 polystyrene Polymers 0.000 claims description 8
- 239000002244 precipitate Substances 0.000 abstract description 7
- 238000004140 cleaning Methods 0.000 abstract description 6
- 238000010276 construction Methods 0.000 abstract description 6
- 230000006378 damage Effects 0.000 abstract description 5
- 238000007711 solidification Methods 0.000 abstract description 4
- 230000008023 solidification Effects 0.000 abstract description 4
- 238000012423 maintenance Methods 0.000 abstract description 3
- 239000011440 grout Substances 0.000 abstract 2
- 239000011083 cement mortar Substances 0.000 description 12
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 210000005069 ears Anatomy 0.000 description 6
- 239000007788 liquid Substances 0.000 description 6
- 238000003466 welding Methods 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 229910052742 iron Inorganic materials 0.000 description 4
- 238000005086 pumping Methods 0.000 description 4
- 238000004062 sedimentation Methods 0.000 description 4
- 239000010865 sewage Substances 0.000 description 4
- 239000002699 waste material Substances 0.000 description 4
- 238000001556 precipitation Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000004033 plastic Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000005406 washing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000010926 purge Methods 0.000 description 1
- 239000006228 supernatant Substances 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The utility model provides a float formula dredge pump and dredge pump flotation device, the dredge pump flotation device include: float the storehouse with accomodate in float the floating body in the storehouse, be equipped with the assembly structure who is used for the be assembled between/be connected between dredge pump on the showy storehouse, it includes the pump body and the dredge pump flotation device of assembly on the body to float the formula dredge pump. The utility model discloses reducible dredge pump and grout precipitate contact time reduce the destruction of grout precipitate solidification to the dredge pump. Not only can effectively save the labour of manual cleaning or maintenance blowdown pump, reduce construction cost, can also lengthen equipment life.
Description
Technical field
This utility model is related to building engineering field and in particular to a kind of floatation type dredge pump and dredge pump flotation gear.
Background technology
With the development of Building technology, high-rise more and more with high-rise building.Pour work high-rise with superelevation layer main body
In journey construction, the application of Super High concrete pumping system is also more and more frequent.Concrete pumping system using after complete, if not
Cleaning concrete conveyance conduit in time, can cause residual concrete in conveyance conduit to condense, conveyance conduit will be led to when serious to block up
Plug.At present, concrete pumping system cleaning typically has air purge and washing.Wherein, a large amount of waste residues can be produced in water-washing process and give up
The mixture of water.For environmental protection, by after waste residue and waste water mixture separating treatment, cement mortar can be introduced in sedimentation tank further
Precipitation, the sewage being settled out can be using the conveyance conduit of blowdown pumped cleaning concrete pumping system again.
When extracting sewage using dredge pump, cement mortar precipitation solidification can cause to dredge pump to damage.In order to not affect to arrange
The service life of dirty pump, needs labor cleaning or maintenance dredge pump, improves construction cost, and affect the duration.
Utility model content
For overcoming the defect existing for prior art, now provide a kind of floatation type dredge pump and dredge pump flotation gear, with
Solve cement mortar precipitation solidification and dredge pump is caused with the problems such as damage.
For achieving the above object, this utility model adopts the following technical scheme that:
In a first aspect, providing a kind of dredge pump flotation gear to include:Floating bin and the floating body being accommodated in floating bin, drift
Floating warehouse is provided with the assembling structure for assembly connection dredge pump.
Further, floating bin includes at least first floating bin and the second floating bin.First floating bin and the second floating bin
Assembly connection, assembling structure is the installation running-on being formed at the first floating bin and the second floating bin assembly connection.
Further, the first floating bin is formed with the first inner groovy, the second floating bin is formed with the second inner groovy.The
One inner groovy and the second inner groovy surround formation and install running-on.
Further, the first floating bin and the second floating bin include warehouse respectively and are covered on the Cang Gai on warehouse.
Further, the warehouse of the first floating bin is provided with and locks hole positioned at the first of the first inner groovy opposite sides, the
The warehouse of two floating bins be provided with corresponding to first lock hole and be located at the second inner groovy opposite sides second lock hole.Relatively
First answering is locked hole and locks with second and be fixedly connected by fastening structure between hole.
Further, fastening structure includes being arranged in first and locks the screw piece that hole locks hole with second and being screwed together in and screws togather
Securing member on part.
Further, floating body is extruded polystyrene board.
Second aspect, provides a kind of pump housing and is assemblied in the dredge pump flotation gear on the pump housing.
Dredge pump flotation gear includes:Floating bin and the floating body being accommodated in floating bin, floating bin is provided with for filling
Join the assembling structure connecting the pump housing.
Further, floating bin includes at least first floating bin and the second floating bin.First floating bin and the second floating bin
Assembly connection, assembling structure is the installation running-on being formed at the first floating bin and the second floating bin assembly connection.
Further, the first floating bin is formed with the first inner groovy, the second floating bin is formed with the second inner groovy.The
One inner groovy and the second inner groovy surround formation and install running-on.
Further, the first floating bin and the second floating bin include warehouse respectively and are covered on the Cang Gai on warehouse.
Further, the warehouse of the first floating bin is provided with and locks hole positioned at the first of the first inner groovy opposite sides, the
The warehouse of two floating bins be provided with corresponding to first lock hole and be located at the second inner groovy opposite sides second lock hole.Relatively
First answering is locked hole and locks with second and be fixedly connected by fastening structure between hole.
Further, fastening structure includes being arranged in first and locks the screw piece that hole locks hole with second and being screwed together in and screws togather
Securing member on part.
Further, floating body is extruded polystyrene board.
The beneficial effects of the utility model are, when largely decreasing dredge pump and contacting with cement mortar precipitate
Between, reduce the destruction to dredge pump for the cement mortar precipitate solidification.Not only can effectively save labor cleaning or the labor of maintenance dredge pump
Power, reduces construction cost moreover it is possible to extension device service life.
Brief description
Fig. 1 is the structural representation of this utility model floatation type dredge pump.
Fig. 2 is the structural representation of dredge pump flotation gear.
Fig. 3 is the first floating bin and floating body constitutional diagram.
Fig. 4 is floating bin warehouse structural representation.
Fig. 5 is floating bin warehouse top view.
Fig. 6 is partial enlarged drawing at C in Fig. 5.
Fig. 7 is floatation type dredge pump work sheet.
Specific embodiment
Below by way of specific instantiation, embodiment of the present utility model is described, those skilled in the art can be by this theory
Content disclosed by bright book understands other advantages of the present utility model and effect easily.This utility model can also be by addition
Different specific embodiments is carried out or applies, and the every details in this specification based on different viewpoints and can also be answered
With carrying out various modifications and changes under without departing from spirit of the present utility model.
Fig. 1 is the structural representation of this utility model floatation type dredge pump.Fig. 2 is flotation gear structural representation.Fig. 3 is
First floating bin and floating body constitutional diagram.Fig. 4 is floating bin warehouse structural representation.Fig. 5 is floating bin warehouse top view.Fig. 6
For partial enlarged drawing at C in Fig. 5.Fig. 7 is floatation type dredge pump work sheet.
With reference to Fig. 2 to Fig. 7, this utility model provides a kind of dredge pump flotation gear, including the first floating bin 21 and the
Two floating bins 22, the first floating bin 21 and the second floating bin 22 assembly connection and formed for installing dredge pump at assembly connection
1 installation running-on 23.
Floating body 3 can select rubber pneumatic bag, or wooden unit, plastic foamboard isodensity are less than the material of water.In this enforcement
In example, floating body 3 is extruded polystyrene board.
Floating bin 2 includes warehouse and Cang Gai.Storehouse lid can be made from galvanized iron sheet, and warehouse selects the waste and old steel of construction site
Plate weld is formed.Cang Gai and warehouse are encircled into a closed space, are stuffed entirely with extruded polystyrene board in closed space.
Install for convenience, be provided with the first inner groovy 214 in a bulkhead of the first floating bin 21, the one of the second floating bin 22
Bulkhead relatively is provided with the second inner groovy 224.As shown in figure 5, the first inner groovy 214 and the second inner groovy 224 relative symmetry, close
Enclose one installation running-on 23 of formation.The top running-on diameter installing running-on 23 should be less than the overall diameter of dredge pump 1 cover, and bigger
Overall diameter in dredge pump 1 motor housing.When dredge pump 1 is in liquid down blow, dredge pump flotation gear is assemblied in dredge pump 1 machine
With, it is stuck in the cover of dredge pump 1 with lower portion so that dredge pump 1 cannot skid off from installing running-on 23 simultaneously.
Further, in order to allow dredge pump flotation gear to be preferably assembled together with dredge pump 1, the first floating bin 21 He
Second floating bin 22 can be fixedly connected by welding, or the opposite side hinge of the first floating bin 21 and the second floating bin 22
Chain connects, and opposite side iron wire locks.
In the present embodiment, as shown in figure 5, the first floating bin 21 is fixedly connected by fastening structure with the second floating bin 22
Together.Fastening structure includes screw piece and is screwed together in the securing member on screw piece.Screw piece is bolt 4, and securing member is nut
5.In conjunction with Fig. 4, for the ease of the installation of fastening structure, electric welding on the first floating bin warehouse 211 offers first and locks hole
215, spot welding on the second floating bin warehouse 221 opens up second and locks hole 225.First locks hole 215 and second locks hole 225 respectively
Lock hole including two.First locks two that hole 215 opens up locks the opposite sides that hole is located at the first inner groovy 214 respectively,
Second locks two that hole 225 opens up locks the opposite sides that hole is located at the second inner groovy 224 respectively.First locks hole 215 He
Second lock hole 225 position mutually corresponding.Bolt 4 sequentially passes through first and locks hole 215, second locks hole 225 and nut 5 spiral shell
It is connected together.
Further, in order to increase the connectivity robustness between the first floating bin 21 and the second floating bin 22, can also be
The both sides of the first floating bin 21 and the second floating bin 22 are respectively welded one group of connection and pick up the ears.Open up on the picking up the ears of first floating bin 21
3rd locks hole, the picking up the ears of the second floating bin 22 opens up the 4th and locks hole.Screw bolt and nut locks hole and the 4th by the 3rd
Lock hole the first floating bin 21 and the second being more firmly fixed from both sides of floating bin 22 link together.
When actually used, first the first floating bin warehouse 211 and the second floating bin warehouse 221 are enclosed within the machine of dredge pump 1
On body shell, the first floating bin warehouse 211 and the second floating bin warehouse 221 is allowed to be simultaneously in below the cover bottom of dredge pump 1
Position, with bolt 4 and nut 5 by the first floating bin warehouse 211 and the second floating bin warehouse 221 by locking hole 215 and lock
Attached hole 225 is fixed together.Then the first floating bin warehouse 211 and the second floating bin warehouse 221 are filled up extruded polystyrene
Plate.Finally the first floating bin storehouse lid 212 and the second floating bin storehouse lid 222 are covered respectively in the first floating bin warehouse 211 and second
On floating bin warehouse 221.
Referring to figs. 1 to Fig. 7, this utility model provides a kind of floatation type dredge pump, including:Dredge pump 1 and the row of being assemblied in
Dredge pump flotation gear on dirty pump 1.
Dredge pump flotation gear dredge pump flotation gear, including the first floating bin 21 and the second floating bin 22, the first floating
Storehouse 21 and the second floating bin 22 assembly connection and form the installation running-on 23 for installing dredge pump 1 at assembly connection.
Floating body 3 can select rubber pneumatic bag, or wooden unit, plastic foamboard isodensity are less than the material of water.In this enforcement
In example, floating body 3 is extruded polystyrene board.
Floating bin 2 includes warehouse and Cang Gai.Storehouse lid can be made from galvanized iron sheet, and warehouse selects the waste and old steel of construction site
Plate weld is formed.Cang Gai and warehouse are encircled into a closed space, are stuffed entirely with extruded polystyrene board in closed space.
Install for convenience, be provided with the first inner groovy 214 in a bulkhead of the first floating bin 21, the one of the second floating bin 22
Bulkhead relatively is provided with the second inner groovy 224.As shown in figure 5, the first inner groovy 214 and the second inner groovy 224 relative symmetry, close
Enclose one installation running-on 23 of formation.The top running-on diameter installing running-on 23 should be less than the overall diameter of dredge pump 1 cover, and bigger
Overall diameter in dredge pump 1 motor housing.When dredge pump 1 is in liquid down blow, dredge pump flotation gear is assemblied in dredge pump 1 machine
With, it is stuck in the cover of dredge pump 1 with lower portion so that dredge pump 1 cannot skid off from installing running-on 23 simultaneously.
Further, in order to allow dredge pump flotation gear to be preferably assembled together with dredge pump 1, the first floating bin 21 He
Second floating bin 22 can be fixedly connected by welding, or the opposite side hinge of the first floating bin 21 and the second floating bin 22
Chain connects, and opposite side iron wire locks.
In the present embodiment, as shown in figure 5, the first floating bin 21 is fixedly connected by fastening structure with the second floating bin 22
Together.Fastening structure includes screw piece and is screwed together in the securing member on screw piece.Screw piece is bolt 4, and securing member is nut
5.In conjunction with Fig. 4, for the ease of the installation of fastening structure, electric welding on the first floating bin warehouse 211 offers first and locks hole
215, spot welding on the second floating bin warehouse 221 opens up second and locks hole 225.First locks hole 215 and second locks hole 225 respectively
Lock hole including two.First locks two that hole 215 opens up locks the opposite sides that hole is located at the first inner groovy 214 respectively,
Second locks two that hole 225 opens up locks the opposite sides that hole is located at the second inner groovy 224 respectively.First locks hole 215 He
Second lock hole 225 position mutually corresponding.Bolt 4 sequentially passes through first and locks hole 215, second locks hole 225 and nut 5 spiral shell
It is connected together.
Further, in order to increase the connectivity robustness between the first floating bin 21 and the second floating bin 22, can also be
The both sides of the first floating bin 21 and the second floating bin 22 are respectively welded one group of connection and pick up the ears.Open up on the picking up the ears of first floating bin 21
3rd locks hole, the picking up the ears of the second floating bin 22 opens up the 4th and locks hole.Screw bolt and nut locks hole and the 4th by the 3rd
Lock hole the first floating bin 21 and the second being more firmly fixed from both sides of floating bin 22 link together.
In floatation type blowdown pump work, as shown in fig. 7, sewage pump flotation gear is assemblied in outside the motor of dredge pump 1
On shell 11, it is stuck in dredge pump 1 cover bottom simultaneously.Then whole floatation type dredge pump is put into the cement mortar equipped with cement mortar
In sedimentation tank 7, dredge pump 1 is floated on the first liquid level 8 using natural buoyancy by sewage pump flotation gear.With the operation of dredge pump 1,
The supernatant liquid of cement mortar sedimentation tank 7 constantly reduces.When liquid level drops to the second liquid level 9, the bottom of dredge pump 1 and cement mortar
The cement mortar precipitate 6 of sedimentation tank 7 bottom contacts, thus avoid long-time the contact with cement mortar precipitate 6 of dredge pump 1 and
Damage is solidified by cement mortar precipitate 6.
It should be noted that structure depicted in this specification institute accompanying drawings, ratio, size etc., all only in order to coordinate
Content disclosed in bright book, so that those skilled in the art understands and reads, being not limited to this utility model can implement
Qualificationss, therefore do not have technical essential meaning, the adjustment of the modification of any structure, the change of proportionate relationship or size,
Under not affecting this utility model effect that can be generated by and the purpose that can reach, all should still fall to disclosed in this utility model
Technology contents obtain and can cover in the range of.Meanwhile, in this specification cited as " on ", D score, "left", "right", " in
Between " and " one " etc. term, be merely convenient to describe understands, and is not used to limit the enforceable scope of this utility model, its
Being altered or modified of relativeness, under no essence change technology contents, when being also considered as the enforceable category of this utility model.
Above in association with accompanying drawing embodiment, this utility model is described in detail, those skilled in the art can root
According to described above, this utility model is made with many variations example.Thus, some details in embodiment should not be constituted to this practicality
New restriction, this utility model is by the scope being defined using appended claims as protection domain.
Claims (8)
1. a kind of dredge pump flotation gear is it is characterised in that include:Floating bin and the floating body being accommodated in described floating bin,
Described floating bin is provided with the assembling structure for assembly connection dredge pump.
2. dredge pump flotation gear according to claim 1 is it is characterised in that described floating bin includes at least first floating
Storehouse and the second floating bin;Described first floating bin and described second floating bin assembly connection, described assembling structure is for being formed at
State the installation running-on at the first floating bin and described second floating bin assembly connection.
3. dredge pump flotation gear according to claim 2 is it is characterised in that be formed with first on described first floating bin
Inner groovy, described second floating bin is formed with the second inner groovy;Described first inner groovy and described second inner groovy surround shape
Become described installation running-on.
4. dredge pump flotation gear according to claim 3 is it is characterised in that described first floating bin floats with described second
Floating warehouse includes warehouse and the Cang Gai being covered on described warehouse respectively.
5. dredge pump flotation gear according to claim 4 is it is characterised in that the warehouse of described first floating bin is provided with
Lock hole positioned at the first of described first inner groovy both sides, the warehouse of described second floating bin is provided with corresponding to the described first lock
Attached hole and positioned at described second inner groovy both sides second locks hole;Corresponding described first locks hole and locks with described second
It is fixedly connected by fastening structure between hole.
6. dredge pump flotation gear according to claim 5 it is characterised in that described fastening structure include being arranged in described
First locks hole and described second locks the screw piece in hole and is screwed together in the securing member on described screw piece.
7. dredge pump flotation gear according to claim 1 is it is characterised in that described floating body is extruded polystyrene board.
8. a kind of floatation type dredge pump is it is characterised in that include:
Dredge pump;And
Be assemblied on described dredge pump, as any one of claim 1 to 7 dredge pump flotation gear.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620828244.3U CN205977767U (en) | 2016-08-02 | 2016-08-02 | Float formula dredge pump and dredge pump flotation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620828244.3U CN205977767U (en) | 2016-08-02 | 2016-08-02 | Float formula dredge pump and dredge pump flotation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205977767U true CN205977767U (en) | 2017-02-22 |
Family
ID=58028758
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620828244.3U Expired - Fee Related CN205977767U (en) | 2016-08-02 | 2016-08-02 | Float formula dredge pump and dredge pump flotation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205977767U (en) |
-
2016
- 2016-08-02 CN CN201620828244.3U patent/CN205977767U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107447767B (en) | A kind of prefabricated reinforced concrete bottom plate steel lifted trunk and its construction method | |
CN103215917B (en) | Rectangular square box breakwater structure and physical model testing device thereof | |
CN205977767U (en) | Float formula dredge pump and dredge pump flotation device | |
CN207972114U (en) | A kind of novel tubular pile charge car | |
CN206752574U (en) | Buried major axis pumping plant | |
CN206289586U (en) | Hydraulic engineering ecological protection slope | |
CN203284065U (en) | Sludge carrying lifting hopper | |
CN205427643U (en) | Water -level switch mechanism and drainage | |
CN208949931U (en) | A kind of villa basement inwall flow-guiding structure | |
CN2715520Y (en) | Suspension type frame for aquaculture mesh cage | |
CN204492705U (en) | Assembly combined bottomless steel case mud pit | |
CN208747900U (en) | A kind of three format plastic septic tanks | |
CN201276696Y (en) | Pontoon type trash blocking fence | |
CN214116907U (en) | Anti-sedimentation plastic inspection well | |
CN201768407U (en) | V-shaped groove in V-shaped filter tank | |
CN213329113U (en) | Outdoor buried water meter well for tap water | |
CN210384947U (en) | Underground settling chamber for treating domestic sewage | |
CN203497139U (en) | Amphibious platform for mining vertical pump | |
CN208136058U (en) | septic tank | |
CN206800190U (en) | A kind of science of bridge building plastic composite tapping pipe | |
KR200475727Y1 (en) | pontoon assembly | |
CN202644549U (en) | Single-wall steel hanging box cofferdam | |
CN207278577U (en) | A kind of high Yang Cheng cutting types proof submersible sand discharging pump | |
CN207073185U (en) | The equipped inspection shaft for carrying mud basket | |
CN206859164U (en) | A kind of light concrete floating wharf |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 |
|
CF01 | Termination of patent right due to non-payment of annual fee |