CN205976691U - Concrete pole - Google Patents

Concrete pole Download PDF

Info

Publication number
CN205976691U
CN205976691U CN201620669430.7U CN201620669430U CN205976691U CN 205976691 U CN205976691 U CN 205976691U CN 201620669430 U CN201620669430 U CN 201620669430U CN 205976691 U CN205976691 U CN 205976691U
Authority
CN
China
Prior art keywords
concrete
main part
concrete main
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620669430.7U
Other languages
Chinese (zh)
Inventor
吴太锋
胡裕成
潘祖兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhijiang Exin Cement Product Co Ltd
Original Assignee
Zhijiang Exin Cement Product Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhijiang Exin Cement Product Co Ltd filed Critical Zhijiang Exin Cement Product Co Ltd
Priority to CN201620669430.7U priority Critical patent/CN205976691U/en
Application granted granted Critical
Publication of CN205976691U publication Critical patent/CN205976691U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model provides a concrete pole, including concrete main part and main muscle, wherein the concrete main part is the columnar structure roughly, and main muscle is a plurality of list structures and imbeds in the concrete main part, and the extending direction of main muscle is unanimous with the extending direction of concrete main part, discrete state for not setting up connection structure between a plurality of main muscle. The utility model discloses during production earlier in the mould grout form the concrete main part, again will main muscle squeeze into the concrete main part, then carry out centrifugation, steam curing and the drawing of patterns to the concrete main part, can obtain the finished product, therefore leave out the steel bones RACK manufacturing process in the production of current concrete pole, solved the technology bias that prior art exists, started a new concrete pole structure and aquatic products method, greatly promoted production efficiency, just the utility model discloses need not to use steel ring or spiral muscle to fix main muscle, thus the structure is simpler, materials still less, the cost is lower.

Description

A kind of concurrent
Technical field
This utility model is related to electric power facility field, more particularly, to a kind of concurrent.
Background technology
Electric pole is the most basic facility of electric power transport, and traditional electric pole is wooden electric pole, because the wooden electric pole life-span is shorter, Insufficient strength and material is more and more rare, and gradually replaced by concurrent and irony electric pole, wherein concurrent master To be formed by concrete and framework of steel reinforcement, during its production, one of indispensability operation is exactly to make framework of steel reinforcement, existing reinforcing bar Skeleton all includes some straight cage bars and some steel rings or a spiral bar, needs first to be positioned cage bar, then during making By steel ring or spiral bar welding or with steel wire lashing in cage bar so that some cage bars combination formation one entirety reinforcing bar Frame, has been manually done because the making of framework of steel reinforcement fully relies on manpower, so that expending more man-hour, limits concrete electric The production efficiency of bar.
Utility model content
For the deficiency in the presence of prior art, this utility model provides a kind of concurrent, and its structure is more Simply, during production, breviary has fallen the manufacturing process of framework of steel reinforcement, thus drastically increases production efficiency, and more saves material Material cost.
For achieving the above object, this utility model employs following technical scheme:
A kind of concurrent, including concrete main body and cage bar, wherein concrete main body is column structure, if cage bar is Dry list structure is simultaneously embedded in concrete main body, and the bearing of trend of cage bar is consistent with the bearing of trend of concrete main body, institute State between some cage bars is the discrete state being not provided with attachment structure.
Further, described concrete main body is the column structure of hollow.
Further, described concrete main body is taper or isometrical column structure.
Further, main ribs are 16 and the central shaft around concrete main body is evenly distributed.
Compared to prior art, this utility model has the advantages that:
1. when this utility model produces, first grouting forms concrete main body in a mold, then cage bar is driven into concrete master In body, then concrete main body is carried out being centrifuged, steam curing and the demoulding, you can obtain finished product, be greatly saved operation, carry Rise production efficiency;
2. this utility model is fixed to cage bar without using steel ring or spiral bar, thus structure is simpler, materials Less, cost is lower.
Brief description
Fig. 1 is upward view of the present utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment further illustrates to the technical scheme in this utility model.
As shown in Figure 1 and Figure 2, the utility model proposes a kind of concurrent, including concrete main body 1 and cage bar 2, Wherein concrete main body 1 is the column structure of the taper of hollow;Cage bar 2 is 16 list structures and is embedded in concrete main body In 1, cage bar 2 can be made using reinforcing bar, and cage bar 2 is evenly distributed around the central shaft of concrete main body 1, and the extension of cage bar 2 Direction is consistent with the bearing of trend of concrete main body 1, is the discrete state being not provided with attachment structure between described some cage bars 2.
When this utility model produces, first grouting forms concrete main body 1 in a mold, then cage bar 2 is driven into concrete In main body 1, then concrete main body 1 is carried out being centrifuged, steam curing and the demoulding, you can obtain finished product, thus eliminate existing Making of reinforcement cage process in concurrent production, solves the technology prejudice of prior art presence, has started a kind of new Concurrent structure and Aquatic product method, significant increase production efficiency;Simultaneously because this utility model is without using steel ring Or spiral bar is fixed to cage bar, thus structure is simpler, materials are less, cost is lower.
Finally illustrate, above example only in order to the technical solution of the utility model to be described and unrestricted, although ginseng According to preferred embodiment, this utility model is described in detail, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent, the objective without deviating from technical solutions of the utility model and model Enclose, it all should be covered in the middle of right of the present utility model.

Claims (4)

1. a kind of concurrent, including concrete main body and cage bar, wherein concrete main body is column structure, and cage bar is some List structure is simultaneously embedded in concrete main body, and the bearing of trend of cage bar is consistent with the bearing of trend of concrete main body, and it is special Levy and be:It is the discrete state being not provided with attachment structure between described some cage bars.
2. as claimed in claim 1 a kind of concurrent it is characterised in that:Described concrete main body is the column knot of hollow Structure.
3. as claimed in claim 1 a kind of concurrent it is characterised in that:Described concrete main body is taper or isometrical Column structure.
4. as claimed in claim 1 a kind of concurrent it is characterised in that:Main ribs are 16 and around concrete master The central shaft of body is evenly distributed.
CN201620669430.7U 2016-06-29 2016-06-29 Concrete pole Active CN205976691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620669430.7U CN205976691U (en) 2016-06-29 2016-06-29 Concrete pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620669430.7U CN205976691U (en) 2016-06-29 2016-06-29 Concrete pole

Publications (1)

Publication Number Publication Date
CN205976691U true CN205976691U (en) 2017-02-22

Family

ID=58022612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620669430.7U Active CN205976691U (en) 2016-06-29 2016-06-29 Concrete pole

Country Status (1)

Country Link
CN (1) CN205976691U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476637A (en) * 2017-08-16 2017-12-15 辽宁工程技术大学 The wind-power tower and construction method of resin covering framework and fibre reinforced concrete

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476637A (en) * 2017-08-16 2017-12-15 辽宁工程技术大学 The wind-power tower and construction method of resin covering framework and fibre reinforced concrete
CN107476637B (en) * 2017-08-16 2019-05-10 辽宁工程技术大学 The wind-power tower and construction method of resin covering frame and fibre reinforced concrete

Similar Documents

Publication Publication Date Title
CN102966093B (en) The prefabricated soldier pile of uneven arrangement of reinforcement and forming method thereof and moulding form
CN105971160A (en) Method for preventing 3D printing reinforced masonry shear wall being unshelled
JP2016519011A (en) Method and system for producing elongated concrete articles
CN205575408U (en) Concrete precast component shedder
CN103758291A (en) Shearing reinforcing type semi-grouting sleeve
CN104480933B (en) The manufacture method of pencil-type pile tube
US9561632B2 (en) Method for forming an elongate support structure
JP2016519011A5 (en)
CN205976691U (en) Concrete pole
CN104164996A (en) Protection-layer-free concrete electric pole and manufacturing method thereof
CN204551244U (en) Precast hollow bridge pier
CN203129684U (en) Partially pre-stressed segmented pole
CN206205547U (en) A kind of annular concrete electric pole flange connecting apparatus
CN103993771A (en) Glass reinforced plastic telegraph pole and manufacturing method thereof
CN107654110A (en) Concurrent
CN207656905U (en) A kind of molding die of prefabricated high-strength concrete bridge pier
CN101725269A (en) Large bending moment electrical pole with partial prestress, and bar arranging and manufacturing method thereof
CN104989106A (en) Full prestress tension plate external member
CN208529643U (en) A kind of demolding structure of locomotive hollow combined insulator
CN211368685U (en) Stability tubular pile for geotechnical engineering
CN102975282A (en) Method for forming unnonuniformly reinforcement-arranged precast pile
CN210289324U (en) Anti-skidding easily-climbing cement telegraph pole
CN204209799U (en) The mould of in-situ precast building roof system ardealite permanent mold shell
CN204983902U (en) Civilian dress formula enclosure hood
CN207829579U (en) A kind of electric pole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A concrete pole

Effective date of registration: 20221017

Granted publication date: 20170222

Pledgee: Hubei Zhijiang Rural Commercial Bank Co.,Ltd.

Pledgor: ZHIJIANG EXI CEMENT PRODUCTS CO.,LTD.

Registration number: Y2022980018490

PE01 Entry into force of the registration of the contract for pledge of patent right