CN205976120U - Braced system and large -span stone material moulding of large -span stone material moulding - Google Patents

Braced system and large -span stone material moulding of large -span stone material moulding Download PDF

Info

Publication number
CN205976120U
CN205976120U CN201620779955.6U CN201620779955U CN205976120U CN 205976120 U CN205976120 U CN 205976120U CN 201620779955 U CN201620779955 U CN 201620779955U CN 205976120 U CN205976120 U CN 205976120U
Authority
CN
China
Prior art keywords
vertical keel
steel
support system
large span
transverse connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620779955.6U
Other languages
Chinese (zh)
Inventor
吴长青
沈秋汉
高源�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU KELIDA PHOTOELECTRIC CURTAIN WALL CO Ltd
Original Assignee
SUZHOU KELIDA PHOTOELECTRIC CURTAIN WALL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU KELIDA PHOTOELECTRIC CURTAIN WALL CO Ltd filed Critical SUZHOU KELIDA PHOTOELECTRIC CURTAIN WALL CO Ltd
Priority to CN201620779955.6U priority Critical patent/CN205976120U/en
Application granted granted Critical
Publication of CN205976120U publication Critical patent/CN205976120U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a braced system and large -span stone material moulding of large -span stone material moulding, braced system include two at least transverse connection spares, and on the concrete structure beam -ends face of position department between the layer was fixed to one end, the other end stretched out concrete structure beam -ends shape of face and becomes the free end, two at least coupling assembling are used for respectively fixing a vertical keel and the 2nd vertical keel at transverse connection spare, and the 2nd vertical keel lies in a vertical keel's the outside, and the front end stone material hangs on the 2nd vertical keel. Large -span stone material moulding includes foretell braced system. Utilizing coupling assembling all to fix a vertical keel and the 2nd vertical keel on transverse connection spare, making whole braced system's simple structure, transverse connection spare is fixed on the concrete structure roof beam for the atress of transverse connection spare is clear and definite simple with the power transmittance process, can transmit better to the concrete structure on, guarantees this braced system's atress.

Description

The support system of large span stone moulding and large span stone moulding
Technical field
This utility model belongs to stone curtain wall decoration technique field and in particular to the support system of large span stone moulding System and large span stone moulding.
Background technology
Stone curtain wall is peripheral structure or the decorating structure of the building wall being formed by Bracing Systems and stone material, due to Stone curtain wall adopts the stone material of natural material, has the advantages that attractive in appearance, high temperature resistant, freexing tolerance and comprcssive strength are high, extensively should In architectural decoration.Wherein, large span stone moulding can enrich elevation of building due to its moulding, vertically Decorative thread can more project the concave-convex effect of facade so that elevation appearance is fine and smooth and attractive in appearance, more come extensive by people Favor.
But, the support meanss of existing large span stone moulding, main inclusion is vertically directly anchored to The vertical steel joist of bulk on xoncrete structure, and vertically firm other parallel Os Draconis of Os Draconis, stone material is fixed on other Os Draconis, Other Os Draconis hang and are fixed on vertical steel joist, for ensureing that other Os Draconis can more securely be fixed on vertical steel joist, Also need to set up structure with oblique member between vertical steel joist and other Os Draconis, so that the complex structure of support meanss, erect Stress to steel joist is complicated and stress transmission is indefinite, and also need that vertical steel joist does is sufficiently large simultaneously, and just enabling will be big Span stone decoration lines.
Utility model content
Therefore, technical problem to be solved in the utility model be large span stone moulding in prior art Support arrangement complex structure and stress are complicated.
For this reason, this utility model provides a kind of support system of large span stone moulding, including
Transverse connection, is at least two, be arranged in parallel in the horizontal direction, one end is fixed on interlayer position by fixation kit Put on the concrete structured beam end face at place, the other end stretches out described concrete structured beam end face and forms free end;
Coupling assembly, is at least two, is respectively used to the first vertical keel and the second vertical keel are fixed on and are laterally connected On fitting, described second vertical keel is located at the outside of described first vertical keel, and it is vertical that front end stone material is suspended on described second On Os Draconis.
The support system of above-mentioned large span stone moulding, described fixation kit includes being fixed on described xoncrete structure Board slot built-in fitting in beam end, is fixed on the first junction steel plate on described transverse connection end, and passes through described the One junction steel plate and board slot built-in fitting, described first junction steel plate is fixed on the first connector on described board slot built-in fitting.
The support system of above-mentioned large span stone moulding, described coupling assembly includes
It is molded on underlying described transverse connection top surface and opening up steel bushing core, described first erects It is set on described steel bushing core to the bottom of Os Draconis or described second vertical keel;
One end is held within the described transverse connection lower surface of top, and it is vertical that the other end is fixed on described first The first angle steel at the top of Os Draconis or described second vertical keel;And it is vertical that described first angle steel is fixed on described first The second connector at the top of Os Draconis or described first vertical keel.
The support system of above-mentioned large span stone moulding, positioned at the first vertical keel described in same in the layer with described The channel-section steel of level is also set up between second vertical keel.
The support system of above-mentioned large span stone moulding, also includes the width along described channel-section steel, is arranged on institute At least one second junction steel plate stated on channel-section steel and stretch out, side stone material is suspended on described second connection steel by suspension member On plate both ends.
The support system of above-mentioned large span stone moulding, along the short transverse of described second vertical keel, described Second angle steel is arranged on the outer side surface of the second vertical keel, described front end stone material is suspended on described second angle steel by suspension member On.
The support system of above-mentioned large span stone moulding, described suspension member is SE suspension member.
The support system of above-mentioned large span stone moulding, along the width of described channel-section steel, described first is vertical The width of Os Draconis is more than its length, and the width of described second vertical keel is more than its length.
The support system of above-mentioned large span stone moulding, described transverse connection is steel corbel;And/or
Described channel-section steel is zinc-plated channel-section steel;And/or
Described second junction steel plate is galvanized steel plain sheet.
This utility model provides a kind of large span stone moulding, including
Support system described in any of the above-described;
First vertical keel and the second vertical keel, are separately fixed at described transverse connection by described support system On, described second vertical keel is located at the outside of described first vertical keel;
Front end stone material and two sides stone material, are suspended on described second vertical keel and channel-section steel respectively.
The technical scheme that this utility model provides, has the advantage that:
1. the support system of the large span stone moulding that this utility model provides, including two transverse connections, edge Horizontal direction parallel is arranged, and one end is fixed on the concrete structured beam end face at inter-layer position by fixation kit, the other end Stretch out xoncrete structure crossbeam end face and form free end;Two coupling assemblies, are respectively used to erect the first vertical keel and second It is fixed on transverse connection to Os Draconis, the second vertical keel is located at the outside of the first vertical keel, front end stone material is suspended on the On two vertical keels.
The support system of this structure, arranges transverse connection on the concrete structured beam end face at inter-layer position, utilizes First vertical keel and the second vertical keel are each attached on transverse connection coupling assembly, also need not set as in documents Put structure with oblique member, and replace big vertical keel in prior art with the first vertical keel and the first vertical keel, make whole The structure of individual support system is simple, and transverse connection is fixed on concrete structured beam so that the stress of transverse connection is clear and definite Simple with power transmittance process, can preferably be transferred on xoncrete structure.
2. the support system of the large span stone moulding that this utility model provides, coupling assembly includes being molded over and is located at Lower section transverse connection top surface on and opening up steel bushing core, the bottom of the first vertical keel or the second vertical keel It is set on steel bushing core;One end is held within the transverse connection lower surface of top, and it is vertical that the other end is fixed on first The first angle steel at the top of Os Draconis or the second vertical keel and the first angle steel is fixed on the first vertical keel or first erects To the second connector at the top of Os Draconis.The coupling assembly of this structure, due to the first vertical keel or the second vertical keel Bottom is set on the steel bushing core of transverse connection, and when stone material is subject to extraneous wind load, the first vertical keel or second erects Can move up and down on steel bushing core to the bottom of Os Draconis, realize the vertical telescopicing performance of Os Draconis, better against extraneous Active force.
3. the large span stone moulding that this utility model provides, including the support system of any of the above-described;First erects To Os Draconis and the second vertical keel, excessively described support system is separately fixed on transverse connection all, the second vertical keel position Outside in the first vertical keel;Front end stone material and two sides stone material, are suspended on described second vertical keel and channel-section steel respectively.
The large span stone moulding of this structure, because the support system using above-mentioned offer is so that this large span stone The structure of material moulding is simple, and transverse connection is fixed on concrete structured beam, preferably power can be transferred to coagulation It is ensured that the stress of this support system in soil structure, improve the ability that this large span stone moulding bears extraneous wind load.
Brief description
In order to be illustrated more clearly that this utility model specific embodiment or technical scheme of the prior art, below will be right In specific embodiment or description of the prior art the accompanying drawing of required use be briefly described it should be apparent that, below describe In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
The horizontal section schematic diagram of the support system of the large span stone moulding that Fig. 1 provides for this utility model;
The longitudinal profile schematic diagram of the support system of the large span stone moulding that Fig. 2 provides for this utility model;
In the support system of the large span stone moulding that Fig. 3 provides for this utility model, the structure of board slot built-in fitting is shown It is intended to;
In the support system of the large span stone moulding that Fig. 4 provides for this utility model, the left side of transverse connection shows It is intended to;
Description of reference numerals:1- transverse connection;2- first vertical keel;3- second vertical keel;4- board slot built-in fitting; 5- first junction steel plate;6- first connector;71- front end stone material;72- side stone material;8- suspension member;9- second junction steel plate;10- Channel-section steel;11- first angle steel;12- second angle steel;13- steel bushing core;14- second connector.
Specific embodiment
Below in conjunction with accompanying drawing, the technical solution of the utility model is clearly and completely described it is clear that described Embodiment is a part of embodiment of this utility model, rather than whole embodiments.Based on the embodiment in this utility model, this The every other embodiment that field those of ordinary skill is obtained under the premise of not making creative work, broadly falls into this practicality Novel protected scope.
In description of the present utility model, it should be noted that term " first ", " second ", " the 3rd " are only used for describing mesh , and it is not intended that indicating or hint relative importance.Unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or is integrally connected;Can To be to be mechanically connected or electrical connection;Can be to be joined directly together it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in utility model.
As long as additionally, involved technical characteristic in this utility model different embodiments disclosed below is each other The conflict of not constituting just can be combined with each other.
Embodiment 1
The present embodiment provides a kind of support system of large span stone moulding, as depicted in figs. 1 and 2, including two Transverse connection 1, be arranged in parallel in the horizontal direction, and one end is fixed on the concrete structured beam at inter-layer position by fixation kit On end face, the other end stretches out xoncrete structure crossbeam end face and forms free end;Two coupling assemblies, are respectively used to vertical by first Os Draconis 2 and the second vertical keel 3 are fixed on transverse connection 1, and the second vertical keel 3 is located at the outside of the first vertical keel 2, Front end stone material 71 is suspended on the second vertical keel 3.
The support system of this structure, arranges transverse connection 1 on the concrete structured beam end face at inter-layer position, utilizes First vertical keel 2 and the second vertical keel 3 are each attached on transverse connection 1 coupling assembly, need not be as in documents Also set up structure with oblique member, and replace big vertical dragon in prior art with the first vertical keel 2 and the second vertical keel 3 Bone, makes the structure of whole support system simple, and transverse connection 1 is fixed on concrete structured beam so that transverse connection 1 Stress is clearly and power transmittance process is simple, can preferably be transferred on xoncrete structure.
As deformation, the number of above-mentioned transverse connection 1 can also be three, four, five, six etc., connects The number of assembly can be three, four, five, six etc., as the setting number of transverse connection 1 and coupling assembly, Depending on actually used situation.
As preferred embodiment, as shown in Fig. 2 fixation kit includes the plate being fixed in xoncrete structure beam end Groove built-in fitting 4, is fixed on the first junction steel plate 5 on transverse connection 1 end, and passes through the first junction steel plate 5 and board slot Built-in fitting 4, the first junction steel plate 5 is fixed on the first connector 6 on board slot built-in fitting 4.
It is further preferred that the first junction steel plate 5 is welded on the end of transverse connection 1, or, using prior art In other fixed forms.
Preferably, as shown in figure 3, board slot built-in fitting 4 includes plate, this board slot built-in fitting is embedded in xoncrete structure, plate Installation groove outside opening direction is also had on block, this installation groove stretches into xoncrete structure for passing through for the first connector 6 In.Preferably, the first connector 6 is bolt, or other connectors.
As variant embodiment, fixation kit can also be other fixed structures of the prior art, only need to be by laterally The end of connector 1 is fixed on concrete structured beam end face.
As preferred embodiment, as shown in Fig. 2 coupling assembly includes
It is molded on underlying transverse connection 1 top surface and opening up steel bushing core 13, the first vertical dragon The bottom of bone 2 or the second vertical keel 3 is set on steel bushing core 13;
One end be held within top transverse connection 1 lower surface on, the other end be fixed on the first vertical keel 2 or The first angle steel 11 at the top of the second vertical keel 3;And the first angle steel 11 is fixed on the first vertical keel 2 or the first erects To the second connector 14 at the top of Os Draconis 2.
In this embodiment, the bottom due to the first vertical keel 2 or the second vertical keel 3 is set in transverse connection 1 Steel bushing core 13 on, when stone material is subject to extraneous wind load, the bottom of the first vertical keel 2 or the second vertical keel 3 is permissible Steel bushing core 13 moves up and down, realizes the vertical telescopicing performance of Os Draconis, better against extraneous active force.
It is further preferred that steel bushing core 13 is U-shaped steel tank, the second connector 14 is bolt, one end weldering of the first angle steel 11 It is connected in the lower surface of transverse connection 1, the other end is bolted on the first vertical keel 2 or the second vertical keel 3 On.More preferably preferably, by two angle steel and a bolt, the first vertical keel 2 or the second vertical keel 3 are fixed on laterally On connector 1.
As preferred embodiment, as shown in Fig. 2 being located at same in the layer the first vertical keel 2 and the second vertical dragon The channel-section steel 10 of level is also set up between bone 3.By channel-section steel 10, first vertical keel 2 is connected so that with the second vertical keel 3 Two vertical keels 3 can more firmly hang front end stone material 71.
It is further preferred that the two ends of channel-section steel 10 are respectively welded on the first vertical keel 2 and the second vertical keel 3.
As further preferred embodiment, as shown in figure 1, along the width of channel-section steel 10, also including being arranged on groove On steel 10 and at least one second junction steel plate 9 of stretching out, side stone material 72 is suspended on the second junction steel plate by suspension member 8 On 9 both ends.By stretching out the second junction steel plate 9 of channel-section steel 10, side stone material 72 is fixed on channel-section steel 10.
As preferred embodiment, the second vertical keel 3 outer side surface arranges the second angle steel 12, front end stone material 71 It is suspended on the second vertical keel by suspension member 8.
It is further preferred that suspension member 8 is SE suspension member 8, can preferably improve the shock resistance of stone decoration, outer surface is also put down Whole, increase its aesthetics.More preferably preferably, SE suspension member 8 is made using aluminum alloy material.
As further preferred embodiment, as shown in figure 1, along the width of channel-section steel 10, the first vertical keel 2 Width is more than its length, and the width of the second vertical keel 3 is more than its length, namely the first vertical keel 2 and the second vertical keel 3 All transversely arrange, strengthen the support force of Os Draconis.
As most preferably preferred embodiment, above-mentioned transverse connection 1 is steel corbel, as shown in figure 4, along its width side To longitudinal cross-section be rectangle, internal is hollow-core construction.
Preferably, channel-section steel 10 is zinc-plated channel-section steel;Second junction steel plate 9 is galvanized steel plain sheet, and bolt is stainless steel bolt.Separately Outward, the first above-mentioned vertical keel 2 and the second vertical keel 3 are all using steel matter.
Embodiment 2
The present embodiment provides a kind of large span stone moulding, including
The support system of any one providing in embodiment 1;
First vertical keel 2 and the second vertical keel 3, are separately fixed on transverse connection 1 by support system, second Vertical keel 3 is located at the outside of the first vertical keel 2;
Front end stone material 71 and two sides stone material 72, be suspended on respectively on the second vertical keel 3 and channel-section steel 10 on.
The large span stone moulding of this structure, due to using in embodiment 1 provide support system so that this greatly across The structure of degree stone decoration lines is simple, so that two vertical keels and the stress of transverse connection 1 was clearly transmitted with power Journey, simply it is ensured that the stress of this support system, improves the ability that this large span stone moulding bears extraneous wind load.
In addition, the installation process of above-mentioned large span stone moulding is:First steel corbel is passed through board slot built-in fitting solid It is scheduled on the concrete structured beam at inter-layer position, angle steel is passed through at the top of the first vertical keel 2 and the second vertical keel 3 respectively Be bolted in steel corbel lower surface above, bottom is respectively sleeved at the steel bushing core 13 of underlying steel corbel On, thus forming hanging connected mode;Non- inter-layer position or be located at same in the layer the first vertical keel 2 and the second vertical keel Channel-section steel 10 is welded, as crossbeam between 3;By stainless steel bolt, the second junction steel plate 9 is fixed on this crossbeam;SE suspension member 8 Base be fixed on the angle steel on the second junction steel plate 9 by stainless steel bolt, and SE suspension member 8 is then fixed on stone material 7 in advance On, finally SE suspension member 8 is hung on base.
Obviously, above-described embodiment is only intended to clearly illustrate example, and the not restriction to embodiment.Right For those of ordinary skill in the art, can also make on the basis of the above description other multi-forms change or Change.There is no need to be exhaustive to all of embodiment.And the obvious change thus extended out or Change among the protection domain created still in this utility model.

Claims (10)

1. a kind of support system of large span stone moulding is it is characterised in that include
Transverse connection (1), is at least two, be arranged in parallel in the horizontal direction, one end is fixed on interlayer position by fixation kit Put on the concrete structured beam end face at place, the other end stretches out described concrete structured beam end face and forms free end;
Coupling assembly, is at least two, is respectively used to be fixed on laterally the first vertical keel (2) and the second vertical keel (3) On connector (1), described second vertical keel (3) is located at the outside of described first vertical keel (2), and front end stone material (71) hangs On described second vertical keel (3).
2. large span stone moulding according to claim 1 support system it is characterised in that:Described fixation kit Including the board slot built-in fitting (4) being fixed in described xoncrete structure beam end, it is fixed on described transverse connection (1) end The first junction steel plate (5), and pass through described first junction steel plate (5) and board slot built-in fitting (4), by described first connection steel Plate (5) is fixed on the first connector (6) on described board slot built-in fitting (4).
3. large span stone moulding according to claim 1 and 2 support system it is characterised in that:Described connection Assembly includes
It is molded on underlying described transverse connection (1) top surface and opening up steel bushing core (13), described The bottom of one vertical keel (2) or described second vertical keel (3) is set on described steel bushing core (13);
One end is held within described transverse connection (1) lower surface of top, and it is vertical that the other end is fixed on described first The first angle steel (11) at the top of Os Draconis (2) or described second vertical keel (3);And described first angle steel (11) is fixing The second connector (14) at the top of described first vertical keel (2) or described first vertical keel (2).
4. large span stone moulding according to claim 3 support system it is characterised in that:In same layer Described first vertical keel (2) and described second vertical keel (3) between also set up the channel-section steel (10) of level.
5. large span stone moulding according to claim 4 support system it is characterised in that:Also include along described The width of channel-section steel (10), is arranged at least one second junction steel plate (9) that described channel-section steel (10) is upper and stretches out, side Face stone material (72) is suspended on described second junction steel plate (9) both ends by suspension member (8).
6. large span stone moulding according to claim 4 support system it is characterised in that:Described second is vertical Second angle steel (12) is arranged on Os Draconis (3) outer side surface, described front end stone material (71) is suspended on described second jiao by suspension member (8) On steel (12).
7. the large span stone moulding according to claim 5 or 6 support system it is characterised in that:Described suspension member (8) it is SE suspension member.
8. large span stone moulding according to claim 5 support system it is characterised in that:Along described channel-section steel (10) width, the width of described first vertical keel (2) is more than its length, the width of described second vertical keel (3) More than its length.
9. large span stone moulding according to claim 5 support system it is characterised in that:Described lateral connection Part (1) is steel corbel;And/or
Described channel-section steel (10) is zinc-plated channel-section steel;And/or
Described second junction steel plate (9) is galvanized steel plain sheet.
10. a kind of large span stone moulding is it is characterised in that include
Support system as any one of claim 5-9;
First vertical keel (2) and the second vertical keel (3), are separately fixed at described transverse connection by described support system (1), on, described second vertical keel (3) is located at the outside of described first vertical keel (2);
Front end stone material (71) and two sides stone material (72), are suspended on described second vertical keel (3) and channel-section steel (10) respectively.
CN201620779955.6U 2016-07-22 2016-07-22 Braced system and large -span stone material moulding of large -span stone material moulding Active CN205976120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620779955.6U CN205976120U (en) 2016-07-22 2016-07-22 Braced system and large -span stone material moulding of large -span stone material moulding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620779955.6U CN205976120U (en) 2016-07-22 2016-07-22 Braced system and large -span stone material moulding of large -span stone material moulding

Publications (1)

Publication Number Publication Date
CN205976120U true CN205976120U (en) 2017-02-22

Family

ID=58025968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620779955.6U Active CN205976120U (en) 2016-07-22 2016-07-22 Braced system and large -span stone material moulding of large -span stone material moulding

Country Status (1)

Country Link
CN (1) CN205976120U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678246A (en) * 2018-05-23 2018-10-19 山西八建集团有限公司 A kind of building method of stone material grid upright posts of glass curtain wall, mounting bracket and mounting bracket
CN110185178A (en) * 2019-06-11 2019-08-30 北京港源幕墙有限公司 Glass curtain wall and its construction method with stone panel shade structures
CN115853286A (en) * 2022-11-21 2023-03-28 安徽华章工程管理有限公司 Construction method of outer wall assembled horizontal decoration line based on steel keel support

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678246A (en) * 2018-05-23 2018-10-19 山西八建集团有限公司 A kind of building method of stone material grid upright posts of glass curtain wall, mounting bracket and mounting bracket
CN108678246B (en) * 2018-05-23 2023-10-10 山西八建集团有限公司 Building method of upright post, mounting frame and mounting frame of stone grid glass curtain wall
CN110185178A (en) * 2019-06-11 2019-08-30 北京港源幕墙有限公司 Glass curtain wall and its construction method with stone panel shade structures
CN115853286A (en) * 2022-11-21 2023-03-28 安徽华章工程管理有限公司 Construction method of outer wall assembled horizontal decoration line based on steel keel support

Similar Documents

Publication Publication Date Title
CN200992763Y (en) Ceiling unit structure hanging aluminium slat under hyperboloid grid third quavter
CN205976120U (en) Braced system and large -span stone material moulding of large -span stone material moulding
CN206941898U (en) Corner type drag-line glass curtain wall system
CN107060166B (en) A kind of circular arc diamond shape stone curtain wall
CN206189680U (en) Steel sheet rib bearing structure curtain system
CN2821004Y (en) Ceiling suspension top keel structure
CN103437423A (en) Controllable quantitative release connection method and structure for steel truss
CN109138160A (en) A kind of height web member beam based on assembled light gauge cold-formed steel shape
CN208899928U (en) Stage building structure
CN105464277B (en) A kind of steel joist suspended ceiling fastener
CN108104335B (en) Assembled flexible dry hanging system of curtain wall
CN203452201U (en) Controllable type quantified releasing connecting structure of steel truss
CN203334552U (en) Assembly-type rectangular planar roof
CN105464278B (en) A kind of ceiling system for reinforcing lightgage steel joist
CN204781361U (en) Alternately open last quarter node fastener of string truss structure
CN206769158U (en) A kind of cable-arch system lighting roof
CN215254199U (en) Wall aluminum plate's mounting structure and aluminum plate wall
CN205637139U (en) Support flat push formula multicavity steel pipe -concrete composite post braced frame system
CN206110589U (en) Stone cladding process slabstone fixed knot constructs with high anti -shock function
CN205329437U (en) Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
CN205276656U (en) Light gauge steel furred ceiling fastener
CN211548254U (en) Corner curtain wall upright post-free connecting structure
CN203049851U (en) Building curtain wall grid
WO2019218679A1 (en) Cfrp suspension strip intersecting cable support structure
CN205804174U (en) A kind of bridge tower structure adapting to the parallel suspension cable in double rope faces

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant