CN205975997U - Aligning device is assembled to prefabricated post - Google Patents

Aligning device is assembled to prefabricated post Download PDF

Info

Publication number
CN205975997U
CN205975997U CN201620656187.5U CN201620656187U CN205975997U CN 205975997 U CN205975997 U CN 205975997U CN 201620656187 U CN201620656187 U CN 201620656187U CN 205975997 U CN205975997 U CN 205975997U
Authority
CN
China
Prior art keywords
post
angle steel
base plate
para
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620656187.5U
Other languages
Chinese (zh)
Inventor
伍云天
陈怡宏
张意
何小勇
苏义庭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Original Assignee
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University, Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd filed Critical Chongqing University
Priority to CN201620656187.5U priority Critical patent/CN205975997U/en
Application granted granted Critical
Publication of CN205975997U publication Critical patent/CN205975997U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an aligning device is assembled to prefabricated post still including being used for make going up a plurality of counterpoint moulds that multi -edged corner post and multi -edged corner post were down counterpointed and is assembled, adopts the modulization connecting plate to connect between the adjacent counterpoint mould, the modulization connecting plate is the rectangle structure, equidistant division has a plurality of registration hole that are used for installing the reinforcing bar on the modulization connecting plate, the counterpoint mould is including being fixed in bottom plate and the connected angle steel that is formed by connecting perpendicularly two steel sheets that is close to multi -edged corner post upper end level setting down, the extension end that the muscle was indulged to the post is good at to the angle steel. This device simple structure, easy and simple to handle, it is strong to install holistic stability, when using, can not produce the skew, counterpoint through angle steel guide, it is rapid, accurate to counterpoint, construction convenience, and can not produce the damage to the lower part reinforcing bar, and the construction facility has apparent advantage in the aspect of green, industrialization construction.

Description

A kind of prefabricated post assembly alignment device
Technical field
This utility model be related to prefabricated assembled concrete component technology field and in particular to a kind of prefabricated post assembly para-position Device.
Background technology
In recent years, because labour force starts shortage and to the reasons such as environmental conservation pay attention to day by day, Building Trade in China During being in deep transition and upgrade.Modern industry green building tool with prefabricated assembled concrete structure as representative There is the little, advantage such as industrialization degree is high, energy-conserving and environment-protective of pollution, widelyd popularize in recent years.However, prefabricated assembled concrete Structure further genralrlization application be also faced with bottleneck, be mainly manifested in prefabricated assembled concrete structure main member be Prefabrication simultaneously transports job site assembly, and compared with traditional cast-type structure, the fine requirement to construction technology is higher, especially It is vertical structure component with prefabricated post as representative is important primary structure member in prefabricated assembled concrete structure, even more spells Emphasis in dress construction and difficult point, but current workmen's specialized capability is not overall high, lacks prefabricated assembled concrete knot The technical experience accumulation of structure and summarizing, the technological process to fabricated construction and key points for operation lack comprehensive, careful understanding and Grasp, cause efficiency of construction low, construction error is bigger than normal, or even working vessels.Therefore, in order to promote modern industryization green The development of color building, promotes the smooth enforcement of Building Trade in China transition and upgrade, further genralrlization application prefabricated assembled concrete Building, how to carry out quickly accurately assembly to prefabricated assembled component is the key technical problem needing to solve.
Vertical structure component is the main bearing member in fabricated construction, and in theory, the company of prefabricated assembled component Connecing node is its weak link, therefore the concatenation construction technology of precast assembled vertical member is whole prefabricated construction construction In important step.In prefabricated vertical structure component para-position, due to stretching out so that the prefabricated post on upper strata is in peace of lower rebar It is impossible to quickly and accurately carry out para-position during dress, the cylinder weight being additionally, since top is very big, when mounted easily to bottom Reinforcing bar produces and damages.
Utility model content
For the deficiency in the presence of prior art, this utility model provides a kind of prefabricated post assembly alignment device, its Para-position is guided to the paraposition components on top, para-position is rapid, easy construction, and damage will not be produced to lower rebar.
For achieving the above object, this utility model employs following technical scheme:
A kind of prefabricated post assembly alignment device, is provided separately down multi-angular corner post and upper multi-angular angle including relative up and down Post, described under be provided with post in multi-angular corner post and indulge muscle, described post is indulged the upper end of multi-angular corner post under muscle extends, is also included For make upper multi-angular corner post and under the assembled multiple para-position moulds of multi-angular corner post para-position, adopt modulus between adjacent para-position mould Change connecting plate connect, described modularization connecting plate be rectangular configuration, described modularization connecting plate equidistantly has multiple for The registration holes of reinforcing bar are installed;
Described para-position mould include being fixed near under the horizontally disposed base plate in multi-angular corner post upper end and connected by The angle steel that two steel plates are vertically formed by connecting, described angle steel is longer than the elongated end that muscle indulged by post;Described base plate is rectangular configuration, along described Wherein one jiao two edge of base plate has the right-angle notch extending into base plate, and one end of described angle steel is mated with this right-angle notch even Connect, described angle steel is all symmetrically tiltedly installed with supporting linkage in opposite directions away from the marginal position of two steel plate junctions, described modulus Change connecting plate to be located between adjacent angle steel and be connected with supporting linkage.
Wherein, also include the support bar being obliquely installed, one end of described support bar is connected with base plate, outside the other end and angle steel The junction of side two steel plate connects.
Specifically, the marginal position of described base plate has fixing hole, and described fixing in the hole is prefabricated with fixture.
Further, described base plate is made using transparent material.
Compared to prior art, this utility model has the advantages that:
1st, this apparatus structure is simple, easy and simple to handle, and the overall stability of device is strong, when using, will not produce skew;
2nd, para-position is guided by angle steel, para-position is rapid, accurate, easy construction, and damage will not be produced to lower rebar, apply Work facilitates, and has significant advantage in environmental protection, industrialization construction party face.
Brief description
Fig. 1 is assembling structure schematic diagram of the present utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is this utility model structural representation.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment further illustrates to the technical scheme in this utility model.
As shown in Figure 1, Figure 2, Figure 3 shows, the utility model proposes a kind of prefabricated post assembly alignment device, include up and down with respect to The lower four corner angle corner posts 1 being provided separately and upper four corner angle corner posts 2, are provided with post in described lower four corner angle corner posts 1 and indulge muscle 3, described Post indulge the upper end that muscle 3 extends lower four corner angle corner posts 1, adopt when lower assembled between four corner angle corner posts 1 and upper four corner angle corner posts 2 Post indulges muscle 3 and the sleeve para-position splicing being located in upper four corner angle corner post 2 lower end;Also include for make upper four corner angle corner posts 2 and under The assembled multiple para-position moulds of four corner angle corner post 1 para-position, are connected using modularization connecting plate 7 between adjacent para-position mould, described mould Numberization connecting plate 7 is rectangular configuration, and described modularization connecting plate 7 equidistantly has multiple registration holes 9 for installing reinforcing bar; Be provided with modularization connecting plate 7 between multiple angle steel 5, registration holes 9 spacing of modularization connecting plate 7 is fixed, by from different Registration holes 9 connect, so that being adapted to the right of different size of prefabricated post by the alignment device that multiple contraposition modules are closed Position.When using, multiple para-position moulds are separately fixed at the edges and corners of four corner angle corner posts, adopt mould between four adjacent corner angle corner posts Numberization connecting plate 7 and supporting linkage 6 are connected.
Described para-position mould includes being fixed near the horizontally disposed base plate 4 in lower four corner angle corner post 1 upper end and connected The angle steel 5 being vertically formed by connecting by two steel plates, described angle steel 5 is longer than the elongated end that muscle 3 indulged by post;During para-position, will not be to bottom steel Muscle produces and damages, and brings the facility in construction.Described base plate 4 is rectangular configuration, opens along wherein one jiao two edge of described base plate 4 The right-angle notch extending in oriented base plate 4, one end of described angle steel 5 is connected with this right-angle notch coupling, the outside of angle steel 5 one end Mate fixed installation with right-angle notch, such as, weld, be integrally formed, using making angle steel 5 with base plate 4 steadily, processing technique is simple Single, low cost.Described angle steel 5 is all symmetrically tiltedly installed with supporting linkage 6 in opposite directions away from the marginal position of two steel plate junctions, Described modularization connecting plate 7 is located between adjacent angle steel 5 and is connected with supporting linkage 6.Supporting linkage 6 is used for phase Being connected of adjacent modularization connecting plate 7, simultaneously works as the effect supporting;Connecting hole is had on described supporting linkage 6, Support connecting rod 6 runs through connecting hole with modularization connecting plate 7 using beam steel and registration holes 9 are connected.Para-position is rapid, construction party Just, and will not to lower rebar produce damage, bring the facility in construction, have in environmental protection, industrialization construction party face Significant advantage.
Preferably, also include the support bar 8 being obliquely installed, one end of described support bar 8 is connected with base plate 4, separately One end is connected with the junction of angle steel 5 outside two steel plates.Between support bar 8 and angle steel 5 and base plate 4, all the work of support is played in welding With so that angle steel 5 keeps vertical.
Preferably, the marginal position of described base plate 4 has fixing hole, and described fixing in the hole is prefabricated with fixture 10.Described fixing in the hole is preset with bolt, when using, base plate 4 is passed through bolt by the fixation that is connected of base plate 4, makes whole Device is in horizontal level para-position and fixing.
Preferably, described base plate 4 is made using transparent material, using transparent material when fixing, is easy to The para-position observing fixing hole is fixed, and the fixation of base plate 4 is quick and easy.
When using, one end that the angle steel 5 in this device is connected with base plate 4 fixes at lower four corner angle angles this utility model The corner angle position of post 1, the other end stretches out the upper edge of this lower four corner angle corner post 1 and extends vertical muscle 3 upper end of post;Then pass through spiral shell Bolt and fixing hole, by the horizontal level para-position of this device, fixation, prevent this device horizontal level from moving;After fixation, angle steel 5 another The outside of muscle 3 indulged by the post that end is stretched out the upper edge of this lower four corner angle corner post 1 and extended on lower four corner angle corner posts 1, prevents down four On corner angle corner post 1, end bar is impaired;Four corner angle corner posts 1 and upper four corner angle corner posts 2 are held to relatively spelling up and down by para-position mould Guiding para-position, make down to be provided with many posts in four corner angle corner posts 1 and indulge muscle 3 and be socketed in the set that four corner angle corner post 2 lower end is arranged In pipe, carry out para-position assembled;Meanwhile, beam steel runs through the registration holes 9 on modularization connecting plate 7.Para-position is rapid, accurate, construction Convenient, and lower rebar will not be produced and damage, convenient construction, have significantly excellent in environmental protection, industrialization construction party face Gesture.Meanwhile, this apparatus structure is simple, easy and simple to handle, and the overall stability of device is strong, when using, will not produce skew.
Finally illustrate, above example only in order to the technical solution of the utility model to be described and unrestricted, although ginseng According to preferred embodiment, this utility model is described in detail, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent, the objective without deviating from technical solutions of the utility model and model Enclose, it all should be covered in the middle of right of the present utility model.

Claims (4)

1. a kind of prefabricated post assembly alignment device, is provided separately down multi-angular corner post and upper multi-angular angle including relative up and down Post, described under be provided with post in multi-angular corner post and indulge muscle, described post indulges the upper end of multi-angular corner post under muscle extends, its feature It is:Also include for make upper multi-angular corner post and under the assembled multiple para-position moulds of multi-angular corner post para-position, adjacent para-position mould Between connected using modularization connecting plate, described modularization connecting plate is rectangular configuration, on described modularization connecting plate equidistantly Have multiple registration holes for installing reinforcing bar;
Described para-position mould include being fixed near under the horizontally disposed base plate in multi-angular corner post upper end and connected by two steel The angle steel that plate is vertically formed by connecting, described angle steel is longer than the elongated end that muscle indulged by post;Described base plate is rectangular configuration, along described base plate Wherein one jiao two edge has the right-angle notch extending into base plate, and one end of described angle steel is connected with this right-angle notch coupling, Described angle steel is all symmetrically tiltedly installed with supporting linkage in opposite directions away from the marginal position of two steel plate junctions, and described modularization is even Fishplate bar is located between adjacent angle steel and is connected with supporting linkage.
2. as claimed in claim 1 a kind of prefabricated post assembly alignment device it is characterised in that:Also include the support being obliquely installed Bar, one end of described support bar is connected with base plate, and the other end is connected with the junction of two steel plates outside angle steel.
3. as claimed in claim 1 or 2 a kind of prefabricated post assembly alignment device it is characterised in that:The margin location of described base plate Put and have fixing hole, described fixing in the hole is prefabricated with fixture.
4. as claimed in claim 3 a kind of prefabricated post assembly alignment device it is characterised in that:Described base plate adopts transparent material It is made.
CN201620656187.5U 2016-06-28 2016-06-28 Aligning device is assembled to prefabricated post Expired - Fee Related CN205975997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620656187.5U CN205975997U (en) 2016-06-28 2016-06-28 Aligning device is assembled to prefabricated post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620656187.5U CN205975997U (en) 2016-06-28 2016-06-28 Aligning device is assembled to prefabricated post

Publications (1)

Publication Number Publication Date
CN205975997U true CN205975997U (en) 2017-02-22

Family

ID=58021702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620656187.5U Expired - Fee Related CN205975997U (en) 2016-06-28 2016-06-28 Aligning device is assembled to prefabricated post

Country Status (1)

Country Link
CN (1) CN205975997U (en)

Similar Documents

Publication Publication Date Title
CN209636847U (en) A kind of adjustable tower crane built-in fitting accurate positioning tool
CN204152217U (en) The assembled moulding bed of the assembling that a kind of Construction of Steel Structure is general
CN104002377A (en) Steel bar binding and corrugated pipe locating device for precasting box girder
CN110005073A (en) A kind of fixed built-in fitting of non-solder plate and its fixing means
CN104912191B (en) Assembled concrete fabricated column splicing device and use method of splicing device
CN205918142U (en) Aligning device is assembled to shear force wall
CN110924678B (en) Construction method and device for large-span variable-section haunch plate template
CN205975997U (en) Aligning device is assembled to prefabricated post
CN203201569U (en) Positioning device for arch centering connection plate used for tunnel
CN211037784U (en) Structure of encorbelmenting of building external corner
CN205419600U (en) A base steel construction for constructing tower crane base accurate positioning installation
CN206829610U (en) A kind of removable variable cross-section steel framework wooden model
CN211736417U (en) Thickness and reinforcing bar protective layer thickness inspection instrument are pour to floor
CN203654784U (en) Assembly and location mould for main beam and end plate of boiler steel frame structure
CN203049608U (en) Communication tower foundation pre-buried foundation bolt device
CN205935715U (en) Prefabricated assembled concrete member positioner
CN210195244U (en) Square column template design reinforcement
CN204753815U (en) Simple and easy assembly quality of assembled precast concrete post
CN204689525U (en) A kind of equipment jacking apparatus being convenient to measure
CN206722088U (en) Steel pile foundation bolt positioning device
CN210239143U (en) Reserved hole sleeve fixing part for laminated floor slab
CN203440827U (en) Bay bolt positioning mold for steel pipe support of overhead contact system of electric railway
CN203188612U (en) Beam frame type building template system
CN206693058U (en) A kind of pinner template is accurately positioned erecting device
CN104746861B (en) The cradle structure of high-altitude crossbeam lower surface monitoring point layout and installation method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20180628

CF01 Termination of patent right due to non-payment of annual fee