CN205975477U - Novel block up device - Google Patents
Novel block up device Download PDFInfo
- Publication number
- CN205975477U CN205975477U CN201620970679.1U CN201620970679U CN205975477U CN 205975477 U CN205975477 U CN 205975477U CN 201620970679 U CN201620970679 U CN 201620970679U CN 205975477 U CN205975477 U CN 205975477U
- Authority
- CN
- China
- Prior art keywords
- wire rope
- steel wire
- head
- sleeve pipe
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 54
- 239000010959 steel Substances 0.000 claims abstract description 54
- 239000004575 stone Substances 0.000 claims abstract description 23
- 230000002787 reinforcement Effects 0.000 claims abstract description 20
- 230000000903 blocking effect Effects 0.000 abstract description 8
- 239000002689 soil Substances 0.000 abstract description 4
- 230000009172 bursting Effects 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a novel block up device, including riveting the stake, the attacking head, the sleeve pipe, wire rope, the stone steel reinforcement cage, tapered pile head, be no less than two the spunlace that falls, be no less than 2 fastening screw, when blocking up, use tools strikes the attacking head and makes and to rivet the stake and insert in the riverbed, place the stone steel reinforcement cage in the breach position, because wire rope pulls, the stone steel reinforcement cage can not washed away by rivers, use multiunit the device to plug up bursting, it can the position of adjusting bush on riveting the stake to unscrew fastening screw, thereby it blocks up to adapt to the breach of different water levels, the spunlace that falls is used for the increase to grab the soil volume, make that to rivet the stake fixed firm reliable. The device simple structure, easy operation is reliable, effectively propose breach department to the river and block up, and it is efficient to block up, furthest's the guarantee people person and property safety.
Description
Technical field
This utility model is related to a kind of ferry device, more particularly, to a kind of new plugging device.
Background technology
Soil and material when blocking up, wrap up in head from breach door two ends and relatively enter stifled, progressively constriction mouth door, finally reach a fixed width
Intercept rapidly stayed breach when spending, complete to block up and close up, concrete grammar is:Rapidly stifled closure robbed by sand throwing bag, also can sink if necessary
Arrange, shipwreck dams, then throw earth bag and close up, because the current that burst are anxious, sandbag is easily washed away, and effect of not only blocking up is bad, and
And need to put into substantial amounts of manpower and material.In view of drawbacks described above, it is necessary in fact to design a kind of new plugging device.
Utility model content
Technical problem to be solved in the utility model is:A kind of new plugging device is provided, to solve using rapidly
The problem of the method effect difference that sand throwing bag is blocked up.
For solving above-mentioned technical problem, the technical solution of the utility model is:A kind of new plugging device, including riveting stake,
Attacking head, sleeve pipe, steel wire rope, stone steel reinforcement cage, tapered pile crown, the agnail head no less than two pieces, the fastening spiral shell no less than 2
Nail, described attacking head is located at riveting stake top portion, and described attacking head is connected with riveting stake one, and described sleeve pipe is located at outside riveting stake
Side, described sleeve pipe is connected with riveting stake gap, and described steel wire rope is located at sleeve pipe side, described steel wire rope and casing threads phase
Even, described stone steel reinforcement cage is located at steel wire rope side, and described stone steel reinforcement cage is connected with steel wire rope screw thread, and described is tapered
Pile crown is located at riveting stake bottom, and described tapered pile crown is connected with riveting stake one, and described agnail head is located at riveting stake lower end outside, institute
The agnail head stated and riveting stake are weldingly connected, and described trip bolt passes through biography sleeve pipe, and described trip bolt is connected with casing threads.
The further improvement of this utility model is as follows:
Further, described attacking head is additionally provided with neonychium, and described neonychium is located at and hits head, described guarantor
Protective pad is connected with hitting head thread.
Further, described sleeve pipe is additionally provided with the first hangers, and the first described hangers is weldingly connected and and steel with sleeve pipe
Cord screw thread is connected.
Further, described steel wire rope is additionally provided with rope clamp, and described rope clamp is located at outside steel wire rope, described rope clamp with
Steel wire rope screw thread is connected.
Further, described stone steel reinforcement cage is additionally provided with the second hangers, second described hangers one end and stone reinforcing bar
Cage is weldingly connected, and the other end is connected with steel wire rope screw thread.
Compared with prior art, this new plugging device, when blocking up, taps attacking head using instrument and makes riveting stake insertion river
In bed, stone steel reinforcement cage is positioned over breach position, due to the traction of steel wire rope, stone steel reinforcement cage will not be washed away by current, make
Can be blocked bursting with this device multigroup, unscrewing trip bolt is position in riveting stake for the adjustable whole-set pipe, thus adapting to not
Breach with water level is blocked up, and agnail head grabs soil amount so that riveting stake fixation is reliable for increase.This apparatus structure is simple, behaviour
Make simple and reliable, effectively river carried and blocking up at breach, and efficiency high of blocking up, ensure to greatest extent people's person and
Property safety.
Brief description
Fig. 1 illustrates this utility model main structure schematic diagram
Riveting stake 1 attacking head 2
Sleeve pipe 3 steel wire rope 4
The tapered pile crown 6 of stone steel reinforcement cage 5
Agnail head 7 trip bolt 8
Neonychium 201 first hangers 301
Rope clamp 401 second hangers 201
Specific embodiment
As shown in Figure 1, there is shown, a kind of new plugging device, including riveting stake 1, attacking head 2, sleeve pipe 3, steel wire rope 4, stone reinforcing bar
Cage 5, tapered pile crown 6, the agnail head 7 no less than two pieces, the trip bolt 8 no less than 2, described attacking head 2 is located at riveting stake 1
Top, described attacking head 2 is connected with riveting stake 1 one, and described sleeve pipe 3 is located at outside riveting stake 1, described sleeve pipe 3 and riveting stake 1
Gap is connected, and described steel wire rope 4 is located at sleeve pipe 3 side, and described steel wire rope 4 is connected with sleeve pipe 3 screw thread, described stone steel
Muscle cage 5 is located at steel wire rope 4 side, and described stone steel reinforcement cage 5 is connected with steel wire rope 4 screw thread, and described tapered pile crown 6 is located at riveting
Stake 1 bottom, described tapered pile crown 6 is connected with riveting stake 1 one, and described agnail head 7 is located at riveting stake 1 lower end outside, described
Agnail head 7 is weldingly connected with riveting stake 1, and described trip bolt 8 passes through biography sleeve pipe 3, described trip bolt 8 and sleeve pipe 3 screw thread phase
Even, described attacking head 2 is additionally provided with neonychium 201, and described neonychium 201 is located at attacking head 2 top, described neonychium
201 are connected with attacking head 2 screw thread, and described sleeve pipe 3 is additionally provided with the first hangers 301, and the first described hangers 301 is welded with sleeve pipe 3
Connect and be connected and be connected with steel wire rope 4 screw thread, described steel wire rope 4 is additionally provided with rope clamp 401, described rope clamp 401 is located at steel wire rope 4
Outside, described rope clamp 401 is connected with steel wire rope 4 screw thread, and described stone steel reinforcement cage 5 is additionally provided with the second hangers 501, described
Second hangers 501 one end and stone steel reinforcement cage 5 are weldingly connected, and the other end is connected with steel wire rope 4 screw thread, this new plugging device,
When blocking up, tap attacking head 2 using instrument and make, in riveting stake 1 insertion riverbed, stone steel reinforcement cage 5 to be positioned over breach position, by
In the traction of steel wire rope 4, stone steel reinforcement cage 5 will not be washed away by current, can be blocked bursting using this device multigroup, unscrew tight
Gu screw 8 is position in riveting stake 1 for the adjustable whole-set pipe 3, thus the breach adapting to different water levels is blocked up, agnail head 7 is used for increasing
Grab greatly soil amount so that riveting stake 1 fixation is reliable.This apparatus structure is simple, and operation is simple and reliable, effectively river is carried entering at breach
Row is blocked up, and efficiency high of blocking up, and ensures people's person and property safety to greatest extent
This utility model is not limited to above-mentioned specific embodiment, and those of ordinary skill in the art visualizes from above-mentioned
Send out, without performing creative labour, a variety of conversion made, all fall within protection domain of the present utility model.
Claims (5)
1. a kind of new plugging device is it is characterised in that include riveting stake, attacking head, sleeve pipe, steel wire rope, stone steel reinforcement cage, tapered
Pile crown, the agnail head no less than two pieces, the trip bolt no less than 2, described attacking head is located at riveting stake top portion, and described beats
Tap the head and be connected with riveting stake one, outside riveting stake, described sleeve pipe is connected with riveting stake gap for described sleeve pipe, described steel wire
Rope is located at sleeve pipe side, and described steel wire rope is connected with casing threads, and described stone steel reinforcement cage is located at steel wire rope side, described
Stone steel reinforcement cage be connected with steel wire rope screw thread, described tapered pile crown is located at riveting stake bottom, described tapered pile crown and riveting stake
One is connected, and described agnail head is located at riveting stake lower end outside, and described agnail head is weldingly connected with riveting stake, described fastening spiral shell
Nail passes through biography sleeve pipe, and described trip bolt is connected with casing threads.
2. new plugging device is it is characterised in that described attacking head is additionally provided with neonychium, described as claimed in claim 1
Neonychium is located at and hits head, and described neonychium is connected with hitting head thread.
3. new plugging device is it is characterised in that described sleeve pipe is additionally provided with the first hangers, described as claimed in claim 1
First hangers is weldingly connected with sleeve pipe and is connected with steel wire rope screw thread.
4. as claimed in claim 1 new plugging device it is characterised in that described steel wire rope is additionally provided with rope clamp, described rope
Folder is located at outside steel wire rope, and described rope clamp is connected with steel wire rope screw thread.
5. as claimed in claim 1 new plugging device it is characterised in that described stone steel reinforcement cage is additionally provided with the second hangers,
Second described hangers one end is weldingly connected with stone steel reinforcement cage, and the other end is connected with steel wire rope screw thread.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620970679.1U CN205975477U (en) | 2016-08-28 | 2016-08-28 | Novel block up device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620970679.1U CN205975477U (en) | 2016-08-28 | 2016-08-28 | Novel block up device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205975477U true CN205975477U (en) | 2017-02-22 |
Family
ID=58038424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620970679.1U Expired - Fee Related CN205975477U (en) | 2016-08-28 | 2016-08-28 | Novel block up device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205975477U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107447728A (en) * | 2017-07-28 | 2017-12-08 | 华北水利水电大学 | Blocking method is robbed in a kind of rivers crevasse that earth anchor is bored based on array rocket |
CN110093902A (en) * | 2019-06-18 | 2019-08-06 | 安徽聚源水利科技有限公司 | One kind inrushes Quick-action opening blocking-up device and method |
CN111624028A (en) * | 2020-06-18 | 2020-09-04 | 辽宁省公路勘测设计公司 | Riverbed information acquisition and detection device capable of being automatically fixed and construction method |
-
2016
- 2016-08-28 CN CN201620970679.1U patent/CN205975477U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107447728A (en) * | 2017-07-28 | 2017-12-08 | 华北水利水电大学 | Blocking method is robbed in a kind of rivers crevasse that earth anchor is bored based on array rocket |
CN107447728B (en) * | 2017-07-28 | 2020-02-07 | 华北水利水电大学 | River breach blockage grabbing method based on array rocket drill ground anchor |
CN110093902A (en) * | 2019-06-18 | 2019-08-06 | 安徽聚源水利科技有限公司 | One kind inrushes Quick-action opening blocking-up device and method |
CN111624028A (en) * | 2020-06-18 | 2020-09-04 | 辽宁省公路勘测设计公司 | Riverbed information acquisition and detection device capable of being automatically fixed and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205975477U (en) | Novel block up device | |
CN109338996A (en) | A kind of plugging device for throwing hanging dike breach | |
CN107514946A (en) | A kind of explosion isolation protecting device of convenient use | |
CN207538048U (en) | A kind of protection structure of ecological revetment | |
CN102493401A (en) | Method for rapidly plugging dike breach | |
CN107034850B (en) | A kind of plugging device suitable for the small-sized breach of dykes and dams | |
CN106088084B (en) | A kind of reinforcement protection device of bridge pile foundation | |
CN208167650U (en) | A kind of flood-control wall ruggedized construction | |
CN204370452U (en) | Umbellate form fixed type slope supporting mesh | |
CN207064003U (en) | A kind of intumescent grouted anchor bar | |
CN206859234U (en) | A kind of protector for mountain area mud-rock flow | |
CN211143094U (en) | A safe slope protection net device for environment is administered | |
CN206188346U (en) | Reveal instrument of cable well cover board | |
CN205475088U (en) | Dykes and dams bank protection structure for hydraulic engineering | |
CN203129111U (en) | Floating garbage blocking net for river way | |
CN208933843U (en) | A kind of soft protecting net system suitable for large impact amount | |
CN207985116U (en) | A kind of ship anchor being applicable in sand mud geology | |
CN207163727U (en) | Adjusting water bottom Bentonic organism collector | |
CN206706990U (en) | A kind of flood control desilting hook | |
CN206554026U (en) | A kind of anti-erosion protective slope structure of Channel slope | |
CN207348015U (en) | A kind of W-shaped corridor or corridor waterproof enter device | |
CN207660625U (en) | The quick protrusion-dispelling water installations of the big water burst of high pressure | |
CN206396708U (en) | A kind of hydraulic engineering slope protection net | |
CN206570762U (en) | Protection slope | |
CN204418212U (en) | A kind of Novel retaining wall of hydraulic engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190917 Address after: 247000 Chizhou economic and Technological Development Zone, Anhui Patentee after: Anhui Chizhou Chuanhe Water Conservancy Technology Co.,Ltd. Address before: 247000 Anhui Province, Chizhou city Guichi District Tang Tian Zhen Patentee before: ANHUI CHIZHOU BAICHUAN HYDRAULIC DAM SCIENCE & TECHNOLOGY CO.,LTD. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 |