CN205975246U - Brick permeates water in gap - Google Patents
Brick permeates water in gap Download PDFInfo
- Publication number
- CN205975246U CN205975246U CN201620874724.3U CN201620874724U CN205975246U CN 205975246 U CN205975246 U CN 205975246U CN 201620874724 U CN201620874724 U CN 201620874724U CN 205975246 U CN205975246 U CN 205975246U
- Authority
- CN
- China
- Prior art keywords
- gap
- water
- brick
- discharge orifice
- interlocking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a brick permeates water in gap belongs to road construction technical field. It has solved the current brick that the permeates water inefficiency that permeates water, and easy the blockage, the brick body is easy to be damaged, and the road surface is subsided, weedy problem, this brick permeates water in gap includes the body of cuboid, and the both sides face is equipped with interlocking rib post and interlocking groove around the body, the interlocking rib post of the leading flank of every brick and interlocking groove structure can with the interlocking groove and the interlocking rib column combination formation interlocking of the trailing flank of another brick, the accumulation of side held the discharge orifice groove about the body lower part was equipped with and link up, inwards sunken being equipped with at the left and right sides of body face or unilateral, permeates water hole both sides and two adjacent accumulation in the gap and holds and be equipped with the water conservancy diversion eaves between the discharge orifice groove in gap that intercommunication body upper surface and accumulation hold the discharge orifice groove hole of permeating water, it is good that this brick permeates water in gap has the water permeability, the difficult blockage, prevents that the road surface from subsiding weedy advantage.
Description
Technical field
This utility model belongs to field of road construction, is related to a kind of water-permeable brick, particularly a kind of gap water-permeable brick.
Background technology
Constantly develop with society, in the People's Bank of China of municipal works and residential quarter construction project and factory construction engineering
Road, people track, residence district, garden landscape and plant area etc. are increasingly paid attention to the bad hydraulic permeability on road surface and cause waterlogging to make
Become the inconvenience of people.Existing water-permeable brick adopts the gap of brick body itself or hole permeable, and does not focus on draining impurities removal, and the time is long
Permeable gap or the hole is often caused to be blocked so as to water permeable ability declines by debris.And on the other hand, due to typically saturating
The splitting of its brick body of the special construction of water brick, tensile strength are relatively low, and the gap location of brick and brick easily deposits impurity or soil makes weeds
Grow, caused roadbed subsidence by under rainwater immersion or bearing pressure, be all water-permeable brick technical problem to be solved.
Content of the invention
The purpose of this utility model is that there are the problems referred to above for existing technology it is proposed that a kind of permeable effect is good, no
Easily obstruction, anti-settling, suppression weeds propagation and widespread and the high gap water-permeable brick of intensity.
The purpose of this utility model can be realized by following technical proposal:A kind of gap water-permeable brick, including in cuboid
Body, before and after body, two sides are provided with interlocking rib post and interlocking groove, and the interlocking rib post position on leading flank corresponds to trailing flank
On interlocking groove, the interlocking rib post on the corresponding trailing flank of interlocking groove location on leading flank, the section of interlocking rib post and interlocking groove
Being shaped as rectangle or end is semicircle, the leading flank interlocking rib post of every piece of brick and interlocking slot structure can with another piece of brick after
Side interlocking groove and interlocking rib column combination form interlocking, when one piece of brick is subject to downward pressure, front and back sides can be driven to interlock
Brick body bears pressure jointly;The accumulation that body lower part is provided with insertion body left and right sides stores discharge orifice groove, and accumulation stores discharge orifice groove and breaks
Face is circular or arch, and accumulation is stored discharge orifice channel section and intersected with body bottom surface on body bottom surface top, is formed in the bottom surface of body
Opening, or accumulation stores discharge orifice channel section on body bottom surface top, is formed at the through hole of body interior, it is furthermore preferred that body lower part
The accumulation being provided with insertion front and back sides stores discharge orifice groove, is arranged at the width position of left and right side 1/4, so saturating in this gap
It is in even latticed drainage channel that left and right sides UNICOM can be formed under the road surface that water brick is paved into, and road surface can be provided a certain amount of
Water holding capacity;It is provided with and caves inward in the left and right sides of body or one side, connection body upper surface and accumulation store discharge orifice groove
The permeable mouth in gap, gap permeable mouth thickness is 3-6mm, stores on gap permeable mouth both sides and two neighboring accumulation and sets between discharge orifice groove
There is water conservancy diversion eaves, the water conservancy diversion eaves original position positioned at gap permeable mouth both sides is in body upper surface away from leading flank or trailing flank 5-
10mm, connects to neighbouring accumulation and stores the inwall of discharge orifice groove, and stores with this accumulation that discharge orifice groove inwall is tangent, described positioned at two
The water conservancy diversion eaves that accumulation stores between discharge orifice groove is in arch or taper upwards;The brick body material of this gap water-permeable brick is concrete material
Matter, using pressing one-time molding.
Compared with prior art, this gap water-permeable brick has advantages below:
1st, pass through to arrange interlocking rib post and interlocking groove in body front and back sides, before and after making, adjacent two pieces of bricks form interlocking, expand
Scattered load, prevents roadbed subsidence.
, by body lower part arrange accumulation store discharge orifice slot structure, can be formed under the road surface that this gap water-permeable brick is paved into
Left and right sides UNICOM is in even latticed drainage channel, and can provide road surface a certain amount of water holding capacity, increases water permeable ability.
, permeable by the permeable mouth in gap of body left and right sides or one side, the guiding gutter on gap permeable mouth both sides is by rain
Water, dust or debris enter the permeable mouth in gap and can enter accumulation and store in discharge orifice groove along water conservancy diversion eaves and store the current in discharge orifice groove with accumulation
Take away, will not be deposited in the permeable mouth in gap, not easily cause obstruction.
, the setting of interlocking rib post and interlocking slot structure can block the weed growth of brick body front and back sides connection gap,
The presence at the seamed effusion mouth of a river between two brick body, and it does not deposit debris and dust, equally suppresses growing of weeds.
, this gap water-permeable brick brick body material be concrete, using pressing one-time molding, brick body be difficult splitting, tension strong
Degree is high, and abrasion resistance is high.
Brief description
Fig. 1 is the structural representation of this gap water-permeable brick embodiment one.
Fig. 2 is the side view of this gap water-permeable brick embodiment two.
In figure, 1, interlocking rib post;2nd, interlocking groove;3rd, body;4th, accumulation stores discharge orifice groove;5th, the permeable mouth in gap;6th, water conservancy diversion eaves.
Specific embodiment
The following is specific embodiment of the utility model and combine accompanying drawing, the technical solution of the utility model is made further
Description, but this utility model is not limited to these embodiments.
Embodiment one
As shown in figure 1, this gap water-permeable brick includes the body 3 in cuboid, before and after body 3, two sides are provided with interlocking rib
Post 1 and interlocking groove 2, the interlocking groove 2 of the corresponding trailing flank in interlocking rib post 1 position on leading flank, interlocking groove 2 position on leading flank
Interlocking rib post 1 on corresponding trailing flank, when this gap water-permeable brick is paved into road surface, interlocking rib post 1 He on the leading flank of every piece of brick
Interlocking groove 2 structure can combine formation two-way S type interlocking with interlocking groove 2 on the trailing flank of another piece of brick and interlocking rib post 1, when one
When block brick is subject to downward pressure, the brick body of interlocking can spread load, and the pressure of minimizing brick bottom reaches and prevents roadbed subsidence.Interlocking
The section configuration end of rib post 1 and interlocking groove 2 be semicircle, it is possible to reduce corner angle strengthen its robustness, be difficult in transit
Collided with damage.Simultaneously as the setting of interlocking rib post 1 and interlocking groove 2 can block the miscellaneous of brick body front and back sides connection gap
Grass growth.
The accumulation being provided with insertion body 3 left and right sides in body 3 bottom stores discharge orifice groove 4, and accumulation stores discharge orifice groove 4 section and is
Arch, accumulation is stored discharge orifice groove 4 section and is intersected with body 3 bottom surface on body 3 bottom surface top, forms opening in the bottom surface of body 3, this
Sample can form the drainage channel of left and right sides UNICOM under the road surface that this gap water-permeable brick is paved into, and simultaneously enter accumulation and store discharge orifice groove 4
Can also permeate the ground, and accumulation stores discharge orifice groove 4 and can provide a certain amount of water holding capacity in road surface thus considerably increasing road surface
Water permeable ability.Wherein accumulation stores discharge orifice groove 4 circle or the section of arch can reduce because of setting accumulation storage discharge orifice groove 4 as far as possible
Cause the phenomenon that brick strength reduces.
It is provided with the one side of the left and right side of body 3 and caves inward, connection body 3 upper surface and accumulation store discharge orifice groove 4
The permeable mouth in gap 5, the permeable mouth in gap 5 thickness is 5mm, stores between discharge orifice groove 4 on the permeable mouth in gap 5 both sides and two neighboring accumulation
Be provided with water conservancy diversion eaves 6, water conservancy diversion eaves 6 original position positioned at the permeable mouth in gap 5 both sides on the body 3 surface away from leading flank or trailing flank
5-10mm, connects to neighbouring accumulation and stores the inwall of discharge orifice groove 4, and tangent with this accumulation storage discharge orifice groove 4 inwall, and described is located at
Water conservancy diversion eaves 6 between two accumulation storage discharge orifice grooves 4 is in arch or taper upwards, and it is permeable that rainwater, dust or debris enter gap
Mouth 5 can enter in accumulation storage discharge orifice groove 4 along water conservancy diversion eaves 6 and take away with the current in accumulation storage discharge orifice groove 4, will not be deposited on gap saturating
In the mouth of a river 5, do not easily cause obstruction, in the permeable mouth in gap 5, do not have the alluvial of dust would not have weeds propagation and widespread.
The brick body material of this gap water-permeable brick is concrete material, and using pressing one-time molding, its brick body is difficult splitting, resists
Tensile strength is high, and abrasion resistance is high.
Embodiment two
The present embodiment two is essentially identical with the structure similar principles of embodiment one, and different structure is:Section shape
Shape is rectangle, and the section that accumulation stores discharge orifice groove 4 is circular and is distributed on body 3 bottom surface, two adjacent accumulations store discharge orifice grooves 4 it
Between water conservancy diversion eaves 6 domed.
Specific embodiment described herein is only explanation for example to this utility model spirit.This utility model institute
Belong to those skilled in the art described specific embodiment can be made with various modifications or supplement or using similar
Mode substitute, but without departing from of the present utility model spirit or surmount scope defined in appended claims.
Claims (10)
1. a kind of gap water-permeable brick, including the body in cuboid it is characterised in that the two sides in front and back of described body are provided with
Interlocking rib post and interlocking groove, the interlocking groove on the corresponding trailing flank in the interlocking rib post position on leading flank, the interlocking groove on leading flank
Interlocking rib post on the corresponding trailing flank in position, the accumulation that described body lower part is provided with insertion body left and right sides stores discharge orifice groove,
It is saturating with the gap of accumulation storage discharge orifice groove that the left and right sides of described body or single side face are provided with the connection body upper surface that caves inward
The mouth of a river, stores on described gap permeable mouth both sides and two neighboring accumulation and is provided with water conservancy diversion eaves between discharge orifice groove.
2. gap according to claim 1 water-permeable brick is it is characterised in that the section shape of described interlocking rib post and interlocking groove
Shape is rectangle or end is semicircle.
3. gap according to claim 1 water-permeable brick it is characterised in that described accumulation store discharge orifice channel section be circular or
Arch.
4. gap according to claim 1 water-permeable brick is it is characterised in that described accumulation stores discharge orifice channel section and body bottom
Face is intersected, and forms opening in the bottom surface of body.
5. gap according to claim 1 water-permeable brick is it is characterised in that described accumulation stores discharge orifice channel section at body bottom
Face top.
6. gap according to claim 1 water-permeable brick is it is characterised in that described body lower part is provided with side before and after insertion
The accumulation in face stores discharge orifice groove, is arranged at left and right sides 1/4 width position.
7. gap according to claim 1 water-permeable brick is it is characterised in that described gap permeable mouth thickness is 3-6mm.
8. gap according to claim 1 water-permeable brick is it is characterised in that the permeable mouth in described gap is arranged on the list of body
Side, thickness is 5mm.
9. gap according to claim 1 water-permeable brick is it is characterised in that the described water conservancy diversion positioned at gap permeable mouth both sides
Eaves original position away from leading flank or trailing flank 5-10mm, connects to neighbouring accumulation and stores the inwall of discharge orifice groove in body upper surface,
And tangent with this accumulation storage discharge orifice groove inwall, the described water conservancy diversion eaves storing positioned at two accumulations between discharge orifice groove is in arch upwards
Or taper.
10. gap according to claim 1 water-permeable brick is it is characterised in that the brick body material of described gap water-permeable brick is
Concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620874724.3U CN205975246U (en) | 2016-08-12 | 2016-08-12 | Brick permeates water in gap |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620874724.3U CN205975246U (en) | 2016-08-12 | 2016-08-12 | Brick permeates water in gap |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205975246U true CN205975246U (en) | 2017-02-22 |
Family
ID=59978045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620874724.3U Expired - Fee Related CN205975246U (en) | 2016-08-12 | 2016-08-12 | Brick permeates water in gap |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205975246U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107059526A (en) * | 2017-06-04 | 2017-08-18 | 王行忠 | A kind of sponge urban water-through brick |
CN110130171A (en) * | 2019-04-10 | 2019-08-16 | 广东工业大学 | A kind of assembly concrete road surface and the Road System that is self-regulated |
-
2016
- 2016-08-12 CN CN201620874724.3U patent/CN205975246U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107059526A (en) * | 2017-06-04 | 2017-08-18 | 王行忠 | A kind of sponge urban water-through brick |
CN110130171A (en) * | 2019-04-10 | 2019-08-16 | 广东工业大学 | A kind of assembly concrete road surface and the Road System that is self-regulated |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101775839B (en) | Rainwater penetrating-discharging integrated ecological system | |
CN103132485A (en) | External water interception and purification type urban river multi-element ecological embankment physical structural system | |
CN205501932U (en) | Novel afforestation water conservancy bank protection | |
CN205975246U (en) | Brick permeates water in gap | |
CN207201426U (en) | A kind of urban green space grass-planting ecological ditch | |
CN211185126U (en) | Roof greening system of building | |
CN204626612U (en) | A kind of modular assembly type gutter | |
CN206575904U (en) | A kind of domatic saline and alkaline improvement vegetation water-saving structure | |
CN208328945U (en) | A kind of highway slope protection device of environmental protection | |
CN201817851U (en) | Rainwater ecological utilization system | |
CN211646422U (en) | Highway cutting side slope ecological protection system | |
CN201080615Y (en) | Ravine type dry method red mud storage yard water drainage structure | |
CN204741963U (en) | A rainwater garden for greenbelt in middle of road | |
CN208685550U (en) | A kind of improvement type revetment brick | |
CN105887761A (en) | River embankment structure for sponge city construction | |
CN204940056U (en) | A kind of greening discharge conduit of catchwork irrigation | |
CN211646654U (en) | Ecological shallow dish gutter suitable for green highway | |
CN213358503U (en) | Natural bank slope protective structure based on sponge city idea | |
CN212561003U (en) | Greening environment-friendly efficient water control ground system | |
CN207646690U (en) | A kind of hydraulic engineering ecological protection slope water purification wall | |
CN207476351U (en) | A kind of sponge urban ecology grass planting ditch | |
CN207295362U (en) | A kind of novel water permeable water storage grass planting ecological brick | |
CN111997009A (en) | Lining method of farmland ecological drainage ditch | |
CN111139707A (en) | Quick drainage system in sponge city ground | |
CN204940058U (en) | A kind of road rain water accumulation greenbelt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 Termination date: 20190812 |
|
CF01 | Termination of patent right due to non-payment of annual fee |