CN205973466U CN201620851788.1U CN201620851788U CN205973466U CN 205973466 U CN205973466 U CN 205973466U CN 201620851788 U CN201620851788 U CN 201620851788U CN 205973466 U CN205973466 U CN 205973466U
Authority
CN
China
Prior art keywords
bucket
rope
connector
sheave
handling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620851788.1U
Other languages
Chinese (zh)
Inventor
马福霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI GONGMAO CRANE EQUIPMENT CO Ltd
Original Assignee
SHANGHAI GONGMAO CRANE EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI GONGMAO CRANE EQUIPMENT CO Ltd filed Critical SHANGHAI GONGMAO CRANE EQUIPMENT CO Ltd
Priority to CN201620851788.1U priority Critical patent/CN205973466U/en
Application granted granted Critical
Publication of CN205973466U publication Critical patent/CN205973466U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

Two suo shuan lamellas loading and unloading grab bucket, it articulates a set of swing arm (3) downwards respectively to go up connector (2) symmetrical both sides, go up connector (2) downside mid -mounting top sheaves (7), furthermore, articulate a bucket body (6) respectively at this two groups swing arm (3) lower extreme, the relative edge hinged of these two bucket body (6) together, on this coupling point under the side -mounting connector (5), the upper portion installation lower sheave (9) of connector (5) under, lifting rope (8) are connected in the winding between top sheave (7) and the lower sheave (9). The service life of the grab bucket prevents that lifting rope is in tensile state, extension lifting rope always is prolonged. Flexible movements are accurate, and the controllability is strong, operation easy to assemble, and simple operation safety, easy to maintain, production efficiency is high.

Description

Double rope bivalve handling grab buckets
Technical field
This utility model is related to the structure improved technology of crane gear grab mechanisms, especially double rope bivalve handling grab buckets.
Background technology
Grab bucket is the bucket to capture silt and various bulk goods can open and close.Be a kind of mainly by left and right two combination bucket or The folding crawl of multiple jaws and the suspender drawing off bulk material.The keep left folding of right two combination buckets or multiple jaw of grab bucket is grabbed Take and draw off the suspender of bulk material, gripper is also in the grab bucket being made up of multiple jaws.
Mechanical type grab bucket is configured without opening-closing structure in itself, is generally driven by rope or connecting rod external force, can by operating feature It is divided into twin rope grab and single rope grab, be most commonly used that twin rope grab.
Twin rope grab has support rope and opening and closing rope, rotating around on the reel of supporting mechanism and switching mechanism.Twin rope grab Work process:A is to support that rope and opening and closing rope decline simultaneously, opens quarrel insertion stockpile.B is to tighten up opening and closing rope, and jaw closes And capture material.C is to support after grab bucket closes that rope and opening and closing rope rise simultaneously.D is to support that rope is motionless, and opening and closing rope declines, quarrel Open and unload material.Twin rope grab reliable operation, easy and simple to handle, productivity ratio is high, is widely used.Just become using after two groups of duplex types For four rope grab, work process is identical with twin rope grab.
Current grab bucket all controls opening and closure of bucket body using around the rope being located on assembly pulley, maintains it in and opens The pulling force of open state can be constantly in tensioning state mainly by horizontal swinging arm and rope, therefore rope, if things go on like this can be right Rope causes to damage, and shortens the service life of rope.
Single rope grab supports that restricting and be opened and closed rope uses same steel cable.Steel wire rope is made to rise in turn by special locker To the effect supported and be opened and closed.The winding mechanism of single rope grab is simpler, but productivity ratio is low, seldom adopts during a large amount of handling operation With.
Grab bucket is divided into according to the bulk density of crawled material that as light-duty in crawl corn, such as to capture gravel medium-sized and such as grab again Take iron ore heavy type 3 classes;It is divided into double jaw plates grab buckets and orange-peel grab by jaw number, be most commonly used that double jaw plates grab buckets.For Lump ore, iron filings and steel scrap etc. preferably adopt orange-peel grab, because it has the characteristics that multijaw, otch point it is easy to insertion is expected Heap, can get preferable crawl effect.Also has a kind of scissors grab of imitative scissor construction principle, its grasp force can be with jaw Close and be gradually increased, reach maximum when closure ends;The area of the aperture of its quarrel and covering material is also grabbed than typically Struggle against as big, improve Grasping skill, be conducive to cleaning stock ground and cabin, but for bulk materials because its initial grasp force is little, effect Really poor.
Utility model content
The purpose of this utility model is to provide double rope bivalve handling grab buckets.
The purpose of this utility model will be realized by following technical measures:The symmetrical both sides of upper connector are respectively articulated with downwards One group of swing arm, under upper connector, middle side part installs pulley, further, is respectively articulated with a bucket body in this two groups of swing arm lower ends, The opposite edges of this two bucket bodies are hinged, and connector under installing on the upside of this hinge point, on the top of lower connector Lower sheave is installed, be intertwined and connected between top sheave and lower sheave rope.
Especially, at upper connector top, motor and hangoff receptacle are installed.
Especially, the adjacent junction edge of two bucket bodies is worked in coordination.
Especially, bucket body downside is arc shovel, upper side and leading flank hollow out.
Especially, top sheave axis, lower sheave axis and two bucket body jointed shafts are parallel to each other, and bucket body axial width is more than two The hinged shaft length of bucket body.
Advantage of the present utility model and effect:Improve the service life of grab bucket, prevent rope to be constantly in extended state, Extend the service life of rope.Accurately, controllability is strong for flexible movements, facilitates installation operation, simple operation safety is it is easy to tie up Shield, production efficiency is high.
Brief description
Fig. 1 is this utility model embodiment 1 structural representation.
Reference includes:
Motor 1, upper connector 2, swing arm 3, hangoff receptacle 4, lower connector 5, bucket body 6, top sheave 7, rope 8, lower sheave 9.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment 1:As shown in figure 1 and 2, the symmetrical both sides of upper connector 2 are respectively articulated with downwards one group of swing arm 3, upper connection 2 times middle side parts of body install pulley 7, further, are respectively articulated with a bucket body 6 in this two groups of swing arm 3 lower ends, this two bucket bodies 6 Opposite edges hinged, on the upside of this hinge point install under connector 5, the top of lower connector 5 install glide Wheel 9, be intertwined and connected between top sheave 7 and lower sheave 9 rope 8.
In aforementioned, at upper connector 2 top, motor 1 and hangoff receptacle 4 are installed.
In aforementioned, the adjacent junction edge of two bucket body 6 is worked in coordination.After guaranteeing that lower connector 5 above carries, two bucket bodies 6 are permissible Obvolvent completely.
In aforementioned, bucket body 6 downside is arc shovel, upper side and leading flank hollow out.
In aforementioned, top sheave 7 axis, lower sheave 9 axis and two bucket body 6 jointed shaft are parallel to each other, and bucket body 6 axial width is big In the hinged shaft length of two bucket body 6.
In the present embodiment, grab bucket always high 3450mm, the wide 2440mm of bucket body 6, maximum open width when both sides bucket body 6 is opened 3794mm, biggest lifting capacity 10t, bucket capacity 7m3, unit weight 0.8t/m, 4 times of pulley block ratio, diameter of pulley 560mm, steel wire rope is straight Footpath 28mm, 10 ° of dorsal horn, maximum opening 3794mm, conduct oneself with dignity 4.35t.

Claims (5)

1. pair rope bivalve handling are grabbed bucket it is characterised in that the symmetrical both sides of upper connector (2) are respectively articulated with downwards one group of swing arm (3), Under upper connector (2), middle side part installs pulley (7), further, is respectively articulated with a bucket body in this two groups of swing arm (3) lower ends (6), the opposite edges of this two bucket bodies (6) are hinged, and connector (5) under installing on the upside of this hinge point, in lower company Lower sheave (9) is installed on the top of junctor (5), and be intertwined and connected between top sheave (7) and lower sheave (9) rope (8).
2. double rope bivalve handling are grabbed bucket it is characterised in that installing motor at upper connector (2) top as claimed in claim 1 And hangoff receptacle (4) (1).
3. double rope bivalve handling are grabbed bucket it is characterised in that the adjacent junction edge of two bucket bodies (6) is mutual as claimed in claim 1 Cooperation.
4. double rope bivalve handling are grabbed bucket it is characterised in that bucket body (6) downside is arc shovel as claimed in claim 1, upside Face and leading flank hollow out.
5. as claimed in claim 1 double rope bivalves handling grab bucket it is characterised in that in top sheave (7) axis, lower sheave (9) Axle is parallel to each other with two bucket bodies (6) jointed shaft, and bucket body (6) axial width is more than the hinged shaft length of two bucket bodies (6).
CN201620851788.1U 2016-08-08 2016-08-08 Two suo shuan lamellas loading and unloading grab bucket Expired - Fee Related CN205973466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620851788.1U CN205973466U (en) 2016-08-08 2016-08-08 Two suo shuan lamellas loading and unloading grab bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620851788.1U CN205973466U (en) 2016-08-08 2016-08-08 Two suo shuan lamellas loading and unloading grab bucket

Publications (1)

Publication Number Publication Date
CN205973466U true CN205973466U (en) 2017-02-22

Family

ID=58029630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620851788.1U Expired - Fee Related CN205973466U (en) 2016-08-08 2016-08-08 Two suo shuan lamellas loading and unloading grab bucket

Country Status (1)

Country Link
CN (1) CN205973466U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113660854A (en) * 2019-04-25 2021-11-16 莱利专利股份有限公司 Feeding system and method for feeding animals and feed gripper

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113660854A (en) * 2019-04-25 2021-11-16 莱利专利股份有限公司 Feeding system and method for feeding animals and feed gripper
CN113660854B (en) * 2019-04-25 2023-11-14 莱利专利股份有限公司 Feeding system and method for feeding animals and feed gripper

Similar Documents

Publication Publication Date Title
CN203946450U (en) A kind of self-unloading lift van
US4012069A (en) Loading apparatus
CN102674149A (en) Shear type leakproof grab bucket
CN106516660A (en) Grain conveyor
CN205973466U (en) Two suo shuan lamellas loading and unloading grab bucket
CN207418135U (en) A kind of new and effective material grasping grab bucket
CN203545429U (en) Bar material lifting tool
CN107690416A (en) The scissors grab of four cables operation
CN203199373U (en) Bucket cover for fruit grain washing bucket
CN204569164U (en) A kind of multi-clove type Leakage-proof Clamshell
CN202785300U (en) Asynchronous steel-scrap grab bucket
CN201102861Y (en) Lotus leaf valve type grab bucket
CN103523660B (en) The board-like combination grab bucket of polylith transfiguration
CN204823718U (en) Grab bucket of single cable wireless remote control timber
CN104925664A (en) Single-rope wireless remote-control timber grab bucket
CN206375581U (en) One kind, which is slagged tap, uses monkey
CN203033661U (en) Double-connection wood grab bucket
CN211226040U (en) Grab bucket device of iron remover
CN211769822U (en) Semi-shearing type rake-collecting double-petal grab bucket
CN205275025U (en) Clamp grab bucket structure
CN208932812U (en) A kind of four rope grab
CN203033662U (en) Shear mode leakage-proof grab bucket
CN204624969U (en) To in bundle steel pipe underdeck operation special hanger
CN211114887U (en) Reinforcing bar conveyer for building site
CN210594934U (en) Leakage-proof grab bucket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222