CN204624969U - To in bundle steel pipe underdeck operation special hanger - Google Patents

To in bundle steel pipe underdeck operation special hanger Download PDF

Info

Publication number
CN204624969U
CN204624969U CN201520299229.XU CN201520299229U CN204624969U CN 204624969 U CN204624969 U CN 204624969U CN 201520299229 U CN201520299229 U CN 201520299229U CN 204624969 U CN204624969 U CN 204624969U
Authority
CN
China
Prior art keywords
shackle
steel pipe
shackle plate
special hanger
thick stick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520299229.XU
Other languages
Chinese (zh)
Inventor
肖寰
杨伟明
颜培祥
李洪卫
王春双
王瑛
周围
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Port No1 Stevedoring Co Ltd
Original Assignee
Tianjin Port No1 Stevedoring Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Port No1 Stevedoring Co Ltd filed Critical Tianjin Port No1 Stevedoring Co Ltd
Priority to CN201520299229.XU priority Critical patent/CN204624969U/en
Application granted granted Critical
Publication of CN204624969U publication Critical patent/CN204624969U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a kind of special hanger of steel pipe underdeck operation of in bundling, described swivel eye is the seal ring of the upper hoist cable one end of hook two, 360 ° of rotary motions can be done, the top of described thick stick is provided with shackle plate, the two ends of propping up thick stick are respectively equipped with shackle plate, each shackle plate is provided with three lifting hole(eyelet)s, and the other end of upper hoist cable is connected with shackle plate by shackle, and chain is connected by buckle on the lifting hole(eyelet) of shackle plate.Effect of the present utility model is that this suspender project organization is reasonable, from heavy and light, load is large, intensity is high, small investment, instant effect.Use simple to operate, cargo operation is steady, safe and reliable.Put into operation so far, any job safety and quality accident do not occur, compare former handling tool, efficiently solve a steel pipe underdeck operation difficult problem of in bundling for requirements for quality.Easy and simple to handle, flexible, reduce labor strength.Actv. protects the handling quality of goods, decreases damage cargo.Operating speed is fast, efficiency is high, raises the efficiency and reaches two times, improves the degree of utilization of volume of compartment, increases goods stowage quantity.

Description

To in bundle steel pipe underdeck operation special hanger
Technical field
The utility model to belong in cabin, harbour handling and in bundle steel pipe lifting tool, and particularly a kind of handling high to handling requirements for quality are in bundled the special hanger of steel pipe underdeck operation.
Background technology
One of dominant company of steel and breakbulk is loaded and unloaded as PORT OF TIANJIN by Tianjin Harbour First Stevedoring Co., Ltd., becomes the steel pipe of bale packaging to rise gradually in company working's loading and unloading capacity in recent years.For ensureing handling quality, the owner of cargo has been inserted in again the lifting waist of polyamide fibre material after tying up steel pipe on steel pipe, for lifting operation.Because underdeck operation in bundles steel pipe without special hanger, often use interim instrument to ship, easily form goods damage and safety misadventure, steel pipe operation of therefore in bundling in cabin urgent need is improved special hanger and is loaded and unloaded.
Summary of the invention
Technical problem to be solved in the utility model is: the special hanger providing a kind of steel pipe underdeck operation of in bundling, reaches easy and simple to handle, improves handling efficiency, ensures the object of handling quality.
For achieving the above object, the technical solution adopted in the utility model is to provide a kind of special hanger of steel pipe underdeck operation of in bundling, wherein: described swivel eye is the seal ring of the upper hoist cable one end of hook two, 360 ° of rotary motions can be done, the top of described thick stick is provided with shackle plate, and the two ends of a thick stick are respectively equipped with shackle plate, and each shackle plate is provided with three lifting hole(eyelet)s, the other end of upper hoist cable is connected with shackle plate by shackle, and chain is connected by buckle on the lifting hole(eyelet) of shackle plate.
Effect of the present utility model is that this suspender project organization is reasonable, from heavy and light, load is large, intensity is high, small investment, instant effect.Use simple to operate, cargo operation is steady, safe and reliable.Put into operation so far, any job safety and quality accident do not occur, compare former handling tool, efficiently solve a steel pipe underdeck operation difficult problem of in bundling for requirements for quality.Easy and simple to handle, flexible, reduce labor strength.Actv. protects the handling quality of goods, decreases damage cargo.Operating speed is fast, efficiency is high, raises the efficiency and reaches two times, improves the degree of utilization of volume of compartment, increases goods stowage quantity.
Accompanying drawing explanation
Fig. 1 is steel pipe underdeck operation special hanger structural representation;
Fig. 2 is steel pipe underdeck operation special hanger operation schematic diagram.
In figure:
1, swivel eye 2, shackle 3, upper hoist cable 4, thick stick 5, chain 6, eye suspension hook
Detailed description of the invention
By reference to the accompanying drawings steel pipe underdeck operation special hanger structure of in bundling of the present utility model is illustrated.
As shown in Figure 1, structure of in bundling steel pipe underdeck operation special hanger of the present utility model is: this steel pipe underdeck operation special hanger of in bundling combines primarily of swivel eye 1, shackle 2, upper hoist cable 3, a thick stick 4, chain 5, eye suspension hook 6.Swivel eye 1 is the annulus closed up and down, and centre is linked into an integrated entity by S. A., and upper and lower annulus can rotate freely around S. A.; Upper hoist cable 3 has two, is that two end band close the steel rope hanging nose, connects swivel eye 1 and a thick stick 4 respectively by shackle 2; Prop up thick stick 4 by rectangular tube excision forming, the shackle plate 4-1 above it connects upper hoist cable 3 by shackle 2, and the trapezoidal shackle plate 4-1 at length direction two ends connects chain 5 by shackle 2; Chain 5 is combined by multiple high strength chain link, and its lower end connects eye suspension hook 6 by shackle 2.
The swivel eye 1 of this special hanger is formed by the alloy material forging that intensity is high, can do 360 with axle .the seal ring of rotary motion.Upper hoist cable 3 is suppressed by steel rope and is formed, and two ends have closedly ring-likely hangs nose, has two, connects on the shackle plate above a thick stick by shackle 2; Prop up thick stick 4 by rectangular tube excision forming, its top correspondence is welded with two shackle plate 4-1, and connect two upper hoist cables 3 by shackle 2, both sides correspondence is welded with two trapezoidal shackle plate 4-2, and each shackle plate 4-2 leaves 3 lifting hole(eyelet)s respectively, connects chain by shackle; Chain 5 is combined by high strength chain link, and its end is connected with eye suspension hook 6, and eye suspension hook 6 adopts carbon constructional quality steel to forge and heat-treats and forms, and can carry out loading and unloading operation by the in bundle lifting waist of steel pipe of hook.
During use, first the chain 5 being connected with eye suspension hook 6 is connected on the trapezoidal shackle plate 4-2 of thick stick 4 both sides, again upper hoist cable 3 one end is hung nose to be connected with the shackle plate 4-1 above a thick stick 4, then upper hoist cable 3 other end is hung nose and swivel eye 1 couples together, swivel eye 1 is hung on crane hook, the lifting waist in bundled on steel pipe finally by eye suspension hook 6 hook carries out lifting by crane the operation of steel pipe of in bundling, and during operation, two the lifting waists often tying steel pipe can distinguish hook 1 eye suspension hook.Eye suspension hook hook packaging waist hoists goods, and position in appointment cabin can be placed in swivel eye adjustment goods direction.As shown in Figure 2.
This steel pipe underdeck operation special hanger safety load of in bundling is 3t/ cover, is applicable to the ship-loading operation process of the steel pipe of in bundling having very special quality requirement in cabin.

Claims (2)

1. the special hanger of steel pipe underdeck operation of in bundling, this special hanger includes swivel eye, shackle, upper hoist cable, prop up thick stick, chain, eye suspension hook, it is characterized in that: described swivel eye (1) is the seal ring of upper hoist cable (3) one end of hook two, 360 ° of rotary motions can be done, the top of described thick stick (4) is provided with shackle plate (4-1), the two ends of propping up thick stick (4) are respectively equipped with shackle plate (4-2), each shackle plate (4-2) is provided with three lifting hole(eyelet)s, the other end of upper hoist cable (3) is connected with shackle plate (4-1) by shackle (2), chain (5) is connected on the lifting hole(eyelet) of shackle plate (4-2) by shackle (2).
2. the special hanger of steel pipe underdeck operation of in bundling according to claim 1, is characterized in that: described shackle plate (4-2) is trapezoidal shape.
CN201520299229.XU 2015-05-08 2015-05-08 To in bundle steel pipe underdeck operation special hanger Expired - Fee Related CN204624969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520299229.XU CN204624969U (en) 2015-05-08 2015-05-08 To in bundle steel pipe underdeck operation special hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520299229.XU CN204624969U (en) 2015-05-08 2015-05-08 To in bundle steel pipe underdeck operation special hanger

Publications (1)

Publication Number Publication Date
CN204624969U true CN204624969U (en) 2015-09-09

Family

ID=54044018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520299229.XU Expired - Fee Related CN204624969U (en) 2015-05-08 2015-05-08 To in bundle steel pipe underdeck operation special hanger

Country Status (1)

Country Link
CN (1) CN204624969U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105329765A (en) * 2015-11-06 2016-02-17 天津港第二港埠有限公司 Method for steel pipe winding and pocket hoisting work through steel wire rope buckles
CN113998192A (en) * 2021-10-12 2022-02-01 包头钢铁(集团)有限责任公司 Method for forming and packaging steel pipe

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105329765A (en) * 2015-11-06 2016-02-17 天津港第二港埠有限公司 Method for steel pipe winding and pocket hoisting work through steel wire rope buckles
CN113998192A (en) * 2021-10-12 2022-02-01 包头钢铁(集团)有限责任公司 Method for forming and packaging steel pipe
CN113998192B (en) * 2021-10-12 2024-01-30 包头钢铁(集团)有限责任公司 Method for molding and packing steel pipes

Similar Documents

Publication Publication Date Title
CN203199875U (en) Special hanger for steel pipe operation
CN106829726A (en) A kind of new equipment safety hanging apparatus and application method without hoisting platform
CN204624969U (en) To in bundle steel pipe underdeck operation special hanger
CN202609767U (en) Adjustable hanging beam special for bag goods
CN201411319Y (en) Anti-scratching mesh bag hanger
CN202785300U (en) Asynchronous steel-scrap grab bucket
CN203513086U (en) Special lifting appliance for long-bundle-shaped material
CN201254428Y (en) Bag hanging type cold coiling plate composite cargo sling
CN205132903U (en) Steel wire slings
CN203946779U (en) Loose steel pipe operation combined sling
CN205709466U (en) Load and unload chemical fertilizer special hanger in bulk
CN208327139U (en) A kind of drum hoisting clamp
CN206051268U (en) The vehicle frame boom hoisting of quick despatch
CN206494642U (en) A kind of new equipment safety hanging apparatus without hoisting platform
CN206345596U (en) A kind of armoring machine steel tape hoist
CN215101472U (en) Special lifting appliance for shipping flexible freight bag
CN203946780U (en) Pulley-type hot-strip automatic turning suspender
CN208200146U (en) A kind of I-beam wheel grabbing device with pneumatic clamper
CN202829276U (en) Special lifting hook for container bag operation of excavator
CN205555857U (en) Portable hoisting structure
CN201605087U (en) Goods hoisting device
CN207209766U (en) A kind of nitric acid bucket boom hoisting
CN210001440U (en) Self-unloading hoisting device
CN202321997U (en) Dedicated lifting hook of H-shaped steel
CN210236847U (en) Special combined lifting appliance for lifting steel pipes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

CF01 Termination of patent right due to non-payment of annual fee