CN205955771U - Mine combination formula drainage and exhaust system - Google Patents

Mine combination formula drainage and exhaust system Download PDF

Info

Publication number
CN205955771U
CN205955771U CN201620931780.6U CN201620931780U CN205955771U CN 205955771 U CN205955771 U CN 205955771U CN 201620931780 U CN201620931780 U CN 201620931780U CN 205955771 U CN205955771 U CN 205955771U
Authority
CN
China
Prior art keywords
drainage
mine
water
rescue
discharge pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620931780.6U
Other languages
Chinese (zh)
Inventor
冯立杰
杨武洲
杨郑
唐晓宾
孙国亮
张世斌
徐远征
丁学臻
薛雅娟
龙向天
张海滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN MINE EMERGENCY RESCUE AND DISASTER RELIEF CENTER
Original Assignee
HENAN MINE EMERGENCY RESCUE AND DISASTER RELIEF CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN MINE EMERGENCY RESCUE AND DISASTER RELIEF CENTER filed Critical HENAN MINE EMERGENCY RESCUE AND DISASTER RELIEF CENTER
Priority to CN201620931780.6U priority Critical patent/CN205955771U/en
Application granted granted Critical
Publication of CN205955771U publication Critical patent/CN205955771U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a rescue of speedily carrying out rescue work fast of the calamity that mine combination formula drainage and exhaust system, specially adapted mine " empty the gushing water " always. This system is established ties by a plurality of drainage unit (1) or the parallel combination mode is formed, and every drainage unit (1) is a whole set of submerged motor pump (2) of can the autonomous working, also can associated working, has drain line (3) of independent power supply system and full -amount lift separately and installs conveniently, and at " empty gushing water always " when taking place, a plurality of drainage unit (1) is through series connection or parallel combination mode formation drainage and exhaust system to reach the mesh of quick drainage blowdown rescue. The utility model provides a difficult problem of the quick drainage blowdown of water inrush in mine calamity rescue has been solved effectively to system and method, especially when flooding the outburst of well water disaster, can deal with various rescue environment at the flow of water is violent, sediment content is big, the destructiveness is big " empty gushing water always " more fast, in a flexible way, and more time is striven for in the rescue in order to speedily carry out rescue work.

Description

A kind of mine combined water-drainage drainage
Technical field
The utility model is related to Pitwater disaster emergency drainage field and in particular to a kind of mine combined water-drainage blowdown system System, is particularly well-suited to the rapid rescue rescue of mine " empty gushing water always " disaster.
Background technology
Coal is the main energy sources of China, and coal industry is the basic industries of China.But special palegeology environment, certainly Determine China's coal-mine hydrogeologic condition sufficiently complex compared with other country of the world, the exploitation of coal resources is threatened by water disaster Seriously, water inrush accident frequently occurs.Coal mine flooding becomes one of great key issue of impact China's coal-mine safety in production.
Coal mine flooding rescue core technology be emergency drainage blowdown technology, that is, the ponding in drained mine laneway and Implement other rescue works after silt.As higher " the empty gushing water always " Disaster Characteristics of occurrence frequency it is:The water yield less but hydraulic pressure Height, breaks with tremendous force and is often accompanied by a large amount of silts, tunnel caves in and blocks the phenomenons such as rescue passage, often results in group dead group wound, to ore deposit The destruction of well is extremely serious.
Take place frequently and endanger serious water disaster for this, general high-power submerged electric pump is because volume is big, installation period Long, high to requirements of installation space the features such as, it is unsuitable for the rescue of " empty gushing water always " disaster;And general small-sized diving electric pump blowdown energy Power is poor, operational reliability is low it is impossible to meet the requirement of Quick rescue;The expanding design of simultaneously different disaster-stricken mines totally different so that The flow of required water disaster treatment equipment and lift are difficult to unify, and more increase the difficulty that " empty gushing water always " floods the treatment of well water disaster Degree.
Content of the invention
The purpose of this utility model is to provide a kind of mine combined water-drainage drainage, solves existing draining blowdown side Formula can not meet the problem that mine " empty gushing water always " requires.
In order to solve problem above, the utility model is achieved through the following technical solutions:
A kind of described mine combined water-drainage drainage, by multiple drainage cell serial or parallel connection integrated mode institutes group Become, wherein drainage cell can be worked independently by a whole set of, can also associated working the latent dirt with independent electric power system Pump is formed with the discharge pipe line with full-amount lift, and discharge pipe line is arranged to pit shaft from ground and is fixed on overhanging beam or support On Guan Liang, and submersible sewage pump head and the tail two ends are connected with the discharge pipe line in pit shaft respectively and hang fixation in the wellbore.
The model of described submersible sewage pump should be mutually matched, it is to avoid system operation is in poorly efficient area.
Described discharge pipe line is all connected using flexible pipe, and connection in series or in parallel with each other can carry out multitube draining.
Based on above-mentioned combined water-drainage drainage, a kind of mine combined water-drainage blowdown that the utility model provides Method, comprises the following steps:
(1) in mine " empty gushing water always " disaster outburst, the very first time is checked on the spot by down-hole and consults relevant drawing Data, the waterflooding situation of analysis outlet area pit shaft, the mining flow needed for estimation scene and lift, design calculates discharge pipe line Stringing scheme and required drainage cell quantity;
(2) according to design requirement, discharge pipe line is arranged in pit shaft, each submersible sewage pump is transported in pit shaft simultaneously and is pacified Dress is fixed, and connects discharge pipe line and combines each drainage cell formation drainage system;
(3) after waiting each drainage cell ready, with jet vacuum pump, air in submersible sewage pump and drainage pipeline is extracted out, utilize High-speed jet pumping in compressed air and discharge pipe line starts submersible sewage pump;
(4) connect the power supply of each drainage cell, run submersible sewage pump, the waterflooding in pit shaft is passed through discharge pipe line pump drainage to ground Face.
The beneficial effects of the utility model are as follows:
With the contrast of conventional emergency drainage method, using this combined water-drainage drainage, mine " empty gushing water always " disaster is flooded Aqua region carries out disaster relief draining and has following characteristics and advantage:
(1) use this drainage and exhaust system and method, build by the way of serial or parallel connection combines multiple drainage cells Drainage and exhaust system, can meet the dewatering needs under various difference operating modes, be with a wide range of applications;
(2) this drainage and exhaust system and method are used, selecting can be with the husky small-sized submersible sewage pump composition draining of draining coal, spoil disposal Unit, also possesses stronger pollution discharge capability while draining, can pump drainage silt and larger " always empty prominent of coal slurry content well Water " disaster waterflooding;
(3) use this drainage and exhaust system and method, system is divided into some drainage cells to carry out assembling simultaneously and runs, fortune Defeated simple and convenient, there is stronger mobility, the set-up time of equipment can be greatlyd save simultaneously, be the fast of mine water bursting disaster Speed rescue offer condition.
Brief description
Fig. 1 is installed in series schematic diagram for one kind of the present utility model;
Fig. 2 is another schematic diagram that is installed in series of the present utility model;
Fig. 3 is installed in parallel schematic diagram for one kind of the present utility model;
In figure is labeled as:1- drainage cell;2- latent dirt electric pump;3- discharge pipe line;4- pit shaft;5- main drainpipe road.
Specific embodiment
For the ease of those skilled in the art it will be appreciated that and implementing the utility model, below in conjunction with accompanying drawing to practicality New embodiment is described further, but embodiment not limited to this of the present utility model.
Embodiment one
As shown in Figure 1, 2, a kind of mine combined water-drainage drainage, by drainage cell 1 institute of multiple serial or parallel connections Composition;Each of which cover drainage cell 1 include a whole set of can work independently, can also associated working submersible sewage pump 2, each have There is the discharge pipe line 3 of independent electric power system and full-amount lift.
Wherein, in submersible sewage pump 2 normally runs, the parallel connection pump of different model should be avoided, in order to avoid occurring poorly efficient Rate operating point, also should avoid controlling flow with gate valve simultaneously as far as possible, in order to avoid increasing restriction loss;Submersible sewage pump 2 should adopt without bottom valve Run, that is, cancel Pump Suction water end (W.E.) bottom valve, using jet vacuum pump, air in submersible sewage pump 2 body is extracted, using compressed air with High-speed jet pumping in discharge pipe line 3 starts submersible sewage pump 2.
For the little mine of general water yield " empty gushing water always " disaster, frequently with the mode of multiple drainage cells 1 of connecting Composition drainage system can reach the requirement that live draining is speedily carried out rescue work.Specific implementation step is as follows:
According to the waterflooding situation in gushing water tunnel, the mining flow needed for estimation scene and lift, design calculates discharge pipe line 3 Arranged in series scheme and required series connection drainage cell 1 quantity;
According to design requirement, discharge pipe line 3 is arranged in pit shaft 4, each submersible sewage pump 2 is transported in pit shaft 4 simultaneously and carries out Install and fix, discharge pipe line 3 is connected in series with each submersible sewage pump 2, form drainage system;
After waiting each drainage cell 1 ready, with jet vacuum pump, air in each submersible sewage pump 2 and discharge pipe line 3 is extracted out, profit Start submersible sewage pump 2 with the high-speed jet pumping in compressed air and discharge pipe line 3;
Connect the power supply of each drainage cell 1, run submersible sewage pump 2, the waterflooding in pit shaft 4 is passed through discharge pipe line 3 pump drainage extremely Ground.
Should select thicker discharge pipe line 3 is installed when designing train, so that each submersible sewage pump 2 is operated in industry as far as possible Within the scope of the big flow in area.
Embodiment two
As shown in figure 3, when disaster scene gushing water tunnel water yield is larger, in order to improve mining amount and draining effect further Rate, drainage system that can in parallel in multiple embodiments one, carry out united drainage operation.Specific implementation step is as follows:
According to the waterflooding situation in gushing water tunnel, the mining flow needed for estimation scene and lift, design calculates discharge pipe line 3 Be arranged in parallel scheme and required parallel connection drainage cell 1 quantity;
According to design requirement, discharge pipe line 3 is arranged in parallel in pit shaft 4 respectively, each submersible sewage pump 2 is transported to well simultaneously Carry out in cylinder 4 installing fixing, respectively the discharge pipe line 3 of each branch road is connected in series rear parallel connection to main draining with submersible sewage pump 2 Pipeline 5, forms drainage system;
After waiting each drainage cell 1 ready, with jet vacuum pump, air in each submersible sewage pump 2 and discharge pipe line 3 is extracted out, profit Start submersible sewage pump 2 with the high-speed jet pumping in compressed air and discharge pipe line 3;
Connect the power supply of each drainage cell 1, run submersible sewage pump 2, drawn water by each branch road discharge pipe line 3, finally simultaneously Ground is discharged to by main drainpipe road 5.
When designing parallel system, main drainpipe road 5 caliber installed is selected to should be greater than each branch road discharge pipe line 3, so that Whole drainage system can more efficiently operate.
As needed the above-mentioned drainage and exhaust system of Long-Time Service, then need periodic detection water pump and discharge pipe line characteristic, periodically clearly Except channel interior institute scaling, reduce pipe resistance.The water pump of off-target operating point is reasonably adjusted and is coordinated, made The intersection point of pump characteristic and characteristic curve of pipeline, in efficiency highest zone, improves drainage efficiency.

Claims (3)

1. the treatment of a kind of mine combined water-drainage drainage " empty gushing water always " water disaster it is adaptable to mine, by multiple drainings Unit serial or parallel connection integrated mode formed it is characterised in that:Drainage cell(1)Can be worked independently, also may be used by a whole set of Submersible sewage pump with associated working(2)With coupled discharge pipe line(3)Composition, discharge pipe line(3)Arrange to pit shaft from ground (4)Interior and be fixed on overhanging beam or trustship beam, and submersible sewage pump(2)Head and the tail two ends respectively with pit shaft(4)Interior discharge pipe line(3) Connect and hang and be fixed on pit shaft(4)In.
2. as claimed in claim 1 a kind of mine combined water-drainage drainage it is characterised in that:Described submersible sewage pump(2)'s Model is mutually matched.
3. as claimed in claim 1 a kind of mine combined water-drainage drainage it is characterised in that:Described discharge pipe line(3) It is attached by the way of flexible pipe is by serial or parallel connection.
CN201620931780.6U 2016-08-24 2016-08-24 Mine combination formula drainage and exhaust system Expired - Fee Related CN205955771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620931780.6U CN205955771U (en) 2016-08-24 2016-08-24 Mine combination formula drainage and exhaust system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620931780.6U CN205955771U (en) 2016-08-24 2016-08-24 Mine combination formula drainage and exhaust system

Publications (1)

Publication Number Publication Date
CN205955771U true CN205955771U (en) 2017-02-15

Family

ID=57977964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620931780.6U Expired - Fee Related CN205955771U (en) 2016-08-24 2016-08-24 Mine combination formula drainage and exhaust system

Country Status (1)

Country Link
CN (1) CN205955771U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109677569A (en) * 2018-12-29 2019-04-26 深圳市水务科技发展有限公司 The control method of dock draining

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109677569A (en) * 2018-12-29 2019-04-26 深圳市水务科技发展有限公司 The control method of dock draining

Similar Documents

Publication Publication Date Title
CN208220665U (en) A kind of multi-cycle runner well system for big size hole hard rock drilling well
CN112197448B (en) Geothermal development system
CN105507938B (en) Hydraulic flushing in hole combines the construction method of anti-reflection extraction system with presplit blasting in drilling
CN111155929B (en) Coal mine underground water hole prevention and control high-water-pressure water jacking directional drilling tool and drilling method
CN102704872A (en) Gas-lift reverse circulation slurry circulation system
CN107558962A (en) Concentric tube type batch-type gaslift drainage technology
CN110847961A (en) Tunnel drainage system
RU48205U1 (en) WELL PUMP UNIT (OPTIONS)
CN110748377B (en) Gas and water double-extraction device in abandoned mine
CN210637109U (en) Underground mine underground temporary drainage structure
CN205955771U (en) Mine combination formula drainage and exhaust system
CN103867148A (en) Coal bed gas well concentric pipe pulverized coal discharging system and pulverized coal discharging method
CN106121719A (en) A kind of mine combined water-drainage drainage and method
CN206957764U (en) A kind of underground mine capital construction phase temporary drainage system
CN201110665Y (en) Strong anti-block automatic pollution discharge breast wall type back pouring apparatus
CN1844796A (en) Dual-well alternant pumping type transducer
CN100543380C (en) The strong anti-block automatic pollution discharge breast wall type backflow device
CN208702385U (en) A kind of water drainage gas production device for natural gas extraction
JP2007009576A (en) Excavated earth and sand exhausting device and shield device
CN107476785A (en) A kind of closed flow string of the double submersible electric pumps of Oil/gas Well series connection
CN210530427U (en) Main power house layout structure of thermal power plant
CN113482713A (en) Drainage lowering construction process for inclined shaft of extra-long water-rich karst tunnel
CN116066006A (en) Plunger negative pressure gas production device and gas production method
CN102251796A (en) Water circulation system of gas pump station under mine
CN101586568A (en) Eccentric floating semi-submersible type water lifting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170215

Termination date: 20180824