CN205949423U - Novel mediation equipment of petroleum pipeline - Google Patents
Novel mediation equipment of petroleum pipeline Download PDFInfo
- Publication number
- CN205949423U CN205949423U CN201620809230.7U CN201620809230U CN205949423U CN 205949423 U CN205949423 U CN 205949423U CN 201620809230 U CN201620809230 U CN 201620809230U CN 205949423 U CN205949423 U CN 205949423U
- Authority
- CN
- China
- Prior art keywords
- oil
- axle
- dredging
- motor
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a novel mediation equipment of petroleum pipeline, including spiral bit, mediation axle, oil storage box, motor, backup pad and hydraulic telescoping rod, spiral bit sets up in the mediation axle rightmost side, spiral bit is provided with the drill bit bolt, the drill bit bolt sets up on spiral bit, and the drill bit bolt is spiral bit's a partial main part, mediation axle sets up in the middle of oil storage box right side, the mediation axle is provided with mediation axle bolt, mediation axle bolt sets up in mediation axle left side, oil storage box sets up in mediation axle left side, oil storage box is provided with stone oil output pipeline control valve and stone oil output pipe, the drill bit bolt is fixed spiral bit and mediation axle to to the different spiral bit of stone oil plug stopper condition use of difference, in order to improve work efficiency, the utility model discloses novel mediation equipment of petroleum pipeline has the simple structure, and the operation is convenient, to advantages such as object diversifications.
Description
Technical field
The utility model is related to a kind of oil equipment, the new dredging device of specifically a kind of petroleum pipeline.
Background technology
In oil development and course of conveying, often due to poly-doped impurity in crude oil, or due to lowest outlet oil temperature of station and
Minimum export-restriction, the pipeline for transfer oil will block in use for some time, and this is calamity for the transport of oil
Difficulty;In prior art, the dredging for petroleum pipeline mainly to be realized by slinky spring, and is artificial operation, not only labor
Fatigue resistance is big, and it is low to dredge efficiency;It would therefore be desirable to a kind of new dredging device of petroleum pipeline.
Utility model content
The purpose of this utility model is to provide a kind of petroleum pipeline new dredging device, to solve in above-mentioned background technology
The problem proposing.
For achieving the above object, the utility model provides following technical scheme:
A kind of new dredging device of petroleum pipeline, including augers, dredging axle, oil deposit box, motor, gripper shoe and
Hydraulically extensible bar;Described augers is arranged on the dredging axle rightmost side;Described augers is provided with drill bit bolt;Described drill bit
Bolt is arranged on augers, and drill bit bolt is the portion body of augers;Described dredging axle is arranged on oil savings
In the middle of on the right side of case;Described dredging axle is provided with dredging axle bolt;Described dredging axle bolt is arranged on the left of dredging axle;Described oil
Deposit box is arranged on the left of dredging axle;Described oil deposit box is provided with oil output channel control valve and oil efferent duct;Institute
State oil output channel control valve to be arranged on oil efferent duct;Described oil efferent duct is arranged under oil deposit box;Described
Motor is arranged on the left side of oil deposit box, and is connected with dredging axle by rotary shaft;Described motor be provided with rotary shaft and
Motor external circuit;Described rotary shaft is arranged on the right of motor;Described motor external circuit is arranged on outside motor, and and motor
Interior circuit is connected;Described gripper shoe is arranged on below motor and oil deposit box;Described gripper shoe is provided with support bar;Described
Support bar is arranged on the supporting plate, and support bar directly contacts with motor, oil deposit box;Described hydraulically extensible bar is arranged on and props up
Below fagging, and hydraulically extensible bar is vertically perforated through fixed cylinder and is connected with gripper shoe;Described hydraulically extensible bar be provided with fixed cylinder,
Hydraulic cylinder, base and electric wire;Described fixed cylinder is arranged on below hydraulically extensible bar, and fixed cylinder with diameter greater than hydraulically extensible bar
Diameter;Described hydraulic cylinder is arranged on below fixed cylinder;Described base is arranged on below fixed cylinder and ground touches;Described electricity
Line is arranged on hydraulic cylinder, and is joined directly together with external circuit.
As further program of the utility model:Described augers is arranged on the dredging axle rightmost side, and and dredging axle
It is connected to a fixed by drill bit bolt.
As further program of the utility model:Described dredging axle is arranged in the middle of on the right side of oil deposit box, and dredges
The height of the height of axle and rotary shaft is equal.
As further program of the utility model:Described dredging axle bolt is arranged on the left of dredging axle, and can pass through
Bolt connection rotary shaft.
As further program of the utility model:Described oil output channel control valve is arranged on oil efferent duct,
And control the oil in oil deposit box to release.
As further program of the utility model:Described rotary shaft is arranged on the right of motor, and the center line of rotary shaft
Equal with the height of the center line of motor.
As further program of the utility model:Described gripper shoe is provided with support bar, and four support bars uniformly divide
Cloth is on the supporting plate.
As the utility model further scheme:Described base is arranged on below fixed cylinder and ground touches, and
The weight of base accounts for a greater part of of whole equipment.
Compared with prior art, the beneficial effects of the utility model are:
Augers of the present utility model adopts spiral scalariform, thus reach improving the performance drilling oil blocking;Spiral shell
Rotation transmission sheet by augers get through out blocking oil pass through dredge axle rotary action after to oil deposit box in transfer,
Thus improving the efficiency of work;Dredging axle rotates after driving spiral transmission sheet phase and rotates;Oil deposit box saves oil tamper;
Dredging axle bolt fixing dredging axle and rotary shaft, and be dismountable, thus the petroleum pipeline reaching for different tube diameters uses not
The dredging axle of same model;Rotary shaft rotates and drives dredging axle work;Motor work drives rotary shaft to rotate;Motor external circuit is even
Connect motor internal circuit, thus providing power for operation to make motor normal work;Support bar and gripper shoe support motor and oil storage
Store case, thus ensureing the stability of whole equipment;Oil efferent duct exports oil tamper;Oil output channel control valve controls
Whether the output of oil tamper;Hydraulically extensible bar can change height during equipment work, thus reach facing differing heights
Petroleum pipeline can use;Fixed cylinder fixed hydraulic expansion link, thus ensure stablizing of hydraulically extensible bar structure;Hydraulic cylinder
External circuit work is connected by electric wire, thus providing hydraulically extensible bar required power when stretching;Base supports whole equipment
Weight, thus ensure that equipment operationally will not occur rollover or violent shake;Drill bit bolt be fixing augers and
Dredging axle, thus use different augers for different oil stopping states, to improve operating efficiency;This practicality is new
The new dredging device of type petroleum pipeline has simple structure, and operation facility, for the advantages of object variation.
Brief description
Fig. 1 is the structural representation of the new dredging device of petroleum pipeline.
Fig. 2 is the bolted structural representation of drill bit in the new dredging device of petroleum pipeline.
In figure:1- augers, 2- spiral transmission sheet, 3- dredges axle, 4- oil deposit box, and 5- dredges axle bolt, and 6- turns
Moving axis, 7- motor, 8- motor external circuit, 9- support bar, 10- gripper shoe, 11- oil output channel control valve, 12- oil is defeated
Outlet pipe, 13- hydraulically extensible bar, 14- fixed cylinder, 15- hydraulic cylinder, 16- base, 17- electric line, 18- drill bit bolt.
Specific embodiment
With reference to specific embodiment, the technical scheme of this patent is described in more detail.
Refer to Fig. 1-2, a kind of new dredging device of petroleum pipeline, including augers 1, dredging axle 3, oil deposit box
4th, motor 7, gripper shoe 10 and hydraulically extensible bar 13;Described augers 1 is arranged on dredging axle 3 rightmost side, and leads to dredging axle 3
Cross drill bit bolt 18 to be connected to a fixed;Described augers 1 is provided with drill bit bolt 18;Described drill bit bolt 18 is arranged on spiral
On drill bit 1, and drill bit bolt 18 is the portion body of augers 1;Described dredging axle 3 is arranged in oil deposit box 4 right side
Between, and dredge the height of axle 3 and the height of rotary shaft 6 is equal;Described dredging axle 3 is provided with dredging axle bolt 5;Described dredging axle
Bolt 5 is arranged on the left of dredging axle 3, and can be bolted rotary shaft 6;Described oil deposit box 4 is arranged on dredging axle 3
Left side;Described oil deposit box 4 is provided with oil output channel control valve 11 and oil efferent duct 12;Described oil output channel
Control valve 11 is arranged on oil efferent duct 12, and controls the oil in oil deposit box 4 to release;Described oil efferent duct 12
It is arranged under oil deposit box 4;Described motor 7 is arranged on the left side of oil deposit box 4, and by rotary shaft 6 and dredging axle 3 phase
Connect;Described motor 7 is provided with rotary shaft 6 and motor external circuit 8;Described rotary shaft 6 is arranged on the right of motor 7, and rotates
The height of the center line of the center line of axle 6 and motor 7 is equal;Described motor external circuit 8 is arranged on outside motor 7, and and electricity
In machine 7, circuit is connected;Described gripper shoe 10 is arranged on below motor 7 and oil deposit box 4;Described gripper shoe 10 is provided with props up
Strut 9, and four support bars 9 are evenly distributed in gripper shoe 10;Described support bar 9 is arranged on the supporting plate, and support bar is straight
Connect and contact with motor 7, oil deposit box 4;Described hydraulically extensible bar 13 is arranged on below gripper shoe 10, and hydraulically extensible bar is vertical
It is perforated through fixed cylinder 14 to be connected with gripper shoe 10;Described hydraulically extensible bar 13 is provided with fixed cylinder 14, hydraulic cylinder 15, base 16 and
Electric wire 17;Described fixed cylinder 14 is arranged on below hydraulically extensible bar 13, and fixed cylinder 14 with diameter greater than hydraulically extensible bar 13
Diameter;Described hydraulic cylinder 15 is arranged on below fixed cylinder 14;Described base 16 is arranged on fixed cylinder 14 and touches with ground below,
And the weight of base 16 accounts for a greater part of of whole equipment;Described electric wire 17 is arranged on hydraulic cylinder 15, and and the direct phase of external circuit
Even;Augers 1 adopts spiral scalariform, thus reach improving the performance drilling oil blocking;Spiral transmission sheet 2 is by auger
The blocking oil that 1 gets through out passes through to dredge after the rotary action of axle 3 transfer in oil deposit box, thus improving work
Efficiency;Dredging axle 3 rotates after driving spiral transmission sheet 2 phase and rotates;Oil deposit box 4 saves oil tamper;Dredging axle bolt 5
Fixing dredging axle 3 and rotary shaft 6, and be dismountable, thus the petroleum pipeline reaching for different tube diameters uses different model
Dredging axle 3;Rotary shaft 6 rotates and drives dredging axle 3 to work;Motor 7 work drives rotary shaft 6 to rotate;Motor external circuit 8 connects
Motor internal circuit, thus provide power for operation to make motor 7 normal work;Support bar 9 and gripper shoe 10 support motor 7 and oil
Deposit box 4, thus ensure the stability of whole equipment;Oil efferent duct 12 exports oil tamper;Oil output channel controls
Whether the output of valve 11 control oil tamper;Hydraulically extensible bar 13 can change height during equipment work, thus reaching face
The petroleum pipeline facing differing heights can use;Fixed cylinder 14 fixed hydraulic expansion link 13, thus ensure hydraulically extensible bar 13
The stablizing of structure;Hydraulic cylinder 15 connects external circuit work by electric wire 17, thus providing hydraulically extensible bar 13 required when stretching
Power;Base 16 supports whole equipment weight, thus ensureing that equipment operationally will not occur rollover or violent shake;
Drill bit bolt 18 is fixing augers 1 and dredging axle 3, thus using different spirals for different oil stopping states
Drill bit 1, to improve operating efficiency.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment party
Formula, in the ken that one skilled in the relevant art possesses, can also be on the premise of without departing from this patent objective
Make a variety of changes.
Claims (8)
1. the new dredging device of a kind of petroleum pipeline, including augers, dredging axle, oil deposit box, motor, gripper shoe and liquid
Pressure expansion link;It is characterized in that, described augers is arranged on the dredging axle rightmost side;Described augers is provided with drill bit spiral shell
Bolt;Described drill bit bolt is arranged on augers, and drill bit bolt is the portion body of augers;Described dredging axle setting
In the middle of on the right side of oil deposit box;Described dredging axle is provided with dredging axle bolt;It is left that described dredging axle bolt is arranged on dredging axle
Side;Described oil deposit box is arranged on the left of dredging axle;Described oil deposit box is provided with oil output channel control valve and stone
Oily efferent duct;Described oil output channel control valve is arranged on oil efferent duct;Described oil efferent duct is arranged on oil storage
Store under case;Described motor is arranged on the left side of oil deposit box, and is connected with dredging axle by rotary shaft;Described motor setting
There are rotary shaft and motor external circuit;Described rotary shaft is arranged on the right of motor;Described motor external circuit is arranged on outside motor
Side, and be connected with electric self-contained circuit;Described gripper shoe is arranged on below motor and oil deposit box;Described gripper shoe is provided with
Support bar;Described support bar is arranged on the supporting plate, and support bar directly contacts with motor, oil deposit box;Described hydraulic pressure is stretched
Contracting bar is arranged on below gripper shoe, and hydraulically extensible bar is vertically perforated through fixed cylinder and is connected with gripper shoe;Described hydraulically extensible bar
It is provided with fixed cylinder, hydraulic cylinder, base and electric wire;Described fixed cylinder is arranged on below hydraulically extensible bar, and the diameter of fixed cylinder
Diameter more than hydraulically extensible bar;Described hydraulic cylinder is arranged on below fixed cylinder;Described base is arranged on below fixed cylinder and ground
Face contacts;Described electric wire is arranged on hydraulic cylinder, and is joined directly together with external circuit.
2. the new dredging device of petroleum pipeline according to claim 1 it is characterised in that described augers be arranged on thin
The axis rightmost side, and be connected to a fixed by drill bit bolt with dredging axle.
3. the new dredging device of petroleum pipeline according to claim 1 is it is characterised in that described dredging axle is arranged on oil
In the middle of on the right side of deposit box, and dredge the height of axle and the height of rotary shaft is equal.
4. the new dredging device of petroleum pipeline according to claim 1 is it is characterised in that described dredging axle bolt is arranged on
On the left of dredging axle, and rotary shaft can be bolted.
5. the new dredging device of petroleum pipeline according to claim 1 is it is characterised in that described oil output channel controls
Valve is arranged on oil efferent duct, and controls the oil in oil deposit box to release.
6. the new dredging device of petroleum pipeline according to claim 1 is it is characterised in that described rotary shaft is arranged on motor
The right, and the height of the center line of the center line of rotary shaft and motor is equal.
7. the new dredging device of petroleum pipeline according to claim 1 is it is characterised in that described gripper shoe is provided with support
Bar, and four support bars are uniformly distributed on the supporting plate.
8. the new dredging device of petroleum pipeline according to claim 1 is it is characterised in that described base is arranged on fixed cylinder
Touch with ground below, and the weight of base accounts for a greater part of of whole equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620809230.7U CN205949423U (en) | 2016-07-29 | 2016-07-29 | Novel mediation equipment of petroleum pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620809230.7U CN205949423U (en) | 2016-07-29 | 2016-07-29 | Novel mediation equipment of petroleum pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205949423U true CN205949423U (en) | 2017-02-15 |
Family
ID=57973464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620809230.7U Expired - Fee Related CN205949423U (en) | 2016-07-29 | 2016-07-29 | Novel mediation equipment of petroleum pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205949423U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108296234A (en) * | 2017-12-26 | 2018-07-20 | 刘璐 | A kind of inner wall of the pipe high-efficiency cleaning device and fluid pressure drive device |
CN108517954A (en) * | 2018-06-11 | 2018-09-11 | 天津市鼎风逸宸科技发展有限公司 | A kind of pipeline, which twists, to be filled and pipe-dredging machinery equipment |
CN108971153A (en) * | 2018-06-29 | 2018-12-11 | 安徽徽之润纸业有限公司 | Impurity cleaning machine in a kind of paper tube |
CN109304336A (en) * | 2018-11-09 | 2019-02-05 | 中国建筑第八工程局有限公司 | Concrete delivery pump pipe Quick dredging and cleaning plant |
CN110056318A (en) * | 2019-04-23 | 2019-07-26 | 中工国际工程股份有限公司 | A kind of salt hole air reserved storeroom row halogen pipe preventing clogging up device |
CN111940433A (en) * | 2020-07-29 | 2020-11-17 | 晶澳(邢台)太阳能有限公司 | Automatic dredging device for oil outlet of vacuum pump and vacuum pump |
CN113492142A (en) * | 2020-04-02 | 2021-10-12 | 中国石油天然气股份有限公司 | Oil pipeline dredging method and system |
-
2016
- 2016-07-29 CN CN201620809230.7U patent/CN205949423U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108296234A (en) * | 2017-12-26 | 2018-07-20 | 刘璐 | A kind of inner wall of the pipe high-efficiency cleaning device and fluid pressure drive device |
CN108296234B (en) * | 2017-12-26 | 2019-11-05 | 淮北市菲美得环保科技有限公司 | A kind of inner wall of the pipe cleaning device and fluid pressure drive device |
CN108517954A (en) * | 2018-06-11 | 2018-09-11 | 天津市鼎风逸宸科技发展有限公司 | A kind of pipeline, which twists, to be filled and pipe-dredging machinery equipment |
CN108971153A (en) * | 2018-06-29 | 2018-12-11 | 安徽徽之润纸业有限公司 | Impurity cleaning machine in a kind of paper tube |
CN108971153B (en) * | 2018-06-29 | 2021-01-29 | 安徽徽之润纸业有限公司 | Paper intraductal impurity descaling machine |
CN109304336A (en) * | 2018-11-09 | 2019-02-05 | 中国建筑第八工程局有限公司 | Concrete delivery pump pipe Quick dredging and cleaning plant |
CN110056318A (en) * | 2019-04-23 | 2019-07-26 | 中工国际工程股份有限公司 | A kind of salt hole air reserved storeroom row halogen pipe preventing clogging up device |
CN110056318B (en) * | 2019-04-23 | 2023-12-22 | 中工国际工程股份有限公司 | Anti-blocking device for brine discharge pipe of salt cavern gas storage |
CN113492142A (en) * | 2020-04-02 | 2021-10-12 | 中国石油天然气股份有限公司 | Oil pipeline dredging method and system |
CN111940433A (en) * | 2020-07-29 | 2020-11-17 | 晶澳(邢台)太阳能有限公司 | Automatic dredging device for oil outlet of vacuum pump and vacuum pump |
CN111940433B (en) * | 2020-07-29 | 2022-02-11 | 晶澳(邢台)太阳能有限公司 | Automatic dredging device for oil outlet of vacuum pump and vacuum pump |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205949423U (en) | Novel mediation equipment of petroleum pipeline | |
CN208441100U (en) | A kind of hydraulic engineering pile body pile pulling device | |
CN206626281U (en) | A kind of line holder of municipal construction | |
CN106149783A (en) | A kind of urban water conservancy project Accrete clearing device | |
CN207056184U (en) | A kind of anti-blocking filtering drum dust removing device for efficiently making fertilizer | |
CN206185405U (en) | Efficient new forms of energy transport pipe says welding auxiliary device | |
CN204922516U (en) | Viscous crude viscosity reduction device | |
CN204754833U (en) | Pneumatics is turned over to circulate and is settleed hole system | |
CN206156692U (en) | Synchronous support frame of hydraulic pressure for building | |
CN112246853A (en) | Efficient energy-saving thermal desorption kiln body mechanism for repairing organic contaminated soil | |
CN206673674U (en) | Net electric power workover rig energy storage control system | |
CN207589934U (en) | A kind of municipal administration plant chemical spraying device | |
CN205199056U (en) | Thickening machine | |
CN214160857U (en) | Efficient energy-saving thermal desorption kiln body mechanism for repairing organic contaminated soil | |
CN204646093U (en) | The two-way squeezed castinplace pile equipment of three troubles | |
CN204899871U (en) | Scrape wax device | |
CN208094084U (en) | Alarming line self routing tooling | |
CN206206776U (en) | A kind of sewage trombone slide rolling stand | |
CN107119336A (en) | A kind of nylon drying unit of breaking line preventive | |
CN207109731U (en) | A kind of dash module of hydraulic engineering | |
CN205932768U (en) | Retrieve machine recovery system from walking union type drip irrigation zone | |
CN206486900U (en) | A kind of use air compressor machine and water pump concentrate the tube well dewatering system drawn water | |
CN207047903U (en) | A kind of automatic hydraulic well lid being flipped open | |
CN202559518U (en) | All-round rotating sewage suction arm for combined sewage suction truck | |
CN211925146U (en) | Trenchless built-in casing pipe repairing equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170215 Termination date: 20170729 |
|
CF01 | Termination of patent right due to non-payment of annual fee |