CN204754833U - Pneumatics is turned over to circulate and is settleed hole system - Google Patents
Pneumatics is turned over to circulate and is settleed hole system Download PDFInfo
- Publication number
- CN204754833U CN204754833U CN201520330412.1U CN201520330412U CN204754833U CN 204754833 U CN204754833 U CN 204754833U CN 201520330412 U CN201520330412 U CN 201520330412U CN 204754833 U CN204754833 U CN 204754833U
- Authority
- CN
- China
- Prior art keywords
- pipe
- pneumatics
- slag
- slag suction
- dreg inhaling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
本实用新型公开了一种空压反循环清孔系统,包括空压机、进气管、设置在桩孔内的吸渣管、部分或全部位于桩孔外的排渣管;所述进气管一端连接空压机,另一端伸入桩孔内连接在吸渣管下部并与吸渣管内部连通;所述吸渣管底部开设有吸渣口,顶部连接排渣管。本实用新型用于清除桩底沉渣能够有效缩短清孔时间,缩短桩基施工周期,且沉渣清理效果好,具有安装方便、安全性好、环保节约的优点。
This utility model discloses an air-compressed reverse circulation hole cleaning system, including an air compressor, an air inlet pipe, a slag suction pipe installed inside the pile hole, and a slag discharge pipe partially or entirely located outside the pile hole. One end of the air inlet pipe is connected to the air compressor, and the other end extends into the pile hole, connecting to the lower part of the slag suction pipe and communicating with the inside of the slag suction pipe. The slag suction pipe has a slag suction port at the bottom and is connected to the slag discharge pipe at the top. This utility model is used to remove sediment from the bottom of piles, which can effectively shorten the hole cleaning time and the pile foundation construction cycle. It also has good sediment removal effect and the advantages of convenient installation, good safety, and environmental protection and cost saving.
Description
技术领域 technical field
本实用新型涉及工程建设领域桩基础施工清除孔底沉渣技术,具体地,涉及一种空压反循环清孔系统。 The utility model relates to a technology for removing sediment at the bottom of a hole during pile foundation construction in the field of engineering construction, in particular to an air pressure reverse circulation hole cleaning system.
背景技术 Background technique
桩基础是建筑领域常用的基础形式,而钻孔灌注桩以其独特的优点在桩基础应用中占据了主导地位,在各种建筑领域被广泛应用。在桥梁建设中,桩基均为端承桩,沉渣厚度均由严格的要求,桩基施工过程中,无论钻孔还是下钢筋笼,无疑会引起桩底沉渣增厚,因此桩底沉渣控制是桩基施工过程控制中的重难点。 Pile foundation is a commonly used foundation form in the field of construction, and bored piles occupy a dominant position in the application of pile foundations due to their unique advantages, and are widely used in various construction fields. In bridge construction, the pile foundations are all end-bearing piles, and the thickness of the sediment is subject to strict requirements. During the construction of the pile foundation, no matter whether drilling or lowering the reinforcement cage, the sediment at the bottom of the pile will undoubtedly increase. Therefore, the control of sediment at the bottom of the pile is the most important Important and difficult points in the process control of pile foundation construction.
现有技术中常采用换浆法、捞渣换浆法、空压反循环法等几种方法进行清孔清除桩底沉渣。换浆法是在桩基成孔后停止钻机,钻头提离孔底10-20cm低速旋转,泥浆正常循环,置换孔内不满足要求的泥浆,清孔时间需要4-10小时,且清孔效果不明显。捞渣换浆法是在终孔后用捞渣桶捞出粒径较大的泥渣后用高压泥浆泵抽出浓浆,换入满足要求的泥浆,但清孔时间需要3-5小时。空压反循环法采用高压气流反循环直接抽换泥浆,清孔时间为0.5-1.5小时。因此,空压反循环法是清孔时间最短、效果最好的清除桩底沉渣的方法。 In the prior art, several methods such as slurry changing method, slag removing method and air pressure reverse circulation method are often used to clean holes and remove pile bottom sediment. The mud replacement method is to stop the drilling machine after the pile foundation is formed, the drill bit is lifted 10-20cm from the bottom of the hole and rotates at a low speed, the mud circulates normally, and the mud that does not meet the requirements in the replacement hole needs 4-10 hours to clean the hole. Not obvious. The slag removal and slurry replacement method is to use a slag bucket to remove the larger particle size sludge after the final hole, then use a high-pressure mud pump to pump out the thick slurry, and replace it with mud that meets the requirements, but the hole cleaning time needs 3-5 hours. The air pressure reverse circulation method uses high pressure airflow reverse circulation to directly replace the mud, and the cleaning time is 0.5-1.5 hours. Therefore, the air pressure reverse circulation method is the method with the shortest hole cleaning time and the best effect to remove the pile bottom sediment.
实用新型内容 Utility model content
本实用新型的目的就在于提供一种能够有效缩短清孔时间、提高沉渣清理效果的空压反循环清孔系统。 The purpose of the utility model is to provide an air pressure reverse circulation hole cleaning system which can effectively shorten the hole cleaning time and improve the sediment cleaning effect.
本实用新型解决上述问题所采用的技术方案是: The technical solution adopted by the utility model to solve the above problems is:
空压反循环清孔系统,包括空压机、进气管、设置在桩孔内的吸渣管、部分或全部位于桩孔外的排渣管;所述进气管一端连接空压机,另一端伸入桩孔内连接在吸渣管下部并与吸渣管内部连通;所述吸渣管底部开设有吸渣口,顶部连接排渣管。本方案中,吸渣管下部是指吸渣管底部至吸渣管三分之一高度之间的部分。 The air pressure reverse circulation hole cleaning system includes an air compressor, an air inlet pipe, a slag suction pipe installed in the pile hole, and a part or all of the slag discharge pipe located outside the pile hole; one end of the air inlet pipe is connected to the air compressor, and the other end It extends into the pile hole and is connected to the lower part of the slag suction pipe and communicates with the inside of the slag suction pipe; a slag suction port is opened at the bottom of the slag suction pipe, and a slag discharge pipe is connected to the top. In this solution, the lower part of the slag suction pipe refers to the part between the bottom of the slag suction pipe and one third of the height of the slag suction pipe.
作为本实用新型的进一步改进,上述空压反循环清孔系统还包括补充泥浆的入浆管道,入浆管道下端伸入桩孔内。 As a further improvement of the utility model, the air pressure reverse circulation hole cleaning system also includes a slurry inlet pipeline for replenishing mud, and the lower end of the slurry inlet pipeline extends into the pile hole.
进一步,所述进气管包括气管本体和连接管,所述气管本体一端连接空压机,另一端与连接管上端相连,所述连接管下端连接在吸渣管下部。 Further, the air intake pipe includes a pipe body and a connecting pipe, one end of the air pipe body is connected to the air compressor, the other end is connected to the upper end of the connecting pipe, and the lower end of the connecting pipe is connected to the lower part of the slag suction pipe.
进一步,所述吸渣管在吸渣管与连接管的连接部位以上的管段与连接管之间的夹角为45°。 Further, the included angle between the slag suction pipe above the connecting portion of the slag suction pipe and the connecting pipe and the connecting pipe is 45°.
进一步,所述排渣管由设置在桩孔内的竖直管段和位于桩孔外的非竖直管段构成,竖直管段和非竖直管段之间通过一个连接弯头相连。 Further, the slag discharge pipe is composed of a vertical pipe section arranged in the pile hole and a non-vertical pipe section located outside the pile hole, and the vertical pipe section and the non-vertical pipe section are connected by a connecting elbow.
进一步,所述竖直管段由至少两根支管拼接而成。 Further, the vertical pipe section is spliced by at least two branch pipes.
进一步,所述吸渣口数量为2个,两个吸渣口以吸渣管的中心轴线为对称轴对称设置在吸渣管底部的侧壁上,且吸渣口呈半圆环状,其半径不小于4cm。 Further, the number of the slag suction ports is 2, and the two slag suction ports are symmetrically arranged on the side wall at the bottom of the slag suction pipe with the central axis of the slag suction pipe as the symmetry axis, and the slag suction ports are in the shape of a semi-circular ring with a radius of Not less than 4cm.
进一步,所述进气管与吸渣管的连接部位距离吸渣管底部0.8m-1.2m。 Furthermore, the connection between the air intake pipe and the slag suction pipe is 0.8m-1.2m away from the bottom of the slag suction pipe.
进一步,所述吸渣管底部与桩孔内沉渣的顶面之间的高度为25cm至35cm。 Furthermore, the height between the bottom of the slag suction pipe and the top surface of the sediment in the pile hole is 25cm to 35cm.
进一步,所述吸渣管和排渣管的内径为100mm。 Further, the inner diameter of the slag suction pipe and the slag discharge pipe is 100mm.
综上,本实用新型的有益效果是: In summary, the beneficial effects of the utility model are:
1、本实用新型用于清除桩底沉渣能够有效缩短清孔时间,沉渣清理效果好,缩短桩基施工周期; 1. The utility model is used to remove the sediment at the bottom of the pile, which can effectively shorten the hole cleaning time, has good sediment cleaning effect, and shortens the construction period of the pile foundation;
2、本实用新型安装方便、安全性好; 2. The utility model is easy to install and has good safety;
3、本实用新型的各种管道可以重复利用,环保节约。 3. Various pipelines of the present invention can be reused, which is environmentally friendly and economical.
附图说明 Description of drawings
图1是本实用新型的空压反循环清孔系统的结构示意图; Fig. 1 is the structural representation of the air pressure reverse circulation hole clearing system of the present utility model;
图2是实施例2中的空压反循环清孔系统的结构示意图。 Fig. 2 is a schematic structural view of the air pressure reverse circulation hole cleaning system in Example 2.
附图中标记及相应的零部件名称:1-空压机;2-进气管;21-气管本体;22-连接管;3-吸渣管;4-排渣管;5-吸渣口;6-桩孔;7-入浆管道;8-连接弯头;9-沉渣。 The marks in the drawings and the names of corresponding parts: 1-air compressor; 2-intake pipe; 21-trachea body; 22-connecting pipe; 6-pile hole; 7-slurry pipe; 8-connection elbow; 9-sediment.
具体实施方式 Detailed ways
下面结合实施例及附图,对本实用新型作进一步地的详细说明,但本实用新型的实施方式不限于此。 The utility model will be further described in detail below in conjunction with the embodiments and accompanying drawings, but the implementation of the utility model is not limited thereto.
实施例1: Example 1:
如图1所示,空压反循环清孔系统,包括空压机1、进气管2、吸渣管3、排渣管4;吸渣管3竖直设置在桩孔6内,位于桩孔6内的沉渣9上方,吸渣管3底部开设有吸渣口5,顶部连接排渣管4;进气管2一端连接空压机1,另一端伸入桩孔6内连接在吸渣管3下部并与吸渣管3内部连通。本实施例中,吸渣管3下部是指吸渣管3底部至吸渣管3三分之一高度之间的部分。 As shown in Figure 1, the air pressure reverse cycle hole cleaning system includes an air compressor 1, an air intake pipe 2, a slag suction pipe 3, and a slag discharge pipe 4; the slag suction pipe 3 is vertically arranged in the pile hole 6 and is located in the pile hole. Above the sediment 9 in 6, the bottom of the slag suction pipe 3 is provided with a slag suction port 5, and the top is connected to the slag discharge pipe 4; The lower part communicates with the inside of the slag suction pipe 3 . In this embodiment, the lower part of the slag suction pipe 3 refers to the part between the bottom of the slag suction pipe 3 and one-third of the height of the slag suction pipe 3 .
本实施例中,空压机1即空气压缩机,用于提供气源动力,空压机1需根据桩基深度(或与桩基对应的桩孔6深度)选定满足清孔要求的规格型号,主要根据空压机1的额定排气量、排气压力参数而定。一般清孔深度大于50m的桩基选用的空压机1排气量不小于20m3/min,排气压力为0.8Mpa~0.9Mpa;清孔深度小于或等于50m且大于25m的桩基选用的空压机1排气量不小于15m3/min,排气压力为0.7Mpa~0.8Mpa;清孔深度小于或等于25m的桩基选用的空压机1排气量不小于10m3/min,排气压力为0.6Mpa~0.7Mpa。 In this embodiment, the air compressor 1 is an air compressor, which is used to provide air source power, and the air compressor 1 needs to be selected according to the depth of the pile foundation (or the depth of the pile hole 6 corresponding to the pile foundation) to meet the requirements of hole cleaning. The model is mainly determined according to the rated displacement and exhaust pressure parameters of the air compressor 1. Generally, the air compressor 1 selected for pile foundations with a hole cleaning depth greater than 50m has a displacement of not less than 20m 3 /min, and the exhaust pressure is 0.8Mpa~0.9Mpa; for pile foundations with a hole cleaning depth of less than or equal to 50m and greater than 25m The displacement of air compressor 1 is not less than 15m 3 /min, and the exhaust pressure is 0.7Mpa~0.8Mpa; the displacement of air compressor 1 is not less than 10m 3 /min for pile foundations whose hole cleaning depth is less than or equal to 25m. The exhaust pressure is 0.6Mpa~0.7Mpa.
进气管2用于向吸渣管3输送空压机1产生的高压气体,进气管2与空压机1的连接处或者进气管2上可以设置控制输气启停的输气阀门。 The inlet pipe 2 is used to deliver the high-pressure gas produced by the air compressor 1 to the slag suction pipe 3, and the connection between the inlet pipe 2 and the air compressor 1 or the inlet pipe 2 can be provided with a gas delivery valve to control the start and stop of gas delivery.
排渣管4用于排出吸渣管3吸出的桩底沉渣9,本实施例中,吸渣管3顶部低于桩孔6顶部,排渣管4一端伸入桩孔6内与吸渣管3相连,因此排渣管4部分位于桩孔6内、部分位于桩孔6外。本实施例中,排渣管4由设置在桩孔6内的竖直管段和位于桩孔6外的非竖直管段构成,竖直管段和非竖直管段之间通过一个连接弯头8相连。前述的非竖直管段是指不采用竖直方式布置的管段,即排渣管4位于桩孔6外的这部分管段不采用竖直布置的方式,这部分管段可以为平直的管段也可以具有一个或多个弧形段的弯曲管段,且这部分管道水平布置或斜向布置。本实施例中,非竖直管段水平布置,连接弯头8为直角弯头,竖直管段和非竖直管段之间通过该直角弯头相连。实际应用中,如果吸渣管3顶部与桩孔6顶部平齐或高于桩孔6顶部,排渣管4可以全部位于桩孔6外。具体应用在施工现场,可以在施工现场新建一个排渣池和与排渣池相连的排渣渠,排渣管4末端伸入排渣渠内,将沉渣排到排渣渠内,排渣渠使排出的沉渣流至排渣池,排渣渠可设置成横截面呈梯形的结构,排渣渠顶面宽度大于地面宽度。 The slag discharge pipe 4 is used to discharge the pile bottom sediment 9 sucked out by the slag suction pipe 3. In this embodiment, the top of the slag suction pipe 3 is lower than the top of the pile hole 6, and one end of the slag discharge pipe 4 extends into the pile hole 6 to connect with the slag suction pipe. 3 are connected, so the slag discharge pipe 4 is partially located in the pile hole 6 and partially located outside the pile hole 6. In this embodiment, the slag discharge pipe 4 is composed of a vertical pipe section arranged in the pile hole 6 and a non-vertical pipe section located outside the pile hole 6, and the vertical pipe section and the non-vertical pipe section are connected by a connecting elbow 8 . The aforementioned non-vertical pipe section refers to the pipe section that is not vertically arranged, that is, the part of the pipe section where the slag discharge pipe 4 is located outside the pile hole 6 is not vertically arranged, and this part of the pipe section can be a straight pipe section or A curved pipe section with one or more arcuate sections, and this part of the pipe is arranged horizontally or obliquely. In this embodiment, the non-vertical pipe sections are arranged horizontally, and the connecting elbow 8 is a right-angle elbow, through which the vertical pipe section and the non-vertical pipe section are connected. In practical application, if the top of the slag suction pipe 3 is flush with the top of the pile hole 6 or higher than the top of the pile hole 6, the slag discharge pipe 4 can all be located outside the pile hole 6. Specifically applied on the construction site, a slag discharge tank and a slag discharge channel connected to the slag discharge tank can be built on the construction site. The 4 ends of the slag discharge pipe extend into the slag discharge channel to discharge the sediment into the slag discharge channel. The discharged sediment flows to the slag discharge tank, and the slag discharge channel can be set as a trapezoidal structure in cross section, and the width of the top surface of the slag discharge channel is greater than the width of the ground.
本实施例中的空压反循环清孔系统的清孔原理如下: The hole cleaning principle of the air pressure reverse circulation hole cleaning system in this embodiment is as follows:
空压机1启动后,在空压机1的气压达到额定气压时,开启输气阀门,高压气流通过进气管2进入吸渣管3内,高压气流在吸渣管3内强势上袭,吸渣管3下部产生负压,使桩孔6内的沉渣9顺着吸渣管3、排渣管4和高压气流一同排出桩孔6外。 After the air compressor 1 is started, when the air pressure of the air compressor 1 reaches the rated air pressure, the air delivery valve is opened, and the high-pressure air flow enters the slag suction pipe 3 through the intake pipe 2, and the high-pressure air flows strongly in the slag suction pipe 3, sucking The lower part of the slag pipe 3 generates negative pressure, so that the sediment 9 in the pile hole 6 is discharged out of the pile hole 6 along the slag suction pipe 3, the slag discharge pipe 4 and the high-pressure airflow.
由于吸渣口5距离沉渣9顶面高度过高,会导致清孔过程中上吸泥浆沉渣含量小、清孔所需时间长;而吸渣口5距离沉渣9顶面距离过小,会导致清孔过程中气压反循环带出泥浆含渣量大,容易堵管,高压气流上袭,容易出现安全事故。因此本实施例中,吸渣管3底部与桩孔6内沉渣9的顶面之间的高度不小于25cm且不大于35cm,优选为30cm。 Because the distance between the slag suction port 5 and the top surface of the sediment 9 is too high, the sediment content of the upward suction mud during the hole cleaning process is small, and the time required for hole cleaning is long; while the distance between the slag suction port 5 and the top surface of the sediment 9 is too small, it will cause During the hole cleaning process, the air pressure reverse circulation brings out the mud with a large amount of slag, which is easy to block the pipe, and the high-pressure airflow is upward, which is prone to safety accidents. Therefore, in this embodiment, the height between the bottom of the slag suction pipe 3 and the top surface of the sediment 9 in the pile hole 6 is not less than 25 cm and not more than 35 cm, preferably 30 cm.
采用本实用新型的空压反循环清孔系统进行清孔时,清孔用时均在30min-50min范围内,有效缩短清孔时间,缩短了单根桩施工时间,提高了桩基施工效率,而且清孔效果好、安全性高。 When the air pressure reverse circulation hole cleaning system of the utility model is used for hole cleaning, the hole cleaning time is within the range of 30min-50min, which effectively shortens the hole cleaning time, shortens the construction time of a single pile, and improves the construction efficiency of pile foundations. Good cleaning effect and high safety.
实施例2: Example 2:
如图2所示,在实施例1的基础上,本实施例中的空压反循环清孔系统还包括入浆管道7,入浆管道7下端伸入桩孔6内。入浆管道7的作用是在清孔过程中不断补充与外排量等量的泥浆,保证桩孔6内泥浆位置稳定,防止因补充泥浆不足,桩孔6内浆液位置下降,桩孔6的孔壁产生负压,降低护壁效果产生塌孔现象。 As shown in FIG. 2 , on the basis of Embodiment 1, the air pressure reverse circulation hole cleaning system in this embodiment also includes a grouting pipeline 7 , and the lower end of the grouting pipeline 7 extends into the pile hole 6 . The function of the slurry inlet pipeline 7 is to continuously replenish the same amount of mud as the amount of external discharge during the hole cleaning process to ensure that the position of the mud in the pile hole 6 is stable, and to prevent the position of the slurry in the pile hole 6 from falling due to insufficient replenishment of mud. Negative pressure is generated on the hole wall, which reduces the wall protection effect and causes hole collapse.
实施例3: Example 3:
在实施例1或实施例2的基础上,本实施例中,对进气管2进行如下改进: On the basis of embodiment 1 or embodiment 2, in the present embodiment, air intake pipe 2 is improved as follows:
所述进气管2包括气管本体21和连接管22,所述气管本体21一端带有连接螺母、通过该连接螺母连接空压机1,另一端与连接管22上端相连。本实施例中,气管本体21和连接管22为钢管,气管本体21的长度为50m、吸渣管3的长度为5m。所述连接管22下端焊接在吸渣管3下部,焊接部位距离吸渣管3底部1m,实际应用中,焊接部位与吸渣管3底部的距离在0.8m-1.2m的范围内即可。吸渣管3与连接管22之间的夹角为45°,该夹角为开口向上的夹角,即该夹角的两条边分别为焊接部位以上的吸渣管3、连接管2。本实施例中,气管本体21通过一根斜向设置的连接管22连通吸渣管3,且连接管22与吸渣管3之间形成45°的夹角,便于高压气体顺畅地进入吸渣管3。 The air intake pipe 2 includes a pipe body 21 and a connecting pipe 22 , the air pipe body 21 has a connecting nut at one end through which the air compressor 1 is connected, and the other end is connected with the upper end of the connecting pipe 22 . In this embodiment, the gas pipe body 21 and the connecting pipe 22 are steel pipes, the length of the gas pipe body 21 is 50 m, and the length of the slag suction pipe 3 is 5 m. The lower end of the connecting pipe 22 is welded to the lower part of the slag suction pipe 3, and the distance between the welding part and the bottom of the slag suction pipe 3 is 1m. The included angle between the slag suction pipe 3 and the connecting pipe 22 is 45°, and the angle is the angle with the opening upward, that is, the two sides of the included angle are respectively the slag suction pipe 3 and the connecting pipe 2 above the welding position. In this embodiment, the gas pipe body 21 is connected to the slag suction pipe 3 through a connecting pipe 22 arranged obliquely, and an included angle of 45° is formed between the connecting pipe 22 and the slag suction pipe 3, so that the high-pressure gas can enter the slag suction pipe smoothly. Tube 3.
实施例4: Example 4:
在上述任一实施例的基础上,本实施例中,对吸渣管3进行如下改进: On the basis of any of the above-mentioned embodiments, in the present embodiment, the slag suction pipe 3 is improved as follows:
吸渣管3顶端焊接有法兰盘,并通过该法兰盘与排渣管4连接,底部以管道中心轴线为对称轴在两侧对称开设吸渣口5,即两个吸渣口5以吸渣管3中心轴线为对称轴对称设置在吸渣管3底部的侧壁上,且吸渣口5呈半圆环状,开口朝下,圆心位于吸渣管3底部所在的平面上,吸渣口5的半径不小于4cm。 The top of the slag suction pipe 3 is welded with a flange, and is connected to the slag discharge pipe 4 through the flange, and the slag suction port 5 is symmetrically opened on both sides at the bottom with the central axis of the pipe as the axis of symmetry, that is, two slag suction ports 5 The central axis of the slag suction pipe 3 is symmetrically arranged on the side wall of the bottom of the slag suction pipe 3, and the slag suction port 5 is in the shape of a semicircle, with the opening facing downward, and the center of the circle is located on the plane where the bottom of the slag suction pipe 3 is located. The radius of mouth 5 is not less than 4cm.
实施例5: Example 5:
在上述任一实施例的基础上,本实施例中,对排渣管4进行如下改进: On the basis of any of the above-mentioned embodiments, in the present embodiment, the slag discharge pipe 4 is improved as follows:
为了便于排渣管4的安装,排渣管4的竖直管段由至少两根支管拼接而成,这些支管可以长度不同,也可以长度相同,本实施例中,采用9根支管,其中10m长的支管4根、3m长的支管1根、2m长的支管两根、1m长的支管2根,所有支管两端都设置有连接用法兰盘。 In order to facilitate the installation of the slag discharge pipe 4, the vertical pipe section of the slag discharge pipe 4 is spliced by at least two branch pipes. These branch pipes can be of different lengths or the same length. In this embodiment, 9 branch pipes are used, of which 10m is long There are 4 branch pipes, 1 branch pipe with a length of 3m, two branch pipes with a length of 2m, and 2 branch pipes with a length of 1m. Both ends of all branch pipes are provided with connecting flanges.
所述排渣管4的竖直管段与吸渣管3均为钢管,二者的直径相同,本实施例中,二者的内径为100mm、壁厚为3.5mm。 The vertical section of the slag discharge pipe 4 and the slag suction pipe 3 are both steel pipes, and both have the same diameter. In this embodiment, the inner diameter of the two is 100mm, and the wall thickness is 3.5mm.
安装时,使用吊车下设吸渣管3和排渣管4。在吸渣管3管顶下设至桩孔6的孔口时,用临时卡扣将吸渣管3固定在孔口,再将一根支管吊至该位置通过法兰螺栓对接,法兰盘之间设置3mm橡胶垫,连接好后撤销临时卡扣,继续下设,直至安装好的支管顶端到达桩孔6的孔口时,用临时卡扣固定以相同的方式固定下一根支管,依此类推,支管依次下设,直到吸渣管3底部达到预设高度且安装好的支管顶部高出孔口0.1m-5m时,安装连接弯头8及非竖直管段。在吸渣管3及排渣管4下设过程中,应将进气管2固定在吸渣管3一侧。本实施例中,非竖直管段采用直径为127mm、长度为7m的夹布钢丝管。 During installation, a slag suction pipe 3 and a slag discharge pipe 4 are set under the crane. When the top of the slag suction pipe 3 is set to the hole of the pile hole 6, the slag suction pipe 3 is fixed on the hole with a temporary buckle, and then a branch pipe is hoisted to this position and connected by flange bolts, the flange plate Set a 3mm rubber pad between them. After the connection is completed, remove the temporary buckle and continue to install until the top of the installed branch pipe reaches the opening of the pile hole 6. Fix the next branch pipe with the temporary buckle in the same way. By analogy, the branch pipes are successively installed until the bottom of the slag suction pipe 3 reaches the preset height and the top of the installed branch pipe is 0.1m-5m higher than the orifice, and the connecting elbow 8 and the non-vertical pipe section are installed. In the process of setting up the slag suction pipe 3 and the slag discharge pipe 4, the intake pipe 2 should be fixed on the side of the slag suction pipe 3. In this embodiment, the non-vertical pipe section adopts a cloth-clad steel wire pipe with a diameter of 127mm and a length of 7m.
本实施例中,空压反循环清孔系统使用完毕后,可以采取至上而下,先安后拆的原则逐一拆除,并将拆除后的各种管道清洗保存,以便下次再利用,环保节约。 In this embodiment, after the air pressure reverse circulation cleaning system is used, it can be dismantled one by one according to the principle of top down, installation first and then dismantling, and the various pipes after dismantling are cleaned and preserved for reuse next time, which is environmentally friendly and economical .
本实用新型的各种管道的长度、直径、内径等参数并不限于上述各实施例中列出的数值,在具体的施工现场中,可以根据使用需要进行微调。 The parameters such as the length, diameter, and inner diameter of various pipelines of the present invention are not limited to the values listed in the above-mentioned embodiments, and can be fine-tuned according to the needs of the specific construction site.
以上仅是本实用新型的优选实施方式,本实用新型的保护范围并不仅局限于上述实施例,凡属于本实用新型思路下的技术方案均属于本实用新型的保护范围。应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理前提下的若干改进和润饰,应视为本实用新型的保护范围。 The above are only preferred implementations of the utility model, and the scope of protection of the utility model is not limited to the above-mentioned embodiments, and all technical solutions under the thinking of the utility model all belong to the scope of protection of the utility model. It should be pointed out that for those of ordinary skill in the art, some improvements and modifications without departing from the principle of the utility model should be regarded as the protection scope of the utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520330412.1U CN204754833U (en) | 2015-05-21 | 2015-05-21 | Pneumatics is turned over to circulate and is settleed hole system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520330412.1U CN204754833U (en) | 2015-05-21 | 2015-05-21 | Pneumatics is turned over to circulate and is settleed hole system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204754833U true CN204754833U (en) | 2015-11-11 |
Family
ID=54469552
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520330412.1U Expired - Fee Related CN204754833U (en) | 2015-05-21 | 2015-05-21 | Pneumatics is turned over to circulate and is settleed hole system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204754833U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108856817A (en) * | 2018-09-28 | 2018-11-23 | 中车洛阳机车有限公司 | A kind of device of easy cleaning deep hole iron filings |
| CN109469062A (en) * | 2018-12-19 | 2019-03-15 | 中铁二局集团有限公司 | A kind of lock steel pipe pile cofferdam lock borehole cleaning method |
| CN110737943A (en) * | 2019-10-25 | 2020-01-31 | 中铁四局集团有限公司 | Analysis method and analysis system for slag removal in large area underwater foundation pit |
| CN113404454A (en) * | 2021-07-05 | 2021-09-17 | 中铁五局集团第一工程有限责任公司 | Cast-in-situ bored pile hole cleaning device and method |
-
2015
- 2015-05-21 CN CN201520330412.1U patent/CN204754833U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108856817A (en) * | 2018-09-28 | 2018-11-23 | 中车洛阳机车有限公司 | A kind of device of easy cleaning deep hole iron filings |
| CN109469062A (en) * | 2018-12-19 | 2019-03-15 | 中铁二局集团有限公司 | A kind of lock steel pipe pile cofferdam lock borehole cleaning method |
| CN110737943A (en) * | 2019-10-25 | 2020-01-31 | 中铁四局集团有限公司 | Analysis method and analysis system for slag removal in large area underwater foundation pit |
| CN113404454A (en) * | 2021-07-05 | 2021-09-17 | 中铁五局集团第一工程有限责任公司 | Cast-in-situ bored pile hole cleaning device and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203821373U (en) | Slurry gas lift reverse circulation slag removing device | |
| CN105332384B (en) | Super pressure inhales joint pumping system and its method of work | |
| CN204040961U (en) | Gas lift reverse circulation high-efficient cleaning slag system | |
| CN204530731U (en) | Super pressure inhales associating pumping system | |
| CN218713009U (en) | Punching press reverse circulation suction belt cleaning device | |
| CN105649559B (en) | A kind of device and sweep-out method for being used to remove pore-creating filling pile bottom hole sediment | |
| CN108277802A (en) | A kind of suction-type smoothing machine | |
| CN201485896U (en) | Well pumpless differential pressure water supply device | |
| CN201574478U (en) | Garbage leachate automatic drainage device | |
| CN204199310U (en) | Gas slurry guiding device | |
| CN211143181U (en) | A sludge discharge device for long-distance pressure pipelines | |
| CN217841570U (en) | Gas lift reverse circulation hole cleaning device | |
| CN205500116U (en) | Mud lifting means | |
| CN104963383B (en) | A kind of pressure conduit inverted siphon hydraulic automatism erosion and deposition device | |
| CN217735427U (en) | Mud-sucking and hole-cleaning high-pressure air pipe adopting slurry changing method | |
| CN207805516U (en) | A kind of system preventing pump house absorbing well, absorption well sedimentation | |
| CN205444086U (en) | A water intaking structure for pump station river course | |
| CN204327009U (en) | Surface dewatering deep well washing device | |
| CN205296343U (en) | Be applied to waste fitting discharging in workshop | |
| CN205188984U (en) | Joint pumping system is inhaled to super pressure | |
| CN207701096U (en) | Pile foundation construction secondary pile hole cleaning sand filter under a kind of bridge water | |
| CN207545916U (en) | Sand extraction device and sand and water separating system | |
| CN204919666U (en) | Heavy -calibre sump pit shaft bottom whirl sediment outflow device | |
| CN205188985U (en) | Joint pumping system is inhaled to super pressure | |
| CN207567845U (en) | A kind of air type suction dredge for subway underwater excavation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151111 |