CN205936659U - A take stiffening rib shaped steel steelframe for tunnel preliminary bracing - Google Patents

A take stiffening rib shaped steel steelframe for tunnel preliminary bracing Download PDF

Info

Publication number
CN205936659U
CN205936659U CN201620563409.9U CN201620563409U CN205936659U CN 205936659 U CN205936659 U CN 205936659U CN 201620563409 U CN201620563409 U CN 201620563409U CN 205936659 U CN205936659 U CN 205936659U
Authority
CN
China
Prior art keywords
shaped steel
steelframe
web
preliminary bracing
profile steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620563409.9U
Other languages
Chinese (zh)
Inventor
卿伟宸
郑伟
陈峻
张磊
钟昌桂
黄华
孟祥磊
曾宏飞
李泽龙
王芳
王若晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201620563409.9U priority Critical patent/CN205936659U/en
Application granted granted Critical
Publication of CN205936659U publication Critical patent/CN205936659U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides the utility model discloses a shaped steel steelframe of tunnel preliminary bracing area stiffening rib to effectively improve shaped steel steelframe atress performance, avoid the steelframe to take place the bucking unstability, guarantee initial stage supporting construction intensity full play. I shaped steel or the H shaped steel of shaped steel steelframe body for having a web and a pair of wings listrium, the web both sides are followed shaped steel steelframe extended length direction interval and are set up reinforced rib plate, reinforced rib plate and web welding.

Description

A kind of band ribbed stiffener profile steel frame for Tunnel
Technical field
This utility model is related to railway, highway, municipal works field, particularly to a kind of preliminary bracing for tunnel Profile steel frame.
Background technology
At present, bored tunnel is substantially all constructed by New Austrian Tunneling Method principle, using composite lining supporting, including preliminary bracing And secondary lining.Wherein, the support system that preliminary bracing and country rock collectively constitute is primary load bearing structure, and secondary lining is mainly made For safety stock.
Preliminary bracing mainly forms (abbreviation combined bolting and shotcrete) by gunite concrete, anchor pole and reinforced mesh combined supporting, When tunnel passes through bad geological section and fractured weak zone, the auxiliary such as setting shaped steel in pneumatically placed concrete typically can be taken to arrange Apply.
In recent years, it is stained with to six, Lan Yu, Cheng Lan, Yun Gui, the investigation of the railway such as long elder brother find, pass through weak broken for part Country rock, fault belt, the tunnel in soft rock high-ground stress location, preliminary bracing Shaped Steel steelframe often occurs flexing unstability to lead Preliminary bracing is caused to destroy.Trace it to its cause, because profile steel frame is I-shaped or H-shaped, its section is firm in X-direction and Y-direction bending resistance Degree difference is larger, in high-ground stress location, particularly after preliminary bracing pneumatically placed concrete ftractures, the restriction ability of steelframe is subtracted Weak, because section bending rigidity is asymmetric, lead to steelframe that flexing occurs due to the outer unstability of plane, and fail to give full play to steelframe Bearing capacity.
Therefore, in high-ground stress location, for improving preliminary bracing stress performance, give full play to steelframe bearing capacity, pass through Ribbed stiffener is arranged to profile steel frame, steelframe can be prevented effectively from and flexing unstability occurs, thus fully ensuring that preliminary bracing structure safety.
Utility model content
Technical problem to be solved in the utility model be provide a kind of for the shaped steel with ribbed stiffener for the Tunnel Steelframe, to be effectively improved profile steel frame stress performance, it is to avoid steelframe occurs flexing unstability it is ensured that preliminary bracing structural strength is abundant Play.
It is as follows that this utility model solves the technical scheme that its technical problem adopted:
A kind of band ribbed stiffener profile steel frame for Tunnel of the present utility model, profile steel frame body is to have The i shaped steel of web and a pair of flange plate or H profile steel, is characterized in that:Described web both sides are along profile steel frame length bearing of trend Interval setting deep floor, deep floor is welded with web.
The beneficial effects of the utility model are, by arranging ribbed stiffener so that shaped steel section planar outer bending rigidity More symmetrical, it is effectively improved profile steel frame stress performance, it is to avoid steelframe occurs flexing unstability, give full play to preliminary bracing and carry energy Power.
Brief description
This specification includes following five width accompanying drawings:
Fig. 1 be this utility model a kind of for the cross-sectional view with ribbed stiffener profile steel frame for the Tunnel;
Fig. 2 be this utility model a kind of for the cross-sectional view with ribbed stiffener profile steel frame for the Tunnel;
Fig. 3 is the profile of the I-I line along along Fig. 1;
Fig. 4 is that this utility model is a kind of props up for the tunnel initial-stage with ribbed stiffener profile steel frame for the Tunnel for setting The facade layout drawing of shield;
Fig. 5 is the profile of II-II line along along Fig. 4;
In figure illustrates component, toponym and corresponding labelling:Profile steel frame 10, flange plate 11, web 12, deep floor 13rd, rock 20 around hole, shotcrete layer 30, first pneumatically placed concrete layer 31, shotcrete layer 32 in steelframe altitude range, multiple spray Concrete layer 33, prearrangement of deformation amount seam 40, secondary lining 50.
Specific embodiment
With reference to the accompanying drawings and examples this utility model is further illustrated.
Reference Fig. 1, Fig. 2 and Fig. 3, a kind of band ribbed stiffener profile steel frame for Tunnel of the present utility model, Profile steel frame 10 body is i shaped steel or the H profile steel with web 12 and a pair of flange plate 11.Described web 12 both sides are along type Steel steelframe 10 length bearing of trend interval setting deep floor 13, deep floor 13 is welded with web 12.By to traditional just I shaped steel in phase supporting or H profile steel on its web interval setting ribbed stiffener so that the planar outer bending resistance of shaped steel section Rigidity is more symmetrical, is not susceptible to the outer unstability of plane, gives full play to preliminary bracing bearing capacity.
With reference to Fig. 4 and Fig. 5, Tunnel construction includes covering the shotcrete layer 30 of rock 20 around hole, and It is embedded in the profile steel frame 10 in shotcrete layer 30 along tunnel excavation direction interval.Shotcrete layer 30 is by just spraying coagulation Soil layer 31 and multiple pneumatically placed concrete layer 32,33 are combined and constitute, and just pneumatically placed concrete layer 31 covers rock 20 around hole, in steelframe altitude range Shotcrete layer 32 sprays in profile steel frame 10 altitude range and freezes solidly between adjacent two profile steel frame 10, multiple pneumatically placed concrete Layer 33 covers steel steelframe 10 as steelframe protective layer.
A kind of band ribbed stiffener shaped steel steel for Tunnel of the above this utility model that simply explains through diagrams Some principles of frame, are not intended to this utility model is confined in shown and described concrete structure and the scope of application, therefore all It is corresponding modification and the equivalent being possible to be utilized, belong to the apllied the scope of the claims of this utility model.

Claims (1)

1. a kind of band ribbed stiffener profile steel frame for Tunnel, profile steel frame (10) body be have web (12) and The i shaped steel of a pair of flange plate (11) or H profile steel, is characterized in that:Described web (12) both sides are prolonged along profile steel frame (10) length Stretch direction interval setting deep floor (13), deep floor (13) is welded with web (12).
CN201620563409.9U 2016-06-12 2016-06-12 A take stiffening rib shaped steel steelframe for tunnel preliminary bracing Active CN205936659U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620563409.9U CN205936659U (en) 2016-06-12 2016-06-12 A take stiffening rib shaped steel steelframe for tunnel preliminary bracing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620563409.9U CN205936659U (en) 2016-06-12 2016-06-12 A take stiffening rib shaped steel steelframe for tunnel preliminary bracing

Publications (1)

Publication Number Publication Date
CN205936659U true CN205936659U (en) 2017-02-08

Family

ID=57932197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620563409.9U Active CN205936659U (en) 2016-06-12 2016-06-12 A take stiffening rib shaped steel steelframe for tunnel preliminary bracing

Country Status (1)

Country Link
CN (1) CN205936659U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331252A (en) * 2018-04-05 2018-07-27 南京林业大学 A kind of compound box beam of self-heat conserving bamboo and wood
CN108331253A (en) * 2018-04-05 2018-07-27 南京林业大学 A kind of bamboo matter gluing box beam
CN110332007A (en) * 2019-07-29 2019-10-15 中国恩菲工程技术有限公司 Drop shaft diagrid
CN113565544A (en) * 2021-08-02 2021-10-29 中铁二院工程集团有限责任公司 Tunnel support steel frame assembly and tunnel support construction method
CN114135322A (en) * 2021-11-22 2022-03-04 中铁十六局集团第三工程有限公司 Reinforcing method for preventing steel frame from being twisted in large-deformation tunnel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331252A (en) * 2018-04-05 2018-07-27 南京林业大学 A kind of compound box beam of self-heat conserving bamboo and wood
CN108331253A (en) * 2018-04-05 2018-07-27 南京林业大学 A kind of bamboo matter gluing box beam
CN110332007A (en) * 2019-07-29 2019-10-15 中国恩菲工程技术有限公司 Drop shaft diagrid
CN113565544A (en) * 2021-08-02 2021-10-29 中铁二院工程集团有限责任公司 Tunnel support steel frame assembly and tunnel support construction method
CN113565544B (en) * 2021-08-02 2024-09-24 中铁二院工程集团有限责任公司 Tunnel support steel frame assembly and tunnel support construction method
CN114135322A (en) * 2021-11-22 2022-03-04 中铁十六局集团第三工程有限公司 Reinforcing method for preventing steel frame from being twisted in large-deformation tunnel

Similar Documents

Publication Publication Date Title
CN205936659U (en) A take stiffening rib shaped steel steelframe for tunnel preliminary bracing
CN104863614B (en) Method for primary support with corrugated steel plate and concrete combined structure taking place of steel grating
CN109404005B (en) Pre-reinforcing system for small hole and large hole of underground tunnel and construction method
CN104790974A (en) City subway overlapped shield tunnel segment structure adopting special longitudinal connecting pieces
CN103410528B (en) Tunnel lining structure and construction method
CN203702166U (en) Segment lining ring structure applicable to rectangular tunnel
CN201412163Y (en) Circular tunnel lining structure for construction of open-type tunnel boring machine
CN101230784A (en) Tunnel steel arch frame lock foot anchoring stock net-spraying composite structure
CN102213099A (en) Composite liner structure of four-track large-span wall-foundation arched tunnel
CN103775101A (en) Shield tunnel duct piece structure and shield tunnel lining with same
CN101592032A (en) Wear the preliminary bracing structure of speedway uneven strata large section tunnel under the shallow embedding
CN108386213B (en) Variable-thickness steel ring of shield tunnel segment
CN111577336A (en) Section steel and sprayed concrete combined stiff structure tunnel supporting system and construction method
CN103061779B (en) Novel mine tunnel supporting structure and construction method thereof
CN205349377U (en) Waterproof section of jurisdiction of multichannel structure in shield structure or TBM method tunnel
CN103352578B (en) A kind of construction method of carbon fiber cloth steel member composite reinforcement beam
CN110645018B (en) Mine underground strong dynamic pressure roadway prestress anchor-charging integrated supporting structure and method
CN205714226U (en) The Tunnel structure of steel pipe steelframe is set in a kind of
CN202991054U (en) Novel mine tunnel supporting structure
CN105888698A (en) Tunnel primary support structure with built-in steel pipe frame
CN106050261A (en) Preliminary tunnel support structure with internal box type steel frames
CN204899951U (en) Substitute traditional steel grating initial stage supporting construction by ripple steel sheet suitable for CRD excavation
CN107654247B (en) A kind of sliding structure area pole loose thick coal layer coal roadway tunneling is met head on anti-top coal leakage method for leakage
CN111852505A (en) Yielding primary support system for large deformation control of high-ground-stress soft rock tunnel
CN106968338A (en) A kind of full bolting steel coupling beam of assembled bilateral template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant