CN205934689U - Combination beam that contains perforated plate connecting piece - Google Patents

Combination beam that contains perforated plate connecting piece Download PDF

Info

Publication number
CN205934689U
CN205934689U CN201620454402.3U CN201620454402U CN205934689U CN 205934689 U CN205934689 U CN 205934689U CN 201620454402 U CN201620454402 U CN 201620454402U CN 205934689 U CN205934689 U CN 205934689U
Authority
CN
China
Prior art keywords
perforated plate
steel
connector
combination beam
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620454402.3U
Other languages
Chinese (zh)
Inventor
戴昌源
苏庆田
贺欣怡
杜霄
田乐
姜旭
吴冲
曾明根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201620454402.3U priority Critical patent/CN205934689U/en
Application granted granted Critical
Publication of CN205934689U publication Critical patent/CN205934689U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a combination beam that contains perforated plate connecting piece, contains reinforced concrete, girder steel, still includes the perforated plate connecting piece, two -layer reinforcing bar about having among the reinforced concrete, the horizontal position of reinforced concrete lower floor reinforcing bar is passed through the altitude control of slotted hole bottom steel sheet by hole space distance positioning control, vertical position and the protective layer thickness of perforated plate connecting piece, reinforced concrete upper strata reinforcing bar horizontal position passes through the distance control of perforated plate connecting piece top to the concrete upper surface by perforated plate's hole space distance positioning control, vertical position and protective layer thickness. The perforated plate connecting piece adopts the perforated plate connecting piece of taking the boot -shaped slotted hole. The utility model also discloses a construction method of combination beam. The utility model discloses construction convenience has bearing capacity height, the good characteristics of fatigue performance ability, has saved the loaded down with trivial details process of wearing the reinforcing bar in traditional combination beam welding weld nail or the hole, has simplified the construction method, has improved the efficiency of construction, has reduced engineering cost.

Description

A kind of combination beam containing perforated plate connector
Technical field
The utility model belongs to science of bridge building field, is related to composite beam bridge, especially contains the combination beam of perforated plate connector Bridge.
Background technology
Composite beam bridge refers to, using connector, girder steel element and armored concrete are combined into compound section cooperation A kind of composite structure.This structure obtains increasingly because can effectively play steel and the respective advantage of concrete bi-material It is widely applied.
The shear connector of conventional combination beam is generally shaped steel, WELDING STUDS or Conventional open-pore plate connector.Structural steel connecting member Use at present less, at present using more be WELDING STUDS and Conventional open-pore plate connector, the construction method of WELDING STUDS at present than More ripe, there is special construction machinery, but it is relatively complicated to construct when WELDING STUDS is more and intensive;Conventional open-pore plate connector Easy construction is it is only necessary to perforated plate connector be welded on girder steel, weld seam is less, and bearing capacity is higher.But it is conventional Perforated plate connector needs to wear reinforcing bar in hole, and when in hole, reinforcing bar is longer, construction is very loaded down with trivial details, at this moment has two kinds of solutions to do Method, one kind is to be formed directly into reinforcing bar although construction is loaded down with trivial details, but in hole, reinforcing bar can be as lower floor's reinforcing bar of concrete slab;Another Planting is to block reinforcing bar, and segmentation penetrates in hole, and construction is more convenient, but lower floor's reinforcing bar of concrete slab needs in addition to configure, Reinforcing bar is more mixed and disorderly.
It can be seen that objectively need research and development propose a kind of combination beam with perforated plate connector, this kind of combination beam construction when not In addition reinforcing bar in must boring a hole as Conventional open-pore plate connector it is not required that configure lower floor's reinforcing bar of concrete slab, reinforcing bar cloth Put short and sweet.Reinforcement location, thickness of concrete cover and bar spacing etc. can easily be passed through to carry boot-shaped slotted eye simultaneously The size of perforated panel be adjusted, eliminate setting concrete protective layer pad and bar spacing positioning in assembling reinforcement Process, and can effectively ensure that the protective layer thickness of concrete and the uniform of bar spacing.
Utility model content
The purpose of this utility model is to propose a kind of combination beam of employing perforated plate connector, traditional perforated panel with employing The combination beam of connector is compared, and eliminates the cumbersome process wearing reinforcing bar in circular hole, simplifies construction procedure, and perforated panel can simultaneously Using the positioner as levels reinforcing bar in concrete it is not necessary to extra locating piece is so that reinforcing bar positioning is simpler, row Cloth is more orderly.
In order to achieve the above object, the utility model employs the following technical solutions:
A kind of combination beam containing perforated plate connector, is made up of armoured concrete slab, girder steel and perforated plate connector.Wherein Armoured concrete slab has upper and lower two-layer reinforcing bar, and lower floor's transverse steel is from top to bottom put in slotted eye, and level is pushed into boots head position In place, subsequent colligation longitudinal reinforcement, place top mat, pour bridge deck concrete.
Described girder steel can be steel box-girder or plate girder, and steel box-girder can be straight web or skew web plate.
Described perforated plate connector is formed along the cutting of slotted eye position by monoblock rectangular steel plates, and one block of steel plate can make two Block perforated plate connector, and no waste mine generation.Described perforated panel passes through to be welded to connect on described girder steel.
Furthermore, a kind of containing the combination beam with boot-shaped slotted eye perforated plate connector, comprise armoured concrete slab, girder steel With the perforated plate connector with boot-shaped slotted eye.
Described armoured concrete slab can adopt conventional concrete or high performance concrete.Have in armoured concrete slab up and down Two-layer reinforcing bar.
The horizontal level of armoured concrete slab lower floor reinforcing bar is by the slotted eye position location control of perforated panel, vertical position and guarantor Covering thickness is controlled by the height of slotted eye bottom steel plate;Armoured concrete slab top bars horizontal level is by the slotted eye of perforated panel Position location control, vertical position and protective layer thickness pass through perforated panel top to the distance controlling of concrete upper surface.
Armoured concrete slab top bars and lower floor's reinforcing bar have transverse steel and longitudinal reinforcement, wherein transverse steel spacing Controlled by described perforated plate connector slot pitch.
Girder steel can be plate girder can also be steel box-girder, and steel beam web plate can be straight web or skew web plate, can To be plain plate or folding shape steel plate.
Using the perforated plate connector with boot-shaped slotted eye, described perforated plate connector passes through to be welded to connect shear connector On the top flange of described girder steel.
The side of the described perforated plate connector with boot-shaped slotted eye is straight profiles, and the opposite side of shear connector repeats Arrange raised connector and recessed slotted eye, this recessed slotted eye is rendered as boot-shaped;After the shape of this raised connector rotates 180 ° Consistent, equivalently-sized with this recessed pockets hole shape;The connector of two pieces of same sizes, by one of rotation 180 ° after, both Raised connector and recessed slotted eye just be fitted together to docking, spell button be one block of complete batten.
This connector is to process two blocks of concavo-convex alternate plates with boot-shaped slotted eye by one block of rectangle steel lath.
Boot-shaped slotted eye can equal or unequal be arranged.
The boot-shaped slotted eye bottom of connector can be with flat slope or slope.
Described recessed pockets bottom hole portion carries slope, and slope line and horizontal angular range are 5 °~15 °.
Described slope line and horizontal angle are 10 °.
Described perforated plate connector, its processing method is:One piece of complete rectangular steel plates is cut along slotted eye position Cut, be divided into two and obtain two pieces of described perforated plate connector, and no waste mine produces.
Described perforated plate connector, it with the connected mode of concrete is:Reinforcing bar is placed in notch from top to bottom, It is moved horizontally to the position of notch boots head again, casting concrete wraps entirely described perforated plate connector.
, from factory process to field erected method, step is as follows for described combination beam:
Step one:Pre-manufactured steel plate-girder or steel box-girder in processing factory;
Step 2:Rectangular steel plates described in processing factory's internal cutting, the spacing according to concrete slab transverse steel is at every piece Boot-shaped slotted eye shape, the protection thickness of the distance foundation concrete layer reinforcing bar of slotted eye bottom to perforated panel root are drawn on steel plate Degree determines, the height of perforated panel determines according to the protective layer thickness of concrete top bars.By its each steel plate along boot-shaped groove The sideline cutting in hole, forms the perforated plate connector with boot-shaped slotted eye of two pieces of concavo-convex coincidences;
Step 3:On the top flange in processing factory, the perforated plate connector with boot-shaped slotted eye being welded to girder steel, welding The position that boot-shaped slotted eye will be taken into account during perforated plate connector is corresponding with the position of concrete slab reinforcing bar;
Step 4:In building-site, lower floor's transverse steel is put in described notch from top to bottom, then horizontal for lower floor steel Muscle horizontal direction moves to the front end of boot-shaped slotted eye, colligation lower floor longitudinal reinforcement, places top mat;
Step 5:In building-site, when all reinforcing bars are all placed in position after-pouring concrete, reach after age after concrete Form the connection of concrete and girder steel;
Step 6:Construction deck paving, railing etc..
Due to adopting technique scheme, the utility model has the advantages that:
1) perforated plate connector adopts semiclosed slotted eye, during construction is from top to bottom directly placed into transverse steel in concrete In slotted eye, and it is moved horizontally to boots head position, eliminate the step wearing reinforcing bar in Conventional open-pore plate connector aperture, simplify and apply Work, improves efficiency of construction, reduces construction costs.
2) concrete at the middle and upper levels, the protective layer thickness of lower floor's reinforcing bar and bar spacing can pass through described perforated plate connector Size Control, eliminate positioner during assembling reinforcement, further simplify construction procedure, make simultaneously reinforcing bar position more Accurately, arrangement is more orderly.
3) described perforated plate connector can be formed along the cutting of slotted eye shape by monoblock rectangular steel plates, one piece of rectangular steel plates Two pieces of described perforated plate connector can be cut into, no waste mine produces.
4) described perforated plate connector has higher bearing capacity and anti-fatigue performance, applies in combination beam and ensure that Girder steel and effective combination of concrete slab, improve the endurance quality of combination beam.
Brief description
Fig. 1 a shows the machining sketch chart of cutting circuit for shear connector.
Fig. 1 b is to process and separate the schematic diagram obtaining two pieces of shear connectors according to cutting circuit shown in Fig. 1 a.
Fig. 2 is the utility model perforated plate connector and plate girder connection diagram.
Fig. 3 is the utility model perforated plate connector and steel box-girder connection diagram.
The schematic diagram of reinforcing bar is placed for the utility model combination beam when Fig. 4 constructs.
Fig. 5 is the utility model combined steel plate beam lower floor transverse steel rear schematic diagram in place.
Fig. 6 is the utility model compound section steel box girder lower floor transverse steel rear schematic diagram in place.
Fig. 7 is the utility model combination beam connection, upper strata transverse steel and lower floor's transverse steel position relationship schematic diagram.
Fig. 8 is the utility model combined steel plate beam embodiment schematic shapes.
Fig. 9 is the utility model compound section steel box girder embodiment schematic shapes.
Specific embodiment
Below in conjunction with accompanying drawing illustrated embodiment, the utility model is further described.
In steel construction processing factory, steel plate is cut into length to be adapted with girder segmental length, width is the steel plate of a, steel plate Quantity be described with boot-shaped slotted eye perforated plate connector sum half.According between concrete slab transverse steel 301 Away from drawing boot-shaped slotted eye shape on every block of steel plate, the distance of slotted eye bottom to perforated panel root is according to concrete layer reinforcing bar Protective layer thickness determines, the height of perforated panel determines according to the protective layer thickness of concrete top bars.By described steel plate along institute State boot-shaped slotted eye shape line and carry out gas flame cuttiug, one block of steel plate obtains two pieces of described perforated plate connector 4.Longitudinally right for needing The position connecing in succession, bevel cut.
The prefabricated described plate girder 5 of factory's segmentation or steel box-girder 6.
Described perforated plate connector 4 is connected on described plate girder 5 or described steel box-girder 6 using flat filled weld in front and back seam weld, And check weldquality.The position that boot-shaped slotted eye will be taken into account during connector is corresponding with the position of concrete slab reinforcing bar.As Fig. 2 Or shown in Fig. 3.
Prefabricated beam section is transported to job site, carries out on-site consolidation, full framing, free cantilever erection, top can be adopted Push away the construction methods such as construction and rotator construction.
After girder steel is in place, the transverse steel 301 in concrete layer bar-mat reinforcement 3 is placed on described perforated plate connector In 4 boot-shaped groove, placement process is as shown in figure 4, first from top to bottom put in notch, then is moved horizontally to boots head position.
After lower floor's transverse steel 301 is in place, it is closed with the position of described perforated plate connector 4, plate girder 5 or steel box-girder 6 System is as shown in Figure 5 and Figure 6.Described perforated plate connector 4 is welded on described plate girder 5 or steel box-girder 6 by twin fillet wolt Top flange, in lower floor's bar-mat reinforcement 3, transverse steel 301 is placed in the boot-shaped groove of described perforated plate connector 4.
Colligation lower floor bar-mat reinforcement 3 and top mat 2, top mat 2 is placed on described perforated plate connector 4, Transverse steel 301 in transverse steel 201, described perforated plate connector 4 and lower floor's bar-mat reinforcement 3 in rear top mat 2 in place Relative position relation is as shown in Figure 7.In top mat 2, transverse steel 201 is placed on the top of described perforated plate connector 4, In lower floor's bar-mat reinforcement 3, transverse steel 301 is placed in the boot-shaped groove of described perforated plate connector 4.
Treat that all reinforcing bars complete colligation after-pouring bridge deck concrete 1, concrete forms combining structure after reaching age, it Afterwards construction mat formation, railing, lamppost etc..Combination beam schematic diagram after shaping is as shown in Figure 8 and Figure 9.
The above-mentioned description to embodiment is to be understood that for ease of those skilled in the art and apply this reality With new.Person skilled in the art obviously easily can make various modifications to these embodiments, and here is said Bright General Principle is applied in other embodiment without through performing creative labour.Therefore, the utility model is not limited to this In embodiment, those skilled in the art according to announcement of the present utility model, without departing from changing that the utility model category is made Entering and change all should be within protection domain of the present utility model.

Claims (9)

1. a kind of combination beam containing perforated plate connector, comprise armoured concrete slab, girder steel it is characterised in that:Also include perforate Plate connector;There is upper and lower two-layer reinforcing bar in described armoured concrete slab;The horizontal level of armoured concrete slab lower floor reinforcing bar is by opening The pitch of holes location control of orifice plate connector, vertical position and protective layer thickness are controlled by the height of slotted eye bottom steel plate;Steel Reinforced concrete plate top bars horizontal level is passed through to open by the pitch of holes location control of perforated panel, vertical position and protective layer thickness Orifice plate connector top is to the distance controlling of concrete upper surface.
2. combination beam according to claim 1 it is characterised in that:Including transverse steel and longitudinal reinforcement, wherein horizontal steel Muscle spacing is controlled by described perforated plate connector slot pitch.
3. combination beam according to claim 1 it is characterised in that:Described girder steel is plate girder, steel box-girder;Steel beam web plate is Straight web, skew web plate, plain plate or folding shape steel plate.
4. combination beam according to claim 1 it is characterised in that:Described armoured concrete slab is conventional concrete plate or height Performance concrete plate.
5. combination beam according to claim 1 it is characterised in that:Described perforated plate connector is the perforate with boot-shaped slotted eye Plate connector (4), it is fixedly connected on the top flange of described girder steel.
6. combination beam according to claim 5 it is characterised in that:The described perforated plate connector with boot-shaped slotted eye (4) Side is straight profiles, and on the opposite side of shear connector, repeated arrangement raised connector and recessed slotted eye, this recessed slotted eye It is rendered as boot-shaped;The shape of this raised connector is consistent, equivalently-sized with this recessed pockets hole shape after rotating 180 °;Two pieces same The connector of size, after 180 ° of one of rotation, both raised connectors and recessed slotted eye are just fitted together to docking, spell and detain For one block of complete batten.
7. combination beam according to claim 6 it is characterised in that:Described boot-shaped slotted eye bottom is flat slope or slope.
8. combination beam according to claim 6 it is characterised in that:Described recessed pockets bottom hole portion carry slope, slope line with Horizontal angular range is 5 °~15 °.
9. combination beam according to claim 8 it is characterised in that:Described slope line and horizontal angle are 10 °.
CN201620454402.3U 2016-05-18 2016-05-18 Combination beam that contains perforated plate connecting piece Withdrawn - After Issue CN205934689U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620454402.3U CN205934689U (en) 2016-05-18 2016-05-18 Combination beam that contains perforated plate connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620454402.3U CN205934689U (en) 2016-05-18 2016-05-18 Combination beam that contains perforated plate connecting piece

Publications (1)

Publication Number Publication Date
CN205934689U true CN205934689U (en) 2017-02-08

Family

ID=57935123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620454402.3U Withdrawn - After Issue CN205934689U (en) 2016-05-18 2016-05-18 Combination beam that contains perforated plate connecting piece

Country Status (1)

Country Link
CN (1) CN205934689U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887655A (en) * 2016-05-18 2016-08-24 同济大学 Combined beam containing perforated plate connectors and construction method of combined beam
CN109914230A (en) * 2019-04-18 2019-06-21 深圳市市政设计研究院有限公司 Combined box beam
CN109914230B (en) * 2019-04-18 2024-06-04 深圳市市政设计研究院有限公司 Combined box girder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887655A (en) * 2016-05-18 2016-08-24 同济大学 Combined beam containing perforated plate connectors and construction method of combined beam
CN105887655B (en) * 2016-05-18 2018-10-26 同济大学 A kind of combination beam and construction method containing perforated plate connector
CN109914230A (en) * 2019-04-18 2019-06-21 深圳市市政设计研究院有限公司 Combined box beam
CN109914230B (en) * 2019-04-18 2024-06-04 深圳市市政设计研究院有限公司 Combined box girder

Similar Documents

Publication Publication Date Title
CN105887655B (en) A kind of combination beam and construction method containing perforated plate connector
CN205529906U (en) Take semi -closed trough perforated plate's quadrature opposite sex combination bridge panel
CN105887660B (en) A kind of perforated plate connector with boot-shaped slot, girder steel and method
CN104532997B (en) A kind of precast assemble floor system and its construction method
CN204252345U (en) The connecting structure of a kind of precast concrete plank and girder steel
CN201128946Y (en) Anti-shock heat-insulating concrete structure all-fabricated house
CN105625298B (en) Using the continuous underground wall structure and its construction method of glass fiber-reinforced polymer lap joint sleeve milling
CN106120929A (en) A kind of bucket excavating U-shaped gutter and U-shaped gutter sliding formwork cast-in-situ construction method
CN105839818A (en) Integral concrete prefabricated wallboard free of lateral die assembly as well as assembling structure and assembling method thereof
CN209040150U (en) A kind of rigid frame formula peg board retaining wall
CN103572707B (en) Case girder steel outer template and construction method
CN108590008A (en) Fold shape roof system cast-in-place concrete construction method
CN104674647A (en) Steel-concrete combination structure for hybrid girder bridge
CN205934689U (en) Combination beam that contains perforated plate connecting piece
CN207988212U (en) A kind of precast shear wall horizontal connection structure with W-shaped seam
CN206722216U (en) A kind of prefabricated girder of laminated floor slab
CN202745062U (en) Foundation pit supporting structure closely adjacent to built-up underground structure
CN104234185A (en) Wire cage frame hollow concrete framework structure and assembling method thereof
CN208486164U (en) A kind of arch bridge skewback construction improving basic bearing capacity
CN207672828U (en) A kind of hollow pre-fabricated panels reinforcement and strengthening structure
CN206233430U (en) Assembly concrete floorboard system
CN206205267U (en) One kind combination girder with rolled steel section en cased in concrete
CN205348461U (en) Empty core plate shear wall structure of assembled
CN206204761U (en) A kind of perforated plate connector with boot-shaped slotted eye, girder steel and orthotropic plate
CN211257025U (en) Steel sheet pile cofferdam with slip casting platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170208

Effective date of abandoning: 20181026