CN205931167U - Modified tanker longmen bearing structure - Google Patents
Modified tanker longmen bearing structure Download PDFInfo
- Publication number
- CN205931167U CN205931167U CN201620878969.3U CN201620878969U CN205931167U CN 205931167 U CN205931167 U CN 205931167U CN 201620878969 U CN201620878969 U CN 201620878969U CN 205931167 U CN205931167 U CN 205931167U
- Authority
- CN
- China
- Prior art keywords
- steel
- gantry
- support
- longmen
- angle steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a modified tanker longmen bearing structure, transfer to angle iron bracket all through all pipe clamp trompils on, do not relate to longmen support frame, only need adjust during the installation of on -the -spot piping angle iron bracket can, effectively solve the shortcoming that the trompil leads to, through longmen support frame and the independent preparation separately of U -shaped pipe clamp, greatly sparingly produce production cycle, improve part internal field preparation efficiency, owing to do not relate to longmen support frame trompil, consequently can satisfy extensive batch production to install in advance, pipe and angle iron bracket design into the U -shaped pipe clamp and can all assemble in the internal field stage and finish, then dock stage integral hoisting to the support frame of longmen on, the production progress of dock sociable work just can the improvement angle iron bracket welding to longmen support frame greatly shipyard, more obvious to the economic benefits that the construction brought of batch ship, improve the sociable assembly efficiency of parts.
Description
Technical field
This utility model is related to tanker technical field, refers specifically to a kind of improved tanker gantry supporting structure.
Background technology
In tanker in currently runing both at home and abroad, on main deck surface, the support of piping all supports pattern using gantry.Dragon
Door is supported and is uniformly distributed and longitudinally through whole main deck surface with a determining deviation, and various pipings, equipment appurtenance, bracket and cable are equal
It is arranged on gantry to support in formed plane, each gantry is fixed in by the pipe clamp of various types and supports, prevent
Only rock landing, each gantry supports and is aided with longitudinal diagonal brace to ensure the structural strength supporting.At present, gantry backing material is often
From I-steel, to reach firm effect.
Because the piping that gantry supports mainly adopts " U-shaped " pipe clamp or special pipe folder to be fixed on I-steel, therefore I-shaped
Need to join the corresponding hole of brill on the top end face of steel to mate with pipe clamp, and the characteristic of I-steel determines its effective perforated area and only has
The half of top end face, the particularly pipe clamp of some " half breathe out not " require higher to firm banking, and this makes the specification of I-steel must
Must increase and could meet pipe clamp perforate and in-site installation requirement, because this gantry supported amount is numerous, the most direct consequence is just
It is that shipyard cost increases, the light weight of ship increases simultaneously, so can affect cargo shipping useful load;It is limited by gantry to support
The factors such as in-site installation deviation, malformation affect, and general assembly is live often to occur gantry to support the pipe clamp hole opened in advance and reality
Require position do not line up, lead to live piping installation accuracy cannot be guaranteed, slightly deviation may result in pipe cannot be normal
Install, needs scene is repaired one by one, the scene amount of doing over again is big, and the production schedule is difficult to ensure;Outfield perforate when I-steel is installed causes
Live boring work amount is big, and surface treatment cannot solve, and is surface-treated the destroyed internal field that cannot return and processes after perforate, Chuan Dongtong
Often do not accept live touch-up paint yet, and if I-steel also results in the reduction significantly of structural strength, rigidity after directly holing.
Utility model content
The purpose of this utility model is that there are the problems referred to above for existing technology, provides a kind of improved tanker gantry
Supporting construction, in place of overcoming the deficiencies in the prior art, reasonable in design, compact conformation.
For realizing object above, this utility model is achieved by the following technical programs:A kind of improved tanker dragon
Door supporing structure, including gantry bracing frame, U-tube folder and angle bar frame, described gantry bracing frame include I-steel, support base and
Connecting rod, below described I-steel, uniform 6 described support bases, are connected with described connecting rod, described angle between described support base
Steel bracket includes horizontal angle steel and support angle steel, and the vertical upper end of described support angle steel connects the inner side of described horizontal angle steel, described
Support angle steel vertically lower end connects on described I-steel, and described horizontal angle steel is provided with multiple pipe clamping installing holes, described U-shaped
Pipe clamp by binding nut, pipe is fastened on the pipe clamping installing hole of described angle bar frame.
Further, the initial and end support base below described I-steel and middle two support bases are equipped with inclined shore
Seat, described inclined shore seat is located on the direction vertical with described I-steel.
Further, described I-steel and initial and end support base also tilt to be provided with gripper shoe.
Further, the junction of described connecting rod and support base is additionally provided with tension gusset.
Further, described U-tube folder includes U-shaped card and binding nut, and described binding nut has 4, difference two
On two threaded connectors being set in described U-tube card, by binding nut being fastened on respectively the support of described horizontal angle steel
On the upper and lower surface in face, adjust the elastic of pipe support by adjusting binding nut.
Compared with prior art, the beneficial effects of the utility model are:
This utility model provides a kind of improved tanker gantry supporting structure, is all turned by all pipe clamp perforates
Move on on angle bar frame, be not related to gantry bracing frame, live piping only need to adjust angle bar frame when installing, and effectively solving is opened
Hole leads to the disadvantage that;Using separate design technology so that gantry bracing frame and U-tube folder can each independently make, significantly save
Province manufactures the cycle, improves part internal field make efficiency;Due to being not related to gantry bracing frame perforate, big rule therefore can be met
Mould is produced in batches, and installs in advance, and pipe and angle bar frame are designed to U-tube and are clipped in the internal field stage can all assemble and finish,
Then, in dock stage integral hoisting to gantry bracing frame, angle bar frame is simply soldered to gantry and props up by the work in dock outfield
Support, substantially increases the manufacturing schedule of shipyard, and the economic benefit that the construction of batch ship is brought becomes apparent from, and improves
Part outfield general assembly efficiency.
Brief description
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or in description of the prior art the accompanying drawing of required use be briefly described it should be apparent that, drawings in the following description are only
It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise not paying creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is gantry of the present utility model support frame structure schematic diagram;
Specific embodiment
Purpose, technical scheme and advantage for making this utility model embodiment are clearer, new below in conjunction with this practicality
Type embodiment, is clearly and completely described the enforcement it is clear that described to the technical scheme in this utility model embodiment
Example is a part of embodiment of this utility model, rather than whole embodiments.Based on the embodiment in this utility model, this area
The every other embodiment that those of ordinary skill is obtained under the premise of not making creative work, broadly falls into this utility model
The scope of protection.
In conjunction with accompanying drawing 1 and Fig. 2, for realizing object above, this utility model is achieved by the following technical programs:A kind of
Improved tanker gantry supporting structure, including gantry bracing frame 1, U-tube folder 2 and angle bar frame 3, described gantry bracing frame 1
Including I-steel 1.1, support base 1.2 and connecting rod 1.3, the uniform 6 described support bases 1.2 in described I-steel 1.1 lower section, described
It is connected with described connecting rod 1.3, described angle bar frame 3 includes horizontal angle steel 3.1 and support angle steel 3.2, institute between support base 1.2
State the inner side that the vertical upper end of support angle steel 3.2 connects described horizontal angle steel 3.1, described support angle steel 3.2 vertically lower end connects institute
State on I-steel 1.1, described horizontal angle steel 3.1 is provided with multiple pipe clamping installing holes, described U-tube folder 2 passes through to clamp spiral shell
Female 2.1 pipe 4 is fastened on the pipe clamping installing hole of described angle bar frame 3.
Preferably, the initial and end support base of described I-steel 1.1 lower section and middle two support bases are equipped with inclined shore
Seat 1.4, described inclined shore seat 1.4 is located on the direction vertical with described I-steel 1.1;Described I-steel 1.1 is propped up with initial and end
Support seat also tilts to be provided with gripper shoe 1.5;The junction of described connecting rod 1.3 and support base 1.2 is additionally provided with tension gusset 5;Described
Described U-tube folder 2 includes U-shaped card 2.2 and binding nut 2.1, and described binding nut 2.1 has 4, is set in described respectively two-by-two
On the threaded connector of U-tube card 2.2.
To sum up, this utility model provides a kind of improved tanker gantry supporting structure, is supported and pipe by gantry
The separate design of frame, all pipe clamp perforates are all transferred on angle bar frame, are not related to gantry bracing frame, and live piping is installed
When only need to adjust angle bar frame, effectively solving perforate leads to the disadvantage that, the material specification of gantry bracing frame without increasing,
Total height also decreases, and its manufacturing cost and construction weight are far superior to traditional scheme, cost-effective;By gantry bracing frame
Each can independently make with U-tube folder, greatly save the cycle of manufacturing, improve part internal field make efficiency;Due to not relating to
And gantry bracing frame perforate, therefore can meet large-scale mass production, and install in advance, pipe and angle bar frame are designed to U
Shape pipe clamp can all assemble in the internal field stage and finish, then in dock stage integral hoisting to gantry bracing frame, outside dock
Angle bar frame is simply soldered to gantry bracing frame by the work of field, substantially increases the manufacturing schedule of shipyard, to batch ship
The economic benefit brought of construction become apparent from, improve part outfield general assembly efficiency and shipyard manufacturing cost, in-site installation imitated
Rate, manufacturing schedule bring significant effect.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation are made a distinction with another entity or operation, and not necessarily require or imply these entities or deposit between operating
In any this actual relation or order.And, term " inclusion ", "comprising" or its any other variant are intended to
Comprising of nonexcludability, wants so that including a series of process of key elements, method, article or equipment and not only including those
Element, but also include other key elements being not expressly set out, or also include for this process, method, article or equipment
Intrinsic key element.In the absence of more restrictions, the key element that limited by sentence " include ... " it is not excluded that
Also there is other identical element in process, method, article or the equipment including described key element.
Above example only in order to the technical solution of the utility model to be described, is not intended to limit;Although with reference to aforementioned reality
Apply example this utility model has been described in detail, it will be understood by those within the art that:It still can be to front
State the technical scheme described in each embodiment to modify, or equivalent is carried out to wherein some technical characteristics;And these
Modification or replacement, do not make the essence of appropriate technical solution depart from spirit and the model of this utility model each embodiment technical scheme
Enclose.
Claims (5)
1. a kind of improved tanker gantry supporting structure props up it is characterised in that including gantry bracing frame, U-tube folder and angle steel
Frame, described gantry bracing frame includes I-steel, support base and connecting rod, uniform 6 described support bases, institute below described I-steel
State and between support base, be connected with described connecting rod, described angle bar frame includes horizontal angle steel and support angle steel, described support angle steel
Vertical upper end connects the inner side of described horizontal angle steel, and described support angle steel vertically lower end connects on described I-steel, described horizontal
Angle steel is provided with multiple pipe clamping installing holes, and pipe is fastened on described angle bar frame by binding nut by described U-tube folder
Pipe clamping installing hole on.
2. improved tanker gantry supporting structure according to claim 1 is it is characterised in that below described I-steel
It is equipped with inclined shore seat, described inclined shore seat is located at and described I-steel on initial and end support base and middle two support bases
On vertical direction.
3. improved tanker gantry supporting structure according to claim 2 it is characterised in that described I-steel with first,
Tail support base also tilts to be provided with gripper shoe.
4. improved tanker gantry supporting structure according to claim 2 is it is characterised in that described connecting rod and support
The junction of seat is additionally provided with tension gusset.
5. improved tanker gantry supporting structure according to claim 1 is it is characterised in that described U-tube presss from both sides
Including U-shaped card and binding nut, described binding nut has 4, is set in the threaded connector of described U-tube card respectively two-by-two
On.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620878969.3U CN205931167U (en) | 2016-08-05 | 2016-08-05 | Modified tanker longmen bearing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620878969.3U CN205931167U (en) | 2016-08-05 | 2016-08-05 | Modified tanker longmen bearing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205931167U true CN205931167U (en) | 2017-02-08 |
Family
ID=57921153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620878969.3U Active CN205931167U (en) | 2016-08-05 | 2016-08-05 | Modified tanker longmen bearing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205931167U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110254621A (en) * | 2019-07-01 | 2019-09-20 | 上海外高桥造船有限公司 | Deck tube bundle unit installation method |
CN114179996A (en) * | 2021-11-10 | 2022-03-15 | 上海江南长兴造船有限责任公司 | Angle steel butt joint precision control method and device for double-layer bottom segmented dock carrying stage |
-
2016
- 2016-08-05 CN CN201620878969.3U patent/CN205931167U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110254621A (en) * | 2019-07-01 | 2019-09-20 | 上海外高桥造船有限公司 | Deck tube bundle unit installation method |
CN114179996A (en) * | 2021-11-10 | 2022-03-15 | 上海江南长兴造船有限责任公司 | Angle steel butt joint precision control method and device for double-layer bottom segmented dock carrying stage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207079735U (en) | A kind of beam-column node structure | |
CN105401599A (en) | Open trench tunnel main structure tall side wall unilateral vertical mold and construction process thereof | |
CN205931167U (en) | Modified tanker longmen bearing structure | |
CN205806704U (en) | A kind of supporting structure fixing for large-scale pipeline | |
CN206722078U (en) | A kind of C-shape steel connector | |
CN205804939U (en) | template assembly for subway station side wall | |
CN202790933U (en) | Cable bracket | |
CN206873716U (en) | A kind of antidetonation type unitized curtain wall | |
CN206458091U (en) | A kind of constructional form fixing apparatus | |
CN105155742B (en) | Modular metal curtain wall | |
CN106049680A (en) | Combined framework with grid frame and truss being located on same plane and connecting piece | |
CN206874293U (en) | Subway tunnel soft oil support device | |
CN203547129U (en) | Large-cross-section wood form assembly for circular concrete columns | |
CN207499306U (en) | A kind of assembled architecture node connection component | |
CN206685859U (en) | A kind of cable holder stand column being fixed on furrow bank | |
CN205655092U (en) | High strength steel board | |
CN207959935U (en) | A kind of mating support construction of template | |
CN206320504U (en) | A kind of high intensity support shaped steel | |
CN205764624U (en) | Band steel seat board screw welding tooling | |
CN206504010U (en) | A kind of omnipotent assembling support | |
CN206751168U (en) | A kind of 3D plate-type houses hoisting fixture | |
CN206393512U (en) | A kind of assembly mould of steel structural plant roof tie-rod | |
CN206283450U (en) | The erecting device of photovoltaic module | |
CN206029104U (en) | Large -scale steel structure welder shelves | |
CN206467783U (en) | A kind of box bridle iron node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |