CN205929147U - It adds heat engine to retrieve sizing material - Google Patents

It adds heat engine to retrieve sizing material Download PDF

Info

Publication number
CN205929147U
CN205929147U CN201620918778.5U CN201620918778U CN205929147U CN 205929147 U CN205929147 U CN 205929147U CN 201620918778 U CN201620918778 U CN 201620918778U CN 205929147 U CN205929147 U CN 205929147U
Authority
CN
China
Prior art keywords
sizing material
smelting furnace
heating tubes
spherical
melt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620918778.5U
Other languages
Chinese (zh)
Inventor
姚寒
周铸成
方文革
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yongda Plastic Industry Technology Development Co Ltd
Original Assignee
Anhui Yongda Plastic Industry Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Yongda Plastic Industry Technology Development Co Ltd filed Critical Anhui Yongda Plastic Industry Technology Development Co Ltd
Priority to CN201620918778.5U priority Critical patent/CN205929147U/en
Application granted granted Critical
Publication of CN205929147U publication Critical patent/CN205929147U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/62Plastics recycling; Rubber recycling

Landscapes

  • Adhesives Or Adhesive Processes (AREA)

Abstract

The utility model relates to an it adds heat engine to retrieve sizing material, include four no. Three stabilizer blades, the upper end welding of four no. Three stabilizer blades has the collection workbin, and the workbin that converges is the toper structure, and the both ends symmetry is provided with two T type supports about the collection workbin, installs two melt mechanisms respectively through the bolt on two T type supports, and two T type supports play the effect of two melt mechanisms of fixed stay, and the sizing material enters into two melt mechanisms through the collection workbin and melts, install the frame plate between the lower extreme of four no. Three stabilizer blades, the lower extreme both sides symmetrical of frame plate has two double -layered posts, and the end of two double -layered posts centre gripping respectively has two pipes that gather materials. The utility model discloses can realize comprehensive heat fusing function that adds of sizing material, have sizing material heat time short, adopt spherical comprehensive heating, sizing material to melt effectual advantage such as go with work efficiency.

Description

A kind of recovery sizing material heater
Technical field
The utility model is related to glue stick processing technique field, specifically a kind of recovery sizing material heater.
Background technology
PUR is a kind of plastic adhesive, and in certain temperature range, its physical state changes with temperature and changes Become, and chemical characteristic is constant, it is nonpoisonous and tasteless, belong to environmental-protecting chemical product;Because its product is solid in itself, it is easy to packaging, fortune Defeated, storage, solvent-free, pollution-free, nontoxic type;And simple production process, high added value, it is excellent that bonding strength is big, speed is fast etc. Put and enjoy favor.But all can produce a lot of remaining sizing materials, due to these in PUR manufacturing process and during using Sizing material amount is few, producer and the use of business is essentially all directly to discard, and because PUR uses total amount very huge, therefore produces Raw remaining sizing material total amount also very greatly, sizing material wastage huge although also there being a small amount of sizing material reclaimer in existing, but There is following defect:Sizing material processing importantly melting process, but existing sizing material heat time length is it is impossible to comprehensive heat, Sizing material fusing effect is poor.
Utility model content
In order to solve the above problems, the utility model provides a kind of recovery sizing material heater, can solve existing sizing material Reclaimer exist sizing material heat time length, can not heat comprehensively, sizing material fusing effect difference and the inferior difficult problem of inefficiency, Comprehensive heating fusing function of sizing material can be realized, there is the sizing material heat time short, using spherical comprehensive heating, sizing material fusing effect The advantages of fruit is well and operating efficiency is good.
To achieve these goals, the utility model employs the following technical solutions to realize:A kind of recovery sizing material heater, Including four No. three legs, the upper end of four No. three legs is welded with remittance hopper, and remittance hopper is pyramidal structure, the left and right of remittance hopper Two ends are symmetrically arranged with two T-shaped supports, and two T-shaped supports are separately installed with Liang Ge melt mechanism by bolt, and two T-shaped Support plays the fixing effect supporting Liang Ge melt mechanism, and sizing material enters into Liang Ge melt mechanism by remittance hopper and melted; Frame plate is installed between the lower end of described four No. three legs, the lower end both sides of frame plate are symmetrically welded with two folder posts, two folders The end of post is clamped with two aggregate pipes respectively, and two folder posts play the effect of fixed clamp aggregate pipe, two aggregate pipes upper End is separately installed with two cone buckets, and two cone buckets are located at the underface of Liang Ge melt mechanism respectively, the end of two aggregate pipes it Between collecting pipe is installed, through Liang Ge melt mechanism fusing after glue have respectively entered in two cone buckets, then pass through two Root aggregate pipe glue is pooled in collecting pipe and is collected;Described melt mechanism includes being arranged on corresponding T-shaped by screw Connecting plate on frame, integrally formed with segmental support, the two ends inwall of segmental support is connected to by bolt for the lower end of connecting plate Two fixed columns, are provided with spherical smelting furnace between two fixed columns, by two fixed columns, spherical smelting furnace are arranged on segmental support On, spherical smelting furnace is hollow-core construction, and spherical smelting furnace upper end is connected with feed pipe, and the top of feed pipe is provided with connection ring, connects Ring is arranged on the lower end of remittance hopper, and spherical smelting furnace lower end is connected with discharge nozzle, and the middle part of discharge nozzle is provided with magnetic valve, magnetic valve Control the open and close status of discharge nozzle, sizing material enters in spherical smelting furnace from feed pipe, sizing material melts through spherical smelting furnace It is melted into glue, then discharge nozzle is in open mode by magnetic valve, glue flows out through discharge nozzle, the inwall of described spherical smelting furnace In be provided with annular installation cavity, the inboard inwall of annular installation cavity is glued with big heating tube, two middle heating tubes and two successively The little heating tube of root, the outer wall of big heating tube, two middle heating tubes and two little heating tubes is all uniformly clamped on geometrical clamp, and The end of all geometrical clamps is installed on the outside inwall of annular installation cavity, and geometrical clamp adopts heat-resisting material, by greatly Heat pipe, two middle heating tubes and two little heating tubes spherical smelting furnace is carried out spherical uniformly heat comprehensively, can be by fast for sizing material fast thawing Changing is in glue, and fusing effect is good;Described big heating tube is located at the middle part of annular installation cavity, and two middle heating tubes are symmetrically positioned in greatly The both sides of heat pipe, two little heating tubes are located at the both sides of two middle heating tubes respectively.
During work, after sizing material enters into Liang Ge melt mechanism by remittance hopper, Liang Ge melt mechanism starts simultaneously at work, Sizing material enters in spherical smelting furnace by the feed pipe in melt mechanism, the big heating tube on spherical smelting furnace, two middle heating tubes It is constantly in heated condition with two little heating tubes, because big heating tube, two middle heating tubes and two little heating tubes are uniformly divided On spherical interior melter walls, this spherical comprehensive mode of heating makes the whole inwall of shape smelting furnace be in the condition of high temperature to cloth, because The sizing material that this enters in spherical smelting furnace can be become glue by rapid melting, and then discharge nozzle is in open mode, glue by magnetic valve Flow out through discharge nozzle, the glue of outflow has respectively entered in two cone buckets, is then pooled to glue by two aggregate pipes Carry out in collecting pipe collecting outflow collection.
The beneficial effects of the utility model are:
1. the utility model is carried out uniformly to spherical smelting furnace by big heating tube, two middle heating tubes and two little heating tubes Sizing material energy rapid melting can be become glue using this spherical comprehensive mode of heating, the sizing material heat time is short by quick heating, adopts Spherical comprehensive heating and sizing material fusing effect are good;
2. the utility model solve the sizing material heat time length that existing sizing material reclaimer exists, can not heat comprehensively, Sizing material melts effect difference and the inferior difficult problem of inefficiency it is achieved that the utility model melts function to comprehensive heating of sizing material, Have the advantages that the sizing material heat time is short, good using spherical comprehensive heating and sizing material fusing effect.
Brief description
With reference to the accompanying drawings and examples the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is the structural representation of the utility model melt mechanism;
Fig. 4 is the full sectional view of the utility model melt mechanism.
Specific embodiment
In order that technological means, creation characteristic, reached purpose and effect that the utility model is realized are easy to understand, under Face combines and is specifically illustrating, and the utility model is expanded on further.
As shown in Figures 1 to 4, a kind of recovery sizing material heater, including four No. three legs 51, four No. three legs 51 Upper end is welded with remittance hopper 52, and remittance hopper 52 is pyramidal structure, and the left and right two ends of remittance hopper 52 are symmetrically arranged with two T-shaped supports 53, two T-shaped supports 53 are separately installed with Liang Ge melt mechanism 54 by bolt, two T-shaped supports 53 play fixing support The effect of Liang Ge melt mechanism 54, sizing material enters into Liang Ge melt mechanism 54 by remittance hopper 52 and is melted;Described four three Between the lower end of number leg 51, frame plate 55 is installed, the lower end both sides of frame plate 55 are symmetrically welded with two folder posts 56, two folder posts 56 end is clamped with two aggregate pipes 57 respectively, and two folder posts 56 play the effect of fixed clamp aggregate pipe 57, and two are gathered materials The upper end of pipe 57 is separately installed with two cone buckets 58, and two cone buckets 58 are located at the underface of Liang Ge melt mechanism 54 respectively, two Collecting pipe 59 is installed between the end of aggregate pipe 57, the glue after Liang Ge melt mechanism 54 fusing has respectively entered two In individual cone bucket 58, then by two aggregate pipes 57, glue is pooled in collecting pipe 59 and is collected;Described melt mechanism 54 Including the connecting plate 541 being arranged on by screw on corresponding T-shaped support 53, the lower end of connecting plate 541 is integrally formed with segmental support 542, the two ends inwall of segmental support 542 is connected to two fixed columns 543 by bolt, installs between two fixed columns 543 There is spherical smelting furnace 544, by two fixed columns 543, spherical smelting furnace 544 is arranged on segmental support 542, spherical smelting furnace 544 is sky Core structure, spherical smelting furnace 544 upper end is connected with feed pipe 545, and the top of feed pipe 545 is provided with connection ring 546, connection ring 546 lower ends being arranged on remittance hopper 52, spherical smelting furnace 544 lower end is connected with discharge nozzle 547, and the middle part of discharge nozzle 547 is provided with Magnetic valve 548, magnetic valve 548 controls the open and close status of discharge nozzle 547, and sizing material enters into spherical from feed pipe 545 In smelting furnace 544, sizing material is fused into glue through spherical smelting furnace 544, and then discharge nozzle 547 is in open mode by magnetic valve 548, Glue flows out through discharge nozzle 547, is provided with annular installation cavity, in annular installation cavity in the inwall of described spherical smelting furnace 544 Big 549, two middle heating tubes 550 of heating tube and two little heating tubes 551, big heating tube 549, two are glued with successively on the inwall of side All uniformly it is clamped on geometrical clamp 552 on the outer wall of heating tube 550 and two little heating tubes 551 in root, and all geometrical clamps 552 End be installed on the outside inwall of annular installation cavity, geometrical clamp 552 adopts heat-resisting material, by big heating tube 549, Two middle heating tubes 550 and two little heating tubes 551 spherical smelting furnace 544 is carried out spherical uniformly heat comprehensively, can be fast by sizing material Fast thawingization is in glue, and fusing effect is good;Described big heating tube 549 is located at the middle part of annular installation cavity, and two middle heating tubes 550 are right Claim to be located at the both sides of big heating tube 549, two little heating tubes 551 are located at the both sides of two middle heating tubes 550 respectively.
During work, after sizing material enters into Liang Ge melt mechanism 54 by remittance hopper 52, Liang Ge melt mechanism 54 opens simultaneously Beginning work, the feed pipe 545 that sizing material passes through in melt mechanism 54 enters in spherical smelting furnace 544, on spherical smelting furnace 544 greatly The middle heating tube 550 of heat pipe 549, two and two little heating tubes 551 are constantly in heated condition, due to big heating tube 549, two Middle heating tube 550 and two little heating tubes 551 are evenly distributed on spherical smelting furnace 544 inwall, this spherical comprehensive mode of heating The whole inwall making shape smelting furnace 544 is in the condition of high temperature, can be by rapid melting hence into the sizing material in spherical smelting furnace 544 Become glue, then discharge nozzle 547 is in open mode by magnetic valve 548, and glue flows out through discharge nozzle 547, the glue of outflow Have respectively entered in two cone buckets 58, then by two aggregate pipes 57, glue is pooled in collecting pipe 59 and carries out collecting outflow Collect, solve the sizing material heat time length that existing sizing material reclaimer exists, can not heat comprehensively, sizing material fusing effect difference and The inferior difficult problem of inefficiency, has reached purpose.
Of the present utility model general principle, principal character and advantage have been shown and described above.The technical staff of the industry It should be appreciated that the utility model is not restricted to the described embodiments, the simply explanation of the description in above-described embodiment and specification Principle of the present utility model, on the premise of without departing from the utility model spirit and scope, the utility model also has various changes Change and improve, these changes and improvements both fall within the range of claimed the utility model.The utility model claims model Enclose by appending claims and its equivalent thereof.

Claims (2)

1. a kind of reclaim sizing material heater it is characterised in that:Including four No. three legs (51), four No. three legs (51) upper End be welded with remittance hopper (52), converge hopper (52) be pyramidal structure, converge hopper (52) left and right two ends be symmetrically arranged with two T-shaped Support (53), two T-shaped supports (53) are above separately installed with Liang Ge melt mechanism (54) by bolt;Described four No. three legs (51) frame plate (55) is installed between lower end, the lower end both sides of frame plate (55) are symmetrically welded with two folder posts (56), two folders The end of post (56) is clamped with two aggregate pipes (57) respectively, and the upper end of two aggregate pipes (57) is separately installed with two cone buckets (58), two cone buckets (58), respectively positioned at the underface of Liang Ge melt mechanism (54), are pacified between the end of two aggregate pipes (57) Equipped with collecting pipe (59);Described melt mechanism (54) includes the connecting plate being arranged on corresponding T-shaped support (53) by screw (541), integrally formed with segmental support (542), the two ends inwall of segmental support (542) is divided by bolt for the lower end of connecting plate (541) It is not connected with two fixed columns (543), spherical smelting furnace (544), spherical smelting furnace (544) are installed between two fixed columns (543) For hollow-core construction, spherical smelting furnace (544) upper end is connected with feed pipe (545), and the top of feed pipe (545) is provided with connection ring (546), connection ring (546) is arranged on the lower end of remittance hopper (52), and spherical smelting furnace (544) lower end is connected with discharge nozzle (547), goes out The middle part of expects pipe (547) is provided with magnetic valve (548), is provided with annular installation cavity, ring in the inwall of described spherical smelting furnace (544) Big heating tube (549), two middle heating tubes (550) and two little heating tubes are glued with successively on the inboard inwall of shape installation cavity (551), the outer wall of big heating tube (549), two middle heating tubes (550) and two little heating tubes (551) is all uniformly clamped in On geometrical clamp (552), and the end of all geometrical clamps (552) is installed on the outside inwall of annular installation cavity.
2. according to claim 1 a kind of reclaim sizing material heater it is characterised in that:Described big heating tube (549) is located at The middle part of annular installation cavity, two middle heating tubes (550) are symmetrically positioned in the both sides of big heating tube (549), two little heating tubes (551) it is located at the both sides of two middle heating tubes (550) respectively.
CN201620918778.5U 2016-08-23 2016-08-23 It adds heat engine to retrieve sizing material Active CN205929147U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620918778.5U CN205929147U (en) 2016-08-23 2016-08-23 It adds heat engine to retrieve sizing material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620918778.5U CN205929147U (en) 2016-08-23 2016-08-23 It adds heat engine to retrieve sizing material

Publications (1)

Publication Number Publication Date
CN205929147U true CN205929147U (en) 2017-02-08

Family

ID=57947851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620918778.5U Active CN205929147U (en) 2016-08-23 2016-08-23 It adds heat engine to retrieve sizing material

Country Status (1)

Country Link
CN (1) CN205929147U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106182498A (en) * 2016-08-23 2016-12-07 安徽永大胶业科技发展有限公司 A kind of recovery sizing material heater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106182498A (en) * 2016-08-23 2016-12-07 安徽永大胶业科技发展有限公司 A kind of recovery sizing material heater

Similar Documents

Publication Publication Date Title
CN205929147U (en) It adds heat engine to retrieve sizing material
CN114686966A (en) Crystal cooling device for artificial crystal furnace
CN101570886B (en) High-frequency coil structure capable of drawing 22 silicon cores or other crystal materials
CN205925650U (en) Heating device for be used for retrieving sizing material
CN205897756U (en) Tea -seed oil fruit drying -machine
CN106182498A (en) A kind of recovery sizing material heater
CN209459413U (en) A kind of Metal Melting device convenient for dedusting
CN208802984U (en) A kind of induction type heated quartz glass continuous induction melting furnace
CN206326239U (en) Automatic flame weldering device
CN208594430U (en) A kind of dixie cup production lamination discharging device
CN205929146U (en) Sizing material secondary recovery plant
CN208288269U (en) A kind of unidirectional gas solid separation tornadotron for three-level separator
CN204661545U (en) A kind of basalt continuous fiber wire-drawing frame
CN206356526U (en) Nice foundry sand byproduct melts down regenerating unit
CN206828676U (en) Silicon rod clamper for single crystal growing furnace secondary charging
CN206971048U (en) Can be to the flow rate of asphalt weighing device of the uniform heating of pitch
CN202369551U (en) Feeding mechanism of pitch melter
CN207850160U (en) A kind of falling film type heater of special construction
CN206170591U (en) Quick regenerating unit of stick glues
CN108824082A (en) A kind of dixie cup production lamination discharging device
CN207578906U (en) A kind of spectacles nose holder production injection molding machine feed arrangement
CN206008090U (en) A kind of static board-like melting crystallizer
CN200999269Y (en) High-frequency coil capable of producing six silicon cores or other crystal material once
CN205679081U (en) A kind of smelting furnace waste gas collection device
CN110497559A (en) A kind of environment-friendly type waste plastic product recycling and reusing system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant