CN205928317U - General modular fixture of cantilever crane equipment - Google Patents
General modular fixture of cantilever crane equipment Download PDFInfo
- Publication number
- CN205928317U CN205928317U CN201620865279.4U CN201620865279U CN205928317U CN 205928317 U CN205928317 U CN 205928317U CN 201620865279 U CN201620865279 U CN 201620865279U CN 205928317 U CN205928317 U CN 205928317U
- Authority
- CN
- China
- Prior art keywords
- slide
- guide rail
- fixed plate
- model
- install
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a general modular fixture of cantilever crane equipment, including laying the left and right guide rail that parallels in the workshop, on the left and right guide rail respectively slidable mounting have the slide, and install the fixed plate between the slide at both ends, install a supporting beam between the slide at middle part, it has the fixed position hole to distribute respectively on fixed plate and the supporting beam, the slide bottom be equipped with with corresponding guide rail complex guide slot, be equipped with the locking hole on the slide of guide slot both sides respectively, and lock and install the puller bolt in the hole. The utility model discloses a structure of slide and guide rail can satisfy equipment needs of different length cantilever cranes, adjust after the length through puller bolt locking, among the assembly process, put a supporting beam with it earlier on, both ends are fixed on the fixed plate after putting well, and are unsettled with its, can weld and wait the operation, have greatly improved production efficiency and quality, but characteristics such as reuse rate height under fast, the model specification current situation how of product update, have greatly satisfied the needs of producing.
Description
Technical field:
This utility model is related to crane frock clamp field, relates generally to a kind of arm support and assembles general built-up jig.
Background technology:
Arm support group body is the three process that arm support produces, and refers to for group fan operation to spell two single fan web members that point completes
Connect, the operation of Special composition truss structure.For the list fan of belt lacing, spell and typically directly vertically hang about single fan during point
It is contained on fixture, spell level connection joint web member between point two single fan;For the list fan of not belt lacing, need in group body frock simultaneously
Complete joint and cornical is spelled in point prior art, arm support is mostly direct direct-assembling in workshop, directly puts in assembling process
Then progressively welded and overturn on the ground, and need to overturn, wasted time and energy, inefficiency is it is impossible to meet automatization
The requirement producing.
Utility model content:
This utility model purpose is exactly the defect in order to make up prior art, provides a kind of arm support assembling common group co-clip
Tool.
This utility model is achieved through the following technical solutions:
A kind of arm support assemble general built-up jig it is characterised in that:Include and be layed in workshop left and right guide rail arranged side by side,
Be slidably fitted with respectively on described left and right guide rail between slide, and the slide at both ends and fixed plate be installed, the slide at middle part it
Between support beam is installed, stationary positioned hole is distributed with described fixed plate and support beam, described slide bottom is provided with and phase respectively
Answer the guide groove of guide rail cooperation, the slide of described guide groove both sides is respectively equipped with locking hole, and puller bolt is installed in locking hole.
The utility model has the advantages that:
This utility model passes through the structure of slide and guide rail, can meet the assembling needs of different length arm support, adjust length
Locked by puller bolt after degree, in assembling process, first it is put in support beam, after putting well, two ends are fixed on fixed plate
On, it is hanging, you can to carry out the operation such as welding, greatly improve production efficiency and quality, the features such as repeatable utilization rate is high,
Under present situation model change is fast, more than model specification, greatly meet the needs of production.
Brief description:
Fig. 1 is structural representation of the present utility model.
Specific embodiment:
Referring to accompanying drawing.
A kind of arm support assembles general built-up jig, includes and is layed in workshop left and right guide rail arranged side by side 1,2, left and right guide rail
1st, it is slidably fitted with respectively between slide 3, and the slide 3 at both ends on 2 and fixed plate 4 is installed, install between the slide 3 at middle part
Have in support beam 5, fixed plate 4 and support beam 5 and stationary positioned hole 6 is distributed with respectively, slide 3 bottom is provided with and respective track cooperation
Guide groove, the slide of guide groove both sides is respectively equipped with locking hole 7, and in locking hole 7, puller bolt is installed.
Claims (1)
1. a kind of arm support assemble general built-up jig it is characterised in that:Include and be layed in workshop left and right guide rail arranged side by side, institute
State to be slidably fitted with respectively on left and right guide rail between slide, and the slide at both ends and fixed plate is installed, between the slide at middle part
Support beam is installed, stationary positioned hole is distributed with respectively on described fixed plate and support beam, described slide bottom be provided with accordingly
The guide groove of guide rail cooperation, the slide of described guide groove both sides is respectively equipped with locking hole, and is provided with puller bolt in locking hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620865279.4U CN205928317U (en) | 2016-08-10 | 2016-08-10 | General modular fixture of cantilever crane equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620865279.4U CN205928317U (en) | 2016-08-10 | 2016-08-10 | General modular fixture of cantilever crane equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205928317U true CN205928317U (en) | 2017-02-08 |
Family
ID=57922512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620865279.4U Expired - Fee Related CN205928317U (en) | 2016-08-10 | 2016-08-10 | General modular fixture of cantilever crane equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205928317U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107442993A (en) * | 2017-09-29 | 2017-12-08 | 常州伟泰科技股份有限公司 | A kind of robot flexible welding general-purpose platform and assemble welding method |
CN114161064A (en) * | 2021-12-23 | 2022-03-11 | 徐州东特重工科技有限公司 | Adjustable crane boom machining table and application method thereof |
-
2016
- 2016-08-10 CN CN201620865279.4U patent/CN205928317U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107442993A (en) * | 2017-09-29 | 2017-12-08 | 常州伟泰科技股份有限公司 | A kind of robot flexible welding general-purpose platform and assemble welding method |
CN114161064A (en) * | 2021-12-23 | 2022-03-11 | 徐州东特重工科技有限公司 | Adjustable crane boom machining table and application method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204262620U (en) | Robot welding system | |
CN102848496B (en) | Die changing device | |
CN205652760U (en) | Automatic change automobile body transfer chain | |
CN103601067A (en) | Suspender | |
CN205928317U (en) | General modular fixture of cantilever crane equipment | |
CN204737609U (en) | European style hoist girder connection structure | |
CN205147631U (en) | Robot is welding bench in turn | |
CN204282214U (en) | A kind of suspension cable cable saddle being convenient to manufacture and install | |
CN203738302U (en) | Welding jig system | |
CN109317911A (en) | A kind of cross column welding production line | |
CN205111169U (en) | Stereo garage comb plate preparation frock | |
CN204913165U (en) | Artifical assemblage bed -jig of welding H shaped steel | |
CN109317892B (en) | Be used for aluminum alloy battery tray multiaspect welded fastening frock | |
CN204262640U (en) | A kind of tower machine main chord of standard section adapter sleeve integrated positioning Welding device | |
CN203484833U (en) | Electric hoist coiling block blank assembling and welding tool | |
CN205099207U (en) | End beam of bridge crane | |
CN204818594U (en) | Roller type positioner | |
CN205367485U (en) | Crane girder | |
CN205254417U (en) | Flexibility that is suitable for longeron welding production mechanism that remodels | |
CN209021502U (en) | A kind of hanging basket track processing tool mold | |
CN207900528U (en) | A kind of loading carriage arc welding fixture that can control thermal deformation in arc-welding | |
CN208329151U (en) | A kind of assemble welding formula steel construction | |
CN202984943U (en) | Upright H-shaped steel clamping device | |
CN206605186U (en) | A kind of production fixture of generating set | |
CN206717340U (en) | Fork truck inner arm takes the jig of electricity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170208 Termination date: 20170810 |