CN205922554U - Scorpion hibernation structure - Google Patents

Scorpion hibernation structure Download PDF

Info

Publication number
CN205922554U
CN205922554U CN201620899305.5U CN201620899305U CN205922554U CN 205922554 U CN205922554 U CN 205922554U CN 201620899305 U CN201620899305 U CN 201620899305U CN 205922554 U CN205922554 U CN 205922554U
Authority
CN
China
Prior art keywords
brick
fragment
scorpion
cone structure
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620899305.5U
Other languages
Chinese (zh)
Inventor
李竹江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuanshi County Agriculture Farming Co Ltd
Original Assignee
Yuanshi County Agriculture Farming Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuanshi County Agriculture Farming Co Ltd filed Critical Yuanshi County Agriculture Farming Co Ltd
Priority to CN201620899305.5U priority Critical patent/CN205922554U/en
Application granted granted Critical
Publication of CN205922554U publication Critical patent/CN205922554U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model discloses a scorpion hibernation structure belongs to scorpion cultivation techniques field. The utility model discloses its characterized in that: including the fragment of brick group that equipartition in place was put, the stack is handed over to horizontal longitudinal phase between the layer, the cuboid fragment of brick of fragment of brick for having cone structure and locating hole, be equipped with the cone structure of two at least equipartitions in the one side of fragment of brick, the back that is equipped with cone structure brick face is equipped with two at least locating holes that match with the cone structure. The utility model discloses simple structure, it is with low costs, the effectual space that has utilized, its open -air cave nest gap is imitated for the scorpion provides in the clearance between the fragment of brick, simultaneously the utility model discloses the stack is firm, and easy dismounting does benefit to and cleans.

Description

A kind of scorpion hibernation structure
Technical field
The utility model belongs to scorpion breeding technical field and in particular to a kind of scorpion hibernation structure.
Background technology
Scorpion is the traditional famous and precious traditional Chinese medical science medicinal material of China, it not only medical value high, but also there is very high edible valency Value, its consumption figure increases year by year.Hibernation is to propagate the typically requisite step of scorpion artificially.Scorpion can stop living after the Frost's Descent Move and take food, then enter hibernation.Existing when propagating scorpion hibernation artificially, often using build in culturing pool sandy soil or The scorpion nest mode of straw carries out hibernation raising, but this mode takes up room greatly, and low space utilization manages and tears down and build cost High.
Utility model content
The technical problems to be solved in the utility model is for above-mentioned the deficiencies in the prior art, provides a kind of scorpion hibernation knot Structure, it is intended to solve hibernation scorpion nest low space utilization in prior art, manages and tears down and build the problem of high cost.
For solving above-mentioned technical problem, the utility model adopts the technical scheme that:A kind of scorpion hibernation structure, its feature It is:Uniformly put including in layer, interlayer transverse and longitudinal intersect stacking fragment of brick group;Described fragment of brick is with cone structure and location hole Cuboid fragment of brick, the one side of described fragment of brick is provided with least two uniform cone structures, is provided with the back of the body in cone structure brick face Face is provided with least two location holes matching with cone structure.
Preferably, the gap between the fragment of brick uniformly put in described layer is 10-20mm.
Have the beneficial effects that using produced by technique scheme:
The utility model structure is simple, and low cost effectively make use of space, the gap between fragment of brick provides imitative for scorpion Imitate its field Xue Wo gap.The cone structure being arranged by fragment of brick tow sides and location hole, realize the utility model structure Each layer of fragment of brick is uniformly arranged, the uniform interfolded of fragment of brick interlayer, makes the utility model stacking firmly, and easy accessibility is beneficial to Clean.
Brief description
Fig. 1 is the utility model example structure schematic diagram.
Fig. 2 is the structural representation of the fragment of brick in the utility model embodiment.
Fig. 3 is Fig. 2 upward view.
In figure:1st, fragment of brick;11st, cone structure;12nd, location hole;2nd, gap.
Specific embodiment
With reference to the accompanying drawings and detailed description the utility model is described in further detail.
As shown in Figure 1 to Figure 3, a kind of scorpion hibernation structure it is characterised in that:Uniformly put including in layer, interlayer transverse and longitudinal 1 group of the fragment of brick of intersecting stacking;Described fragment of brick 1 is the cuboid fragment of brick 1 with cone structure 11 and location hole 12, described fragment of brick 1 One side be provided with five uniform cone structures 1, be provided with cone structure 11 brick face the back side be provided with five with cone structure 11 The location hole 12 matching.For convenience of statement it is assumed that cuboid fragment of brick 1 is long for length, width and height in the relation of length direction>High>Width, The face that fragment of brick 1 is provided with cone structure 1 can be length and width composition face, grow tall composition face or high width composition face.Preferably, this enforcement Example is provided with cone structure 1 from one of length and width composition face, and such structure both consolidated, and space availability ratio is also high, and another Individual length and width form face, the i.e. back side, then be provided with the location hole 12 matching with cone structure 1.During assembling the utility model embodiment, First put generally uniform for five fragments of brick 1 of bottom, fitted with ground in the length and width face being provided with location hole 12, then the brick by the second layer What the fragment of brick 1 of block 1 and bottom intersected vertically puts, the location hole 12 of the fragment of brick 1 of the second layer cone by fragment of brick 1 each with bottom Structure 1 cooperation positioning, makes the gap of each fragment of brick of bottom 1 more uniform, and putting of second layer fragment of brick 1 is more uniform, by that analogy, Stacking third layer can also up be continued, the 4th layer of grade it is preferable that the present embodiment stacking to third layer to more firm.This Control gauge cultivation rugged construction then, uniform and stable, it is convenient to clean, and dismounting the present embodiment is also more quick simultaneously, space utilization Rate is high.Before and after the Frost's Descent, build the present embodiment, it is preferred to use cross the fragment of brick 1 in summer, because live through the fragment of brick after summer 1 containing There is certain moisture it is ensured that will not be dehydrated during scorpion hibernation.After the Frost's Descent, when scorpion needs hibernation, scorpion can be entered In the gap 2 of above-mentioned the present embodiment fragment of brick 1, cave nest carries out hibernation.The present embodiment can be positioned in culturing pool or box for breeding, Multiple the present embodiment can be placed in one culturing pool or box for breeding.
Preferably, the gap 2 between the fragment of brick 1 uniformly put in described layer is 10mm, the setting of this gap 2 with reference to scorpion Son Individual Size and nature in cave nest habit, gap 2 setting too big or too little be all unfavorable for scorpion habit, therefore preferably incite somebody to action between Gap 2 is set to 7 to 13mm.

Claims (2)

1. a kind of scorpion hibernation structure it is characterised in that:Uniformly put including in layer, interlayer transverse and longitudinal intersect stacking fragment of brick group; Described fragment of brick is the cuboid fragment of brick with cone structure and location hole, and it is uniform that the one side of described fragment of brick is provided with least two Cone structure, the back side being provided with cone structure brick face is provided with least two location holes matching with cone structure.
2. scorpion hibernation structure according to claim 1 is it is characterised in that between the fragment of brick uniformly put in described layer Gap is 7-13mm.
CN201620899305.5U 2016-08-18 2016-08-18 Scorpion hibernation structure Expired - Fee Related CN205922554U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620899305.5U CN205922554U (en) 2016-08-18 2016-08-18 Scorpion hibernation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620899305.5U CN205922554U (en) 2016-08-18 2016-08-18 Scorpion hibernation structure

Publications (1)

Publication Number Publication Date
CN205922554U true CN205922554U (en) 2017-02-08

Family

ID=57918394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620899305.5U Expired - Fee Related CN205922554U (en) 2016-08-18 2016-08-18 Scorpion hibernation structure

Country Status (1)

Country Link
CN (1) CN205922554U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110235855A (en) * 2019-08-02 2019-09-17 杨桂连 A kind of ecological ideas aquaculture pond and its application method
CN111713455A (en) * 2019-03-22 2020-09-29 西安文理学院 Garden type ecological scorpion breeding pond system and method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111713455A (en) * 2019-03-22 2020-09-29 西安文理学院 Garden type ecological scorpion breeding pond system and method thereof
CN110235855A (en) * 2019-08-02 2019-09-17 杨桂连 A kind of ecological ideas aquaculture pond and its application method
CN110235855B (en) * 2019-08-02 2021-09-14 滨州市北海新区海缘养殖科技有限公司 Ecological green culture pond

Similar Documents

Publication Publication Date Title
CN202722287U (en) Ecological, environment-friendly and efficient device for breeding ground beetle
CN104782430A (en) Efficient kiwi plant culturing method through double-layer canopy frame
CN205922554U (en) Scorpion hibernation structure
CN203597150U (en) Drawer type fertilization flowerpot
CN205546706U (en) Overhead cave dish strawberry device of growing seedlings
CN106538403A (en) A kind of goat three-dimensional culture field
CN204860626U (en) Room is bred by soil unit
CN205947011U (en) Bee device is put to movable type
CN202104108U (en) Novel tridimensional poultry breeding shelf
CN202262297U (en) Insect cross pollination shed for crop breeding
CN205511601U (en) Powder ware is fed to crossbeam
CN204206876U (en) A kind of leakage excrement type bamboo rat propagating and breeding cage
CN202509506U (en) Arc structure for side slope regreening
CN203482769U (en) Spawning ground for soft-shelled turtles
CN203435529U (en) Natural mating cage
CN207135995U (en) The numerous easy device for putting Encarsia formosa of vega
CN201905017U (en) Storage device for prompting germination of seeds
CN204968371U (en) Hiller
CN105284468A (en) Ceramic tile cement inclined panel semicircular pipe rack stereoscopic planting device and matrix fertilizer for purple jade iron stick yam
CN206294599U (en) A kind of combined vertical device for raising seedlings
CN102907376A (en) Centipede stereoscopic breeding greenhouse
CN205830523U (en) A kind of Multifunctional plant protection bottle
CN202269292U (en) Centipede stereo breeding nest
CN204590390U (en) A kind of button-type building wall block mutually
CN201869657U (en) Shelf type poultry brooding device on gauze

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20190818