CN205907717U - Assembled inspection shaft - Google Patents

Assembled inspection shaft Download PDF

Info

Publication number
CN205907717U
CN205907717U CN201620891125.2U CN201620891125U CN205907717U CN 205907717 U CN205907717 U CN 205907717U CN 201620891125 U CN201620891125 U CN 201620891125U CN 205907717 U CN205907717 U CN 205907717U
Authority
CN
China
Prior art keywords
well
installing frame
top edge
lower limb
half bore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620891125.2U
Other languages
Chinese (zh)
Inventor
陶坚
朱圣光
谢林根
金鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jufeng City Equipment Co., Ltd.
Original Assignee
Lin'an Jufeng Urban Support Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lin'an Jufeng Urban Support Equipment Co Ltd filed Critical Lin'an Jufeng Urban Support Equipment Co Ltd
Priority to CN201620891125.2U priority Critical patent/CN205907717U/en
Application granted granted Critical
Publication of CN205907717U publication Critical patent/CN205907717U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses an assembled inspection shaft, including base, the at least well body and well cover installation frame, base, the at least well body and well cover installation frame connect gradually, and be adjacent joint between the well body, base, the at least well body and well cover installation frame are moulded plastics by SMC combined material and are formed, the well body is including ring ontology, ring ontology's lower limb is provided with the round arch, the top edge be provided with the round with protruding complex recess, the base includes the base body, base body top edge is provided with the round recess, and the lower limb is provided with flatly. The utility model discloses an assembled inspection shaft compares in traditional brick well, and the SMC combined material well body is very quick when the installation, and the installation back maintenance time is of short duration, can accelerate to come into operation, and a lot of fatigue power costs is saved simultaneously to very big improvement engineering efficiency.

Description

A kind of assembled inspection well
Technical field
This utility model is related to building equipment technical field, more particularly, to a kind of assembled inspection well.
Background technology
Inspection shaft be for the power supply of Urban Underground infrastructure, feedwater, draining, blowdown, communication, cable television, gas pipe, Public lighting circuit etc. keep in repair, easy for installation and arrange.Be generally located at pipeline intersection, turning, caliber or gradient change, with And locate at a certain distance on straight line pipeline section, it is easy for making regular check on auxiliary construction.
Inspection shaft of the prior art, has 2 kinds of structures, and one kind is plastics or iron and steel integrated injection molding inspection shaft, refers to constitute The main well seating portion of inspection shaft adopts once injection moulding, and pit shaft socket adopts 360 degree of ring-like carrying platforms, well bore and well Seat bottom adopts netted reinforcing rib, and each bell and spigot adopts ring-like reinforcing rib design;Another kind is brick well, with fragment of brick and cement etc. Building materials are up piled up from inspection bottom and are formed.
Using the inspection shaft of above two prior art, have the disadvantage in that the inspection with plastics or iron and steel integrated injection molding Well is larger due to volume, and quality is larger, therefore there is a problem of that installation and transportation are inconvenient, meanwhile, plastics or iron and steel integrated injection molding Inspection shaft, due to long-time in the wet environment of underground, perishable, time length, intensity decreases, service life is short;Brick Although well long service life, its complex procedures, install inconvenient, the set-up time is long.
Utility model content
In view of in place of above-mentioned the deficiencies in the prior art, the purpose of this utility model is to provide a kind of assembled inspection well, Installation and transportation are convenient, not perishable, long service life.
In order to achieve the above object, this utility model takes technical scheme below:
A kind of assembled inspection well, including pedestal, at least one piece well body and well lid installing frame, described pedestal, at least a piece Well body and well lid installing frame are sequentially connected, clamping between adjacent described well body, described pedestal, at least one piece well body and well lid peace Frame up and be molded by smc composite, described well body includes annular body, the lower limb of described annular body is provided with one Circle is raised, and top edge is provided with the groove of a circle and described male cooperation, and described pedestal includes base body, described base body Top edge is provided with a circle groove, and lower limb is provided with flat.
Further, on described pedestal, at least one side is provided with for reserving of being connected with the pipeline of other inspection shafts Perforate.
Further, described pedestal includes first module and second unit, and each described reserved perforate includes the first half bore With the second half bore, described first half bore is arranged at the lower limb of described first module, and described second half bore is arranged at described second The top edge of unit, described first half bore and the second half bore can close.
Further, described raised raised for upside-down trapezoid, described groove is trapezoidal groove.
Further, described well lid installing frame includes installing frame body, and the top edge of described installing frame body is provided with flat Flat-shaped raised item, lower limb is provided with the groove with the male cooperation of described well body.
Further, the outside of described flat raised item is provided with multiple reinforcements.
A kind of beneficial effect of assembled inspection well that this utility model provides:
1. material:
1) compared to traditional brick inspection shaft, smc material very light it is easy to transport and installation process in removing Fortune, directly saves manpower.
2) compared to injection inspection shaft, smc composite is much won in intensity, anticorrosive differentiation, durability.In addition The performance of load-bearing stress is also won many, be embodied directly in the effect of anti-well body sedimentation.Can be according to needed for the well lid of top Load-bearing tonnage, accordingly to adjust the load-bearing tonnage of casing.
2. design:
1) layer-stepping design, is readily transported, is easily installed workers carry.
2) inserted installation between levels, very efficiently convenient, without cement and other auxiliary jointing material.
3) position of opening and size can be reserved according to the pipeline entering well body.
4) according to using needs, the shape and size of well body can be made an amendment.
3. install:
1) compared to traditional brick well, smc composite well body is very quick when mounted, and after installation, service time is short Temporarily, can accelerate to come into operation, greatly improve engineering efficiency, save a lot of labor costs simultaneously.
2) well body and well lid integrated design are so that the connection of well lid and well body and installation are very firm, in safety Realization more prominent.
Brief description
Fig. 1 is the structural representation of the assembled inspection well of this utility model specific embodiment.
Fig. 2 is the sectional view of the well body of assembled inspection well of this utility model specific embodiment.
Shown in figure: 1, first module, 2, second unit, the 3, first half bore, the 4, second half bore, 5, well body, 6, well lid peace Frame up, 7, raised, 8, groove, 9, flat raised item, 10, reinforcement.
Specific embodiment
This utility model provides a kind of assembled inspection well.For making the purpose of this utility model, technical scheme and effect more Plus clear, clear and definite, the embodiment that develops simultaneously referring to the drawings further describes to this utility model.It should be appreciated that this place The specific embodiment of description only in order to explain this utility model, is not used to limit this utility model.
As illustrated in fig. 1 and 2, be this utility model specific embodiment assembled inspection well, including pedestal, at least one piece well Body 5 and well lid installing frame 6.
Pedestal, well body 5 and well lid installing frame 6 are sequentially connected.Specifically, pedestal is installed on bottommost, and pedestal includes One unit 1 and second unit 2, first module 1 and second unit 2 clamping, specifically, in the top edge setting of first module 1 Groove 8, for connecting well body 5, the lower limb setting raised 7 of first module 1, the top edge setting of second unit 2 is joined with raised 7 The groove 8 closing, lower limb setting is flat.
It should be noted that inspection shaft is typically also coupled together by pipeline with other inspection shafts in underground, therefore exist Reserved perforate for being connected with the pipeline of other inspection shafts typically can be provided with pedestal, and for the ease of manufacturing procedure, this Reserve perforate a bit and set up and is set to the first half bore 3 and the second half bore 4, the first half bore 3 is arranged at the lower limb of first module 1, second Half bore 4 is arranged at the top edge of described second unit 2, and the first half bore 3 and the second half bore 4 can close.
In actual applications, the block number of well body 5 determines according to the height of dell, unlimited.Logical between adjacent well body 5 Cross clamping to couple together.
Specifically, well body 5 includes annular body, and the lower limb of annular body is provided with a circle projection 7, and top edge is arranged There is the groove 8 of a circle and raised 7 cooperations.
In the present embodiment, raised 7 is upside-down trapezoid projection 7, and described groove 8 is trapezoidal groove 8.It is, of course, also possible to have Other embodiment, such as projection 7 and groove 8 are rectangular block, and such as projection 7 and groove 8 are semicircle.
Well lid installing frame 6 includes installing frame body, and the top edge of described installing frame body is provided with flat raised item 9, Lower limb is provided with the groove 8 with projection 7 cooperation of described well body 5.The outside of flat raised item 9 is provided with multiple reinforcements 10.
A kind of installation method of assembled inspection well, comprises the following steps:
S1, dig out default inspection shaft depth dell;
S2, the pedestal of described assembled inspection well is placed in dell;
S3, according to default height, gradually on pedestal, be superimposed well body 5, until flushing with the height of dell;
S4, finally well lid installing frame 6 is installed in described well body 5;
S5, add a cover inspection well cover.
Also include after s1 step, the reserved perforate according to staying in advance has connected the pipeline being connected with other pipelines.
In assembled inspection well of the present utility model, pedestal, at least one piece well body 5 and well lid installing frame 6 are multiple by smc Condensation material is molded, smc composite, one kind of fiberglass.
Smc composite of the present utility model is by polyester resin 16%, shrinking agent 4%, inner pattern releasing agent applicable 1%, initiator 6%th, aluminium hydroxide 40%, woven glass roving fabric 30%, thickening agent 0.15%, coupling agent 1%, cross-linking agent 0.11%, resistance Poly- agent 1.74%.
It is understood that for those of ordinary skills, can according to the technical solution of the utility model and This utility model design in addition equivalent or change, and all these change or replace all should belong to appended by this utility model Scope of the claims.

Claims (6)

1. a kind of assembled inspection well is it is characterised in that include pedestal, at least one piece well body and well lid installing frame, described pedestal, At least one piece well body and well lid installing frame are sequentially connected, clamping between adjacent described well body, described pedestal, at least one piece well body It is molded by smc composite with well lid installing frame, described well body includes annular body, the lower limb of described annular body It is provided with a circle raised, top edge is provided with the groove of a circle and described male cooperation, and described pedestal includes base body, described Base body top edge is provided with a circle groove, and lower limb is provided with flat.
2. a kind of assembled inspection well according to claim 1 it is characterised in that on described pedestal at least one side set It is equipped with the reserved perforate for being connected with the pipeline of other inspection shafts.
3. a kind of assembled inspection well according to claim 2 is it is characterised in that described pedestal includes first module and Unit two, each described reserved perforate includes the first half bore and the second half bore, and described first half bore is arranged at described first module Lower limb, described second half bore is arranged at the top edge of described second unit, and described first half bore and the second half bore can close.
4. a kind of assembled inspection well according to claim 1 is it is characterised in that described raised raised for upside-down trapezoid, Described groove is trapezoidal groove.
5. a kind of assembled inspection well according to claim 1 is it is characterised in that described well lid installing frame includes installing frame Body, the top edge of described installing frame body is provided with flat raised item, and lower limb is provided with is joined with the projection of described well body The groove closing.
6. a kind of assembled inspection well according to claim 5 is it is characterised in that the outside of described flat raised item sets It is equipped with multiple reinforcements.
CN201620891125.2U 2016-08-16 2016-08-16 Assembled inspection shaft Active CN205907717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620891125.2U CN205907717U (en) 2016-08-16 2016-08-16 Assembled inspection shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620891125.2U CN205907717U (en) 2016-08-16 2016-08-16 Assembled inspection shaft

Publications (1)

Publication Number Publication Date
CN205907717U true CN205907717U (en) 2017-01-25

Family

ID=57800602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620891125.2U Active CN205907717U (en) 2016-08-16 2016-08-16 Assembled inspection shaft

Country Status (1)

Country Link
CN (1) CN205907717U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120861A (en) * 2016-08-16 2016-11-16 临安巨丰城市配套设备有限公司 A kind of assembled inspection well and installation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120861A (en) * 2016-08-16 2016-11-16 临安巨丰城市配套设备有限公司 A kind of assembled inspection well and installation method thereof

Similar Documents

Publication Publication Date Title
CN106120861A (en) A kind of assembled inspection well and installation method thereof
CN206085320U (en) Make vertical vibration steel mould of compound pipe of fibre reinforced plastic concrete
CN108149685B (en) Method for repairing and reinforcing pile head of concrete pipe pile
CN214466717U (en) Composite concrete pipe
CN205907717U (en) Assembled inspection shaft
CN202466631U (en) Prefabricated reinforced concrete inspection well and die thereof
CN218236612U (en) Reinforced concrete pipeline repairing device
CN203782750U (en) Combined type inspection well
CN203514482U (en) Novel sealing plastic inspection well
CN203716186U (en) Inspection well
CN105350578A (en) Compatible plastic inspection well and connecting structure of compatible plastic inspection well and pipeline
CN104179239B (en) A kind of Integral glass fibre reinforced plastic inspection pit
CN105602839A (en) Spliced fiberglass-reinforced plastic biogas fermentation tank
CN205576973U (en) Circular inspection shaft of prefabricated formula
CN109577498B (en) Plugging device suitable for small-area floor entrance to a cave
CN209587479U (en) A kind of PE device for repairing pipeline
CN205742489U (en) The drainage system device of integral type
CN214530781U (en) Inspection shaft convenient to installation
CN106437841A (en) Railway tunnel drainage blind pipe for preventing leakage and construction method thereof
CN112815158A (en) Composite concrete pipe
CN103899115B (en) A kind of vertical plastic water cellar and assemble method thereof
CN217272780U (en) Blind plate structure for water closing test
CN210917655U (en) Infrastructure pit shaft mounting structure
CN204081034U (en) A kind of Integral glass fibre reinforced plastic inspection pit
CN218176069U (en) A repair structure for sewage inspection shaft

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 310000 Langbi Village, Jincheng Street, Linan District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou Jufeng City Equipment Co., Ltd.

Address before: 311300 Langbi Village, Jincheng Street, Linan City, Hangzhou City, Zhejiang Province

Patentee before: LIN'AN JUFENG URBAN SUPPORT EQUIPMENT CO., LTD.

CP03 Change of name, title or address