CN203782750U - Combined type inspection well - Google Patents

Combined type inspection well Download PDF

Info

Publication number
CN203782750U
CN203782750U CN201420145752.2U CN201420145752U CN203782750U CN 203782750 U CN203782750 U CN 203782750U CN 201420145752 U CN201420145752 U CN 201420145752U CN 203782750 U CN203782750 U CN 203782750U
Authority
CN
China
Prior art keywords
group
necking down
transitional cylinder
arc tube
inspection shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420145752.2U
Other languages
Chinese (zh)
Inventor
廖康平
张军华
廖敏
周涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LESHAN MING-SQUARE PLASTIC PRODUCTS TECHNOLOGY Co Ltd
Original Assignee
LESHAN MING-SQUARE PLASTIC PRODUCTS TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LESHAN MING-SQUARE PLASTIC PRODUCTS TECHNOLOGY Co Ltd filed Critical LESHAN MING-SQUARE PLASTIC PRODUCTS TECHNOLOGY Co Ltd
Priority to CN201420145752.2U priority Critical patent/CN203782750U/en
Application granted granted Critical
Publication of CN203782750U publication Critical patent/CN203782750U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a combined type inspection well. The combined type inspection well mainly comprises a well base, a wellbore mounted on the well base in a connecting manner, a necking transition tube, a cover frame and a well cover, and a group of removable independent components is produced and manufactured by decomposing glass fiber or basalt fiber-reinforced thermosetting resin composite materials according to a standardized disassembling principle, and then the group of removable independent components can be mounted to be the firm inspection well through fast connection and combination in a pipeline construction field, so that the technical problems of the conventional integrally formed inspection well such as inconvenience for production, transportation and mounting due to a huge volume can be perfectly solved, and trials show that the combined type inspection well provided by the utility model really has the outstanding advantages of light weight, high strength, strong load-bearing and pressure resistant capabilities, safety and reliability in operation and long service life, thereby having good popularization and application prospect in construction of municipal pipe networks.

Description

Combined inspection shaft
Technical field
The utility model relates to pipe manhole, belong to the ancillary structure of city planting ductwork facility, a specifically combined inspection shaft, it is particularly suitable for installing and using on the city planting ductworks such as optical-fibre communications, cable television, public lighting circuit, gas pipe and fire-fighting, plumbing.
Background technology
Along with the high speed development of Chinese national economy, the process that has effectively advanced Chinese Urbanization to build, in order to improve urban safety high efficiency smart operation level, need to lay such as optical-fibre communications specially at underground, cable television, public lighting circuit, gas pipe, the city planting ductwork such as fire-fighting and plumbing facility, can normally move steadily in the long term in order to ensure these pipe network infrastructure, generally all will be in pipeline intersection, turning, on caliber or gradient change place and straight line pipeline section, locate at a certain distance to build the vertical shaft that is exclusively used in maintenance overhaul, its objective is that being convenient to municipal pipeline maintenance management personnel is entered in pipeline and made regular check on and safeguard and repairing operation by vertical shaft.For a long time, the manhole of urban Underground pipeline is mostly to adopt traditional brick construction, but, the technical problem that in use exists all many-sides such as handling safety, environmental protection resource to be difficult to overcome due to this " manhole of laying bricks ", the Ministry of Construction of China just sent the documents and has clearly specified as far back as 2004: require to ban use of clay solid brick to build manhole, and the work of promoting Novel inspection well is researched and developed in active support on fund policy.Up to now, due to eliminating gradually of " manhole of laying bricks ", a kind of cement manhole of monobloc cast moulding is widely applied in municipal pipe network construction.We but find being engaged in for a long time in city planting ductwork equipment research and development and production installation practice: the cement manhole of this monobloc cast moulding is due to the large heaviness of body, in the manufacturing, transporting and hoisting and installation operation process, also there is many drawbacks, it has not only increased the expense of equipment in transhipment storage and installation, also increase the difficulty of on-site hoisting construction simultaneously and then affect installation exercise efficiency, seriously time, also can restrict the construction progress of city planting ductwork and incur loss through delay the construction period.In order to address this problem, some manufacturing enterprises start to attempt releasing the product of global formation all-plastic manhole (as polyethylene manhole), although it can alleviate the weight of manhole and have good toughness, but, still there is in actual use the structural defect of " bulky " in it, and because all-plastic manhole self material rigidity intensity is low, externally load-bearing voltage endurance capability is poor, easy crushing in actual use, this " all-plastic manhole " product that is existing exists that " rapid wear repair rate is high, working life is shorter " critical defect and a main cause being difficult to apply.This has become a pipe network equipment production industry and municipal administration department technical problem in the urgent need to address, and the utility model will address this problem just.
Utility model content
The purpose of this utility model is intended to overcome prior art above shortcomings part and combined inspection shaft that a kind of new structure is provided.It is to adopt the stand-alone assembly that has the polymer composite of high rigidity, strength character and decompose production standard according to disassembly and assembly structure, again each assembly is transported to pipeline network construction job site and assembles, quick each assembly connection can be become combined inspection shaft for.
The purpose of this utility model realizes according to following technical scheme:
A kind of combined inspection shaft, it comprises well seat, is installed on pit shaft, necking down transitional cylinder, cage and well lid on well seat, it is characterized in that: described pit shaft is assembled and formed by one group of arc tube plate, necking down transitional cylinder is assembled and is formed by one group of necking down transitional cylinder plate, has at least two to be provided with adapter hole in one group of arc tube plate.Its significant design feature is: manhole is decomposed into the stand-alone assemblies such as removable well seat, cage, well lid and one group of arc tube plate, necking down transitional cylinder plate according to product self structure characteristic, high, the lightweight polymer composite of preferred intensity is manufactured respectively the stand-alone assemblies such as single well seat, cage, well lid and one group of arc tube plate, necking down transitional cylinder plate by standardization principle, can assemble fast formation combined inspection shaft to stand-alone assembly in pipeline network construction construction ground, then by municipal pipeline be connected in take over hole can use.This combined inspection shaft has that own wt is light, rigidity intensity is high, load-bearing voltage endurance capability is strong, is difficult for deformed damaged, the good characteristic of safe and reliable to operation, long service life, simultaneously, also can greatly simplify production technology, significantly reduce investment of production equipment expense and manufacturing cost, also be convenient to especially stand-alone assembly to transport the operation of storage and installation, it all has great social effect and great economic benefit to raising piping network installation operating efficiency, reduction of erection time, reduction municipal pipe network construction operating cost.
Furthermore, it also has following technical characterictic:
Be provided with connection otic placode at the periphery of arc tube plate, connect on otic placode and be provided with connecting hole, described pit shaft is to be fixedly connected with one group of arc tube plate assembling by the bolt that is through at connecting hole to form.Structure design with bolts has obvious effect to the bonding strength and the installation efficiency that improve pit shaft.Certainly, also can adopt pin to connect or be riveting to connect or turn round connection etc. other is fixedly connected with mounting means, in practice, also have same result of use.
Connection edge at necking down transitional cylinder plate is provided with installation otic placode, installs on otic placode and is provided with installing hole, and described necking down transitional cylinder is to be fixedly connected with one group of necking down transitional cylinder plate assembling by the bolt that is through at installing hole to form.This structure design with bolts also has obvious effect to the bonding strength and the installation efficiency that improve necking down transitional cylinder.In like manner, also can adopt pin to connect or be riveting and connect or turn round other connection modes such as connection, in practice, also have same result of use.
The quantity of one group of arc tube plate is three to eight, and the quantity of one group of necking down transitional cylinder plate is three to eight.It should be noted that: the concrete quantity of one group of arc tube plate can be determined according to pipeline network construction technical requirements, the quantity of arc tube plate of taking over hole is particularly set, will determines according to the technical indicator that requires to be assembled into straight manhole or turning manhole or three-way inspection well, four-way manhole in pipeline network construction especially.
The quantity of one group of arc tube plate is four, and the quantity of one group of necking down transitional cylinder plate is four.The pit shaft of this " four connections " and necking down transitional cylinder are the most frequently used optimization connecting assembling structures, and it is on relative arc tube plate, to arrange to take over hole, and this structure design is specially adapted to straight manhole.
Cage bottom be provided with necking down transitional cylinder on the suitable annular groove of nozzle, one group of journal stirrup is set cage lateral surface is uniform.This structure design is convenient to the constructing operation of equipped cage on necking down transitional cylinder especially, and it is determined stability and all have certain effect with the axiality of necking down transitional cylinder the jail of improving cage installation.
On well seat, be provided with positioning convex ring and one group of installation screw.This structure design is particularly conducive to and on well seat, is fixedly connected with the constructing operation that pit shaft is installed, and it has good positioning limit effect to pit shaft, and the verticality that further raising pit shaft is installed has positive effect.
Described well seat, one group of arc tube plate, one group of necking down transitional cylinder plate, cage and well lid are to adopt glass fiber or basalt fibre to strengthen thermoset ting resin composite to make.The utility model optimization selects glass-fiber reinforced thermo-setting resin composite material to manufacture assembly, can make full use of the fine quality characteristic that material weight is light, rigidity intensity is high and improve the processing performance of manufacturing, it has obvious effect to the operation working life of further raising combined inspection shaft.
The utility model compared with the existing technology has following substantive distinguishing features and progress:
The utility model has been initiated a kind of combined inspection shaft new structure that can carry out at pipeline network construction scene connection, it is to adopt glass fiber or basalt fibre to strengthen thermoset ting resin composite to decompose and make one group of removable stand-alone assembly by standardization principle, one group of stand-alone assembly is transported to construction ground and can assembles into fast firmly combined inspection shaft.It is compared with existing global formation manhole, can greatly simplify production technology, reduce investment of production equipment expense, be convenient to especially transport, deposit the operation with installation, to improving piping network installation operating efficiency, reduce municipal pipe network construction operating cost and have positive effect, it has ideally solved existing global formation manhole " because bulky being not easy to produced, transport and install " a technical difficult problem, show through on probation: the combined inspection shaft the utility model proposes has lightweight really, intensity is high, externally load-bearing voltage endurance capability is strong, the outstanding advantages of safe and reliable to operation and long service life, in municipal pipe network construction, there is good popularizing application prospect.
Brief description of the drawings
Fig. 1 is the overall structure figure that assembles of the present utility model, and accompanying drawing also makes an abstract simultaneously.
Fig. 2 is the dismounting exploded view of each assembly of the present utility model, shows the structure and the schematic diagram that assembles position of each assembly.
Fig. 3 is the structure chart of well seat, is illustrated in the structural representation that positioning convex ring is set on well seat.
Fig. 4 is the structure chart (amplification) of cage, is illustrated in cage bottom and arranges the equipped structural representation of annular groove setting-in necking down transitional cylinder.
Description of symbols in accompanying drawing:
1 is well lid, and 2 is cage, and 3 for installing otic placode, and 4 is bolt, and 5 for connecting otic placode, and 6 is arc tube plate, 7 for taking over hole, and 8 is well seat, and 9 is connecting hole, and 10 is installing hole, and 11 is necking down transitional cylinder plate, 12 is journal stirrup, and 13 is positioning convex ring, and 14 is installation screw, and 15 is well head, and 16 is annular groove.
Detailed description of the invention
As an example of the straight-through check well of " four connections " structure example, embodiment of the present utility model is described below in conjunction with accompanying drawing:
The combined inspection shaft the utility model proposes, it is mainly by well seat 8, be connected and installed in the pit shaft on well seat 8, necking down transitional cylinder, cage 2 and well lid 1 form, on well seat 8, be provided with pit shaft and adapt and carry out spacing positioning convex ring 13 and one group of installation screw 14, be provided with the annular groove 16 suitable with the upper nozzle of necking down transitional cylinder at cage 2 bottom faces, one group of journal stirrup 12 is set the lateral surface of cage 2 is uniform, described pit shaft is to be provided with and to be connected four arc tube plates 6 of otic placode 5 and assemble and form by periphery, on two relative arc tube plates 6, be provided with the adapter hole 7 for connecting municipal pipeline, its connected mode is: be threaded onto to connect with one group of bolt 4 and in the connecting hole 9 of otic placode 5, carry out fasteningly can assembling into pit shaft, by pit shaft vertically along positioning convex ring 13 outside location and installation on well seat 8, again bolt is screwed in and in one group of installation screw 14, carry out fastening pit shaft can being installed on well seat 8 securely.Described necking down transitional cylinder is to be assembled and formed by four necking down transitional cylinder plates 11 that are provided with installation otic placode 3, its connected mode is: be threaded onto in the installing hole 10 that otic placode 3 is installed and be fastenedly connected and be assembled into necking down transitional cylinder with one group of bolt 4, then necking down transitional cylinder is fixedly connected with and is installed on pit shaft top with one group of bolt 4.Finally, cage 2 is fixedly fitted to the upper nozzle of necking down transitional cylinder, that is to say, the upper nozzle apical margin of necking down transitional cylinder is inserted and be flush-mounted in the annular groove 16 of cage 2 bottoms, then seal well head 15 with well lid 1 and can complete rapidly the installation operation to combined inspection shaft.
In actual production, the assemblies such as above-mentioned well seat 8, one group of arc tube plate 6, one group of necking down transitional cylinder plate 11, cage 2 and well lid 1 are to select glass fiber or basalt fibre to strengthen thermoset ting resin composite to water and be molded as, show through on probation: it can make full use of the fine quality characteristic that material own wt is light, rigidity intensity is high and have good production technology, and the operation work quality of further raising combined inspection shaft is had to positive effect.
It should be noted that: the combined inspection shaft the utility model proposes both can assembling mode with bolts, also can adopt pin to connect or be riveting to connect or turn round connection etc. and be fixedly connected with mode and combine assembling, in practice, also have same result of use.

Claims (8)

1. a combined inspection shaft, it comprises well seat (8), is installed on pit shaft, necking down transitional cylinder, cage (2) and well lid (1) on well seat (8), it is characterized in that: described pit shaft assembles formation by one group of arc tube plate (6), necking down transitional cylinder assembles formation by one group of necking down transitional cylinder plate (11), has at least two to be provided with adapter hole (7) in one group of arc tube plate (6).
2. combined inspection shaft according to claim 1, it is characterized in that: be provided with and connect otic placode (5) at the periphery of arc tube plate (6), connect on otic placode (5) and be provided with connecting hole (9), described pit shaft is to be fixedly connected with one group of arc tube plate (6) assembling by the bolt that is through at connecting hole (9) (4) to form.
3. combined inspection shaft according to claim 1 and 2, it is characterized in that: be provided with at the connection edge of necking down transitional cylinder plate (11) otic placode (3) is installed, install on otic placode (3) and be provided with installing hole (10), described necking down transitional cylinder is to be fixedly connected with one group of necking down transitional cylinder plate (11) assembling by the bolt that is through at installing hole (10) (4) to form.
4. combined inspection shaft according to claim 1 and 2, is characterized in that: the quantity of one group of arc tube plate (6) is three to eight, and the quantity of one group of necking down transitional cylinder plate (11) is three to eight.
5. combined inspection shaft according to claim 4, is characterized in that: the quantity of one group of arc tube plate (6) is four, and the quantity of one group of necking down transitional cylinder plate (11) is four.
6. combined inspection shaft according to claim 1 and 2, is characterized in that: cage (2) bottom be provided with necking down transitional cylinder on the suitable annular groove (16) of nozzle, at the uniform one group of journal stirrup (12) that arranges of cage (2) lateral surface.
7. combined inspection shaft according to claim 1 and 2, is characterized in that: on well seat (8), be provided with positioning convex ring (13) and one group of installation screw (14).
8. combined inspection shaft according to claim 1 and 2, is characterized in that: described well seat (8), one group of arc tube plate (6), one group of necking down transitional cylinder plate (11), cage (2) and well lid (1) is to adopt glass fiber or basalt fibre to strengthen thermoset ting resin composite to make.
CN201420145752.2U 2014-03-28 2014-03-28 Combined type inspection well Expired - Fee Related CN203782750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420145752.2U CN203782750U (en) 2014-03-28 2014-03-28 Combined type inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420145752.2U CN203782750U (en) 2014-03-28 2014-03-28 Combined type inspection well

Publications (1)

Publication Number Publication Date
CN203782750U true CN203782750U (en) 2014-08-20

Family

ID=51318952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420145752.2U Expired - Fee Related CN203782750U (en) 2014-03-28 2014-03-28 Combined type inspection well

Country Status (1)

Country Link
CN (1) CN203782750U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755767A (en) * 2018-07-12 2018-11-06 山东省水利科学研究院 It is assembled can load-bearing concentrate water meter chamber
CN110439083A (en) * 2019-07-25 2019-11-12 银川市川雨节水灌溉有限公司 A kind of Novel inspection well
CN112112195A (en) * 2019-06-19 2020-12-22 中国石油化工股份有限公司 Bolt connection type manhole well of gas station
CN112112196A (en) * 2019-06-19 2020-12-22 中国石油化工股份有限公司 Electric smelting concatenation formula filling station manhole well
CN115387387A (en) * 2022-08-26 2022-11-25 嘉兴汇利通新材料有限公司 Prefabricated assembled resin concrete inspection well and preparation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755767A (en) * 2018-07-12 2018-11-06 山东省水利科学研究院 It is assembled can load-bearing concentrate water meter chamber
CN112112195A (en) * 2019-06-19 2020-12-22 中国石油化工股份有限公司 Bolt connection type manhole well of gas station
CN112112196A (en) * 2019-06-19 2020-12-22 中国石油化工股份有限公司 Electric smelting concatenation formula filling station manhole well
CN110439083A (en) * 2019-07-25 2019-11-12 银川市川雨节水灌溉有限公司 A kind of Novel inspection well
CN110439083B (en) * 2019-07-25 2024-07-23 宁夏绿川科技有限公司 Inspection well
CN115387387A (en) * 2022-08-26 2022-11-25 嘉兴汇利通新材料有限公司 Prefabricated assembled resin concrete inspection well and preparation method thereof

Similar Documents

Publication Publication Date Title
CN203782750U (en) Combined type inspection well
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN209987133U (en) Circular prefabricated inspection shaft steel form of pin-connected panel
CN108867844A (en) Combined-type sewage well prefabricated component
CN203820287U (en) Composite steel carrying pole for hoisting roof tiles of steel structure workshops
CN202131613U (en) Lined prefabricated reinforced concrete inspection well
CN203389471U (en) Ceramic water film dust collector
CN101586347A (en) Combined inspection shaft
CN203716186U (en) Inspection well
CN202416973U (en) Anti-corrosion compound chimney unit and chimney
CN103161179A (en) Assembly inspection well
CN201801882U (en) Positioning and anchoring construction of foundation bolt in foundation concrete
CN109577498B (en) Plugging device suitable for small-area floor entrance to a cave
CN208981357U (en) A kind of module type concrete inspection shaft
CN211037798U (en) Aluminum-wood combined template system for basement
CN208934260U (en) A kind of outer FRP pipe-interior FRP pipe-regeneration concrete open tubular column
CN207917641U (en) It is a kind of can built by separate periods combined type pipe support
CN111945867A (en) On-site large-scale assembled glass fiber reinforced plastic integrated pump station
CN202117390U (en) Segmentally spliced water tank tower
CN204849808U (en) Basis is assembled in prefabrication of large -scale tower machine concrete
CN204728367U (en) A kind of manhole
CN202248225U (en) Check ring for plastic inspection well
CN204849828U (en) Bearing type checking well concrete block
CN210321866U (en) Socket type underground heat-preservation water meter box
CN204370546U (en) A kind of novel drainage inspection well of the draining that crosses

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

Termination date: 20210328

CF01 Termination of patent right due to non-payment of annual fee