CN103161179A - Assembly inspection well - Google Patents
Assembly inspection well Download PDFInfo
- Publication number
- CN103161179A CN103161179A CN2013100792059A CN201310079205A CN103161179A CN 103161179 A CN103161179 A CN 103161179A CN 2013100792059 A CN2013100792059 A CN 2013100792059A CN 201310079205 A CN201310079205 A CN 201310079205A CN 103161179 A CN103161179 A CN 103161179A
- Authority
- CN
- China
- Prior art keywords
- wall plates
- wallboard
- inspection well
- assembly inspection
- assembly unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Sewage (AREA)
Abstract
Provided is an assembly inspection well. The assembly inspection well is formed by assembling of four wall plates in a two-to-two opposite mode, corresponding grooves and bosses are arranged on connection portions of the four wall plates for relevancy and locating with the four wall plates, and the grooves and the bosses are connected and fixed with the connection portions through bolts. According to structural demands of a well body, holes and groove openings which bring convenience to pipeline installation are arranged in relevant positions of the wall plates. Concave platforms are arranged on the wall plates for reducing the weight of the wall plate. Frameworks are arranged inside the wall plates so as to guarantee the strength of the wall plates. The wall plates can be manufactured by concrete, steel fiber concrete, unsaturated polyester resin composite materials, regenerated resin composite materials, engineering plastics and the like in an factory-like mode, and installed on-site. According to the assembly inspection well, a material application range is wide and factory-like production process is simple, and the assembly inspection well is suitable for being used in various inspection wells, high in cost performance, higher than brick setting in strength, simple in on-site construction, convenient to install, short in construction period and strong in safety, and work efficiency can be improved effectively, and good popularization prospect can be possessed.
Description
Technical field
The present invention relates to the manhole used in a kind of municipal engineering, refer to that especially construction is simple, installation period is short, the assembly unit manhole that intensity is high.
Background technology
Urban construction needs the underground installation of supporting various functions, also needs corresponding manhole, is all to build with brickwork for a long time, needs site operation, takes a lot of work, time-consuming, and in short supply along with land resources, limited the use of loam brick now.In prior art, useful cement brick and building block replace loam brick, and this also keeps away the trouble of unavoidable site operation; Also useful integrated well seat, but run into larger well body, make troubles for transportation and installation.
Summary of the invention
The technical problem to be solved in the present invention is the defective that overcomes background technology, and a kind of batch production production is provided, and site operation is simple, and installation period is short, the assembly unit manhole that intensity is high.
Purpose of the present invention is realized by following scheme:
This assembly unit manhole has four wallboards relatively assembled in twos, corresponding groove and boss associated and location is arranged in the junction of these four wallboards, and be joined with bolts; According to the structure requirement of well body, be convenient to install hole and the notch of pipeline in the relevant position setting of wallboard; In order to alleviate the weight of wallboard, concave station is set on wallboard; In order to guarantee the intensity of wallboard, in wallboard inside, skeleton is set; Its wallboard can have the materials such as concrete, steel fiber concrete, unsaturated-resin composite material, recycled plastics, engineering plastics to carry out the batch production making, the on-the-spot installation.
This assembly unit manhole, applied widely to material, factory production process is simple, is suitable for the use with all kinds of manholes, cost performance is high, and its intensity is higher than brickwork, and site operation is simple, and is easy for installation, duration is short, and security performance is strong, effectively increases work efficiency, and good promotion prospect is arranged.
Description of drawings
Accompanying drawing 1 is assembly unit manhole top view of the present invention.
Accompanying drawing 2 is structural representations of assembly unit manhole wallboard 1 of the present invention.
Accompanying drawing 3 is structural representations of assembly unit manhole wallboard 2 of the present invention.
Shown in figure: 1, wallboard 1; 2, wallboard 2; 3, bolt; 4, hole; 5, notch; 6, bolt hole; 7, groove; 8, boss; 9, concave station 9; 10, concave station 10; 11, skeleton.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the invention will be further described.The present invention is not limited to following examples.
This assembly unit manhole has wallboard 1 relative assembled in twos with wallboard 2.Corresponding groove 7 and boss 8 associateds and location are arranged in the junction of wallboard 1 and wallboard 2, and the junction of wallboard 1 and wallboard 2 there are corresponding bolt hole 6 and bolt 3, wallboard 1 and wallboard 2 are joined with bolts; According to the structure requirement of well body, be convenient to install hole 4 and the notch 5 of pipeline in the relevant position setting of wallboard 1 and wallboard 2; In order to alleviate the weight of wallboard, concave station 9 and concave station 10 are set on wallboard 1 and wallboard 2; In order to guarantee the intensity of wallboard, at wallboard 1 and wallboard 2 inside, skeleton 11 is set; Its wallboard 1 and wallboard 2 can have the materials such as concrete, steel fiber concrete, unsaturated-resin composite material, recycled plastics, engineering plastics to carry out the batch production making, the on-the-spot installation.
Claims (7)
1. assembly unit manhole, formed by the surrounding borehole wall, it is characterized in that the described borehole wall is that wallboard (1) is relative assembled in twos with wallboard (2), the junction of described wallboard (1) and wallboard (2) have corresponding groove (7) related with boss (8) and the location.
2. assembly unit manhole according to claim 1 is characterized in that: there are corresponding bolt hole (6) and bolt (3) in the junction of described wallboard (1) and wallboard (2).
3. assembly unit manhole according to claim 1, it is characterized in that: described wallboard (1) has the hole (4) of being convenient to install pipeline.
4. assembly unit manhole according to claim 1, it is characterized in that: described wallboard (2) has the notch (5) of being convenient to install pipeline.
5. assembly unit manhole according to claim 1 is characterized in that: described wallboard (1) have can weight reduction concave station (9).
6. assembly unit manhole according to claim 1 is characterized in that: described wallboard (2) have can weight reduction concave station (10).
7. according to claim 1 and 2,3,4,5,6 described assembly unit manholes, it is characterized in that: in described wallboard (1) and wallboard (2), skeleton (11) is arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100792059A CN103161179A (en) | 2013-03-13 | 2013-03-13 | Assembly inspection well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100792059A CN103161179A (en) | 2013-03-13 | 2013-03-13 | Assembly inspection well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103161179A true CN103161179A (en) | 2013-06-19 |
Family
ID=48584688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100792059A Pending CN103161179A (en) | 2013-03-13 | 2013-03-13 | Assembly inspection well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103161179A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104047354B (en) * | 2014-07-10 | 2015-11-25 | 童中祥 | A kind of assembling general-purpose type fiber glass reinforced plastics inspection well |
CN108149770A (en) * | 2018-01-31 | 2018-06-12 | 常州信息职业技术学院 | A kind of mosaic combined large plastic inspection well well room and preparation method thereof |
CN114809091A (en) * | 2022-04-20 | 2022-07-29 | 浙江三泰新材料科技有限公司 | Spliced inspection well and installation method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3843151A1 (en) * | 1988-12-22 | 1990-07-05 | Bruno Heibges | Construction set for producing shafts of reinforced concrete members |
CN2597553Y (en) * | 2002-12-20 | 2004-01-07 | 北京欣金宇砼制品有限公司 | Prefabricated concrete rectangular door arch type manhole |
KR200427575Y1 (en) * | 2006-06-27 | 2006-09-28 | (주)태경 엔지니어링 | Prefabricated small-sized manhole panel and prefabricated small-sized manhole using the same |
CN201386288Y (en) * | 2009-04-21 | 2010-01-20 | 句容市科达技术开发有限公司 | Conjoined well seat body for detecting well cover and water meter box |
CN201817819U (en) * | 2010-10-19 | 2011-05-04 | 天津市泽宝水泥制品有限公司 | Prefabricated assembled reinforced concrete rectangular inspection well chamber |
CN102767227A (en) * | 2011-05-06 | 2012-11-07 | 徐刚 | Combined rectangular municipal inspection well chamber prefabricating part |
-
2013
- 2013-03-13 CN CN2013100792059A patent/CN103161179A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3843151A1 (en) * | 1988-12-22 | 1990-07-05 | Bruno Heibges | Construction set for producing shafts of reinforced concrete members |
CN2597553Y (en) * | 2002-12-20 | 2004-01-07 | 北京欣金宇砼制品有限公司 | Prefabricated concrete rectangular door arch type manhole |
KR200427575Y1 (en) * | 2006-06-27 | 2006-09-28 | (주)태경 엔지니어링 | Prefabricated small-sized manhole panel and prefabricated small-sized manhole using the same |
CN201386288Y (en) * | 2009-04-21 | 2010-01-20 | 句容市科达技术开发有限公司 | Conjoined well seat body for detecting well cover and water meter box |
CN201817819U (en) * | 2010-10-19 | 2011-05-04 | 天津市泽宝水泥制品有限公司 | Prefabricated assembled reinforced concrete rectangular inspection well chamber |
CN102767227A (en) * | 2011-05-06 | 2012-11-07 | 徐刚 | Combined rectangular municipal inspection well chamber prefabricating part |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104047354B (en) * | 2014-07-10 | 2015-11-25 | 童中祥 | A kind of assembling general-purpose type fiber glass reinforced plastics inspection well |
CN108149770A (en) * | 2018-01-31 | 2018-06-12 | 常州信息职业技术学院 | A kind of mosaic combined large plastic inspection well well room and preparation method thereof |
CN114809091A (en) * | 2022-04-20 | 2022-07-29 | 浙江三泰新材料科技有限公司 | Spliced inspection well and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510640B (en) | A kind of fabricated shear wall and assembly method thereof | |
CN205444458U (en) | Integrated assembled steel construction building | |
CN103993679B (en) | Low layer assembling combined wall house bolt connection node structure | |
CN104947684A (en) | Soil nailing wall supporting construction method based on assembly type recoverable process | |
CN103225422A (en) | Existing masonry structure using light steel structure direct storey-adding technology and construction method of existing masonry structure | |
CN103161179A (en) | Assembly inspection well | |
CN203782750U (en) | Combined type inspection well | |
CN103343547B (en) | Container type prefabricated house assembling steel reinforced concrete four patten and construction method | |
CN210086553U (en) | Dry-type connected precast concrete wall and foundation connection node | |
CN203284801U (en) | Assembled inspection well | |
CN204492328U (en) | A kind of assembling baffle wall | |
CN112282047A (en) | Connecting structure and connecting method for assembled composite floor slab and composite wallboard | |
CN105971394A (en) | Assembly type photovoltaic dam and production process thereof | |
CN203546944U (en) | Assembly type shear wall | |
CN202148599U (en) | Container combined steel-structure building | |
CN201801882U (en) | Positioning and anchoring construction of foundation bolt in foundation concrete | |
CN101906782A (en) | Positioning and anchoring structure of foundation bolt in concrete foundation | |
CN205224388U (en) | Integrated assembled side fascia | |
CN212983870U (en) | Circular working pit supporting member | |
CN210140846U (en) | Independent foundation of precast concrete dry type combination | |
CN203201172U (en) | Existing masonry structure adopting technology of directly increasing layers by lightweight steel construction | |
CN102653992A (en) | Containerized combined type steel structure building | |
CN204457076U (en) | A kind of green assembled light enclosure wall | |
CN106088398A (en) | A kind of combined wall board | |
KR101143553B1 (en) | Construction method for building remodeling by using pc panel for building remodeling, and connecting structure for remodeling pc panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |