CN205907367U - A processing unit in advance for plate technology in succession - Google Patents

A processing unit in advance for plate technology in succession Download PDF

Info

Publication number
CN205907367U
CN205907367U CN201620721705.7U CN201620721705U CN205907367U CN 205907367 U CN205907367 U CN 205907367U CN 201620721705 U CN201620721705 U CN 201620721705U CN 205907367 U CN205907367 U CN 205907367U
Authority
CN
China
Prior art keywords
rinsing bowl
air
descaling bath
pivot
wash bowl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620721705.7U
Other languages
Chinese (zh)
Inventor
张小勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjiang Li Jiang Electronics Co Ltd
Original Assignee
Zhongjiang Li Jiang Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiang Li Jiang Electronics Co Ltd filed Critical Zhongjiang Li Jiang Electronics Co Ltd
Priority to CN201620721705.7U priority Critical patent/CN205907367U/en
Application granted granted Critical
Publication of CN205907367U publication Critical patent/CN205907367U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to an electroplate technical field, disclose a processing unit in advance for plate technology in succession, include along the first wash bowl of workpiece motion direction seriate, the descaling bath, second wash bowl and air -dry groove, first wash bowl lower part is provided with first wash bowl pivot, the descaling bath lower part is provided with the descaling bath pivot, second wash bowl lower part is provided with the pivot of second wash bowl, it is provided with air -dry groove pivot to air -dry the groove middle part, between first wash bowl and descaling bath, between descaling bath and second wash bowl, first middle pivot has set gradually between second wash bowl and air -dry groove, pivot in the middle of the second, pivot in the middle of the third, install the spray pipe in the middle of pivot of second wash bowl and the third between the pivot, it is provided with the air knife to air -dry the inslot. Its simple structure, the preliminary treatment is effectual, and no processing liquid is remained, and the process arrangement is equitable, need not add nice and warm stoving, has reduced the energy consumption, has improved efficiency.

Description

Pretreatment unit for continuous depositing process
Technical field
This utility model is related to electroplating technology field, more particularly, to a kind of pretreatment unit for continuous depositing process.
Background technology
It is typically necessary before at present workpiece plating and carries out pretreatment, to remove the greasy dirt on workpiece and surface of the work residual Free metal ion etc..Existing is generally washing and pickling with processing mode, but existing preprocessing process does not connect Continuous in addition it is also necessary to carry out processs such as heating, energy expenditure greatly, particularly in continuous depositing process, to band or wire rod workpiece Pretreatment is discontinuous, and time-consuming, and the workpiece after processing also can remain the new pollution such as steam or acid solution, affects next The carrying out of step plating, eventually affects the quality electroplated.
Utility model content
This utility model aims to provide a kind of pretreatment unit for continuous depositing process, solves above-mentioned asking well Topic, structure is simple, and pretreating effect is good, no treatment fluid residual, and procedure arrangement rationally it is not necessary to heating and drying, reduces energy Consumption, improves efficiency.
The technical solution of the utility model is a kind of pretreatment unit for continuous depositing process, including along workpiece motion s side To the first rinsing bowl being sequentially arranged, descaling bath, the second rinsing bowl and air-dried groove, the first rinsing bowl bottom is provided with the first washing Groove rotating shaft, descaling bath bottom is provided with descaling bath rotating shaft, and the second rinsing bowl bottom is provided with the second rinsing bowl rotating shaft, in air-dried groove Portion is provided with air-dried groove rotating shaft, between the first rinsing bowl and descaling bath, between descaling bath and the second rinsing bowl, the second rinsing bowl with air-dry It is disposed with the first intermediate rotary shaft, the second intermediate rotary shaft, the 3rd intermediate rotary shaft, in the middle of the second rinsing bowl rotating shaft and the 3rd between groove Between rotating shaft, sparge pipe is installed, in air-dried groove, is provided with air knife.
Further, described first rinsing bowl rotating shaft has two, is symmetricly set on the first rinsing bowl bottom.Make workpiece steady Operate in the first washing trench bottom, workpiece is sufficiently washed.
Further, described descaling bath rotating shaft has two, is symmetricly set on descaling bath bottom.Workpiece is made smoothly to operate in Pickling trench bottom, carries out sufficient pickling, the impurity such as the greasy dirt on removal workpiece and corrosion to workpiece.
Further, described second rinsing bowl rotating shaft is less than the 3rd intermediate rotary shaft.Workpiece is made to form one on direct of travel Individual angle upwards, is easy to sparge pipe and workpiece is sprayed, and so that the water of spray is flow back in the second rinsing bowl along workpiece, prevents Only workpiece air-dries most of water band people in groove, mitigates the air-dried amount air-drying groove.
Further, described sparge pipe is symmetricly set on both sides under workpiece.Make workpiece both up and down all can accept sparge pipe Spray it is ensured that water washing effect.
Further, described air knife is symmetricly set on the upper and lower both sides of workpiece.Make workpiece both up and down all can accept air knife Wind is it is ensured that air-dry effect.
Further, described first intermediate rotary shaft, the second intermediate rotary shaft, be provided with waste liquid below the 3rd intermediate rotary shaft and connect Closing quotation.Waste liquid take-up reel is used for receiving the waste liquid taken out of from the first rinsing bowl, descaling bath, the second rinsing bowl, prevents waste liquid direct It is added dropwise on the ground, prevent the generation polluted.
The beneficial effects of the utility model are: this utility model sets gradually the first rinsing bowl, acid in workpiece motion s direction Washing trough, the second rinsing bowl, air-dried groove, carry out pretreatment to the workpiece needing plating, successively the granule foreign on removal workpiece, oil Dirty corrosion, pickling debris, finally carry out air-drying it is ensured that workpiece efficient pretreating effect before plating, and procedure arrangement closes Reason, it is not necessary to heating and drying, no treatment fluid residual, reduces energy consumption, improves efficiency it is ensured that the electricity of later stage electroplating work procedure Plating quality.
Brief description
Fig. 1 is structure top view of the present utility model;
Fig. 2 is structural front view of the present utility model;
In figure: 1. the first rinsing bowl, 11. first rinsing bowl rotating shafts, 2. descaling bath, 21. descaling bath rotating shafts, 3. the second washing Groove, 31. second rinsing bowl rotating shafts, 32. sparge pipes, 4. air-dried groove, 41. air-dried groove rotating shafts, 42. air knives, 5. the first intermediate rotary shaft, 6. the second intermediate rotary shaft, 7. the 3rd intermediate rotary shaft, 8. waste liquid take-up reel, 9. workpiece.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing, to this reality It is further elaborated with new.
As shown in Figure 1-2, this utility model provides a kind of pretreatment unit for continuous depositing process, including along workpiece The first rinsing bowl 1, descaling bath 2, the second rinsing bowl 3 and air-dried groove 4 that 9 directions of motion are sequentially arranged, the first rinsing bowl 1 bottom sets It is equipped with the first rinsing bowl rotating shaft 11, descaling bath 2 bottom is provided with descaling bath rotating shaft 21, the second rinsing bowl 3 bottom is provided with second Rinsing bowl rotating shaft 31, is provided with air-dried groove rotating shaft 41 in the middle part of air-dried groove 4, between the first rinsing bowl 1 and descaling bath 2, descaling bath 2 and Between two rinsing bowls 3, between the second rinsing bowl 3 and air-dried groove 4, it is disposed with the first intermediate rotary shaft 5, the second intermediate rotary shaft the 6, the 3rd Intermediate rotary shaft 7, is provided with sparge pipe 32 between the second rinsing bowl rotating shaft 31 and the 3rd intermediate rotary shaft 7, is provided with air knife in air-dried groove 4 42.Workpiece 9 direction of motion set gradually the first rinsing bowl 1, descaling bath 2, the second rinsing bowl 3, air-dry groove 4, to need electroplate Workpiece 9 carry out pretreatment, successively remove workpiece on granule foreign, greasy dirt corrosion, pickling debris, finally air-dried, Ensure that workpiece 9 efficient pretreating effect before plating, rationally it is not necessary to heating and drying, no treatment fluid is residual for procedure arrangement Stay, reduce energy consumption, improve efficiency it is ensured that the electroplating quality of later stage electroplating work procedure.
First rinsing bowl rotating shaft 11 has two, is symmetricly set on the first rinsing bowl 1 bottom.Workpiece 9 is made smoothly to operate in First rinsing bowl 1 bottom, is sufficiently washed to workpiece 9.Descaling bath rotating shaft 21 has two, is symmetricly set under descaling bath 2 Portion.Make workpiece 9 smoothly operate in descaling bath 2 bottom, workpiece 9 is carried out with sufficient pickling, remove the greasy dirt on workpiece 9 and rust The impurity such as erosion.Second rinsing bowl rotating shaft 31 is less than the 3rd intermediate rotary shaft 7.Workpiece 9 is made to form one on direct of travel upwards Angle, is easy to sparge pipe 32 and workpiece 9 is sprayed, and makes the rightabout that the water of spray runs along workpiece 9 flow back into second In rinsing bowl 3, prevent workpiece 9 from air-drying most of water band people in groove 4, mitigate the air-dried amount air-drying groove 4.Sparge pipe 32 symmetrically sets Put in 9 times both sides of workpiece.Make workpiece 9 both up and down all can accept the spray of sparge pipe 32 it is ensured that water washing effect.Air knife 42 is right Title is arranged on workpiece, and about 9 both sides.Make workpiece 9 both up and down all can accept the wind of air knife 42 it is ensured that air-drying effect.First It is provided with waste liquid take-up reel 8 below intermediate rotary shaft 5, the second intermediate rotary shaft 6, the 3rd intermediate rotary shaft 7.Waste liquid take-up reel 8 is used for Receive the waste liquid taken out of from the first rinsing bowl 1, descaling bath 2, the second rinsing bowl 3, prevent waste liquid to be directly added dropwise on the ground, prevent dirt The generation of dye.
During work, first workpiece 9 is passed through below the first rinsing bowl rotating shaft 11, be then passed through above the first intermediate rotary shaft 5, then wear Below peracid washing trough rotating shaft 21, it is then passed through above the second intermediate rotary shaft 6, be then passed through, below the second rinsing bowl rotating shaft 31, being then passed through Sparge pipe 32, through above the 3rd intermediate rotary shaft 7, is then passed through air-drying below groove rotating shaft 41, finally passes through i.e. in the middle of air knife 42 Complete the pretreatment process of whole line depositing process, the in figure direction of arrow is the traffic direction of workpiece 9.First rinsing bowl 1, pickling Groove 2, the second rinsing bowl 3 are respectively provided with water, acid solution, water, and the first rinsing bowl 1, descaling bath 2, the second rinsing bowl 3, air-dried groove 4 are successively Granule foreign on removal workpiece 9, greasy dirt corrosion, pickling debris, finally carry out air-drying it is ensured that workpiece 9 is high before plating The pretreating effect of effect, procedure arrangement rationally it is not necessary to heating and drying, no treatment fluid residual, reduces energy consumption, improves effect Rate is it is ensured that the electroplating quality of later stage electroplating work procedure.
Certainly, this utility model also can have other various embodiments, spiritual and its substantive without departing substantially from this utility model In the case of, those of ordinary skill in the art can make various corresponding changes according to this utility model and deform, but these phases The change answered and deformation all should belong to the scope of the claims appended by this utility model.

Claims (7)

1. be used for continuous depositing process pretreatment unit it is characterised in that: include first being sequentially arranged along workpiece motion s direction Rinsing bowl, descaling bath, the second rinsing bowl and air-dried groove, described first rinsing bowl bottom is provided with the first rinsing bowl rotating shaft, described Descaling bath bottom is provided with descaling bath rotating shaft, and described second rinsing bowl bottom is provided with the second rinsing bowl rotating shaft, described air-dried groove Middle part is provided with air-dried groove rotating shaft, between described first rinsing bowl and descaling bath, between descaling bath and the second rinsing bowl, the second rinsing bowl It is disposed with the first intermediate rotary shaft, the second intermediate rotary shaft, the 3rd intermediate rotary shaft, described second rinsing bowl rotating shaft and between air-dried groove And between the 3rd intermediate rotary shaft, sparge pipe is installed, in described air-dried groove, is provided with air knife.
2. the pretreatment unit for continuous depositing process according to claim 1 it is characterised in that: described first rinsing bowl Rotating shaft has two, is symmetricly set on the first rinsing bowl bottom.
3. the pretreatment unit for continuous depositing process according to claim 1 it is characterised in that: described descaling bath rotating shaft There are two, be symmetricly set on descaling bath bottom.
4. the pretreatment unit for continuous depositing process according to claim 1 it is characterised in that: described second rinsing bowl Rotating shaft is less than the 3rd intermediate rotary shaft.
5. the pretreatment unit for continuous depositing process according to claim 1 it is characterised in that: described sparge pipe is symmetrical It is arranged on both sides under workpiece.
6. the pretreatment unit for continuous depositing process according to claim 1 it is characterised in that: described air knife symmetrically sets Put both sides upper and lower in workpiece.
7. the pretreatment unit for continuous depositing process according to claim 1 it is characterised in that: described turn in the middle of first It is provided with waste liquid take-up reel below axle, the second intermediate rotary shaft, the 3rd intermediate rotary shaft.
CN201620721705.7U 2016-07-08 2016-07-08 A processing unit in advance for plate technology in succession Active CN205907367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620721705.7U CN205907367U (en) 2016-07-08 2016-07-08 A processing unit in advance for plate technology in succession

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620721705.7U CN205907367U (en) 2016-07-08 2016-07-08 A processing unit in advance for plate technology in succession

Publications (1)

Publication Number Publication Date
CN205907367U true CN205907367U (en) 2017-01-25

Family

ID=57806080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620721705.7U Active CN205907367U (en) 2016-07-08 2016-07-08 A processing unit in advance for plate technology in succession

Country Status (1)

Country Link
CN (1) CN205907367U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113862761A (en) * 2021-08-09 2021-12-31 镇江耐丝新型材料有限公司 Can clear away electroplating device for steel cord processing of electroplating raffinate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113862761A (en) * 2021-08-09 2021-12-31 镇江耐丝新型材料有限公司 Can clear away electroplating device for steel cord processing of electroplating raffinate

Similar Documents

Publication Publication Date Title
CN207176083U (en) Step-by-step movement cleaning device is used in a kind of zinc-plated production
CN103008268B (en) Method for pretreating automobile coating
CN205907367U (en) A processing unit in advance for plate technology in succession
CN203530435U (en) Pickling bath in novel structure and pickling unit provided with same
CN102758209B (en) Steel wire sealing type smokeless pickling line
CN2869046Y (en) Pure water circulating apparatus for cleaning workpiece for electro phoresis coating
CN202011915U (en) Electroplating device
CN209493633U (en) A kind of water-saving countercurrent rinsing device
CN208234780U (en) A kind of energy-saving glass fiber wire drawing machine
CN202270453U (en) Waste gas purifying system in metal acid cleaning
CN102304706B (en) Anticorrosion treatment device and treatment method for surface of long and narrow runner of aluminium alloy radiator
CN208055499U (en) Water-saving system is electroplated
CN211199440U (en) Electroplating device for steel wire
CN104959337A (en) Coating workpiece reverse backflow cleaning method
CN213113525U (en) Pickling unit is used in production of T2 red copper line for switch board
CN201778140U (en) Circulation water-saving device for plating line
CN204866651U (en) Water -saving before painting handles belt cleaning device
CN204779903U (en) Electroplate panel and rinse recovery unit
CN207176098U (en) A kind of electroplating bath for producing diamond fretsaw bus
CN202107785U (en) Clean and environment-friendly iron wire galvanizing device
CN208429888U (en) Energy saving snaking combiner for water supply network
CN108950672B (en) Superconducting tape electrochemical polishing system
CN208354539U (en) One kind being used for the dedicated lotus root washing device of food processing
CN205907386U (en) A belt cleaning device for electroplate
CN204842300U (en) Hot water wiper mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant