CN205896501U - Pipeline quick connect connector - Google Patents

Pipeline quick connect connector Download PDF

Info

Publication number
CN205896501U
CN205896501U CN201620859400.2U CN201620859400U CN205896501U CN 205896501 U CN205896501 U CN 205896501U CN 201620859400 U CN201620859400 U CN 201620859400U CN 205896501 U CN205896501 U CN 205896501U
Authority
CN
China
Prior art keywords
tract
connecting portion
core
pipeline
black box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620859400.2U
Other languages
Chinese (zh)
Inventor
柳立新
段斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Ju Xin Science And Technology Of Aviation Co Ltd
Original Assignee
Xi'an Ju Xin Science And Technology Of Aviation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Ju Xin Science And Technology Of Aviation Co Ltd filed Critical Xi'an Ju Xin Science And Technology Of Aviation Co Ltd
Priority to CN201620859400.2U priority Critical patent/CN205896501U/en
Application granted granted Critical
Publication of CN205896501U publication Critical patent/CN205896501U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model discloses a pipeline quick connect connector, including the first connecting portion and the second connecting portion of lock joint each other and dismantlement, first connecting portion have a first chamber way that the confession fluid passes through, and first in the way of first chamber is preset the position activity and be provided with a seal assembly, the second connecting portion have the second chamber way that supplies the fluid to pass through, and first during say in the second chamber is preset the position activity and be provided with the 2nd seal assembly, when first connecting portion and second connecting portion lock are connected, the head end of second connecting portion inserts first chamber and promotes a seal assembly in saying and open first chamber way, and simultaneously, the 2nd seal assembly that a seal assembly promoted the second connecting portion opens second chamber way, thereby realize treating lining up fast of connecting line, it is unsatisfactory to have solved the airtight effect of the pipeline quick connect connector among the prior art, the relatively poor technical problem of sealing performance, the present invention has the advantages of simple structure, the gas tightness is good, the lock joint with demolish quick convenient technological effect.

Description

Pipeline fast connecting joint
Technical field
This utility model is related to pipeline and connects apparatus field, in particular to a kind of pipeline fast connecting joint.
Background technology
Pipeline fast connecting joint be for need between the pipeline frequently plugging connect device, have Quick fastening and The performance of fast quick-detach.Have a wide range of applications in some industries related to gas, liquid.Pipeline in the market is quick Jointing is varied, and the place that it uses is also different, but all have that airtight effect is undesirable, sealing property is poor lacks Fall into, existing pipeline fast connecting joint complex structure simultaneously, snapping and dismounting all more bother.
For pipeline fast connecting joint airtight effect of the prior art is undesirable, the poor technical problem of sealing property, At present effective solution is not yet proposed.
Utility model content
This utility model embodiment provides a kind of pipeline fast connecting joint, at least to solve pipeline of the prior art The technical problem that fast connecting joint airtight effect is undesirable, sealing property is poor.
According to this utility model embodiment, there is provided a kind of pipeline fast connecting joint, comprising: can mutually snapping and dismounting First connecting portion and second connecting portion;First connecting portion, is connected with the first end of pipeline to be connected, has and pass through for fluid The first tract, the first predeterminated position in the first tract be movably set with by first tract sealing the first black box;The Two connecting portions, are connected with the second end of pipeline to be connected, have the second tract passing through for fluid, first in the second tract Predeterminated position is movably set with the second black box of the second tract sealing;Wherein, the head end insertion first of second connecting portion When in tract, promote the first black box to leave the first predeterminated position and the first tract is opened, the first black box promotes second Black box leaves the first predeterminated position and opens the second tract;And the head end of second connecting portion is exited by the first tract When, the first black box returns the first predeterminated position in the presence of the first elastomeric element and seals the first tract, the second sealing Assembly returns the first predeterminated position in the presence of the second elastomeric element and seals the second tract.
Further, the first black box includes: the first dynamic core, is slidably disposed on the first default position of the first tract Put, wherein, the first predeterminated position is located at the front end of the first tract, the first dynamic core has and leads to along the first of the first tract axial direction Hole;First determines core, and positioned at the rear end of the first tract, wherein, the first elastomeric element is to be set in the first the first spring determining on core, The rear end of the first spring is determined core with first and is connected, and the front end of the first spring is connected with the first dynamic core, and the first front end determining core extends To first through hole, first through hole is sealed.
Further, the first rear end determining core is provided with the first pod apertures with the first tract insertion, and the first pod apertures set It is equipped with least one.
Further, the first black box also includes: the first sealing ring, is arranged on the first of the first dynamic core and the first tract Between the contact surface of predeterminated position;Second sealing ring, is arranged on first and determines between the front end of core and the contact surface of first through hole.
Further, the first sealing ring is arranged in the groove of the first tract inwall;Second sealing ring is arranged on first and leads to In the groove of in the hole wall.
Further, the second black box includes: the second dynamic core, be slidably disposed on the second tract first preset Position, wherein, the first predeterminated position is located at the front end of the second tract, and the second dynamic core passes through the second elastomeric element and second connecting portion Connect.
Further, second connecting portion also includes: connects dop, is movably connected in the rear end of second connecting portion, connects card Head has the second pod apertures with the second tract insertion, and wherein, the second elastomeric element is second spring, the front end of second spring with Second dynamic core connects, and the rear end of second spring is connected the front end of dop with being connected to.
Further, the second black box also includes: the 3rd sealing ring, is arranged on the first of the second dynamic core and the second tract Between the contact surface of predeterminated position;4th sealing ring, is arranged on connection dop and second connecting portion junction.
Further, the 3rd sealing ring is arranged in the groove of outer wall of the second dynamic core, and the 4th sealing ring is arranged on second In the groove of connecting portion outer wall.
Further, the outer wall of first connecting portion is provided with the first spiral shell being connected with the first end of pipeline to be connected Stricture of vagina, the outer wall of second connecting portion is provided with the second screw thread being connected with the second end of pipeline to be connected.
According to the pipeline fast connecting joint of this utility model embodiment, including can mutually snapping and dismounting the first connection Portion and second connecting portion, first connecting portion is connected with the first end of pipeline to be connected, has the first tract passing through for fluid, The first predeterminated position in first tract is movably set with the first black box of the first tract sealing;Second connecting portion with treat The second end of connecting line connects, and has the second tract passing through for fluid, the first predeterminated position activity in the second tract It is provided with the second black box of the second tract sealing;When first connecting portion and second connecting portion are fastened and connected, the second connection Promote the first black box to leave the first predeterminated position in head end insertion first tract in portion to open the first tract, meanwhile, the One black box promotes the second black box of second connecting portion to leave the first predeterminated position and opens the second tract, thus realizing The quick insertion of pipeline to be connected, solves that pipeline fast connecting joint airtight effect of the prior art is undesirable, sealing Can poor technical problem, reached that structure is simple, air-tightness is good, snapping and remove quickly and easily technique effect.
Brief description
Accompanying drawing described herein is used for providing further understanding to of the present utility model, constitutes the part of the application, Schematic description and description of the present utility model is used for explaining this utility model, does not constitute to of the present utility model improper Limit.In the accompanying drawings:
Fig. 1 is according to optionally a kind of cross-sectional view of pipeline fast connecting joint of this utility model embodiment;
Fig. 2 is according to optionally a kind of section of the first connecting portion of pipeline fast connecting joint of this utility model embodiment Structural representation;
Fig. 3 is according to optionally a kind of section of the second connecting portion of pipeline fast connecting joint of this utility model embodiment Structural representation;
Fig. 4 is according to optionally a kind of perspective view of pipeline fast connecting joint of this utility model embodiment;
Fig. 5 is to be illustrated according to another stereochemical structure of optionally a kind of pipeline fast connecting joint of this utility model embodiment Figure.
Specific embodiment
In order that those skilled in the art more fully understand this utility model scheme, real below in conjunction with this utility model Apply the accompanying drawing in example, the technical scheme in this utility model embodiment is clearly and completely described it is clear that described Embodiment is only the embodiment of this utility model part, rather than whole embodiments.Based on the reality in this utility model Apply example, the every other embodiment that those of ordinary skill in the art are obtained under the premise of not making creative work, all answer When the scope belonging to this utility model protection.
According to the pipeline fast connecting joint of this utility model embodiment, as shown in figure 1, inclusion can mutually snapping and dismounting First connecting portion 1 and second connecting portion 2, first connecting portion 1 is connected with the first end 3 of pipeline to be connected, second connecting portion 2 It is connected with the second end 4 of pipeline to be connected.As shown in Fig. 2 first connecting portion 1 has the first tract 11 passing through for fluid, The first predeterminated position in first tract 11 is movably set with the first black box 12 sealing the first tract 11;As Fig. 3 institute Show, second connecting portion 2 has the second tract 21 passing through for fluid, the first predeterminated position in the second tract 21 is movably set with The second black box 22 that second tract 21 is sealed;When the head end of second connecting portion 2 inserts in the first tract 11, promote first Black box 12 leaves the first predeterminated position and opens the first tract 11, and meanwhile, the first black box 12 promotes the second sealing group Part 22 leaves the first predeterminated position and opens the second tract 21;When the head end of second connecting portion 2 is by exiting in the first tract 11, the One black box 12 returns the first predeterminated position in the presence of the first elastomeric element 13 and seals the first tract 11, the second sealing Assembly 22 returns the first predeterminated position in the presence of the second elastomeric element 23 and seals the second tract 21.
According to the pipeline fast connecting joint of this utility model embodiment, by two ends difference in pipeline to be connected Setting can the mutually first connecting portion 1 of snapping and dismounting and second connecting portion 2, first connecting portion has first passing through for fluid Tract 11, second connecting portion 2 has the second tract 21 passing through for fluid, and the first predeterminated position activity in the first tract 11 sets It is equipped with the first black box 12 that the first tract 11 is sealed, the first predeterminated position in the second tract 21 is movably set with Second black box 22 of two tract sealings, when first connecting portion 1 and second connecting portion 2 are fastened and connected, second connecting portion 2 Promote the first black box 12 to leave the first predeterminated position in head end insertion the first tract 11 to open the first tract 11, meanwhile, First black box 12 promotes the second black box 22 of second connecting portion 2 to leave the first predeterminated position by the second tract 21 dozens Open, thus realizing the quick insertion of pipeline to be connected;Solve pipeline fast connecting joint airtight effect of the prior art not Preferable, the poor technical problem of sealing property, has reached that structure is simple, air-tightness is good, snapping and remove quickly and easily technology effect Really.
When being embodied as, as shown in Fig. 2 being provided with the first end with pipeline to be connected in the middle part of the outer wall of first connecting portion 1 The first screw thread 14 that portion 3 is connected, the outer wall rear end of second connecting portion 2 is provided with and is connected with the second end 4 of pipeline to be connected The second screw thread 24 connecing, first connecting portion 1 is connected with the first end 3 of pipeline to be connected by the first screw thread 14, the second connection Portion 2 is connected with the second end 4 of pipeline to be connected by the second screw thread 24.
First black box 12 includes: core 122 determined by the first dynamic core 121 and first, and the first dynamic core 121 is slidably disposed on First predeterminated position of the first tract 11, wherein, the first predeterminated position is located at the front end of the first tract 11, the first dynamic core 121 Outer wall surface mutually abuts realization sealing with the inner wall surface of the first predeterminated position of the first tract 11.First dynamic core 121 has First through hole 123 along the first tract 11 axial direction;First determines the rear end that core 122 is located at the first tract 11, wherein, the first bullet Property part 13 be set in the first the first spring determining on core, the rear end of the first spring is determined core 122 with first and is connected, the first spring Front end be connected with the first dynamic core 121, after first connecting portion 1 is fixedly connected with the first end 3 of pipeline to be connected, first determines core The relevant position that 122 rear end is connected to pipeline to be connected is fixed, and the first front end determining core 122 extends to the first dynamic core In 121 first through hole 123, the first front end determining core 122 has flange portion, this flange portion and the first through hole circumferentially projecting 123 match, thus first through hole 123 is sealed.
First rear end determining core 122 is again provided with the flange portion circumferentially projecting for clamping first spring, in order to Ensure the first tract 11 before and after insertion, as shown in Figure 4 and Figure 5, first determine to be provided with the flange portion of the rear end of core 122 and the First pod apertures 124 of one tract 11 insertion, the first pod apertures 124 are provided with least one, can specifically arrange one as needed Individual larger pod apertures 124 or the multiple less pod apertures 124 of setting.Of course for ensure the first tract 11 before and after pass through Logical, it would however also be possible to employ other modes, for example, it is possible to the flange portion in the first rear end determining core 122 and the first tract 11 rear end Between the gap passed through for fluid of reservation realize the insertion of the first tract 11, here, not repeating.
In order to ensure the first dynamic core 121 and the first tract 11 the first predeterminated position inwall between and first determine core Better seal between the flange portion of 122 front ends and first through hole 123, the first black box 12 also includes: the first sealing ring 125 With the second sealing ring 126, the first sealing ring 125 is arranged on connecing of the first dynamic core 121 and the first predeterminated position of the first tract 11 Between contacting surface, specifically, the first tract 11 inwall has groove, the first sealing ring 125 is arranged in this groove;Certainly groove Can also be arranged on the outer wall of the first dynamic core 121, thus the first sealing ring 125 is arranged on the outer wall of the first dynamic core 121 Groove in.Second sealing ring 126 is arranged between the first flange portion determining core 122 front end and the contact surface of first through hole 123, Specifically, the inwall of first through hole 123 has groove, the second sealing ring 126 is arranged in this groove, and certainly, groove can also It is arranged in the first flange portion determining core 122 front end, thus the second sealing ring 126 is arranged on the first method determining core 122 front end In the groove in blue portion.
As shown in figure 3, the second black box 22 includes: the second dynamic core 221 and connection dop 222, the second dynamic core 221 can be slided It is arranged on the first predeterminated position of the second tract 21, wherein, the first predeterminated position is located at the front end of the second tract 21, connects dynamicly Dop 222 is movably connected in second connecting portion 2 rear end by screw thread, and the second dynamic core 221 passes through the second elastomeric element and rear end Connect dop 222 to connect.Connection dop 222 has the second pod apertures 223 with the second tract 21 insertion, wherein, the second elasticity Part 23 is second spring, and the second dynamic core 221 rear end has two oblique profiles, the rear end of two oblique profiles pass through back-up ring 224 with The front end of second spring connects, and the rear end of second spring is connected on dop 222 with being connected to.
In order to ensure that second is dynamic between core 221 and the inwall of the first predeterminated position of the second tract 21 and be connected dop Between 222 and the rear end of second connecting portion 2, there is better seal, the second black box 22 also includes: the 3rd sealing ring 225 With the 4th sealing ring 226, the 3rd sealing ring 225 is arranged on connecing of the second dynamic core 221 and the first predeterminated position of the second tract 21 Between contacting surface, specifically, annular groove circumferentially is provided with the outer wall of the second dynamic core 221, the 3rd sealing ring 225 is arranged In this groove.It is of course also possible on the inwall of the first predeterminated position of the second tract 21 circumferentially arranged annular groove, Three sealing rings 225 can be arranged in the groove of the second tract 21 inwall.4th sealing ring 226 be arranged on connection dop 222 with Second connecting portion 2 junction, specifically, second connecting portion 2 circumferentially arranged with the junction being connected dop 222 have annular recessed Groove, the 4th sealing ring 226 is arranged in this groove.It is of course also possible to connect circumferentially arranged annular groove on dop 222, will 4th sealing ring 226 is arranged in the groove connecting dop 222.
When specifically used, as shown in figure 1, first connecting portion 1 passes through the first end 3 of the first screw thread 14 and pipeline to be connected It is connected, second connecting portion 2 is connected with the second end 4 of pipeline to be connected by the second screw thread 24, the head end of second connecting portion 2 First tract 11 of insertion first connecting portion 1 head end carries out snapping, and the head end of second connecting portion 2 promotes in the first tract 11 the One dynamic core 121 is moved rearwards by, and first determine core 122 and promotes second to move core 221 to be moved rearwards by, in the first head end determining core 122 simultaneously Flange portion and the inwall of the second tract 21 between form the gap passed through for fluid so that the first tract 11 and the second tract 21 conductings, the fluid of the first end 3 of pipeline to be connected enters first by the first the first pod apertures 124 determining core 122 rear end In tract 11, and enter pipeline to be connected by the second tract 21 and positioned at the second pod apertures 223 of the second tract 21 rear end The second end 4 thus realizing the conveying of fluid.
After fluid conveying terminates, when needing to disconnect the first end 3 of pipeline to be connected and the second end 4, the second connection The head end in portion 2 is extracted backward by the first tract 11, and during extracting backward, the first dynamic core 121 is in the work of the first spring With lower the first predeterminated position returning the first tract 11, the first sealing ring 125 is by outside the first tract 11 inwall and the first dynamic core 121 Sealed between wall, first through hole 123 inwall and the first flange portion determining core 122 front end are carried out close by the second sealing ring 126 Envelope, thus the first tract 11 is fully sealed;Second dynamic core 221 returns the of the second tract 21 in the effect of second spring simultaneously One predeterminated position, the 3rd sealing ring 225 will be sealed between the inwall of the second tract 21 and the second dynamic core 221, completes pipeline The dismounting of fast connecting joint.
The above is only preferred implementation of the present utility model it is noted that ordinary skill people for the art For member, on the premise of without departing from this utility model principle, some improvements and modifications can also be made, these improvements and modifications Also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of pipeline fast connecting joint is it is characterised in that include:
Can mutually snapping and dismounting first connecting portion and second connecting portion;
Described first connecting portion, is connected with the first end of pipeline to be connected, has the first tract passing through for fluid, and described The first predeterminated position in one tract is movably set with the first black box of described first tract sealing;
Described second connecting portion, is connected with the second end of pipeline to be connected, has the second tract passing through for fluid, and described The first predeterminated position in two tracts is movably set with the second black box of described second tract sealing;
Wherein, when the head end of described second connecting portion inserts in described first tract, described first black box is promoted to leave institute State the first predeterminated position to open described first tract, it is described that described first black box promotes described second black box to leave Described second tract is opened by the first predeterminated position;And
When the head end of described second connecting portion is by exiting in described first tract, described first black box is in the first elastomeric element In the presence of return described first predeterminated position by described first tract sealing, described second black box is in the second elastomeric element In the presence of return described first predeterminated position by described second tract sealing.
2. pipeline fast connecting joint according to claim 1 is it is characterised in that described first black box includes:
First dynamic core, is slidably disposed on described first predeterminated position of described first tract, wherein, the described first default position Setting in the front end of described first tract, the described first dynamic core has the first through hole along described first tract axial direction;
First determines core, and positioned at the rear end of described first tract, wherein, described first elastomeric element is to be set in described first to determine core On the first spring, the rear end of described first spring determines core with described first and is connected, the front end of described first spring and described the One dynamic core connects, and described first front end determining core extends in described first through hole and seals described first through hole.
3. pipeline fast connecting joint according to claim 2 is it is characterised in that described first rear end determining core is provided with With the first pod apertures of described first tract insertion, described first pod apertures are provided with least one.
4. pipeline fast connecting joint according to claim 2 is it is characterised in that described first black box also includes:
First sealing ring, be arranged on the described first dynamic core and described first predeterminated position of described first tract contact surface it Between;
Second sealing ring, is arranged on described first and determines between the front end of core and the contact surface of described first through hole.
5. pipeline fast connecting joint according to claim 4 it is characterised in that
Described first sealing ring is arranged in the groove of described first tract inwall;Described second sealing ring is arranged on described first In the groove of through-hole wall.
6. pipeline fast connecting joint according to claim 1 is it is characterised in that described second black box includes:
Second dynamic core, be slidably disposed on described second tract described first predeterminated position, wherein, described first presets Position is located at the front end of described second tract, and the described second dynamic core is by described second elastomeric element with described second connecting portion even Connect.
7. pipeline fast connecting joint according to claim 6 is it is characterised in that second connecting portion also includes:
Connect dop, be movably connected in the rear end of described second connecting portion, described connection dop is had and passed through with described second tract The second logical pod apertures, wherein, described second elastomeric element is second spring, and the front end of described second spring is moved with described second Core connection, the rear end of described second spring and the front end being connected to described connection dop.
8. pipeline fast connecting joint according to claim 7 is it is characterised in that described second black box also includes:
3rd sealing ring, be arranged on the described second dynamic core and described first predeterminated position of described second tract contact surface it Between;
4th sealing ring, is arranged on described connection dop and described second connecting portion junction.
9. pipeline fast connecting joint according to claim 8 it is characterised in that described 3rd sealing ring be arranged on described In the groove of outer wall of the second dynamic core, described 4th sealing ring is arranged in the groove of described second connecting portion outer wall.
10. pipeline fast connecting joint according to claim 1 is it is characterised in that on the outer wall of described first connecting portion It is provided with the first screw thread being connected with the described first end of described pipeline to be connected, the outer wall of described second connecting portion sets It is equipped with the second screw thread being connected with the described the second end of described pipeline to be connected.
CN201620859400.2U 2016-07-28 2016-07-28 Pipeline quick connect connector Expired - Fee Related CN205896501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620859400.2U CN205896501U (en) 2016-07-28 2016-07-28 Pipeline quick connect connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620859400.2U CN205896501U (en) 2016-07-28 2016-07-28 Pipeline quick connect connector

Publications (1)

Publication Number Publication Date
CN205896501U true CN205896501U (en) 2017-01-18

Family

ID=57781001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620859400.2U Expired - Fee Related CN205896501U (en) 2016-07-28 2016-07-28 Pipeline quick connect connector

Country Status (1)

Country Link
CN (1) CN205896501U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107300078A (en) * 2017-06-21 2017-10-27 巴斯夫上海涂料有限公司 The method and component being adapted to for atomizer
CN108662321A (en) * 2018-05-25 2018-10-16 林文杰 A kind of structure that pipeline is attached using lockset
CN108662325A (en) * 2018-05-25 2018-10-16 林文杰 A method of pipe fitting is attached using lockset
CN109253618A (en) * 2018-10-23 2019-01-22 贝恩医疗设备(广州)有限公司 A kind of dialyzer dryer and its gas path joint

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107300078A (en) * 2017-06-21 2017-10-27 巴斯夫上海涂料有限公司 The method and component being adapted to for atomizer
CN108662321A (en) * 2018-05-25 2018-10-16 林文杰 A kind of structure that pipeline is attached using lockset
CN108662325A (en) * 2018-05-25 2018-10-16 林文杰 A method of pipe fitting is attached using lockset
CN108662321B (en) * 2018-05-25 2020-05-01 永康市杰创工业产品设计有限公司 Structure for connecting pipeline by adopting lockset
CN108662325B (en) * 2018-05-25 2020-07-24 永康市小菜丫厨具有限公司 Method for connecting pipe fittings by adopting lockset
CN109253618A (en) * 2018-10-23 2019-01-22 贝恩医疗设备(广州)有限公司 A kind of dialyzer dryer and its gas path joint
CN109253618B (en) * 2018-10-23 2024-02-06 贝恩医疗设备(广州)有限公司 Dialyser dryer and gas circuit joint thereof

Similar Documents

Publication Publication Date Title
CN205896501U (en) Pipeline quick connect connector
CN203686406U (en) Pipe fitting joint structure
CN105937677A (en) Totally-closed maintenance-free threaded fitting
CN206206865U (en) Pipe fitting fast joint
CN207906682U (en) A kind of water pipe tee connector
CN204164527U (en) A kind of welding type pipe fitting joint applying double-lip sealing ring
CN204226915U (en) A kind of rapid pipe joint
CN206055017U (en) A kind of hose coupling
CN205101722U (en) Smooth compact form tube coupling connects
CN212986349U (en) Pipeline long neck flange connection structure
CN210770782U (en) Sealing pipe joint
CN103174897A (en) Hosepipe bypass seal joint
CN210950279U (en) Air source ball valve adapter device
CN203431369U (en) Pipe joint easy to disassemble and assemble
CN206191130U (en) A quick connector grafting device for truck hydraulic system
CN208107367U (en) A kind of pipe fitting joint structure
CN207178985U (en) Reducing flexibility ballast
CN215326921U (en) Spliced crane pipe with good sealing performance
CN205806760U (en) A kind of new work engine quick connector
CN205136899U (en) Fire pipe joints seal structure
WO2019204951A1 (en) Pipe connecting structure
CN211083171U (en) Connecting and sealing structure of pipe fitting
CN212868909U (en) Nylon hose connector
CN210890471U (en) Detachable connecting pipe fitting
CN210034217U (en) Shift clutch control cannula

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Xi'an Ju Xin science and technology of aviation Co., Ltd

Document name: Notification to Pay the Fees

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20190728