CN205894088U - Soil nail wall supporting construction that anchor pipe and channel -section steel stake combine - Google Patents

Soil nail wall supporting construction that anchor pipe and channel -section steel stake combine Download PDF

Info

Publication number
CN205894088U
CN205894088U CN201620860337.4U CN201620860337U CN205894088U CN 205894088 U CN205894088 U CN 205894088U CN 201620860337 U CN201620860337 U CN 201620860337U CN 205894088 U CN205894088 U CN 205894088U
Authority
CN
China
Prior art keywords
channel
section steel
wall
soil
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620860337.4U
Other languages
Chinese (zh)
Inventor
吴华
杜延华
郭营
连洛培
陈延辉
刘书鹏
李明玉
林琼
刘静香
鲍潇艳
汤俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Planning & Architectural Design Institute Co Ltd
Original Assignee
Luoyang Planning & Architectural Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Planning & Architectural Design Institute Co Ltd filed Critical Luoyang Planning & Architectural Design Institute Co Ltd
Priority to CN201620860337.4U priority Critical patent/CN205894088U/en
Application granted granted Critical
Publication of CN205894088U publication Critical patent/CN205894088U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model belongs to the technical field of excavation supporting, concretely relates to soil nail wall supporting construction that anchor pipe and channel -section steel stake combine. This supporting construction includes the foundation ditch lateral wall, at the bottom of the foundation ditch, a plurality of channel -section steel stakes and a plurality of anchor pipe, foundation ditch lateral wall excavation is vertical form, it is perpendicular with the foundation ditch lateral wall at the bottom of the foundation ditch, the vertical setting of tight foundation ditch lateral wall and its lower extreme are all pasted in a plurality of channel -section steel stakes, and all to be squeezed into the foundation ditch subsoil internal, a plurality of channel -section steel stakes fuse through a plurality of purlins that enclose that parallel interval set up, a plurality of anchors pipe all slope inserts downwards in the foundation ditch lateral wall soil body, the upper end of anchor pipe be located the foundation ditch lateral wall soil body outer and its through the connecting piece with enclose purlin fixed connection. Adopt this supporting construction can solve soil nail unable use not enough in the weak soil, the characteristics of performance channel -section steel front cover have the gliding effect of impervious and the anti foundation ditch soil body, and anchor pipe soil nail cost is hanged down simultaneously, and the channel -section steel can full recovery reuse, and economic benefits is better.

Description

A kind of anchor tube and the soil nailed wall retaining structure of channel-section steel stake combination
Technical field
This utility model belongs to Base hole supporting technology field and in particular to the soil nail wall that a kind of anchor tube and channel-section steel stake combine props up Protection structure.
Background technology
Plate brad supporting is widely used in engineering practice now, but for soft soil foundation, soil shear strength is very Low, substantially there is no tensile strength.Point out in specification " building foundation pit supporting technical regulation (jgj120-2012) ", single soil nail wall It is only used for non-soft soil foundation pit with prestressing force composite soil nailing wall, though cement earth pile composite soil nailing wall and mini pile composite soil nailing wall can For soft soil foundation pit, but it is only used for shallower foundation ditch, the application of soil nailing is restricted.
Additionally, sometimes being limited by foundation ditch surrounding enviroment land used, the necessary vertical cut of foundation ditch, if now deep basal pit soil condition Poor, such as silt soil strata, water content is larger, and foundation ditch vertical cut props up mask and is difficult to molding, soil shear strength very low it is impossible to Using single soil-nail wall support scheme;When foundation ditch periphery has the pipe networks such as combustion gas, common soil nail wall way deforms larger it is difficult to control Foundation pit deformation.
Utility model content
For deficiency of the prior art, this utility model provides the soil nailed wall retaining structure that anchor tube and channel-section steel stake combine, It is applied to soft soil foundation, and cost is only 1/3rd of reinforced concrete pile, and economic benefit is very considerable.
This utility model overcomes the not enough technical scheme adopting of the prior art as follows: a kind of anchor tube and channel-section steel stake combine Soil nailed wall retaining structure, it includes foundation pit side-wall, foundation ditch bottom, some channel-section steel stakes and some anchor tubes, and described foundation pit side-wall excavates In vertical shape, described foundation ditch bottom is vertical with described foundation pit side-wall, and described some channel-section steel stakes are all adjacent to described foundation pit side-wall and vertically set Put and its lower end is all driven in described foundation ditch subsoil body, if the girth purlin that described some channel-section steel stakes are arranged by parallel interval is even Integral, be reserved between described some channel-section steel stakes for described anchor tube insert the described foundation pit side-wall soil body anchor into area, if described Dry anchor tube all inserts in the described foundation pit side-wall soil body diagonally downward, and the upper end of described anchor tube is located at outside the foundation pit side-wall soil body and it is logical Cross connector to be fixedly connected with the described purlin that encloses.
On the basis of technique scheme, this utility model can also do following improvement.
Further, the depth that described channel-section steel stake squeezes in described foundation ditch subsoil body is more than 0.8 times of foundation depth.
Further, the described anchor tube inserting in the described foundation pit side-wall soil body is 10-25 ° with the angle of horizontal plane.
Further, the described some anchor tubes inserting in the described foundation pit side-wall soil body are parallel to each other.
Further, the tube wall of described anchor tube offers some slurry outlets, the tube wall near described slurry outlet is provided with down Thorn.
Further, if described girth purlin is horizontally disposed channel-section steel.
Further, described channel-section steel stake and the described connected mode enclosing purlin are welding or bolt connection.
Further, the described purlin and the connected mode of described connector of enclosing is welding.
Compared with prior art, the beneficial effects of the utility model are: the soil nail wall using channel-section steel stake and anchor tube combination props up Protection structure, can solve the deficiency that soil nailing cannot be applied in weak soil, play the feature of channel-section steel front cover, have impervious and anti-foundation ditch The effect that the soil body slides, anchor pipe soil nail low cost simultaneously, channel-section steel can all recycle and reuse, better economic benefit.
Brief description
A kind of side structure of the soil nailed wall retaining structure of anchor tube engagement groove piling bar that Fig. 1 provides for this utility model is illustrated Figure;
Fig. 2 is a kind of positive structure schematic figure of the soil nailed wall retaining structure of this utility model anchor tube engagement groove piling bar;
Fig. 3 is a kind of structural texture schematic diagram of the soil nailed wall retaining structure of this utility model anchor tube engagement groove piling bar.
In accompanying drawing, the list of parts representated by each label is as follows:
1. foundation ditch bottom;2. foundation pit side-wall;3. anchor tube;4. channel-section steel stake;5. enclose purlin;6. connector.
Specific embodiment
Below in conjunction with accompanying drawing, principle of the present utility model and feature are described, example is served only for explaining this practicality New, it is not intended to limit scope of the present utility model.
As shown in Figures 1 to 3, this utility model provides the soil-nail wall support knot that a kind of anchor tube (3) and channel-section steel stake (4) combine Structure, it includes foundation pit side-wall (2), foundation ditch bottom (1), some channel-section steel stakes (4) and some anchor tubes (3), and described foundation pit side-wall (2) is excavated In vertical shape, described foundation ditch bottom (1) is vertical with described foundation pit side-wall (2), and described some channel-section steel stakes (4) are all adjacent to described foundation ditch side Wall (2) is vertically arranged and its lower end is all driven in described foundation ditch bottom (1) soil body, and described some channel-section steel stakes (4) pass through parallel If the girth purlin (5) every setting is connected, it is reserved with described for described anchor tube (3) insertion between described some channel-section steel stakes (4) Foundation pit side-wall (2) soil body anchor into area, described some anchor tubes (3) are all inserted in described foundation pit side-wall (2) soil body diagonally downward, institute The upper end stating anchor tube (3) is located at that foundation pit side-wall (2) soil body is outer and it is fixedly connected with the described purlin (5) that encloses by connector (6).
Further, described channel-section steel stake (4) squeeze into 0.8 times that depth in described foundation ditch bottom (1) soil body is foundation depth with On.
Further, the described anchor tube (3) in insertion described foundation pit side-wall (2) soil body is 10-25 ° with the angle of horizontal plane.
Further, the described some anchor tubes (3) in insertion described foundation pit side-wall (2) soil body are parallel to each other.
Further, the tube wall of described anchor tube (3) offers some slurry outlets, the tube wall near described slurry outlet is provided with Agnail.
Further, if described girth purlin (5) is horizontally disposed channel-section steel.
Further, described channel-section steel stake (4) and the described connected mode enclosing purlin (5) are welding or bolt connection.
Further, the described purlin (5) and the connected mode of described connector (6) of enclosing is welding.
The above-mentioned anchor tube that this utility model provides and the foundation pit supporting construction of channel-section steel stake combination can be obtained by following steps:
S1., after foundation ditch fluting digs out one layer of soil, described some channel-section steel stakes (4) are adjacent to foundation pit walls and vertically squeeze into The soil body is less than foundation ditch bottom (1) portion designed elevation to the lower end of channel-section steel stake (4);
If s2. the part that described channel-section steel stake (4) is located at more than the soil body is connected using girth purlin (5), by described anchor Pipe (3) stretches into diagonally downward in foundation pit side-wall (2) soil body and is fabricated to soil nailing from the described area that anchors into, described anchor tube (3) upper end position It is fixedly connected with the described purlin (5) that encloses outside foundation pit side-wall (2) soil body and by described connector (6);
S3. stage excavation, often excavates one layer of equal repeat step s2, until stopping after being excavated to foundation ditch bottom (1) portion designed elevation Only.Wherein stage excavation when, the depth cut the earth every time is 25-100cm.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all in this practicality Within new spirit and principle, any modification, equivalent substitution and improvement made etc., should be included in guarantor of the present utility model Within the scope of shield.

Claims (8)

1. the soil nailed wall retaining structure of a kind of anchor tube and channel-section steel stake combination is it is characterised in that include foundation pit side-wall (2), foundation ditch bottom (1), some channel-section steel stakes (4) and some anchor tubes (3), it is in vertical shape, described foundation ditch bottom (1) and institute that described foundation pit side-wall (2) is excavated State foundation pit side-wall (2) vertical, described some channel-section steel stakes (4) are all adjacent to described foundation pit side-wall (2) and are vertically arranged and its lower end all quilts Squeeze in described foundation ditch bottom (1) soil body, described some channel-section steel stakes (4) are if the girth purlin (5) being arranged by parallel interval is linked to be one Body, be reserved between described some channel-section steel stakes (4) for described anchor tube (3) insert described foundation pit side-wall (2) soil body anchor into area, institute State some anchor tubes (3) and all insert in described foundation pit side-wall (2) soil body diagonally downward, the upper end of described anchor tube (3) is located at foundation ditch side Wall (2) soil body is outer and it is fixedly connected with the described purlin (5) that encloses by connector (6).
2. a kind of anchor tube according to claim 1 and channel-section steel stake combine soil nailed wall retaining structure is it is characterised in that described The depth that channel-section steel stake (4) squeezes in described foundation ditch bottom (1) soil body is more than 0.8 times of foundation depth.
3. the soil nailed wall retaining structure of a kind of anchor tube according to claim 1 and channel-section steel stake combination is it is characterised in that insert Described anchor tube (3) in described foundation pit side-wall (2) soil body is 10-25 ° with the angle of horizontal plane.
4. the soil nailed wall retaining structure of a kind of anchor tube according to claim 3 and channel-section steel stake combination is it is characterised in that insert Described some anchor tubes (3) in described foundation pit side-wall (2) soil body are parallel to each other.
5. a kind of anchor tube according to claim 1 and channel-section steel stake combine soil nailed wall retaining structure is it is characterised in that described Some slurry outlets are offered on the tube wall of anchor tube (3), the tube wall near described slurry outlet is provided with agnail.
6. a kind of anchor tube according to claim 1 and channel-section steel stake combine soil nailed wall retaining structure is it is characterised in that described If girth purlin (5) is horizontally disposed channel-section steel.
7. the soil nailed wall retaining structure of a kind of anchor tube according to any one of claim 1 to 6 and channel-section steel stake combination, its feature It is, described channel-section steel stake (4) is welding or bolt connection with the described connected mode enclosing purlin (5).
8. the soil nailed wall retaining structure of a kind of anchor tube according to any one of claim 1 to 6 and channel-section steel stake combination, its feature It is, the described purlin (5) and the connected mode of described connector (6) of enclosing is welding.
CN201620860337.4U 2016-08-09 2016-08-09 Soil nail wall supporting construction that anchor pipe and channel -section steel stake combine Expired - Fee Related CN205894088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620860337.4U CN205894088U (en) 2016-08-09 2016-08-09 Soil nail wall supporting construction that anchor pipe and channel -section steel stake combine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620860337.4U CN205894088U (en) 2016-08-09 2016-08-09 Soil nail wall supporting construction that anchor pipe and channel -section steel stake combine

Publications (1)

Publication Number Publication Date
CN205894088U true CN205894088U (en) 2017-01-18

Family

ID=57781575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620860337.4U Expired - Fee Related CN205894088U (en) 2016-08-09 2016-08-09 Soil nail wall supporting construction that anchor pipe and channel -section steel stake combine

Country Status (1)

Country Link
CN (1) CN205894088U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677941A (en) * 2018-06-08 2018-10-19 常州工学院 A kind of steel plate and channel steel band combined type face layer soil nail wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677941A (en) * 2018-06-08 2018-10-19 常州工学院 A kind of steel plate and channel steel band combined type face layer soil nail wall

Similar Documents

Publication Publication Date Title
CN105840207B (en) Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body
CN207160039U (en) A kind of Tenon prefabricated PC open caisson
CN204418187U (en) Subway protection region soil nail wall is in conjunction with double-row pile deep foundation ditch composite supporting construction
CN213062029U (en) Energy-conserving pile roof beam erects anchor supporting construction based on excavation supporting
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN105155548B (en) A kind of drag-line double-row pile (wall) supporting construction
CN107558319A (en) A kind of GSZ and its construction method with anchor studs
CN105672323A (en) Compound soil nail wall supporting structure system with steel pipe piles and construction method of compound soil nail wall supporting structure system
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN101126241A (en) Scattered row piles-brad wall combination supporting method
CN109898521A (en) A kind of anchored pile supporting and construction method for foundation pit external corner
CN103243724A (en) Bedding cutting high slope closing reinforcement structure
CN204825928U (en) Excavation supporting
CN206768861U (en) A kind of reinforcement ring retaining wall
CN205314108U (en) Compound soil nail wall supporting construction system with steel -pipe pile
CN205776250U (en) A kind of Double-row-piles Structure system being provided with dilazep anchor pattern
CN106836217A (en) A kind of construction method of expansion end formula soil bolt or soil nailing
CN205894088U (en) Soil nail wall supporting construction that anchor pipe and channel -section steel stake combine
CN103967011B (en) Callable umbrella pressure-bearing earth anchor in a kind of soft soil layer
CN109403349A (en) A kind of upper flexible and lower rigid system of deep foundation pit support and its construction method
CN102296620B (en) Curtain water-stop slope wall and construction method thereof
CN208533542U (en) A kind of foundation pit supporting construction using three-level echelon joint system
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN201202120Y (en) Mixing pile foundation pit supporting structure
CN108589738A (en) Half gravity dam formula foundation pit enclosure structure and its construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118