CN205892869U - Sewage treatment plant proposes mark dilatation and reforms transform sewage treatment pond - Google Patents
Sewage treatment plant proposes mark dilatation and reforms transform sewage treatment pond Download PDFInfo
- Publication number
- CN205892869U CN205892869U CN201620750241.2U CN201620750241U CN205892869U CN 205892869 U CN205892869 U CN 205892869U CN 201620750241 U CN201620750241 U CN 201620750241U CN 205892869 U CN205892869 U CN 205892869U
- Authority
- CN
- China
- Prior art keywords
- pond
- level
- aerobic
- sewage treatment
- membrane cisterna
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W10/00—Technologies for wastewater treatment
- Y02W10/10—Biological treatment of water, waste water, or sewage
Landscapes
- Aeration Devices For Treatment Of Activated Polluted Sludge (AREA)
Abstract
The utility model discloses a sewage treatment plant proposes mark dilatation and reforms transform sewage treatment pond for sewage treatment technical field, include along biochemical pond of A2O and two heavy ponds that a water direction of intaking set up, two sink and to set up the partition wall in the ponds, and the partition wall sinks ponds with two to be separated for the good oxygen of membrane cisterna district, MBR membrane cisterna and return sludge district, and the good oxygen of membrane cisterna district, return sludge distinguish the both sides that are listed as the MBR membrane cisterna, and the space in the good oxygen of membrane cisterna district is greater than the space in return sludge district, set up the MBR film element in the MBR membrane cisterna, the return sludge district pipeline through being equipped with the sludge pump is connected with A2O biochemistry pond. The utility model discloses with MBR technology and built the current civil engineering cell body of sewage factory and combine closely, make full use of, very big limit reduces the demolising or changing of original cell body by a wide margin, reduces and reforms transform the degree of difficulty and investment cost. Full play MBR technology advantage, reality reaches the purpose of building sewage factory and proposing mark dilatation transformation with less area, short process flow.
Description
Technical field
This utility model is used for technical field of sewage, and it is dirty that more particularly to a kind of sewage treatment plant carries mark extending capacity reformation
Water treating pond.
Background technology
In sewage treatment area, gradually stepping up with discharge standard, small part sewage treatment plant has begun to requirement and holds
The standard of row earth's surface four class water (except total nitrogen), and the lifting of the Rapid Expansion with city size and waste water collection rate, city
City's sewage total amount quickly increases, and city built Sewage Plant majority is in oepration at full load state, at built Sewage Plant dilatation increase
Reason amount is imperative.Using the reforming technology of conventional biochemical process+advanced treating, not only technological process is long, and floor space is big, goes out
Water water quality is also difficult to stably reaching standard.
At present urban land supply and demand is nervous, using the upgrading technique of conventional biochemical process+advanced treating, long flow path,
Floor space is big, and the project of upgrading and rebuilding is related to removal expropriation of land problem mostly, and removing, time-consuming for expropriation of land, and high cost, for major part
For the built Sewage Plant in city, time needed for earth clearance and fund cost are far beyond its ability to bear.
Utility model content
For solving the above problems, this utility model provides a kind of sewage treatment plant to carry mark extending capacity reformation treatment tank, its
Mbr technique is intimately associated with built Sewage Plant existing civil engineering cell body, makes full use of, very big limit reduces tears open to original cell body
Remove or significantly change, reduce transformation difficulty and cost of investment.Give full play to mbr process advantage, reality is with less occupation of land face
Long-pending, shorter technological process reaches the purpose that built Sewage Plant carries mark extending capacity reformation.
This utility model solves its technical problem and be the technical scheme is that a kind of sewage treatment plant carries mark extending capacity reformation
Treatment tank, including the a2o biochemistry pool arranging along the water outlet direction that intakes and second pond, setting partition wall in described second pond,
Second pond is divided into membrane cisterna aerobic zone, mbr membrane cisterna and sludge reflux area by partition wall, and membrane cisterna aerobic zone, sludge reflux distinguish row
The both sides of mbr membrane cisterna, the space of membrane cisterna aerobic zone is more than setting mbr membrane element in the space in sludge reflux area, described mbr membrane cisterna
Part, sludge reflux area is connected with a2o biochemistry pool by being provided with the pipeline of sludge pump.
It is further used as the improvement of technical solutions of the utility model, setting drain wall in a2o biochemistry pool, drain wall is by a2o
Biochemistry pool is divided into anaerobic pond, anoxic pond and the Aerobic Pond being sequentially distributed along the water outlet direction that intakes.
It is further used as the improvement of technical solutions of the utility model, one jiao of described a2o biochemistry pool and upper in anaerobic pond
Trip is provided with and selects area into water.
It is further used as the improvement of technical solutions of the utility model, in the middle part of described anaerobic pond, be provided with the first training wall, anaerobism
Pond by the first training wall formed annular walk aquaporin.
It is further used as the improvement of technical solutions of the utility model, described anoxic pond includes edge and intakes water outlet direction successively
The one-level anoxic pond of distribution, two grades of anoxic pond, three-level anoxic pond and level Four anoxic pond, are provided with second in the middle part of described one-level anoxic pond
Training wall, one-level anoxic pond walks aquaporin by what the second training wall formed annular, two grades of anoxic pond, three-level anoxic pond and level Four
Anoxic pond walks aquaporin by drain wall formation s shape each other.
It is further used as the improvement of technical solutions of the utility model, described Aerobic Pond includes edge and intakes water outlet direction successively
The one-level Aerobic Pond of distribution, two grades of Aerobic Ponds, three-level Aerobic Pond and level Four Aerobic Pond, one-level Aerobic Pond, two grades of Aerobic Ponds, three-levels
What the drain wall that Aerobic Pond and level Four Aerobic Pond pass through each other formed s shape walks aquaporin.
The beneficial effects of the utility model: the Modification of Secondary Settling Tank of original system is three parts by this utility model: 1. membrane cisterna is good
Oxygen area, increases the aerobic unit time of staying, 2. sludge reflux area, the mud after mbr filtering and concentrating is pumped into a2o biochemistry pool,
3.mbr membrane cisterna, mbr membrane component is positioned in membrane cisterna, by the high-precision filtration of mbr film, obtains the water outlet of high-quality, water outlet
Float is nearly no detectable, thus reaching the purpose of lifting water quality.This utility model will be existing with built Sewage Plant for mbr technique
Civil engineering cell body is intimately associated, and makes full use of, and very big limit reduces the dismounting to original cell body or significantly changes, and reduces transformation difficult
Degree and cost of investment.Give full play to mbr process advantage, with less floor space, shorter technological process reaches built reality
Sewage Plant puies forward the purpose of mark extending capacity reformation.
Brief description
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is this utility model second pond structural representation;
Fig. 2 is this utility model a2o biochemistry pool structural representation.
Specific embodiment
With reference to Fig. 1, Fig. 2, that show the concrete structure of the preferred embodiment of this utility model.Will be detailed below
The construction featuress of each element of this utility model, and during if there are being described to direction (upper and lower, left and right, before and after), be with Fig. 1
Shown structure is with reference to description, but actually used direction of the present utility model is not limited thereto.
The modal technological process of traditional life Sewage Plant is: coarse rack, elevator pump, fine fack setting pot, a20 are biochemical
Pond, second pond, ultraviolet disinfection, water outlet, effluent quality commonly reaches " urban wastewater treatment firm pollutant emission standard "
(gb18918-2002) one-level b, one-level b water outlet leading indicator ammonia nitrogen 8mg/l, cod60mg/l, total phosphorus 1mg/l.Using this practicality
New mbr technique be applied to built Sewage Plant carry mark extending capacity reformation, make full use of original cell body, by changing to original cell body
Make and reach the purpose carrying mark extending capacity reformation, on the premise of not increasing total floor space, only newly-built preprocessing part (coarse rack,
Elevator pump, fine fack, setting pot) cell body, this part accounts for the Sewage Plant gross area 2%, the Sewage Plant process water yield is doubled, goes out
Water water quality reaches terrestrial reference four class water quality standard in addition to total nitrogen, earth's surface four class water water outlet leading indicator ammonia nitrogen 1.5mg/l, cod30mg/l,
Total phosphorus 0.3mg/l.Below Sewage Plant actual water outlet ammonia nitrogen 0.5mg/l, below cod15mg/l.
Specifically, this utility model provides a kind of sewage treatment plant and carries mark extending capacity reformation treatment tank, the master of transformation
Body is a20 biochemistry pool 1 and second pond 2, and a2o biochemistry pool 1 and second pond 2 are along water inlet to the setting of water outlet direction, traditional life sewage
Treatment plant's second pond 2 floor space is big, setting partition wall in described second pond 2, and second pond 2 is divided into membrane cisterna aerobic zone by partition wall
21st, mbr membrane cisterna 22 and sludge reflux area 23, membrane cisterna aerobic zone 21, the both sides of the 23 points of row mbr membrane cisternas 22 in sludge reflux area, film
The space of pond aerobic zone 21 is more than the space in sludge reflux area 23, setting mbr membrane component, sludge reflux in described mbr membrane cisterna 22
Area 23 is connected with a2o biochemistry pool 1 by being provided with the pipeline of sludge pump, and mud is back to a20 biochemistry pool 1 in a large number, improves biochemistry pool
Sludge concentration, improves and processes load, thus reducing the time of staying, processes the double purpose of the water yield.Meanwhile, by second pond
The newly-built corresponding equipment room in side 2, one layer of equipment room mainly has mbr water production system, backwashing system, purging wind system, evacuation
System, medicine system etc., the equipment such as aerator, air compressor machine is installed on one layer of equipment room, and two layers of equipment room is used for distribution, automatic control system
System.After ultraviolet disinfection canal, effluent quality reaches terrestrial reference four class water quality standard in addition to total nitrogen for membranous system water outlet.
The Modification of Secondary Settling Tank of original system is three parts: 1. membrane cisterna aerobic zone 21 by this utility model, increases aerobic unit and stops
Stay the time, 2. sludge reflux area 23, the mud after mbr filtering and concentrating is pumped into a2o biochemistry pool, 3.mbr membrane cisterna 22, by mbr film
Element is positioned in membrane cisterna, by the high-precision filtration of mbr film, obtains the water outlet of high-quality, goes out aqueous suspension and almost detects not
Arrive, thus reaching the purpose of lifting water quality.
12 hours traditional wastewater treatment plant a20 biochemistry pool time of staying, sludge concentration 3500mg/l about, by mbr skill
Art, sludge concentration can be promoted to more than 7000mg/l, and the a2o biochemistry pool time of staying can foreshorten to 6 hours, utilizes from realization
Original cell body reaches the double purpose of aquifer yield.The function of only original cell body need to being carried out again divides, and increases parting wall, real
Existing original function.That is, setting drain wall in a2o biochemistry pool 1, a2o biochemistry pool 1 is divided into along water side of intaking drain wall
To the anaerobic pond 11, anoxic pond and the Aerobic Pond that are sequentially distributed.One jiao of described a2o biochemistry pool 1 and set in the upstream of anaerobic pond 11
Have and select area 12 into water.It is provided with the first training wall 13, anaerobic pond 11 is formed by the first training wall 13 in the middle part of described anaerobic pond 11
Annular walks aquaporin.Described anoxic pond includes 14, the two grades of anoxias of one-level anoxic pond being sequentially distributed along the water outlet direction that intakes
Pond 15, three-level anoxic pond 16 and level Four anoxic pond 17, are provided with the second training wall 18, one-level anoxia in the middle part of described one-level anoxic pond 14
Aquaporin is walked by what the second training wall 18 formed annular in pond 14, two grades of anoxic pond 15, three-level anoxic pond 16 and level Four anoxic pond
The 17 drain walls passing through each other form the aquaporin of walking of s shape, and anoxic pond arranges level Four, increases the anoxia time of staying, reduces
Total nitrogen difficulty up to standard.Described Aerobic Pond includes 19, the two grades of Aerobic Ponds of one-level Aerobic Pond being sequentially distributed along the water outlet direction that intakes
110th, three-level Aerobic Pond 111 and level Four Aerobic Pond 112,19, two grades of Aerobic Ponds 110 of one-level Aerobic Pond, three-level Aerobic Pond 111 and four
Level Aerobic Pond 112 walks aquaporin by drain wall formation s shape each other.
By upgrade expanding transformation is carried out to traditional wastewater factory using technique scheme, before not increasing floor space newly
Put, make full use of original cell body, it is possible to achieve aquifer yield doubles, effluent quality is by " urban wastewater treatment firm pollutant
Discharge standard " (gb18918-2002) one-level b, directly it is promoted to earth's surface four class water quality standard (except total nitrogen), with using traditional work
The technique of skill+advanced treating is compared, and saves floor space more than 50%, and cost of investment saves more than 40%, solves city built
In Sewage Plant upgrade expanding transformation process because of floor space not, need newly-increased soil, removing of bringing is difficult, difficult the asking of expropriation of land
Topic.
Certainly, the invention is not limited to above-mentioned embodiment, and those of ordinary skill in the art are without prejudice to this
Equivalent variations or replacement also can be made, these equivalent modifications or replacement are all contained in the application on the premise of utility model spirit
In claim limited range.
Claims (6)
1. a kind of sewage treatment plant carry mark extending capacity reformation treatment tank it is characterised in that: include setting along the water outlet direction that intakes
The a2o biochemistry pool put and second pond, setting partition wall in described second pond, second pond is divided into membrane cisterna aerobic zone, mbr film by partition wall
Pond and sludge reflux area, the both sides of row mbr membrane cisterna are distinguished in membrane cisterna aerobic zone, sludge reflux, and the space of membrane cisterna aerobic zone is more than
The space in sludge reflux area, setting mbr membrane component in described mbr membrane cisterna, sludge reflux area by be provided with the pipeline of sludge pump with
A2o biochemistry pool connects.
2. sewage treatment plant according to claim 1 carry mark extending capacity reformation treatment tank it is characterised in that: a2o is biochemical
Drain wall is set in pond, and a2o biochemistry pool is divided into the anaerobic pond being sequentially distributed along the water outlet direction that intakes, anoxic pond by drain wall
And Aerobic Pond.
3. sewage treatment plant according to claim 2 carry mark extending capacity reformation treatment tank it is characterised in that: described a2o
One jiao of biochemistry pool and be provided with the upstream of anaerobic pond and select area into water.
4. sewage treatment plant according to claim 2 carry mark extending capacity reformation treatment tank it is characterised in that: described anaerobism
Be provided with the first training wall in the middle part of pond, anaerobic pond by the first training wall formed annular walk aquaporin.
5. sewage treatment plant according to claim 2 carry mark extending capacity reformation treatment tank it is characterised in that: described anoxia
Pond includes water outlet direction is sequentially distributed along intaking one-level anoxic pond, two grades of anoxic pond, three-level anoxic pond and level Four anoxic pond,
Be provided with the second training wall in the middle part of described one-level anoxic pond, one-level anoxic pond by the second training wall formed annular walk aquaporin,
What the drain wall that two grades of anoxic pond, three-level anoxic pond and level Four anoxic pond are passed through each other formed s shape walks aquaporin.
6. sewage treatment plant according to claim 2 carry mark extending capacity reformation treatment tank it is characterised in that: described aerobic
Pond includes water outlet direction is sequentially distributed along intaking one-level Aerobic Pond, two grades of Aerobic Ponds, three-level Aerobic Pond and level Four Aerobic Pond,
The drain wall that one-level Aerobic Pond, two grades of Aerobic Ponds, three-level Aerobic Pond and level Four Aerobic Pond pass through each other forms leaking water of s shape
Passage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620750241.2U CN205892869U (en) | 2016-07-14 | 2016-07-14 | Sewage treatment plant proposes mark dilatation and reforms transform sewage treatment pond |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620750241.2U CN205892869U (en) | 2016-07-14 | 2016-07-14 | Sewage treatment plant proposes mark dilatation and reforms transform sewage treatment pond |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205892869U true CN205892869U (en) | 2017-01-18 |
Family
ID=57773036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620750241.2U Active CN205892869U (en) | 2016-07-14 | 2016-07-14 | Sewage treatment plant proposes mark dilatation and reforms transform sewage treatment pond |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205892869U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106927644A (en) * | 2017-04-28 | 2017-07-07 | 中信环境技术(天津)有限公司 | A kind of sewage disposal system carries the remodeling method of mark dilatation |
CN106986497A (en) * | 2017-04-28 | 2017-07-28 | 中信环境技术(天津)有限公司 | A kind of high-efficiency wastewater treatment system |
CN110668563A (en) * | 2019-10-28 | 2020-01-10 | 陕西朗正环保科技有限公司 | Sewage treatment system reconstruction method |
CN113461158A (en) * | 2021-05-26 | 2021-10-01 | 青岛张村河水务有限公司 | Biological treatment system of underground sewage treatment plant |
-
2016
- 2016-07-14 CN CN201620750241.2U patent/CN205892869U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106927644A (en) * | 2017-04-28 | 2017-07-07 | 中信环境技术(天津)有限公司 | A kind of sewage disposal system carries the remodeling method of mark dilatation |
CN106986497A (en) * | 2017-04-28 | 2017-07-28 | 中信环境技术(天津)有限公司 | A kind of high-efficiency wastewater treatment system |
CN110668563A (en) * | 2019-10-28 | 2020-01-10 | 陕西朗正环保科技有限公司 | Sewage treatment system reconstruction method |
CN113461158A (en) * | 2021-05-26 | 2021-10-01 | 青岛张村河水务有限公司 | Biological treatment system of underground sewage treatment plant |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205892869U (en) | Sewage treatment plant proposes mark dilatation and reforms transform sewage treatment pond | |
CN103936148B (en) | A kind of constant discharging varying duty SVBR sewage treatment process | |
WO2015139484A1 (en) | Constructed wetland sewage treatment device and sewage treatment method therefor | |
CN104310708B (en) | The application method of drop oxygenation-high depth composite under-current artificial wetland technology in rural domestic sewage treatment | |
CN204824550U (en) | A device for rural domestic sewage treatment | |
CN110255714A (en) | A kind of low carbon source urban sewage processing system and method | |
CN109020091A (en) | A kind of combined type artificial marsh sewage treatment system and its processing method | |
CN207713502U (en) | A kind of regeneration effluent process system | |
CN100418904C (en) | Vertical current and horizontal current integrated composite artificial wetland treatment method for treating urban sewage | |
CN110117070A (en) | Energy-efficient compact compound A2/ O dephosphorization denitrogenation processing system and treatment process | |
CN102503036A (en) | High-efficiency denitrification artificial soil subsurface infiltration sewage treatment composite system and method | |
CN107585974A (en) | A kind of sewage water treatment method based on MBBR techniques | |
CN104828941A (en) | A2O-BAF combined process and A2O-BAF combined device | |
CN201598224U (en) | Biological nitrogen and phosphorus removal treatment and filter integrated sewage treatment system | |
CN101746931A (en) | Denitrification dephosphorization biological treatment and filtration integral sewage treatment system and method thereof | |
WO2020133930A1 (en) | High-efficiency biodegradation filter reactor and method using same for treating polluted water | |
CN107954516A (en) | Circulation improvement A/O integrated sewage disposal techniques in one kind four | |
CN106927644A (en) | A kind of sewage disposal system carries the remodeling method of mark dilatation | |
CN101863596B (en) | Sewage treatment system of secondary anaerobic horizontal baffling compound type artificial wetland and sewage treatment method thereof | |
CN209098457U (en) | A kind of domestic sewage processing system | |
CN209065665U (en) | A kind of rapid infiltration system for rural sewage treatment | |
CN102515413B (en) | Sewage treatment system and treatment method of composite horizontal undercurrent constructed wetland | |
CN204125308U (en) | A kind of A 2o-BAF combination process pilot plant | |
CN208151064U (en) | Energy-efficient compact compound A2/O dephosphorization denitrogenation processing system | |
CN210287064U (en) | Assembled sewage treatment wetland |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |