CN205889421U - A drilling equipment for drilling of bamboo piece - Google Patents

A drilling equipment for drilling of bamboo piece Download PDF

Info

Publication number
CN205889421U
CN205889421U CN201620854767.5U CN201620854767U CN205889421U CN 205889421 U CN205889421 U CN 205889421U CN 201620854767 U CN201620854767 U CN 201620854767U CN 205889421 U CN205889421 U CN 205889421U
Authority
CN
China
Prior art keywords
scraping wings
bamboo block
vertical scraping
runner
pushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620854767.5U
Other languages
Chinese (zh)
Inventor
宋发元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangle County Xinfa Bamboo Products Factory
Original Assignee
Jiangle County Xinfa Bamboo Products Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangle County Xinfa Bamboo Products Factory filed Critical Jiangle County Xinfa Bamboo Products Factory
Priority to CN201620854767.5U priority Critical patent/CN205889421U/en
Application granted granted Critical
Publication of CN205889421U publication Critical patent/CN205889421U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a drilling equipment for drilling of bamboo piece, it includes a workstation (1), a bamboo piece clamping mechanism (2) locates with sliding on workstation (1), a drilling mechanism (3) is fixed in be used for implementing drilling to the bamboo piece on the bamboo piece clamping mechanism (2) on workstation (1) of bamboo piece clamping mechanism (2) one side, a pushing equipment (4) are located it is close to extremely to be used for promoting bamboo piece clamping mechanism (2) on workstation (1) of bamboo piece clamping mechanism (2) opposite side drilling mechanism (3) supplies drilling mechanism (3) to implement drilling. The utility model has the advantages that the device realizes the mechanized operation of doing manual work, and is efficient, uses manpower sparingly.

Description

A kind of drilling equipment for the boring of bamboo block
Technical field
This utility model is related to a kind of drilling equipment for the boring of bamboo block.
Background technology
When making bamboo product, need to be formed by connecting by several bamboo blocks, needs will punch on bamboo block, facilitate bamboo block Connection and bamboo block between, in prior art, typically all manually implements punch operation to bamboo block, efficiency is low, wastes time and energy, behaviour Make inconvenient.
Content of the invention
The technical problems to be solved in the utility model is to provide a kind of drilling equipment for the boring of bamboo block, and this device is real Existing mechanization is done manual work and is operated, and efficiency high saves manpower.
For solving above-mentioned technical problem, the technical scheme that this utility model provides is: a kind of boring for the boring of bamboo block Device, it includes a workbench;One bamboo block clamp system, slidably on described workbench;One borehole drill construction, is fixed on institute State and be used on the workbench of bamboo block clamp system side implementing boring to the bamboo block on bamboo block clamp system;One pusher, if It is used for promoting bamboo block clamp system to supply to bore near to described borehole drill construction on the workbench of described bamboo block clamp system opposite side Holes mechanism implements boring.
Further, described bamboo block clamp system include upper substrate, infrabasal plate, upper clamping die head, lower clamping die head, first Pushing and withstanding cylinder and slide;It is provided with connecting rod between described upper substrate and infrabasal plate;Described first pushing and withstanding cylinder is installed on upper substrate Upper and its piston rod passes through upper substrate to be connected with upper clamping die head, and described lower clamping die head is fixed on described infrabasal plate, In setting up and down between described upper clamping die head and lower clamping die head, described slide be fixed on described infrabasal plate lower surface and with Workbench sliding fit, described workbench is provided with the chute that the lower end for slide embeds.
Further, described pusher include the second pushing and withstanding cylinder, the 3rd pushing and withstanding cylinder, the first vertical scraping wings, Two vertical scraping wings, the 3rd vertical scraping wings, the 4th vertical scraping wings, first level scraping wings and the second horizontal scraping wings;Institute State the piston rod of the second pushing and withstanding cylinder and the first vertical scraping wings is connected, described second vertical scraping wings is connected with upper substrate Fixing, described first level scraping wings is fixed between the first vertical scraping wings and the second vertical scraping wings;Described 3rd pushing and withstanding The piston rod of cylinder is connected with the 3rd vertical scraping wings, and described 4th vertical scraping wings is connected with infrabasal plate, described Second horizontal scraping wings is fixed between the 3rd vertical scraping wings and the 4th vertical scraping wings.
Further, a described borehole drill construction includes motor, rotating shaft, drill bit, the first runner, the second runner and transmission belt; The output shaft of described motor is connected with the first runner, and one end of described rotating shaft is connected with the second runner, described first runner and Two runners are connected by transmission belt, and the other end of described rotating shaft is connected with drill bit;The axis of described second runner, the axis of rotating shaft And the axis of drill bit is on same axis.
After above structure, this utility model compared with prior art, has the advantage that its structure includes a job Platform;One bamboo block clamp system, slidably on described workbench;One borehole drill construction, is fixed on described bamboo block clamp system one It is used on the workbench of side implementing boring to the bamboo block on bamboo block clamp system;One pusher, located at described bamboo block clamping machine It is used on the workbench of structure opposite side promoting bamboo block clamp system to supply borehole drill construction to implement boring near to described borehole drill construction.Base In the design of above-mentioned dependency structure, the cooperation by bamboo block clamp system, borehole drill construction and pusher is it is achieved that to bamboo block Mechanization drilling operation, efficiency high, save manpower.
Brief description
Fig. 1 is overall structure diagram of the present utility model.
Shown in figure: 1, workbench;101st, chute;2nd, bamboo block clamp system;201st, upper substrate;202nd, infrabasal plate;203、 Upper clamping die head;204th, lower clamping die head;205th, the first pushing and withstanding cylinder;206th, slide;207th, connecting rod;3rd, borehole drill construction; 301st, motor;302nd, rotating shaft;303rd, drill bit;304th, the first runner;305th, the second runner;306th, transmission belt;4th, pusher; 401st, the second pushing and withstanding cylinder;402nd, the 3rd pushing and withstanding cylinder;501st, the first vertical scraping wings;502nd, the second vertical scraping wings;503、 3rd vertical scraping wings;504th, the 4th vertical scraping wings;601st, first level scraping wings;602nd, the second horizontal scraping wings.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in further detail.
Shown in Fig. 1, a kind of drilling equipment for the boring of bamboo block of this utility model, it includes a workbench 1;One bamboo block folder Tight mechanism 2, slidably on described workbench 1;One borehole drill construction 3, is fixed on the work of described bamboo block clamp system 2 side It is used on platform 1 implementing boring to the bamboo block on bamboo block clamp system 2;One pusher 4, another located at described bamboo block clamp system 2 It is used on the workbench 1 of side promoting bamboo block clamp system 2 to supply borehole drill construction 3 to implement boring near to described borehole drill construction 3.
Described bamboo block clamp system 2 include upper substrate 201, infrabasal plate 202, upper clamping die head 203, lower clamping die head 204, First pushing and withstanding cylinder 205 and slide 206;It is provided with connecting rod 207 between described upper substrate 201 and infrabasal plate 202;Described first pushes away Top gas cylinder 205 is installed on upper substrate 201 and its piston rod passes through upper substrate 201 to be connected with upper clamping die head 203, described Lower clamping die head 204 is fixed on described infrabasal plate 202, in up and down between described upper clamping die head 203 and lower clamping die head 204 Setting, described slide 206 be fixed on described infrabasal plate 202 lower surface and with workbench 1 sliding fit, described workbench 1 sets There is the chute 101 that the lower end for slide 206 embeds.
Described pusher 4 include the second pushing and withstanding cylinder 401, the 3rd pushing and withstanding cylinder 402, the first vertical scraping wings 501, Two vertical scraping wings 502, the 3rd vertical scraping wings 503, the 4th vertical scraping wings 504, first level scraping wings 601 and the second water Horizontal sliding flitch 602;The piston rod of described second pushing and withstanding cylinder 401 is connected with the first vertical scraping wings 501, and described second erects Straight scraping wings 502 is connected with upper substrate 201, described first level scraping wings 601 be fixed on the first vertical scraping wings 501 and Between second vertical scraping wings 502;The piston rod of described 3rd pushing and withstanding cylinder 402 and the 3rd vertical scraping wings 503 are connected, Described 4th vertical scraping wings 504 is connected with infrabasal plate 202, and it is vertical that described second horizontal scraping wings 602 is fixed on the 3rd Between scraping wings 503 and the 4th vertical scraping wings 504.
A described borehole drill construction 3 includes motor 301, rotating shaft 302, drill bit 303, the first runner 304, the second runner 305 and Transmission belt 306;The output shaft of described motor 301 is connected with the first runner 304, one end of described rotating shaft 302 and the second runner 305 Connect, described first runner 304 is connected by transmission belt 306 with the second runner 305, the other end of described rotating shaft 302 and drill bit 303 connections;The axis of the axis, the axis of rotating shaft 302 and drill bit 303 of described second runner 305 is on same axis.
Principle Analysis of the present utility model are as follows: by bamboo block be placed into lower clamping die head 204 adjacent projection it Between, then by starting the first pushing and withstanding cylinder 205, in driving, clamping die head 203 moves down, and causes the other end of bamboo block to be placed in Between adjacent projection on clamping die head 203, clamping is realized by upper clamping die head 203 and lower clamping die head 204 cooperation, it Pass through again afterwards to start the second pushing and withstanding cylinder 401 and the 3rd pushing and withstanding cylinder 402 of pusher 4, by the second pushing and withstanding cylinder 401 Piston rod is connected with the first vertical scraping wings 501, and the second vertical scraping wings 502 is connected with upper substrate 201, the first water Horizontal sliding flitch 601 is fixed between the first vertical scraping wings 501 and the second vertical scraping wings 502;The work of the 3rd pushing and withstanding cylinder 402 Stopper rod is connected with the 3rd vertical scraping wings 503, and the 4th vertical scraping wings 504 is connected with infrabasal plate 202, the second level Scraping wings 602 is fixed between the 3rd vertical scraping wings 503 and the 4th vertical scraping wings 504, and whole bamboo block clamp system 2 is pushed away Top is up to close described borehole drill construction 3, then by the rotation of motor 301, indirectly drives drill bit 303 to rotate, finally realization boring.
Below only most preferred embodiment of the present utility model is described, but is not to be construed as the limit to claim System.This utility model is not limited only to above example, is made in all protection domains in this utility model independent claims Various change is all in protection domain of the present utility model.

Claims (2)

1. a kind of for bamboo block boring drilling equipment it is characterised in that: it includes a workbench (1);One bamboo block clamp system (2), slidably on described workbench (1);One borehole drill construction (3), is fixed on the work of described bamboo block clamp system (2) side Station (1) is upper to be used for implementing boring to the bamboo block on bamboo block clamp system (2);One pusher (4), located at the clamping of described bamboo block It is used on the workbench (1) of mechanism (2) opposite side promoting bamboo block clamp system (2) to supply boring near to described borehole drill construction (3) Mechanism (3) implements boring;Described bamboo block clamp system (2) includes upper substrate (201), infrabasal plate (202), upper clamping die head (203), lower clamping die head (204), the first pushing and withstanding cylinder (205) and slide (206);Described upper substrate (201) and infrabasal plate (202) it is provided with connecting rod (207) between;Described first pushing and withstanding cylinder (205) is installed on upper substrate (201) above and its piston rod is worn Cross upper substrate (201) to be connected with upper clamping die head (203), described lower clamping die head (204) is fixed on described infrabasal plate (202), on, it is in setting up and down between described upper clamping die head (203) and lower clamping die head (204), described slide (206) is fixing In described infrabasal plate (202) lower surface and with workbench (1) sliding fit, described workbench (1) is provided with for slide (206) The chute (101) that lower end embeds;Described pusher (4) include the second pushing and withstanding cylinder (401), the 3rd pushing and withstanding cylinder (402), the One vertical scraping wings (501), the second vertical scraping wings (502), the 3rd vertical scraping wings (503), the 4th vertical scraping wings (504), first level scraping wings (601) and the second horizontal scraping wings (602);The piston rod of described second pushing and withstanding cylinder (401) It is connected with the first vertical scraping wings (501), described second vertical scraping wings (502) is connected with upper substrate (201), institute State first level scraping wings (601) to be fixed between the first vertical scraping wings (501) and the second vertical scraping wings (502);Described The piston rod of the 3rd pushing and withstanding cylinder (402) is connected with the 3rd vertical scraping wings (503), described 4th vertical scraping wings (504) be connected with infrabasal plate (202), described second horizontal scraping wings (602) be fixed on the 3rd vertical scraping wings (503) with Between 4th vertical scraping wings (504).
2. according to claim 1 a kind of for bamboo block boring drilling equipment it is characterised in that: a described borehole drill construction (3) motor (301), rotating shaft (302), drill bit (303), the first runner (304), the second runner (305) and transmission belt are included (306);The output shaft of described motor (301) is connected with the first runner (304), one end of described rotating shaft (302) and the second runner (305) connect, described first runner (304) is connected by transmission belt (306) with the second runner (305), described rotating shaft (302) The other end is connected with drill bit (303);The axis of described second runner (305), the axis of rotating shaft (302) and drill bit (303) Axis is on same axis.
CN201620854767.5U 2016-08-09 2016-08-09 A drilling equipment for drilling of bamboo piece Expired - Fee Related CN205889421U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620854767.5U CN205889421U (en) 2016-08-09 2016-08-09 A drilling equipment for drilling of bamboo piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620854767.5U CN205889421U (en) 2016-08-09 2016-08-09 A drilling equipment for drilling of bamboo piece

Publications (1)

Publication Number Publication Date
CN205889421U true CN205889421U (en) 2017-01-18

Family

ID=57781303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620854767.5U Expired - Fee Related CN205889421U (en) 2016-08-09 2016-08-09 A drilling equipment for drilling of bamboo piece

Country Status (1)

Country Link
CN (1) CN205889421U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112659276A (en) * 2020-12-23 2021-04-16 陈彦利 Wood system cylinder drilling equipment of polishing for wood working

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112659276A (en) * 2020-12-23 2021-04-16 陈彦利 Wood system cylinder drilling equipment of polishing for wood working

Similar Documents

Publication Publication Date Title
CN104563912B (en) A kind of well drilling pipe column automation operating system
CN205889422U (en) A drilling equipment for drilling of bamboo piece with carry function
AR101195A1 (en) TRANSPORTATION TERMINATION OPERATIONS AND TOOLS BY UNION
CN205889420U (en) Bamboo piece drilling equipment with carry function
CN104819858B (en) Test device for evaluating reliability of downhole tool of horizontal well
CN203614056U (en) Automatic operation system of drilling tubular column
CN104632241A (en) Track crane with excavation function
CN205889421U (en) A drilling equipment for drilling of bamboo piece
CN204238880U (en) The drilling rod automatic powder adding of underground drill rig adds retracting device
CN204175194U (en) Rig telescopic rail
CN205889423U (en) Bamboo piece drilling equipment
CN204283255U (en) The two rod drilling rod library of a kind of top hammer churn
CN202023514U (en) Oil pipe righting device for well drilling and repairing operations
CN205296142U (en) Heavy -calibre wet thoughtlessly spouting futilely spouts stirring stake machine of using simultaneously with height
CN203701961U (en) Drilling, punching and fracturing integrated operation machine for coal mine
CN202381046U (en) Negative pressure flow string for oilfield pumping well
CN204899789U (en) Rigid suspension contact net platform of perpendicularly upwards driling
CN205200619U (en) Camshaft terminal surface boring grab
CN204298829U (en) A kind of prosthetic device being applied to underground large discharge seepage
CN204002593U (en) Portable all-hydraulic geology rock-core borer
CN204418180U (en) A kind of hydraulic pressure plays a machine
CN202300248U (en) Mechanical arraying and placing system of drill rods
CN205209803U (en) Portable hydraulic pressure earth boring auger device
CN204108682U (en) the vertical clamping device of lock core
CN104493257A (en) Fixture for clamping of connecting base

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20170809