CN205888154U - Lightweight pipeline tapping device - Google Patents
Lightweight pipeline tapping device Download PDFInfo
- Publication number
- CN205888154U CN205888154U CN201620912199.XU CN201620912199U CN205888154U CN 205888154 U CN205888154 U CN 205888154U CN 201620912199 U CN201620912199 U CN 201620912199U CN 205888154 U CN205888154 U CN 205888154U
- Authority
- CN
- China
- Prior art keywords
- tapping machine
- support
- pipeline
- tapping
- perforate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a lightweight pipeline tapping device, slide the support including the tapping machine, slidable mounting had the trompil frame on the tapping machine coasted the support, install the tapping machine on the trompil frame, the tapping machine slides the below of support and installs pipeline bracket, last having placed of pipeline bracket is located the tapping machine slides the pipeline of support below, install simple and easy water -chilling plant on the tapping machine, the utility model discloses mounting adjustment accomplishes the back, pushes away the tapping machine to required the drilling position according to drilling needs, and light flexibility has improved the trompil quality, reduction intensity of labour, and machining precision and work efficiency can be increased substantially.
Description
Technical field
This utility model is related to light-duty steel plate perforate and small-bore pipeline venting techniques field, and more particularly, to one kind is to light-duty
The perforating device that steel plate and small-bore pipeline are punched.
Background technology
In order to accelerate the development of enterprise, and the normal conveying of raw material, pipeline is applied to all trades and professions, becomes me
Live in one of indispensable important infrastructure.And the development with modern industry, various large enterprises, large-scale business
, communal facility region place gets more and more." security against fire " also becomes the indispensable part in these large-scale fields, once
There is the burst accidents such as fire, it can effectively reduce life and property loss.With the requirement of fire-fighting career development, various new
Fire-fighting tubing and interconnection technique continuously emerge, and effectively applied in various Practical Projects.These new techniques, new equipment
It is required for us to be summarized so that various fire-fighting class tubing is more perfect effective in fire-fighting system application in fire-fighting construction
With economic and practical.Wherein, pipeline indent and pipe collar threeway are exactly one of the more commonly used connected mode in fire-fighting system, especially
Especially common in automatic spray and sprinkling system.
Perforate in spray piping construction is requisite one operational procedure, and the quality of perforate not only affects pipeline peace
Dress processing quality, can directly influence spray system serviceability when serious, lead to safety devices to lose efficacy.And in site operation often
Tapping machine need to move back and forth, and just can carry out perforate using chain reinforcing on pipeline, easily causes perforate position during fastening
The change put.Tapping procedures must be noted that tapping machine degree of balance and drill bit cooled down, and is drilled a hole and need to lift to after unloading again
Another place continues perforate.Working procedure is complicated, and number of users is more.
Utility model content
Technical problem to be solved in the utility model is the lightweight pipeline providing a kind of punching accurate and easy to use
Boring device.
For solving above-mentioned technical problem, the technical solution of the utility model is: lightweight pipeline tapping device, including perforate
Machine skid brackets, described tapping machine skid brackets are slidably fitted with perforate support, described perforate support are provided with tapping machine;
The lower section of described tapping machine skid brackets is provided with support of pipelines, described support of pipelines is placed with and opens positioned at described
Pipeline below the machine skid brackets of hole, described tapping machine is provided with simple water-cooling apparatus.
As a kind of preferred technical scheme, described tapping machine skid brackets include sliding of two spacing parallel arranging settings
Seat, described sliding is installed with two slide bars between seat, described perforate support is slidably mounted on two described slide bars.
As a kind of preferred technical scheme, described perforate support includes machine base body, fixing peace in described machine base body
Slide set equipped with four, the described set that slides is sleeved on described tapping machine skid brackets, slide described at least one and put installation
There is the fixing bolt described machine base body being fixed on described tapping machine skid brackets.
As a kind of preferred technical scheme, described support of pipelines includes the rack body of two spacing parallel arranging settings, institute
The top stating rack body is provided with anticreep groove with described pipeline outer wall compression fit, and described anticreep groove is located at described tapping machine
The underface of drill bit.
As a kind of preferred technical scheme, described simple water-cooling apparatus includes being inverted at tapping machine coolant intake
Water-storing bottle, the opening of described water-storing bottle is connected with outlet pipe, is provided with reducer in described outlet pipe.
As a kind of preferred technical scheme, described reducer includes the iron wire less than described diameter of outflow tube 2/3, described
One end of iron wire is stretched in described water-storing bottle and has been provided with u-shaped fixed knot.
Due to employing technique scheme, lightweight pipeline tapping device, including tapping machine skid brackets, described perforate
Perforate support is slidably fitted with machine skid brackets, described perforate support is provided with tapping machine;Described tapping machine skid brackets
Lower section support of pipelines is installed, described support of pipelines is placed with the pipeline below described tapping machine skid brackets, institute
State and simple water-cooling apparatus is provided with tapping machine;After the completion of this utility model mounting and adjusting, needed tapping machine according to boring
It is pushed into required bore position, light and flexible, improves perforate quality, reduce labor intensity, machining accuracy and work efficiency energy
It is greatly improved.
Brief description
The following drawings is only intended to, in this utility model is done with schematic illustration and explanation, not limit model of the present utility model
Enclose.Wherein:
Fig. 1 is the front view of this utility model embodiment;
Fig. 2 is the side view of this utility model embodiment;
In figure: 11- slides seat;12- slide bar;22- slides set;23- fixing bolt;3- tapping machine;41- rack body;42-
Anticreep groove;43- pipeline.
Specific embodiment
With reference to the accompanying drawings and examples, this utility model is expanded on further.In the following detailed description, only pass through to say
Bright mode describes some one exemplary embodiment of the present utility model.Undoubtedly, those of ordinary skill in the art is permissible
Recognize, in the case of without departing from spirit and scope of the present utility model, can by with various different in the way of to described
Embodiment is modified.Therefore, accompanying drawing and description are inherently illustrative, rather than for limiting the protection of claim
Scope.
As depicted in figs. 1 and 2, lightweight pipeline tapping device, including tapping machine skid brackets, described tapping machine slides and props up
What frame included the setting of two spacing parallel arrangings slides seat 11, and described sliding is installed with two slide bars 12 between seat 11, two institutes
State and perforate support is slidably fitted with slide bar 12, described perforate support includes machine base body (not shown), described support is originally
It is installed with four on body and slides set 22, the described set 22 that slides is sleeved on described tapping machine skid brackets, at least one institute
State to slide, on set 22, the fixing bolt 23 being fixed on described machine base body on described tapping machine skid brackets is installed;Described open
Tapping machine 3 is provided with the support of hole;
As depicted in figs. 1 and 2, the lower section of described tapping machine skid brackets is provided with pipeline 43 support, 43, described pipeline
Frame includes the rack body 41 of two spacing parallel arranging settings, and the top of described rack body 41 is provided with and described pipeline 43 outer wall
The anticreep groove 42 of compression fit, described anticreep groove 42 is located at the underface of described tapping machine 3 drill bit;Put on described pipeline 43 support
It is equipped with the pipeline 43 below described tapping machine skid brackets, described tapping machine 3 is provided with simple water-cooling apparatus (in figure
Not shown), described simple water-cooling apparatus includes being inverted in the water-storing bottle at tapping machine 3 coolant intake, described water-storing bottle
Opening is connected with outlet pipe, is provided with reducer in described outlet pipe, and described reducer is included less than described diameter of outflow tube
2/3 iron wire, one end of described iron wire is stretched in described water-storing bottle and has been provided with u-shaped fixed knot.
Tapping machine skid brackets are selected and are made:
1st, tapping machine 3 dragging track, i.e. slide bar 12: for enabling perforate support flexibly to move on open pore level line, scene
Determine from fire-fighting carbon steel piping 43 as slide bar 12, reduce the friction area of perforate support.Can be opened according to pipeline 43 during construction
The actual range in hole determines the length of slide bar 12, such as our field pipes 43 perforate distance great majority at 3 meters one, from one
3.7 meters of slide bar 12.After choosing slide bar 12 length, then need whether the bearing capacity testing pipeline 43 center meets during perforate
Maximum moment is without bending.During perforate, maximum is defeated and is generally kept in below 40kg after tested, if power is too greatly to perforate
The loss of machine 3 can accordingly increase.
If 2 inconvenient on-the-spot tests also can be by the maximum pressure-bearing of computing formula acquisition pipeline 43:
The computing formula of maximum deflection direct stress is: σ=m/ (γ x*wnx).Wherein: m is the maximal bending moment that steel pipe bears;
The plasticity coefficient in γ x --- section;For steel tube section, it is taken as 1.15, wnx --- steel pipe net section modulus, also referred to as
Net section resistance moment.If section does not weaken, can be found by the shaped steel form in Steel Structural Design handbook, if section
There is weakening, can be calculated by computing formula according to sectional dimension according to the formula of the mechanics of materials.
3rd, after the completion of slide bar 12, can select to slide length and the mounting means of seat 11 according to live material context, slide seat
11 highly should not be too high, is usually no more than that 60cm can (the too high not only waste of materials of supporting leg but also inconvenience be by perforate pipeline
43 placement), but nor it is less than 30cm (if too low cannot install by the support of perforate pipeline 43);Must assure that during making
Slide the perpendicularity of seat 11 it is ensured that slide rail both ends horizontal is completely the same, weld seam foot welding height is maintained at 3~5mm.
4th, put fixed position according to what the size of pipeline 43 tapping machine 3 determined the size of perforate support and tapping machine 3, open
Hole machine 3 must fixation on perforate support.The hexagon for 30cm*30cm is sat at our field pipes 43 tapping machine 3 bottoms, is
Can preferably be put on perforate support by the pipeline 43 of perforate, tapping machine 3 is arranged on tapping machine and seats against by scene slides rail
The position of the side 16cm (center of tapping machine 3) of road support.
Perforate support fixing bolt 23 be m16*40mm, so our angle bar must select more twice angle than the diameter of bolt
Ferrum can fix tapping machine 3;For ensureing fabricating quality, blanking must carry out blanking, the blanking of perforate support using cutting machine
Width is tapping machine skid brackets inboard width 2mm, need to be with two (the distance too easy off-center of large opening size);Length is
Perforate support width unanimously, need to be with three, and the central point of two is opened m16 bolt hole and is used for fixing tapping machine 3 wherein.
Then select with slide bar 12 pipeline 43 diameter angle steel of a size, perforate support is fixed on slide bar 12.Choosing
Slide bar 12 just can be embraced by angle steel, first the angle steel of upper plane is spoted weld with perforate support together with, keep horizontal vertical
Distance.After the spot welding of four points connects, whether test perforate support slides smooth on slide bar 12, looks into reason if any flase drop and carries out
Adjustment, gets final product firm welding Ru errorless.A positioner can be made in fixing end side nuts and bolt if necessary, can prevent
Only tapping machine 3 support is in the crucial moment shift position of perforate;Finally by mouth fixation under angle steel, best with the spacing of support
It is maintained at 1mm, and tapping machine 3 is fixed on the perforate support made.
5th, the making of pipeline 43 support:
The material of pipeline 43 support using the clout in construction or waste material, but can must assure that its quality, pipeline 43 support
The centre-to-centre spacing of channel-section steel must (the namely centre-to-centre spacing of channel-section steel and pipeline 43 hole making drill consistent with the centre-to-centre spacing of tapping machine 3 perforate
Centre-to-centre spacing is consistent);The distance of pipe top to pipeline 43 tapping machine 3 cannot be greater than 5cm and (meets tapping machine 3 up and down
Big stroke).
6th, simple water-cooling apparatus, as water-storing bottle, one saves long 40cm diameter 4mm's to the plastic bottle preparing a 2l-5l
As outlet pipe (pipe too flood runs off quickly) and as reducer, (iron wire is too less than plastics pipe diameter 2/3 iron wire for plastic flexible pipe
Slightly easily cause plastic conduit 43 to block);Plastic tube is fixed on bottle cap and shifts to an earlier date prefabricated pipeline 43 in the hole, iron wire is inserted
Bending to u-shaped after exceeding bottle cap 1cm in pipeline 43 does not allow it drop out from bottle cap, and the plastic tube made is solid from tapping machine 3
Surely rise in riser and lead to hole making drill tapping alignment apertures device.
Economic benefit:
1st, before pipeline 43 tapping machine 3 is unlocked, bad grasp perforate degree of balance and cooling water size, easily cause hole making drill card
The phenomenons such as dead fracture, more serious meeting damages tapping machine 3.
Example: such as open the probability of 20 Kong Youyi damage, 260,12 hole+warehouses of 23 * every of dormitory hole=536/20
Average 70sr/=1890sr*1.77rmb=3345rmb of=27 * Saudi Arabia market prices.If tapping machine 3 damages and recasts.
2nd, artificial:
Before not doing tapping machine skid brackets: drilling bit of tapper must find pipeline 43 position of opening accurately, will be opened with fixing chain
Hole machine 3 is fixed on pipeline 43, with tightening fastened by screw (should be noted that during fastening, tapping machine 3 easily changes position).Perforate needs one
People's switch power supply balances with pushing tapping machine 3, people's holding tapping machine 3, and a people pours water cooling hole making drill;After the completion of unclamped with spanner
Tighten bolt, more same step carry out second perforate, after tested the perforate time 6 points 30 seconds about one.
After tapping machine skid brackets make: only need two people that pipeline 43 is placed on pipeline 43 support, a people can be complete
Become perforate, and pore can be completely secured on a centrage, with about when 2 points 30 seconds.
Description of the present utility model is given for the sake of example and description, and is not exhaustively or to incite somebody to action this
Utility model is limited to disclosed form.Many modifications and variations are obvious for the ordinary skill in the art.
Select and description embodiment is in order to principle of the present utility model and practical application are more preferably described, and make the common skill of this area
Art personnel are it will be appreciated that this utility model is thus design is suitable to the various embodiments with various modifications of special-purpose.
Claims (6)
1. lightweight pipeline tapping device it is characterised in that: include tapping machine skid brackets, sliding on described tapping machine skid brackets
Move and perforate support is installed, described perforate support is provided with tapping machine;
The lower section of described tapping machine skid brackets is provided with support of pipelines, and described support of pipelines is placed with positioned at described tapping machine
Pipeline below skid brackets, described tapping machine is provided with simple water-cooling apparatus.
2. lightweight pipeline tapping device as claimed in claim 1 it is characterised in that: described tapping machine skid brackets include two
What individual spacing parallel arranging was arranged slides seat, and described sliding is installed with two slide bars between seat, described perforate support is slidably installed
On two described slide bars.
3. lightweight pipeline tapping device as claimed in claim 1 it is characterised in that: described perforate support include support this
Body, described machine base body is installed with four and slides set, and the described set that slides is sleeved on described tapping machine skid brackets, extremely
Slide to put described in few one and the fixing bolt being fixed on described machine base body on described tapping machine skid brackets is installed.
4. lightweight pipeline tapping device as claimed in claim 1 it is characterised in that: described support of pipelines include two interval
The rack body being set up in parallel, the top of described rack body is provided with the anticreep groove with described pipeline outer wall compression fit, institute
State the underface that anticreep groove is located at described tapping machine drill bit.
5. lightweight pipeline tapping device as claimed in claim 1 it is characterised in that: described simple water-cooling apparatus includes down
It is placed in the water-storing bottle at tapping machine coolant intake, the opening of described water-storing bottle is connected with outlet pipe, peace in described outlet pipe
Equipped with reducer.
6. lightweight pipeline tapping device as claimed in claim 5 it is characterised in that: described reducer include less than described go out
The iron wire of water pipe diameter 2/3, one end of described iron wire is stretched in described water-storing bottle and is provided with u-shaped fixed knot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620912199.XU CN205888154U (en) | 2016-08-22 | 2016-08-22 | Lightweight pipeline tapping device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620912199.XU CN205888154U (en) | 2016-08-22 | 2016-08-22 | Lightweight pipeline tapping device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205888154U true CN205888154U (en) | 2017-01-18 |
Family
ID=57778916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620912199.XU Active CN205888154U (en) | 2016-08-22 | 2016-08-22 | Lightweight pipeline tapping device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205888154U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107195344A (en) * | 2017-06-07 | 2017-09-22 | 四川行之智汇知识产权运营有限公司 | Device for nuclear power station specialized fluids pipeline tapping |
CN110440067A (en) * | 2019-07-15 | 2019-11-12 | 五冶集团上海有限公司 | The clamping hoop type connection method of fire chief road |
CN111618338A (en) * | 2020-06-08 | 2020-09-04 | 温州益蓉机械有限公司 | Drilling machine for mechanical manufacturing for cooling pipeline blockage |
-
2016
- 2016-08-22 CN CN201620912199.XU patent/CN205888154U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107195344A (en) * | 2017-06-07 | 2017-09-22 | 四川行之智汇知识产权运营有限公司 | Device for nuclear power station specialized fluids pipeline tapping |
CN110440067A (en) * | 2019-07-15 | 2019-11-12 | 五冶集团上海有限公司 | The clamping hoop type connection method of fire chief road |
CN110440067B (en) * | 2019-07-15 | 2021-03-30 | 五冶集团上海有限公司 | Clamp type connection method for main fire-fighting pipeline |
CN111618338A (en) * | 2020-06-08 | 2020-09-04 | 温州益蓉机械有限公司 | Drilling machine for mechanical manufacturing for cooling pipeline blockage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205888154U (en) | Lightweight pipeline tapping device | |
US20100133040A1 (en) | Roof clamp for fall protection safety equipment | |
CN102316939A (en) | Pole safety assembly | |
CN204354118U (en) | For the defective work automatic marking device of motor bellows | |
CN201307104Y (en) | Quality detector of band steel weld-joint | |
KR101556994B1 (en) | Faucet establishing jig | |
CN207600708U (en) | Auto radiator water room falling weight impact test device | |
CN108080990A (en) | Tapping machine steel tube fixing device | |
CN210032390U (en) | Roof photovoltaic power plant safety device that is under construction | |
CN108020393A (en) | Auto radiator water room falling weight impact test device | |
CN204514720U (en) | A kind of checkout equipment of waterproof roll zero elongation rupture performance | |
CN210459521U (en) | C-shaped steel convenient to installation | |
CN209050338U (en) | A kind of circulating water pipe welding support | |
CN208408617U (en) | Tapping machine runner device and tapping machine device | |
Ocel | Fatigue testing of galvanized and ungalvanized socket connections. | |
CN201803085U (en) | Steel wire frame used for adjusting and detecting devices | |
CN201212505Y (en) | Connecting piece for guard rail of pipe material | |
CN204728685U (en) | For the wall-connecting piece of fastener type steel pipe external scaffolding | |
CN104897702A (en) | Special gamma ray detection tool for small diameter tube butt joints | |
CN207318142U (en) | Drilling sampling device for pile pile | |
AU2007200819B2 (en) | A safety anchor | |
CN204975857U (en) | Vertical ladder protects cage welding frock | |
CN109307578A (en) | A kind of calibration fixture of suspension and support anti-seismic performance detection device | |
CN208703376U (en) | A kind of two-tube parallel tee structure of water supply polyethylene with support warning device | |
CN203742141U (en) | Reversible safe repairing platform for electric-power steel tube tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd. Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee before: POWERCHINA NUCLEAR ENGINEERING Co. |