CN205876340U - Activities supporting institution of boxing girder half -through landing stage - Google Patents

Activities supporting institution of boxing girder half -through landing stage Download PDF

Info

Publication number
CN205876340U
CN205876340U CN201620402474.3U CN201620402474U CN205876340U CN 205876340 U CN205876340 U CN 205876340U CN 201620402474 U CN201620402474 U CN 201620402474U CN 205876340 U CN205876340 U CN 205876340U
Authority
CN
China
Prior art keywords
support mechanism
trestle
movable support
rail
landing stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620402474.3U
Other languages
Chinese (zh)
Inventor
郑怀臣
王祥军
王亚波
程波
李骥
毛成宝
张维颂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuxin Formwork Co Ltd
Original Assignee
Hunan Wuxin Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Wuxin Formwork Co Ltd filed Critical Hunan Wuxin Formwork Co Ltd
Priority to CN201620402474.3U priority Critical patent/CN205876340U/en
Application granted granted Critical
Publication of CN205876340U publication Critical patent/CN205876340U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to an automatic landing stage technical field of tunnel invert construction specifically indicates an activities supporting institution of boxing girder half -through landing stage. Including the landing stage main part, still including the activities supporting institution who hangs the U type outside the box beam, the upper and lower plane of box beam is provided with upper beam rail and underbeam rail respectively, and activities supporting institution removes along the upper beam rail, and correspondingly, activities supporting institution is including last gyro wheel, the bottom roller of following upper beam rail, the removal of underbeam rail respectively. The utility model has the advantages of its simple structure, the reliability is high, convenient to use, application scope is extensive, holistic stability has been increased, when the landing stage moves, need not to carry out the processing of any ground to moving the route orientation, convenient to use, swift does not increase extra work, the efficiency of work is improved, very big saving the cost of labor. Boxing girder's middle part construction space is big, can conveniently carry out the construction of tunnel center ditch or central culvert pipe.

Description

The movable support mechanism of box type girder half-through trestle
Technical field
This utility model relates to a kind of automatic trestle technical field for the construction of tunnel inverted arch, refers specifically to a kind of box master The movable support mechanism of beam half-through trestle.
Background technology
When constructing tunnel, the section-bottom arc of excavation is referred to as inverted arch;And at the work progress at inverted arch position, tunnel In, inverted arch trestle need be set up in inverted arch excavation face, to connect excavation face and filling face, rear end, the tunnel passage of front end, tunnel, Filling face i.e. inverted arch carries out term during concrete construction, the existence of inverted arch trestle make tunnel excavation outwards slag tap and material to In hole, transport is not executed by inverted arch and is affected, it is ensured that inverted arch concrete construction and tunnel excavation continuously, carry out simultaneously.But at present Trestle used in construction generally has the disadvantage that
The most traditional trestle uses I-steel Site Welding, Heavy Weight, and I-steel does not has self-power system, moves The dynamic usage mining machine that is required in place is carried, although this method is with low cost, but span is the least, just cannot use and dig when span is the biggest Pick machine is carried, and executes man-hour requirement and uses power-equipment to move frequently, very inconvenient.
2. part producing producer tradition trestle work structure on install dynamical system additional, make trestle can with automatic moving, tradition skill Although the trestle span of art can reach about 12 meters, but it designs its inverted arch that cannot complete more large span of structures shape and executes , there is the not convenient of use in work.
3. the trestle of part producing producer uses both sides truss+center-aisle structure to alleviate main bridge weight, increases further Main spanning degree;The construction length enabling trestle reaches about 16 meters.But due to truss structure fail to meet further greatly across , there is the not convenient of use in the construction requirement of degree.
4. the trestle of the large span used of constructing at present, the most only can be suitably used for a certain specific construction method, especially It is intended to the excavation tap cinder construction taken into account bottom inverted arch, needs to increase trestle pedal, makes trestle total length at least increase by tens Rice, when clearing up bottom ash, pedal and trestle need all to return back to accomplish fluently on the inverted arch filling face of concrete, and on the one hand rollback is non- Often trouble, the construction of follow-up link is too far apart, and feeds and slags tap to produce and interferes, and the most well solves Certainly way so that the application of trestle is by strong influence.
5. more and more higher along with the grade of constructing tunnel, for ensureing the globality of inverted arch construction, improve bearing capacity, build Unit requires that inverted arch one-off construction length to reach more than 24 meters, with the trestle of current existing kind, it is impossible to realizes flowing water and makees Industry is constructed.
6., at present the requirement of satisfied construction length while, tunnel excavation there has also been the requirement of full face tunneling, for stack There has been higher requirement put and the front access bridge angle position of bridge front end, with the trestle of current existing kind, it is impossible to realize flowing water Operation is constructed.
Utility model content
This utility model provides a kind of fully automatic hydraulic trestle equipment for overcoming the shortcoming of prior art, specifically refers to A kind of movable support mechanism of box type girder half-through trestle.
This utility model is achieved through the following technical solutions, and including trestle main body, described trestle main body is by the left and right sides pair Claim two box-girders arranged to constitute, also include the U-shaped movable support mechanism being suspended on outside box-girder;Box-girder upper, Lower plane is respectively arranged with upper beam rail and underbeam rail, and movable support mechanism moves along upper beam rail, correspondingly, and movable support mechanism Including the upper roller moved along upper beam rail, underbeam rail respectively, bottom roller, upper roller passes through fluid motor-driven.
It is provided with front two rows, totally four support oil cylinders in the sidewall of described movable support mechanism.
Described movable support mechanism is additionally included on U-shaped transverse section the boom hoisting increased.
Described movable support mechanism is additionally included on U-shaped transverse section the traction apparatus increased.
The utility model has the advantage of the movable support mechanism providing a kind of box type girder half-through trestle, its structure Simply, reliability is high, easy to use, applied widely;Add the stability of entirety;When trestle moves, it is not necessary to for shifting Dynamic path direction carries out any floor treatment, easy to use, quick, does not increase extra work;Improve work efficiency, greatly Saved cost of labor.The middle part construction space of box type girder is big, it is convenient to carry out tunnel Central drain or center culvert pipe Construction.
Accompanying drawing explanation
Fig. 1 is trestle front view.
Fig. 2 is box beam schematic diagram.
Fig. 3 is movable support mechanism cross sectional representation.
Fig. 4 is Fig. 3 right view..
Fig. 5 is this utility model structural representation.
Fig. 6 is that trestle prepares walking states.
Fig. 7 is trestle walking process one.
Fig. 8 is trestle walking process two.
Fig. 9 is trestle walking process three.
Figure 10 is trestle walking completion status.
Figure 11 is movable support mechanism service hoisting center culvert pipe schematic diagram.
Figure 12 is movable support mechanism auxiliary traction effect schematic diagram.
Detailed description of the invention
The utility model is described in further detail for 1 to accompanying drawing 12 below in conjunction with the accompanying drawings, but the reality of this self-propelled mobile trestle The mode of executing is not limited thereto, and the replacement carried out in common knowledge as well known to those skilled in the art should include protection domain in.
As Fig. 1 is to shown in 5, and this utility model includes that trestle main body 10, described trestle main body 10 are set by left and right sides symmetry Two box-girders 2 put are constituted, and also include the U-shaped movable support mechanism 3 being suspended on outside box-girder 2;Box-girder 2 upper, Lower plane is respectively arranged with upper beam rail 21 and underbeam rail 22, and movable support mechanism 3 moves along upper beam rail 21, correspondingly, and movable Support mechanism 3 includes upper roller 31, the bottom roller 32 moved respectively along upper beam rail 21, underbeam rail 22, and upper roller 31 is by hydraulic pressure horse Reach 34 drivings.Being provided with support oil cylinder 33 in the support of movable support mechanism 3, can meet the support on different supporting surfaces, this is lived Dynamic support can be arranged increases joint.Movable support mechanism 3 is U-shaped design, is suspended on the outside of two box beam 2, when upper beam rail 21 Contact with upper roller 31, drive upper roller 31 that movable support mechanism 3 can be made can to reach the optional position of upper beam rail 21;Work as activity When support oil cylinder 33 elongation of supporting mechanism 3 touches supporting surface and stress, underbeam rail 22 contacts with bottom roller 32, now trestle Main body 10 with under effect, with movable support mechanism 3 as fulcrum, drives trestle main body 10 to move forward and backward in drive mechanism.
It is provided with front two rows, totally four support oil cylinders 33 in the sidewall of described movable support mechanism 3.
As shown in Figure 6, when under trestle, inverted arch construction and filling construction complete, and tunnel continues to excavate forward, and trestle needs forward Mobile, front access bridge, rear access bridge are respectively required for by front lift cylinder, rear lift cylinder is liftoff, and movable support mechanism 3 is in trestle front end Supporting to excavation face 200, trestle main body 10 falls on the bottom roller 32 of movable support mechanism 3, makes movable support mechanism 3 as stack The fulcrum of bridge main body 10, drive mechanism acts on the concrete in filling face 400, and trestle prepares to travel forward.
As it is shown in fig. 7, under the driving force of drive mechanism, trestle main body 10 along movable support mechanism 3 bottom roller 32 to Front slide, it is achieved that trestle reach in tunnel, when sliding into close to trestle main body 10 centre position, answers the movement of center of gravity And the fulcrum position relative to box beam 2 need to be changed.
As shown in Figure 8, before making, fixing supporting mechanism by oil cylinder and is increased joint and is supported in excavation face 200, upwards shrinks The support oil cylinder 33 of movable support mechanism 3, movable support mechanism 3 falls on the upper beam rail 21 of box beam 2, and hydraulic motor 34 drives Upper roller 31, makes movable support mechanism 3 move to box beam 2 front end, for preparing as fulcrum next time.
As it is shown in figure 9, movable support mechanism 3 falls in activity in trestle front support to excavated section 200, trestle main body 10 On the bottom roller 32 of supporting mechanism 3, four support oil cylinders 33 extend downwardly from, and regulate voluntarily to movable support mechanism 3 level, make Movable support mechanism 3 is again as the fulcrum of trestle main body 10, and drive mechanism acts on the concrete in filling face 400, orders about Trestle moves forward to operating position next time.
As shown in Figure 10, front lift cylinder, rear lift cylinder work respectively, put down front access bridge, rear access bridge, forward and backward access bridge Contact ground, trestle reaches job site situation, forms continuous print line production.
As shown in figure 11, described movable support mechanism 3 is additionally included on U-shaped transverse section the boom hoisting 35 increased.Movable Supporting mechanism 3 can also use as lifting means, increases boom hoisting 35, tool on the U-shaped transverse section of movable support mechanism 3 When body is implemented, this boom hoisting 35 can lift by crane center culvert pipe.In the present embodiment, boom hoisting 35 has the hydraulic pressure of hook for front end Oil cylinder.
As shown in figure 12, described movable support mechanism 3 is additionally included on U-shaped transverse section the traction apparatus 36 increased.Movable Supporting mechanism 3 can also be as pulling equipment, on the U-shaped transverse section of movable support mechanism 3, increases traction apparatus 36, utilizes Certainly the principle of walking of movable support mechanism 3, by other hanging equipments in traction apparatus 36, draws other equipment and goes.This enforcement In example, traction apparatus 36 is hanger or otic placode.
In sum, this utility model provides the movable support mechanism of a kind of box type girder half-through trestle, its structure Simply, reliability is high, easy to use, applied widely.

Claims (4)

1. the movable support mechanism of box type girder half-through trestle, including trestle main body (10), is characterized in that:
Described trestle main body (10) is made up of symmetrically arranged two box-girders (2) in the left and right sides, also includes being suspended on box-girder (2) the U-shaped movable support mechanism (3) in outside;
The upper and lower plane of box-girder (2) is respectively arranged with upper beam rail (21) and underbeam rail (22), and movable support mechanism (3) is along upper Beam rail (21) is mobile, and correspondingly, movable support mechanism (3) includes respectively along upper beam rail (21), the upper rolling of underbeam rail (22) movement Wheel (31), bottom roller (32), upper roller (31) is driven by hydraulic motor (34).
The movable support mechanism of box type girder half-through trestle the most according to claim 1, is characterized in that: described activity is propped up It is provided with front two rows, totally four support oil cylinders (33) in the sidewall of support mechanism (3).
The movable support mechanism of box type girder half-through trestle the most according to claim 1, is characterized in that: described activity is propped up Support mechanism (3) is additionally included on U-shaped transverse section the boom hoisting (35) increased.
The movable support mechanism of box type girder half-through trestle the most according to claim 1, is characterized in that: described activity is propped up Support mechanism (3) is additionally included on U-shaped transverse section the traction apparatus (36) increased.
CN201620402474.3U 2016-05-06 2016-05-06 Activities supporting institution of boxing girder half -through landing stage Active CN205876340U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620402474.3U CN205876340U (en) 2016-05-06 2016-05-06 Activities supporting institution of boxing girder half -through landing stage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620402474.3U CN205876340U (en) 2016-05-06 2016-05-06 Activities supporting institution of boxing girder half -through landing stage

Publications (1)

Publication Number Publication Date
CN205876340U true CN205876340U (en) 2017-01-11

Family

ID=57686739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620402474.3U Active CN205876340U (en) 2016-05-06 2016-05-06 Activities supporting institution of boxing girder half -through landing stage

Country Status (1)

Country Link
CN (1) CN205876340U (en)

Similar Documents

Publication Publication Date Title
CN205876339U (en) Boxing girder half -through is hydraulic pressure invert trestle by oneself
CN102381635B (en) Tube segment shipping and trolley towing integrated device of shield machine
CN108442948B (en) Double-lane inverted arch trestle and construction method
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN103016029A (en) Grouped second liner construction method for large cross-section tunnel
CN104328734A (en) Multi-connection and multi-span continuous steel truss girder bridge and construction method thereof
CN109210274A (en) Push pipe pipeline docking facilities and interconnection method
CN105952480A (en) Box girder through type self-propelled hydraulic invert trestle
CN203295070U (en) Multifunctional trackless portal crane
CN205876340U (en) Activities supporting institution of boxing girder half -through landing stage
CN203035204U (en) Large-section tunnel second lining grouping formwork trolley
CN104372746B (en) The prefabricated post stretching Simple T-Girders note concrete form support of railroad bridge and mounting process thereof
CN206016825U (en) Box type girder base-supporting voluntarily hydraulic pressure inverted arch trestle
CN207673352U (en) Cable trough lining trolley
WO2018214893A1 (en) Bridge erection machine for suspension bridge, and construction method for same
CN207063990U (en) A kind of automatic inverted arch trestle
CN108217448A (en) A kind of integrated bridge floor device for hoisting for composite beam construction
CN205477643U (en) Binary channels fluid pressure type tunnel invert landing stage
CN211898417U (en) Construction structure based on cutter-suction type ground is wall local to replace campshed and is strutted
CN206092012U (en) Operation car is demolishd to subway deep tunnel reinforced concrete pipe piece
CN205474856U (en) Bearing capacity 50t rolling device
CN204919341U (en) Installing the system of prefabricated decking of dysmorphism on uncovered lattice formula girder steel of arched bridge
CN107989635A (en) A kind of trestle bridge type circular telescoping steel form that is voluntarily open to traffic
CN208594948U (en) Tunnel bottom ash material conveyer
CN208122855U (en) A kind of tunnel Deeply buried ditch construction self-propelled lifting combination trestle

Legal Events

Date Code Title Description
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zheng Huaichen

Inventor after: Wang Yabo

Inventor after: Cheng Bo

Inventor after: Li Ji

Inventor after: Mao Chengbao

Inventor after: Zhang Weisong

Inventor before: Zheng Huaichen

Inventor before: Wang Xiangjun

Inventor before: Wang Yabo

Inventor before: Cheng Bo

Inventor before: Li Ji

Inventor before: Mao Chengbao

Inventor before: Zhang Weisong