CN205875755U - Steel platform of unloading - Google Patents
Steel platform of unloading Download PDFInfo
- Publication number
- CN205875755U CN205875755U CN201620864719.4U CN201620864719U CN205875755U CN 205875755 U CN205875755 U CN 205875755U CN 201620864719 U CN201620864719 U CN 201620864719U CN 205875755 U CN205875755 U CN 205875755U
- Authority
- CN
- China
- Prior art keywords
- steel
- platform
- welded
- utility
- unloading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a steel platform of unloading, including the platform main part, the platform main part is tiling steel plate structure, the girder that has the I -steel to make is welded to the both sides of platform main part, the below welding of girder has the secondary beam, and the equidistance interval sets up between the secondary beam, the front end and the both sides welding of platform main part have the rail guard, and the rail guard adopts the reinforcing bar to make, the utility model discloses with the welding of I -steel and channel -section steel, guarantee to have sufficient rigidity, increase service life, the platform of unloading adopts the whole steel sheet that tiles, and is seamless, reduces the article phenomenon that drops, and the platform of unloading adopts the steel pipe to weld the system rail guard all around, reduces the potential safety hazard, and production making is simple, low cost, can have enough to meet the need and use extensive application as construction unit, creates good economic benefits and social.
Description
Technical field
This utility model relates to delivery device, specifically a kind of steel platform for material unloading.
Background technology
Discharging platform is the commonly used a kind of structure arrived in work progress, deposits structurally in traditional discharging platform more
Shortcoming.
During architectural engineering main structure construction, having bad luck of floor gap material is that a potential safety hazard is higher all the time
Problem, traditional discharging platform uses I-steel to be welded liner scaffold board, there is bigger space, using between scaffold board
Hanging thing in journey easily to drop, there is bigger potential safety hazard, the present invention uses I-steel and welded steel plate to form, and is significantly reduced
The phenomenon that article drop occurs, and reduces potential safety hazard;The purpose of this utility model is to provide a kind of steel platform for material unloading, to solve
The problem proposed in above-mentioned background technology.
Utility model content
For achieving the above object, the following technical scheme of this utility model offer:
A kind of steel platform for material unloading, including main platform body, main platform body is tiling steel plate structure, the both sides of described main platform body
Being welded with the girder that I-steel is made, the lower section of described girder is welded with equi-spaced apart between secondary beam, and secondary beam and arranges;Platform master
The front end of body and both sides are welded with guard rail, and guard rail uses reinforcing bar to make, and the lower section of guard rail is welded with what steel plate was made
Protective plate, utilizes protective plate to prevent material from situation about dropping occur.
As further program of the utility model: be also welded with suspension ring on described girder, suspension ring are utilized to facilitate entirety to hang
Dress.
As this utility model further scheme: a length of 4.3m of described main platform body, width is 3m.
As this utility model further scheme: a length of 6m of described girder.
As this utility model further scheme: the height of described guard rail is 1.5m.
Compared with prior art, the beneficial effects of the utility model are: this utility model steel I-beam and channel welds, and protect
Card has enough rigidity, increases service life, and discharging platform uses entirety tiling steel plate, seamless, reduces article and drops phenomenon,
Discharging platform surrounding uses steel pipe to be welded guard rail, reduces potential safety hazard, and production is simple, with low cost, can have enough to meet the need and make
With being widely applied as unit in charge of construction, create good economic benefit and social benefit.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of steel platform for material unloading of this utility model.
In figure: 1-main platform body, 2-girder, 3-secondary beam, 4-guard rail, 5-protective plate, 6-suspension ring.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Referring to Fig. 1, in this utility model embodiment, a kind of steel platform for material unloading, including main platform body 1, main platform body 1 is
Tiling steel plate structure, the both sides of described main platform body 1 are welded with the girder 2 that I-steel is made, and the lower section of described girder 2 is welded with
Between secondary beam 3, and secondary beam 3, equi-spaced apart is arranged;The front end of main platform body 1 and both sides are welded with guard rail 4, and guard rail 4 uses
Reinforcing bar is made, and the lower section of guard rail 4 is welded with the protective plate 5 that steel plate is made, and utilizes protective plate 5 to prevent material from occurring dropping
Situation.
Also it is welded with suspension ring 6 on described girder 2, utilizes suspension ring 6 to facilitate integral hoisting.
The a length of 4.3m of described main platform body 1, width is 3m.
The a length of 6m of described girder 2.
The height of described guard rail 4 is 1.5m.
Operation principle of the present utility model is: discharging platform steel I-beam and channel welds, it is ensured that have enough rigidity, increases
Adding service life, discharging platform uses entirety tiling steel plate, seamless, reduces article and drops phenomenon, and discharging platform surrounding uses
Steel pipe is welded guard rail, lining steel plate, reduces potential safety hazard, and production is simple, with low cost, can have enough to meet the need use widely
Application is unit in charge of construction, creates good economic benefit and social benefit.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it is possible to realize this practicality in other specific forms new
Type.Therefore, no matter from the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, this practicality is new
The scope of type is limited by claims rather than described above, it is intended that by the containing of equivalency in claim that fall
All changes in justice and scope are included in this utility model.Should not be considered as any reference in claim limiting
Involved claim.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only wraps
Containing an independent technical scheme, this narrating mode of description is only that for clarity sake those skilled in the art should
Description can also be formed those skilled in the art through appropriately combined as an entirety, the technical scheme in each embodiment
May be appreciated other embodiments.
Claims (5)
1. a steel platform for material unloading, it is characterised in that include main platform body (1), main platform body (1) is tiling steel plate structure, institute
The both sides stating main platform body (1) are welded with the girder (2) that I-steel is made, and the lower section of described girder (2) is welded with secondary beam (3),
And equi-spaced apart is arranged between secondary beam (3);The front end of main platform body (1) and both sides are welded with guard rail (4), and guard rail (4) is adopted
Make with reinforcing bar, and the lower section of guard rail (4) is welded with the protective plate (5) that steel plate is made.
Steel platform for material unloading the most according to claim 1, it is characterised in that be also welded with suspension ring (6) on described girder (2).
Steel platform for material unloading the most according to claim 1, it is characterised in that a length of 4.3m of described main platform body (1), wide
Degree is 3m.
Steel platform for material unloading the most according to claim 1, it is characterised in that a length of 6m of described girder (2).
Steel platform for material unloading the most according to claim 1, it is characterised in that the height of described guard rail (4) is 1.5m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620864719.4U CN205875755U (en) | 2016-08-10 | 2016-08-10 | Steel platform of unloading |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620864719.4U CN205875755U (en) | 2016-08-10 | 2016-08-10 | Steel platform of unloading |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205875755U true CN205875755U (en) | 2017-01-11 |
Family
ID=57704188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620864719.4U Expired - Fee Related CN205875755U (en) | 2016-08-10 | 2016-08-10 | Steel platform of unloading |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205875755U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111663789A (en) * | 2020-06-16 | 2020-09-15 | 北京欧斯度科技有限公司 | Embedded-free discharging platform |
-
2016
- 2016-08-10 CN CN201620864719.4U patent/CN205875755U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111663789A (en) * | 2020-06-16 | 2020-09-15 | 北京欧斯度科技有限公司 | Embedded-free discharging platform |
CN111663789B (en) * | 2020-06-16 | 2022-02-11 | 北京欧斯度科技有限公司 | Embedded-free discharging platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101761184A (en) | Steel column and beam structure with corrugated steel web and special welding device thereof | |
CN205875755U (en) | Steel platform of unloading | |
CN207191310U (en) | One kind is used for ship plank construction portable unit | |
CN205296802U (en) | Well steel platform | |
CN104401865B (en) | Steel billet handling appliance | |
CN205873624U (en) | Construction cage | |
CN108951861A (en) | A kind of construction steel structure girder | |
CN203938968U (en) | The auxiliary hanging basket of installation of continuous beam arch suspension rod bottom anchored end | |
CN209310498U (en) | A kind of kiln top hanging structure | |
CN202670986U (en) | Safety lifting lug for lifting blast furnace downcomer | |
CN205669054U (en) | Non-water-cooled partition wall | |
CN206987415U (en) | Folding is gone along with sb. to guard him temporarily | |
CN202481877U (en) | Standard section of construction hoist | |
CN206903176U (en) | A kind of civil engineering load-bearing hanger | |
CN204916872U (en) | Body panel is unloaded to comprehensive removal of home movable type of adopting in colliery | |
CN206308627U (en) | A kind of portable beam body side operation frame | |
CN206858018U (en) | A kind of tool-type tower crane passageway | |
CN212977290U (en) | Suspension operation and protection platform for steel structure welding operation | |
CN204847843U (en) | Hoist traveling carriage bearing structure | |
CN203755351U (en) | I steel connector structure of underground continuous wall | |
CN109405553A (en) | A kind of kiln top hanging structure | |
CN204727486U (en) | A kind of electric block anti-falling safe protection device | |
CN203412309U (en) | Security isolation platform of formed lift shaft | |
CN202936997U (en) | Protective turn-over plate | |
CN206014239U (en) | Suspender for the U-shaped beam reinforcement cages of handling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20170810 |
|
CF01 | Termination of patent right due to non-payment of annual fee |