CN205875459U - A mounting structure for assembled is gone along with sb. to guard him - Google Patents
A mounting structure for assembled is gone along with sb. to guard him Download PDFInfo
- Publication number
- CN205875459U CN205875459U CN201620774774.4U CN201620774774U CN205875459U CN 205875459 U CN205875459 U CN 205875459U CN 201620774774 U CN201620774774 U CN 201620774774U CN 205875459 U CN205875459 U CN 205875459U
- Authority
- CN
- China
- Prior art keywords
- installed part
- installation
- guard
- assembled
- mounting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 claims abstract description 70
- 229910000831 Steel Inorganic materials 0.000 abstract description 17
- 239000010959 steel Substances 0.000 abstract description 17
- 238000010276 construction Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 abstract description 7
- 239000011449 brick Substances 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 3
- 239000012634 fragment Substances 0.000 abstract 2
- 230000007423 decrease Effects 0.000 description 2
- 238000004321 preservation Methods 0.000 description 2
- 238000010792 warming Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model relates to a mounting structure for assembled is gone along with sb. To guard him, include: install the support body, locate one side of envelope, the installation support body corresponds the envelope interval is equipped with the installation fossil fragments, first installed part has set firmly on the installation fossil fragments, and with first installed part assorted second installed part, the second installed part is worn to establish envelope and with first installed part block is fixed. Adopt the installation support body to install envelope on the steel construction house, need not to build the building block by laying bricks or stones at the outer wall position, reduced the consumption artifical and material, can lighten the total weight of building, relevant cost such as reduction structure and basis. Adopt installation support body laian dress envelope, can directly hoist, will install the support body fix on the steel construction can, can save a large amount of time limits for a project, and the block of first installed part and second installed part is fixed, increase envelope and the connection stability that installs the support body, guarantee the security of the process of hoisting.
Description
Technical field
This utility model relates to the realm of building construction, refers in particular to a kind of mounting structure gone along with sb. to guard him for assembled.
Background technology
Conventional decorative heat-preservation plate is installed with concrete walls or masonry wall as base material, uses mortar and anchor, by viscous anchor
In conjunction with mode be arranged on construction wall.
Due to steel construction many employings frame system, if building building block by laying bricks or stones to provide metope at exterior wall position, can expend bigger
Manpower and materials, increase the gross weight of structure.
Utility model content
The purpose of this utility model is to overcome the defect of prior art, it is provided that a kind of installation knot gone along with sb. to guard him for assembled
Structure, solves the manpower that during construction of existing steel house, the consuming of employing concrete substrate installation decorative heat-preservation plate existence is bigger
Material resources and the problem increasing structure gross weight.
The technical scheme realizing above-mentioned purpose is:
This utility model provides a kind of mounting structure gone along with sb. to guard him for assembled, including:
Installation frame body, is located at the side of building enclosure, and the corresponding described building enclosure of described installation frame body is interval with installation
Os Draconis, described installation Os Draconis are installed with the first installed part;And
The second installed part matched with described first installed part, described second installed part wear described building enclosure and with
Described first installed part is fixed.
Use installation frame body building enclosure to be installed on steel house, it is not necessary to build building block by laying bricks or stones at exterior wall position, reduce
Artificial and the consumption of material, can alleviate the gross weight of building, reduces structure and the correlative charges such as basic.Use installing rack
Body installs building enclosure, can directly lift, and installation frame body is fixed on steel construction, can save substantial amounts of
Duration, and being fixed of the first installed part and the second installed part, increase the connective stability of building enclosure and installation frame body, really
Protect the safety of hoisting process.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, the end of described first installed part
Portion has been bent to form the first hook groove, and the end of described second installed part is bent to form and matches with described first hook groove
Second hook groove, described second hook groove is stung merga pass connecting bolt mutually and is connected fixing with described first hook groove.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, the end of described second installed part
Portion is formed with spacing wing plate in the outside of described building enclosure.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, fixed on described installation Os Draconis
Having installation corner fittings, described installation corner fittings is connected fixing with described first installed part.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, described first installed part is corresponding
Described installation corner fittings is provided with installation wing plate, and described installation wing plate is connected fixing by bolt with described installation corner fittings.
Further improvement is that, between described installation frame body includes of the mounting structure that this utility model is gone along with sb. to guard him for assembled
Every the multiple vertical keels arranged and multiple horizontal keel, described horizontal keel is connected with described vertical keel.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, the top of described vertical keel
Connect and have Os Draconis of encorbelmenting, described in Os Draconis of encorbelmenting be installed with connector.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, the top of described vertical keel
Be folded with a pair fixture being fixedly arranged on base structure with bottom, described fixture by the screw rod that wears be anchored on described vertically
Os Draconis.
Accompanying drawing explanation
Fig. 1 is the front view of the mounting structure that this utility model is gone along with sb. to guard him for assembled.
Fig. 2 is the mounted side view of mounting structure that this utility model is gone along with sb. to guard him for assembled.
Fig. 3 is enlarged diagram at A in Fig. 2.
Fig. 4 is the front view of vertical keel attachment structure at B in Fig. 2.
Fig. 5 is the front view of another embodiment of the mounting structure that this utility model is gone along with sb. to guard him for assembled.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
This utility model provides a kind of mounting structure gone along with sb. to guard him for assembled, it is adaptable to steel house, for steel
The installation of the building enclosure in structure house.Building enclosure is fixed on mounting structure, lifts by crane then as mounting structure one
The position being filled to set is fixed, it is not necessary to arrange in existing steel house builds building block by laying bricks or stones, decreases artificial, material etc.
Consume, alleviate the gross weight of building, reduce structure and the correlative charges on basis.And lifting installation, easy construction is quick, it is possible to
Save the substantial amounts of duration, use the first installed part and the second installed part to be mutually twisted and realize the fixing of building enclosure and installation frame body
Connect, add the stability of connection, prevent screw from damaging and destroy connection entirety, it is ensured that the safety of lifting.Tie below
The mounting structure that this utility model is gone along with sb. to guard him by conjunction accompanying drawing for assembled illustrates.
As depicted in figs. 1 and 2, the mounting structure that this utility model is gone along with sb. to guard him for assembled includes installation frame body 21, first
Installed part 23 and the second installed part 24, installation frame body 21 is located at the side of building enclosure 22, and this installation frame body 21 correspondence is gone along with sb. to guard him
Structure 22 is interval with installation Os Draconis 211, and these installation Os Draconis 211 are installed with the first installed part 23, the second installed part 24 and the
One installed part 23 matches, and this second installed part 24 wears building enclosure 22 and is fixed with the first installed part 23.By
Being mutually clamped of two installed parts 24 and the first installed part 23, it is achieved that building enclosure 22 is fixedly connected in installation frame body 21, enters
And by installation frame body 21 lifting, building enclosure 22 is installed.During installation, building enclosure 22 is as the body of wall of steel house, and this encloses
Protection structure 22 covers the lateral surface in steel house, and the outer surface of building enclosure 22, will as the alien invasion of steel house
Installation frame body 21 is fixedly arranged on the girder steel 13 of steel house, upper strata floor 11 and lower floor's floor 12, carries for building enclosure 22
Supply to stablize and connection has firmly been installed.
Shown in Fig. 2 and Fig. 3, the end of the first installed part 23 has been bent to form the first hook groove 231, and the other end sets
There are installation wing plate 232, this first installed part 23 t shape.The end of the second installed part 24 has been bent to form and the first hook groove
231 the second hook grooves 241 matched, the other end is formed with spacing wing plate 242, the second hook groove 241 and the first hook groove
231 phases are engaged and are bolted fixing.First hook groove 231 and the second hook groove 241 are U-lag, two U-lag phases
Catching on mutually, form stable drawknot structure, so latter two U-lag is bolted fixing.Occlusion secure fit bolt is fixed,
Add the stability of connection, it is ensured that the safety of hoisting process.
The spacing wing plate 242 of the second installed part 24 end is attached at the outside of building enclosure 22, and this building enclosure 22 uses
Multiple unit spliceds form, and this spacing wing plate 242 is attached at the outer surface of two unit, and building enclosure 22 is applied inside drawing
Clamp force, with against building enclosure 22 and then fastening building enclosure 22.The position of the corresponding spacing wing plate 242 in the outside of building enclosure 22
It is installed with storage tank so that this spacing wing plate 242 is placed in storage tank, it is ensured that building enclosure 22 outer surface smooth attractive in appearance.
Being installed with installation corner fittings 2111 on Os Draconis 211 installing, this installation corner fittings 2111 is L-shaped part, a folding of L-shaped part
While be secured by bolts on installation Os Draconis 211, another flanging and the first fixing connection of installed part 23, the first installed part 23 end
The flanging laminating setting installing wing plate 232 and this L-shaped part in portion, is then bolted fixing.Wing plate 232 and L is being installed
Between the flanging of shape part, pad is provided with rubber blanket.
As depicted in figs. 1 and 2, installation frame body 21 includes spaced multiple vertical keel 212 and multiple horizontal keel
213, vertical keel 212 interval is arranged, and horizontal keel 213 is also spaced setting, and horizontal keel 213 is connected solid with vertical keel 212
Fixed, vertical keel 212 and horizontal keel 213 transverse and longitudinal have been cross-linked to form installation frame body 21, the installation dragon in installation frame body 21
Bone 211 be arranged in parallel with horizontal keel 213.Connect on the top of vertical keel 211 and have Os Draconis 214 of encorbelmenting, these Os Draconis 214 of encorbelmenting
On be installed with connector 25, Os Draconis 214 of encorbelmenting are placed in the end of upper strata floor 11, and these Os Draconis 214 of encorbelmenting are folded in upper floor
Between plate 11 and building enclosure 22, Os Draconis 214 of encorbelmenting are fixed on upper strata floor 11 by wearing the expansion bolt of connector 25.
Also it is installed with installation Os Draconis 211 on Os Draconis 214 encorbelmenting, is connected with building enclosure 22 fixing by these installation Os Draconis 211.
Shown in Fig. 4, the top of vertical keel 212 and bottom sandwiched are fixedly arranged on a pair fixture 26 of base structure,
This fixture 26 is anchored on vertical keel 212 by the screw rod 27 worn.Shown in Fig. 2, it is positioned at vertical keel 212 top
Fixture 26 is fixed on girder steel 13, is provided with upper strata floor 11 on this girder steel 13.It is positioned at the fixture bottom vertical keel 212
26 are fixed on lower floor's floor 12, and the fixture 26 being fixed on lower floor's floor 12 is anchored in lower floor's floor 12 by dowel.
Below the installation process of the mounting structure that this utility model is gone along with sb. to guard him for assembled is illustrated.
Vertical keel, horizontal keel and installation Os Draconis assembly is utilized to form installation frame body, fixed on installation Os Draconis now
Having the first installed part 23, be then connected on the first installed part 23 being positioned at bottom the second installed part 24, and passes through bolt
Connect the first installed part 23 and the second installed part 24, on the second installed part 24, then place building enclosure 22, this building enclosure
22 include warming plate and are overlying on the decorative panel outside warming plate, and in the bottom of decorative panel, corresponding second installed part 24 is provided with accommodating
Groove, the spacing wing plate 242 of the second installed part 24 is placed in this storage tank, and the bottom of building enclosure 22 is anchored on installation frame body
On.Then installing the second installed part 24 of last layer, the spacing wing plate of the second installed part 24 of last layer is placed in mounted
In the storage tank at the top of building enclosure 22, such building enclosure 22 is anchored on peace by the second installed part 24 of top and bottom
Shelving on body 21, repeat the above steps i.e. completes building enclosure 22 and is installed in installation frame body 21, then by installation frame body 21
Lift together with building enclosure 22 to setting position, spiral shell is passed through in top and the bottom of the vertical keel 212 in installation frame body 21
Bar 27 is fixed on girder steel 13 and lower floor's floor 12, and Os Draconis 214 of encorbelmenting are fixed on upper strata floor 11, just by connector 25
The lifting completing building enclosure 22 is installed.
The size of installation frame body 21 of the present utility model selects as required, when installing a body of wall, and Ke Yifen
Become multiple installation frame body 21, utilize multiple installation frame body 21 to be spliced to form a body of wall.As shown in Figure 5, it is also possible to by installing rack
The size being dimensioned so as to a body of wall of body 21, so integral hoisting installation can just complete executing of a body of wall
Work, in this installation frame body 21, corresponding door-window opening is installed with opening 14.
Having the beneficial effect that of the mounting structure that this utility model is gone along with sb. to guard him for assembled
Use the first installed part and the second installed part to be connected, and combine the fixing connection of bolt, add connection
Stability, after preventing bolt failure, connects entirety destroyed, it is ensured that the safety of lifting.
The assembly of installation frame body 21 and building enclosure 22 can complete in factory, according to the size Selection breadth in room
Size, so on-the-spot directly lifting is installed, and saves the substantial amounts of duration.
This mounting structure is applicable to steel-frame structure, it is not necessary to build building block by laying bricks or stones at exterior wall position, utilizes installation frame body to provide peace
Dress face, cancels conventional building block, decreases the artificial and Bears Aiwa of material, alleviates the gross weight of building simultaneously, drop further
Low structure and the correlative charges on basis.
Being described in detail this utility model above in association with accompanying drawing embodiment, those skilled in the art can root
According to described above, this utility model made many variations example.Thus, some details in embodiment should not be constituted this practicality
Novel restriction, this utility model by the scope that defines using appended claims as protection domain of the present utility model.
Claims (8)
1. the mounting structure gone along with sb. to guard him for assembled, it is characterised in that including:
Installation frame body, is located at the side of building enclosure, and the corresponding described building enclosure of described installation frame body is interval with installation Os Draconis,
It is installed with the first installed part on described installation Os Draconis;And
The second installed part matched with described first installed part, described second installed part wears described building enclosure and with described
First installed part is fixed.
2. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 1, it is characterised in that the end of described first installed part
Portion has been bent to form the first hook groove, and the end of described second installed part is bent to form and matches with described first hook groove
Second hook groove, described second hook groove is stung merga pass connecting bolt mutually and is connected fixing with described first hook groove.
3. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 1 or 2, it is characterised in that described second installed part
End be formed with spacing wing plate in the outside of described building enclosure.
4. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 1, it is characterised in that fixed on described installation Os Draconis
Having installation corner fittings, described installation corner fittings is connected fixing with described first installed part.
5. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 4, it is characterised in that described first installed part is corresponding
Described installation corner fittings is provided with installation wing plate, and described installation wing plate is connected fixing by bolt with described installation corner fittings.
6. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 1, it is characterised in that between described installation frame body includes
Every the multiple vertical keels arranged and multiple horizontal keel, described horizontal keel is connected with described vertical keel.
7. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 6, it is characterised in that the top of described vertical keel
Connect and have Os Draconis of encorbelmenting, described in Os Draconis of encorbelmenting be installed with connector.
8. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 6, it is characterised in that the top of described vertical keel
Be folded with a pair fixture being fixedly arranged on base structure with bottom, described fixture by the screw rod that wears be anchored on described vertically
Os Draconis.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620774774.4U CN205875459U (en) | 2016-07-22 | 2016-07-22 | A mounting structure for assembled is gone along with sb. to guard him |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620774774.4U CN205875459U (en) | 2016-07-22 | 2016-07-22 | A mounting structure for assembled is gone along with sb. to guard him |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205875459U true CN205875459U (en) | 2017-01-11 |
Family
ID=57698184
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620774774.4U Expired - Fee Related CN205875459U (en) | 2016-07-22 | 2016-07-22 | A mounting structure for assembled is gone along with sb. to guard him |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205875459U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318484A (en) * | 2019-07-22 | 2019-10-11 | 金螳螂精装科技(苏州)有限公司 | A kind of assembled clear water brick partition mounting structure |
-
2016
- 2016-07-22 CN CN201620774774.4U patent/CN205875459U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318484A (en) * | 2019-07-22 | 2019-10-11 | 金螳螂精装科技(苏州)有限公司 | A kind of assembled clear water brick partition mounting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105507539B (en) | A kind of lightweight exterior wall point hangs thermal-insulation decorative board combination and is anchored system and its construction method | |
CN104100028B (en) | A kind of rod-type back of the body bolt altogether mounts system | |
CN209277282U (en) | A kind of connection structure of damper assembling frame node | |
CN205530794U (en) | Installation node of wallboard connecting piece and wallboard | |
CN212001800U (en) | Connecting assembly and connecting structure of external wall panel | |
CN205875459U (en) | A mounting structure for assembled is gone along with sb. to guard him | |
CN110130546A (en) | A kind of assembled anti-knock internal partition wall and its installation method | |
CN106401024B (en) | The partition wall of pre- crack resistence | |
CN105507541B (en) | Building fancy face plate jhook type attachment device and installation method | |
CN205314449U (en) | Building decorative board dogging formula connecting device | |
CN215484254U (en) | External wall heat preservation system | |
CN104878902A (en) | Veneer point hanging system and construction method thereof | |
CN102425254B (en) | Keel connecting device based on suspended curtain wall | |
CN206607709U (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN215888819U (en) | Open wire strip type drop ceiling | |
CN209053358U (en) | A kind of mounting structure of elevator hall's metope slabstone | |
CN208594653U (en) | A kind of assembled anti-knock internal partition wall | |
CN113463815A (en) | Open wire strip type drop ceiling and installation method thereof | |
CN204876451U (en) | Installed part and have decorative board installation component of this installed part | |
CN202530603U (en) | Small-unit stone material suspended ceiling hanging piece system with double safety structures | |
CN207032758U (en) | A kind of installation system of groove formula porcelain plate | |
CN206829392U (en) | A kind of external wall insulation | |
CN206143975U (en) | Curtain wall system | |
CN206070832U (en) | Stone curtain wall fixed structure and stone curtain wall | |
CN104863489B (en) | Fire resisting shutter levelling gear |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 |