Prior art keywords
built
fitting
template
fixing device
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620667201.1U
Other languages
Chinese (zh)
Inventor
冯先德
杨灵
陈小赞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongye Changtian International Engineering Co Ltd
Original Assignee
Zhongye Changtian International Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongye Changtian International Engineering Co Ltd filed Critical Zhongye Changtian International Engineering Co Ltd
Priority to CN201620667201.1U priority Critical patent/CN205875206U/en
Application granted granted Critical
Publication of CN205875206U publication Critical patent/CN205875206U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an utility tunnel lateral wall built -in fitting fixing device, the device includes built -in fitting unit (1), recoverable fastening unit (2) and template (3), built -in fitting unit (1) is positioned the utility tunnel lateral wall through recoverable fastening unit (2) and template (3). Can the accurate control when the device makes piping lane lateral wall embedded part installation, prevent the skew of work progress built -in fitting through taking reliable fixed measure to the assurance with its displacement, level deviation control within the permissible variation scope of standard regulation.

Description

A kind of pipe gallery sidewall built-in fitting fixing device
Technical field
This utility model relates to the constructing device of a kind of municipal works, particularly relates to a kind of pipe gallery sidewall built-in fitting solid Determine device.
Background technology
Pipe gallery, is to build at Urban Underground, for concentrating the public tunnel laying municipal pipeline.Pipe gallery can have Effect stops " slide fastener road " phenomenon, allows technical staff without excavated pavement repeatedly, just can rob all kinds of pipelines in piping lane Repair, safeguard, extending capacity reformation etc., the Ye Shi present stage Party Central Committee and State Council support energetically and pay much attention to civilian infrastructure work Journey.
The construction of present stage pipe gallery mostly is cast-in-situ reinforced concrete, and pre-embedded steel slab during civil engineering props up for follow-up each pipeline Frame is installed, and owing to pipe gallery accommodates multiple municipal pipeline, comprises electric power, communication, radio and television, feedwater etc., and each pipeline needs Hanging on piping lane medial wall, therefore support installs quantity greatly, also leads to the pre-embedded steel slab scale of construction big, and quantity is many.Pipe gallery is Project of vital and lasting importance engineering, therefore, must accomplish accurately to control to installation of embedded parts, and takes reliable fixation to prevent skew, To ensure to control within the scope of the tolerance that specification specifies its displacement, smooth deviation.
Municipal works cast-in-situ reinforced concrete construct in, for being embedded in the steel plate built-in fitting on reinforced concrete surface, its location with Fixing usual processing method is: be embedded in template in order to built-in fitting location along built-in fitting surrounding nail by built-in fitting temporarily, The dowel of built-in fitting is welded on the main muscle of reinforced concrete structure, fixing in order to built-in fitting.This built-in fitting fixed form exists Problems with: 1, in concreting process, often occurs loosening even coming off in order to position the nail of built-in fitting, thus Cause built-in fitting displacement, crooked and concrete surface not in quality problems such as same plane even submerge in concrete;2, filling Slurry is with under the percussion vibrated, and reinforced concrete structure framework of steel reinforcement also can occur relative shift, thus will cause being welded in reinforcing bar There is off normal the most therewith in the built-in fitting on skeleton;3, must etc. structure reinforcing bars skeleton colligation complete after could weld built-in fitting, and Welding capacity is big, and speed of application is relatively slow, is unfavorable for parallel operations;4, built-in fitting and template surface laminating be not tight, insecure, by right The structural safety of whole engineering leaves hidden danger, the use function of relevant device is caused significant impact, and it is repaired difficulty by the later stage Spend big, long in time limit, costly;The 5 pipe gallery support settings built-in fitting scale of construction of being correlated with is big, and quantity is many, as the work of project of vital and lasting importance Journey, prior art obviously can not solve problem.
Utility model content
For overcoming the deficiency of pre existing embedded part technique for fixing, the purpose of this utility model is to provide a kind of pipe gallery side Wall built-in fitting fixing device.This device makes to be precisely controlled during piping lane sidewall installation of embedded parts, the most solid by taking Set down measures and prevent work progress built-in fitting from offseting, to ensure the tolerance that its displacement, smooth deviation are controlled to be specified in specification Within the scope of.
The embodiment provided according to this utility model, it is provided that a kind of pipe gallery sidewall built-in fitting fixing device:
A kind of pipe gallery sidewall built-in fitting fixing device, this device include built-in fitting unit, recyclable fastening unit and Template.Built-in fitting unit is connected with pipe gallery sidewall.Template is arranged on built-in fitting unit by receiving fastening unit.
In this utility model, built-in fitting unit include pre-buried pieces steel bar material (i.e. the lamellar steel of strip, sheet material Thickness such as 0.5-5cm, such as 3 or 4cm), multiple attaching nut and multiple built-in fitting crab-bolt.Attaching nut is fixed on pre-buried pieces The both sides of steel bar material (length direction is vertical direction, i.e. for vertical).Built-in fitting crab-bolt is fixed on pre-buried pieces steel bar material Inner surface.Built-in fitting unit is arranged on pipe gallery sidewall by built-in fitting crab-bolt.
In this utility model, recyclable fastening unit includes double threaded screw, locking nut, fastening clip and spacing spiral shell Female.Stop nut, fastening clip, locking nut are successively set on double threaded screw outward by inner.
In this utility model, template is offered through hole.
In this utility model, double threaded screw is fixed on attaching nut through through hole.Double threaded screw by inner the most successively Run through template through hole, stop nut, fastening clip and locking nut.
In this utility model, double threaded screw two ends are all provided with screw thread.The one end being connected with attaching nut is spacing thread segment, The other end is locking screw section.
As preferably, the length of spacing thread segment is more than stop nut thickness, template thickness and attaching nut's thickness sum 3~20mm, preferably 5~15mm, more preferably 5~10mm.
As preferably, the diameter of through hole than double threaded screw overall diameter big 1~15mm, preferably 2~10mm, more preferably 3 ~5mm.
As preferably, this device also includes the steel frame pipe that horizontal direction or horizontal direction are arranged, and steel frame pipe is arranged on The both sides up and down of the multiple double threaded screws (201) being on same level line, and it is positioned at the outside of template.
As preferably, attaching nut and built-in fitting crab-bolt are fixed on pre-buried pieces steel bar material by welding manner.
In this utility model, first template carries out the numbering of template and setting of modulus before pre-buried pieces steel bar material is installed Fixed, the position of pre-buried pieces steel bar material it is accurately positioned by template modulus.
In this utility model, by attaching nut, template, stop nut and double threaded screw, pre-buried pieces steel bar material is solid Due to template, make an entirety.
In this utility model, after armored concrete has poured, before form removal, double threaded screw is exited, the most recyclable Built-in fitting fixing device.
In this utility model, by double threaded screw, locking nut, fastening clip and steel frame pipe by the most pre-buried pieces Steel bar material and template form an entirety and resist pre-buried pieces steel bar material and template, opposing concrete vibrating and the work of impact load With, it is particularly well-suited to the sweeping engineering of piping lane embedded part.
In this utility model, the quantity of attaching nut is unrestricted, can set according to actual needs, as long as can be steady Solid model plate.The quantity of built-in fitting crab-bolt is unrestricted, can set according to actual needs, as long as built-in fitting list can be consolidated Unit.
In this utility model, the both sides of pre-buried pieces steel bar material refer to the position being fixed on pipe gallery with built-in fitting See, towards built-in fitting, along two faces of pipe gallery left and right directions.The inner surface of pre-buried pieces steel bar material refers to built-in fitting solid The position being scheduled on pipe gallery is seen, built-in fitting be adjacent to pipe gallery a face (i.e. the people in piping lane invisible that Simultaneously, or deviate from the side of piping lane inner space).
In this utility model, the quantity of double threaded screw is identical with the quantity of attaching nut, it is also possible to than attaching nut's Quantity is few, as long as template can be consolidated.
In this utility model, fastening clip is fastening clip commonly used in the prior art, it is possible to produce certain deformation, And there is tension force.
In this utility model, template is offered through hole so that double threaded screw, through hole, attaching nut's centrage are positioned at same On one straight line.The quantity of through hole is unrestricted, can set according to actual needs, the double threaded screw needed according to fixed form Depending on quantity.
In this utility model, the effect of steel frame pipe is the template in pipe gallery to be fixed together, formed one whole Body, strengthens the steadiness of whole device.
Compared with prior art, this utility model has the beneficial effect that
1, the pipe gallery built-in fitting fixing device that this utility model provides, construction quality is easy to control and precision is high, can Ensure that built-in fitting position is accurate, can make again that built-in fitting and template are seamless to be close to, it is ensured that built-in fitting surfacing, solve existing The problems such as present in built-in fitting burial and construction installation accuracy is the highest, fixing loosely, second-rate, be particularly well-suited to a high standard, Require that tight pipe gallery engineering embedded part positions.
2, this utility model construction procedure is simple, it is not necessary to be connected with structure reinforcing bars by built-in fitting dowel, without at embedded part Perforate on sheet steel bar material, saves location reinforcement material, artificial and set-up time, and speed of application is fast, reduces cost.
3, by double threaded screw, locking nut, fastening clip and steel frame pipe, built-in fitting is formed an entirety with template, Opposing built-in fitting and template opposing concrete vibrating and the effect of impact load, be particularly well-suited to extensive piping lane engineering.
4, the processing of this utility model recyclable fastening unit is simple, available job site waste material steel bar meter, and can weight Have enough to meet the need use again, economical, environmental protection.
Accompanying drawing explanation
Fig. 1 is this utility model structure section figure;
Fig. 2 is this utility model structural plan figure;
Fig. 3 is built-in fitting cell schematics;
Fig. 4 is recyclable fastening unit schematic diagram;
Reference: 1: built-in fitting unit;101: pre-buried pieces steel bar material;102: attaching nut;103: built-in fitting crab-bolt; 2: recyclable fastening unit;201: double threaded screw;202: locking nut;203: fastening clip;204: stop nut;205: spacing Thread segment;206: locking screw section;3: template;301: through hole;4: steel frame pipe;5 pipe galleries.
Detailed description of the invention
The embodiment provided according to this utility model, it is provided that a kind of pipe gallery sidewall built-in fitting fixing device:
A kind of pipe gallery sidewall built-in fitting fixing device, this device includes built-in fitting unit 1, recyclable fastening unit 2 And template 3.Built-in fitting unit 1 is connected with pipe gallery 5 sidewall.Template 3 is arranged on built-in fitting unit 1 by receiving fastening unit 2 On.
In this utility model, built-in fitting unit 1 includes pre-buried pieces steel bar material 101 (the i.e. lamellar steel of strip, sheet The thickness of material such as 0.5-5cm, such as 3 or 4cm), multiple attaching nut 102 and multiple built-in fitting crab-bolt 103.Attaching nut 102 It is fixed on the both sides of the pre-buried pieces steel bar material 101 being vertically arranged.Built-in fitting crab-bolt 103 is fixed on the pre-buried pieces being vertically arranged The inner surface of steel bar material 101.Built-in fitting unit 1 is arranged on pipe gallery 5 sidewall by built-in fitting crab-bolt 103.
In this utility model, recyclable fastening unit 2 includes double threaded screw 201, locking nut 202, fastening clip 203 And stop nut 204.Stop nut 204, fastening clip 203, locking nut 202 are successively set on double threaded screw outward by inner On 201.
In this utility model, template 3 is offered through hole 301.
In this utility model, double threaded screw 201 is fixed on attaching nut 102 through through hole 301.Double threaded screw 201 Template through hole 301, stop nut 204, fastening clip 203 and locking nut 202 is sequentially passed through outward by inner.
In this utility model, double threaded screw 201 two ends are all provided with screw thread.The one end being connected with attaching nut 102 is spacing Thread segment 205, the other end is locking screw section 206.
As preferably, the length of spacing thread segment 206 is than stop nut 204 thickness, template 3 thickness and attaching nut 102 Thickness 3~20mm, preferably 5~15mm, more preferably 5~10mm.
As preferably, the diameter of through hole than double threaded screw overall diameter big 1~15mm, preferably 2~10mm, more preferably 3 ~5mm.
As preferably, this device also includes the steel frame pipe 4 that horizontal direction or horizontal direction are arranged, and steel frame pipe 4 is arranged In the both sides up and down of the multiple double threaded screws 201 being on same level line, and it is positioned at the outside of template 3.
As preferably, attaching nut 102 and built-in fitting crab-bolt 103 are fixed on pre-buried pieces steel bar material by welding manner On 101.
Embodiment 1
A kind of pipe gallery sidewall built-in fitting fixing device, this device includes built-in fitting unit 1, recyclable fastening unit 2 And template 3.Built-in fitting unit 1 is connected with pipe gallery 5 sidewall.Template 3 is arranged on built-in fitting unit 1 by receiving fastening unit 2 On.
Built-in fitting unit 1 includes pre-buried pieces steel bar material 101, attaching nut 102 and built-in fitting crab-bolt 103.Attaching nut 102 outer surfaces being fixed on pre-buried pieces steel bar material 101.Built-in fitting crab-bolt 103 is fixed on the interior table of pre-buried pieces steel bar material 101 Face.Built-in fitting unit 1 is arranged on pipe gallery 5 sidewall by built-in fitting crab-bolt 103.Attaching nut 102 and built-in fitting crab-bolt 103 are fixed on pre-buried pieces steel bar material 101 by welding manner.
Recyclable fastening unit 2 includes double threaded screw 201, locking nut 202, fastening clip 203 and stop nut 204. Stop nut 204, fastening clip 203, locking nut 202 are successively set on double threaded screw 201 outward by inner.
Through hole 301 is offered in template 3.
Double threaded screw 201 is fixed on attaching nut 102 through through hole 301.Double threaded screw 201 is sequentially provided with outward by inner Template 3, stop nut 204, fastening clip 203 and locking nut 202.Double threaded screw 201 two ends are all provided with screw thread.With attaching nut 102 one end being connected are spacing thread segment 205, and the other end is locking screw section 206.
The length of spacing thread segment 206 is longer than stop nut 204 thickness, template 3 thickness and attaching nut 102 thickness sum 5mm.The diameter of through hole 301 is than the double threaded screw 201 big 4mm of diameter.
Embodiment 2
Repeating embodiment 1, simply this device also includes that steel frame pipe 4, steel frame pipe 4 are arranged on the both sides of double threaded screw 201, and And it is positioned at the outside of template 3.
Embodiment 3
Repeating embodiment 1, the length of the most spacing thread segment 206 is than stop nut 204 thickness, template 3 thickness and connection The long 10mm of nut 102 thickness sum.
Embodiment 4
Repeating embodiment 1, simply the diameter of through hole 301 is than the double threaded screw 201 big 5mm of diameter.
Embodiment 5
During certain pipe gallery engineering civil engineering, piping lane wall needs pre-buried 14# channel-section steel, long 1500mm, array pitch 1500mm.
(1) it is welded to connect nut 102, such as Fig. 3 in both sides, three positions point, described pre-buried pieces steel bar material 101 upper, middle and lower Shown in, attaching nut 102 supports the use with double threaded screw 201.
(2) material of double threaded screw 201 uses Ф 12-Ф 18 plain bar, according to attaching nut 102 thickness, template 3 thickness Degree, stop nut 204 thickness, determine spacing section of screw thread process length of double threaded screw 201.Described spacing thread segment 206 length Ratio stop nut thickness and template thickness and attaching nut's thickness sum long 3~5mm, screw thread specification M10~M16, thread segment is most End puts stop nut 204.Double threaded screw total length also should consider locking nut 202, fastening clip 203 size, and Relevant working space.
(3) before pre-buried pieces steel bar material 101 is installed, the numbering of template and the setting of modulus are carried out, accurate by template modulus Determine the position of position pre-buried pieces steel bar material, and in template 3, offer associated through-holes 301 according to the position of attaching nut 102, logical Hole 301 diameter is than double threaded screw 201 diameter big 3~5mm so that double threaded screw 201, through hole, attaching nut 102 centrage are positioned at On same straight line.
(4) after steel reinforcement cage colligation completes, use double threaded screw 201 to be screwed into attaching nut 102 through template through hole, pass through Pre-buried pieces steel bar material 101 is tightened to template by double threaded screw 201, attaching nut 102, stop nut 204 and template 3 On 3, pre-buried pieces steel bar material is fixed on shuttering work to be completed.Tight owing to installing array pitch, template 3 need to be reinforced, therefore edge Steel frame pipe is laid in double threaded screw 2 both sides, such as Fig. 1 and Fig. 2, and by locking nut 202 and fastening clip 203 will front and back embedded part and Formwork reinforcement is an entirety, to prevent the vibratory impulse in concreting process from making pre-buried pieces steel bar material sideslip, template Destroy.
(5) after armored concrete has poured, being exited by double threaded screw 201 before form removal, the most recyclable built-in fitting is solid Determine device.

Claims (10)

1. a pipe gallery sidewall built-in fitting fixing device, it is characterised in that: this device includes built-in fitting unit (1), can return Receiving fastening unit (2) and template (3), built-in fitting unit (1) is positioned comprehensively by recyclable fastening unit (2) and template (3) Piping lane sidewall.
Pipe gallery sidewall built-in fitting fixing device the most according to claim 1, it is characterised in that: built-in fitting unit (1) Including pre-buried pieces steel bar material (101), multiple attaching nut (102) and multiple built-in fitting crab-bolt (103), attaching nut (102) Being fixed on the both sides of pre-buried pieces steel bar material (101), built-in fitting crab-bolt (103) is fixed on the interior of pre-buried pieces steel bar material (101) Surface, built-in fitting unit (1) is anchored on pipe gallery sidewall (5) by built-in fitting crab-bolt (103).
Pipe gallery sidewall built-in fitting fixing device the most according to claim 1 and 2, it is characterised in that: recyclable fastening Unit (2) includes double threaded screw (201), locking nut (202), fastening clip (203) and stop nut (204), stop nut (204), fastening clip (203), locking nut (202) are successively set on double threaded screw (201) outward by inner.
Pipe gallery sidewall built-in fitting fixing device the most according to claim 3, it is characterised in that: template is offered on (3) Through hole (301).
Pipe gallery sidewall built-in fitting fixing device the most according to claim 4, it is characterised in that: double threaded screw (201) Being fixed on attaching nut (102) through through hole (301), double threaded screw (201) is sequentially passed through template through hole outward by inner (301), stop nut (204), fastening clip (203) and locking nut (202).
6. according to the pipe gallery sidewall built-in fitting fixing device described in claim 4 or 5, it is characterised in that: double threaded screw (201) two ends are all provided with screw thread, and the one end being connected with attaching nut (102) is spacing thread segment (205), and the other end is locking screw Section (206).
Pipe gallery sidewall built-in fitting fixing device the most according to claim 6, it is characterised in that: spacing thread segment (206) length is more than stop nut (204) thickness, template (3) thickness and attaching nut (102) thickness sum 3~20mm.
8. according to the pipe gallery sidewall built-in fitting fixing device according to any one of claim 4,5 or 7, it is characterised in that: The diameter of through hole (301) is than double threaded screw (201) overall diameter big 1~15mm.
Pipe gallery sidewall built-in fitting fixing device the most according to claim 1, it is characterised in that: this device also includes steel Frame pipe (4), the both sides up and down of multiple double threaded screws (201) that steel frame pipe (4) is set on same level line, and be positioned at The outside of template (3).
Pipe gallery sidewall built-in fitting fixing device the most according to claim 2, it is characterised in that: attaching nut (102) It is fixed on pre-buried pieces steel bar material (101) by welding manner with built-in fitting crab-bolt (103).
CN201620667201.1U 2016-06-30 2016-06-30 Utility tunnel lateral wall built -in fitting fixing device Active CN205875206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620667201.1U CN205875206U (en) 2016-06-30 2016-06-30 Utility tunnel lateral wall built -in fitting fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620667201.1U CN205875206U (en) 2016-06-30 2016-06-30 Utility tunnel lateral wall built -in fitting fixing device

Publications (1)

Publication Number Publication Date
CN205875206U true CN205875206U (en) 2017-01-11

Family

ID=57694557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620667201.1U Active CN205875206U (en) 2016-06-30 2016-06-30 Utility tunnel lateral wall built -in fitting fixing device

Country Status (1)

Country Link
CN (1) CN205875206U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100277A (en) * 2017-05-26 2017-08-29 五冶集团上海有限公司 The fixing means of built-in fitting
CN107268678A (en) * 2017-07-26 2017-10-20 中国十九冶集团有限公司 The installation method of pipe gallery madial wall built-in fitting
CN108716368A (en) * 2018-06-28 2018-10-30 中冶长天国际工程有限责任公司 A kind of derrick support column, derrick and derrick method for correcting error
CN110616737A (en) * 2019-09-11 2019-12-27 江苏永联精筑建设集团有限公司 Method for improving positioning qualification rate of pipe gallery embedded part

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100277A (en) * 2017-05-26 2017-08-29 五冶集团上海有限公司 The fixing means of built-in fitting
CN107268678A (en) * 2017-07-26 2017-10-20 中国十九冶集团有限公司 The installation method of pipe gallery madial wall built-in fitting
CN108716368A (en) * 2018-06-28 2018-10-30 中冶长天国际工程有限责任公司 A kind of derrick support column, derrick and derrick method for correcting error
CN108716368B (en) * 2018-06-28 2024-02-13 中冶长天国际工程有限责任公司 Derrick support column, derrick and derrick deviation correcting method
CN110616737A (en) * 2019-09-11 2019-12-27 江苏永联精筑建设集团有限公司 Method for improving positioning qualification rate of pipe gallery embedded part

Similar Documents

Publication Publication Date Title
CN204054323U (en) Steel construction assembled beam making bench
CN205875206U (en) Utility tunnel lateral wall built -in fitting fixing device
CN103061505A (en) Multifunctional split bolt and application thereof
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN103981897B (en) A kind of waterproof construction method of outer wall of basement stiffened column
KR100910987B1 (en) Backfilling Apparatus for Wale
CN210857510U (en) Beam tenon-and-mortise joint unit and connector of beam tenon-and-mortise joint unit and profile steel concrete beam
CN106638940A (en) Fabricated high-rise residence precast concrete component construction method
CN209891084U (en) Bridge support cushion stone anchor bolt hole positioning fixture
CN105350654A (en) Construction method for adjusting steel plate embedded parts to reach design and construction accuracy
CN104405165B (en) The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof
CN113202222A (en) Construction method for assembled type superposed beam slab
CN204059391U (en) A kind of steel work and the pre-buried syndeton in basis
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN207739404U (en) Precast floor slab connecting piece and precast floor slab
CN102926554A (en) Steel hanging seat template supports and construction method thereof
CN103132494B (en) Embedded anchor cone accurate positioning method
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN203756190U (en) Trolley device for herringbone forked tunnel
CN110820794A (en) Integrated construction method for equipment base and foundation embedded part
CN207435906U (en) For the bracket of bridge construction
CN109853973A (en) For the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate
CN210507799U (en) Connector of semi-prefabricated section steel concrete column-section steel concrete beam node unit and section steel concrete beam
CN210459229U (en) Support assembled in deep basal pit and trade and prop construction frock
JP5345238B1 (en) Construction method of base-isolated base structure and base-isolated base structure

Legal Events

Date Code Title Description
GR01 Patent grant